Attachment L-3 Past Performance Relevancy Matrix.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Research, Engineering, and Mission Integration Services 2 (REMIS2) Federal contract opportunity
- Solicitation number
- 80JSC023REMIS2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| REMIS2 DRFP Questions and Answers.pdf | ||
| REMIS2 Industry Day Questions and Answers.pdf | ||
| Attachment L-7 Business Systems Reviews and Status Information Template.xlsx | XLSX spreadsheet | |
| Attachment L-8 Prime and Subcontractor Identification and SOW Division of Work Listing.xlsx | XLSX spreadsheet | |
| Attachment J-9 JSC Wage Determination 15-5233.pdf | ||
| Attachment L-5 Cost Price Template.xlsx | XLSX spreadsheet | |
| 80JSC023REMIS2 REMIS2 DRFP.pdf | ||
| Attachment L-6 PRE-AWD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST.pdf | ||
| REMIS2 Industry Day Charts.pdf | ||
| REMIS2 DSOW.pdf | ||
| REMIS RFTOPs.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
ATTACHMENT L-3: PAST PERFORMANCE RELEVANCY MATRIX
| Past Performance Matrix of Relevant Experience | |||||||||||||||||||||||||||||||||
| Name of Team Member | Role | Contract Name and Number | Statement of Work (SOW) Sections | ||||||||||||||||||||||||||||||
| Contract Type (IDIQ, FFP, CPFF, etc.) | Period of Performance | Total Contract Value | 2.0 Program Management | 2.1 Status Meetings | 2.2 Formal Reviews | 2.3 Configuration Management | 2.4 Data and Records Management | 2.5 Export Control Management | 2.6 Information Technology | 2.7 Safety and Health | 2.8 Safety Requirements | 2.9 Data Delivery | 2.10 Contract Management Data Deliverables | 3.0 Quality Assurance | 3.1 Additional Quality Assurance Requirments | 3.2 GIDEP and NASA Advisories | 3.3 Government Property | 4.0 Engineering | 4.1 Studies/Analyses | 4.2 Hardware/Software Design and Development | 4.3 Sustaining Engineering | 4.4 Verification and Test Services | 4.5 Integration Processes | 5.0 Mission Integration and Operations | 5.1 Science/Technology Integration, Verification, and Validation | 5.2 Planning | 5.3 Training | 5.4 On-Orbit Operations | 5.5 Ground Operations | 5.6 Research Data Management | |||
| [Name] | Prime | [Contract Name/Number] | |||||||||||||||||||||||||||||||
| [Contract Name/Number] | |||||||||||||||||||||||||||||||||
| [Contract Name/Number] | |||||||||||||||||||||||||||||||||
| [Name] | Major Subcontractor | [Contract Name/Number] | |||||||||||||||||||||||||||||||
| [Contract Name/Number] | |||||||||||||||||||||||||||||||||
| [Contract Name/Number] | |||||||||||||||||||||||||||||||||
| [Name] | Minor Subcontractor | [Contract Name/Number] | |||||||||||||||||||||||||||||||
| [Contract Name/Number] | |||||||||||||||||||||||||||||||||
| [Contract Name/Number] | |||||||||||||||||||||||||||||||||
| [Name] | Parent Company | [Contract Name/Number] | |||||||||||||||||||||||||||||||
| [Contract Name/Number] | |||||||||||||||||||||||||||||||||
| [Name] | Affiliate | [Contract Name/Number] | |||||||||||||||||||||||||||||||
| [Contract Name/Number] | |||||||||||||||||||||||||||||||||
| [Name] | Company Division | [Contract Name/Number] | |||||||||||||||||||||||||||||||
| [Contract Name/Number] | |||||||||||||||||||||||||||||||||
| [Name] | Program Manager | [Contract Name/Number] | |||||||||||||||||||||||||||||||
| [Contract Name/Number] |
Note to Offerors: The matrix "Roles" above should be considered an example only. Offerors should provide the matrix roles consistent with their proposal data. Additionally, Offerors should place at least one "dot" (multiple is acceptable) in each appropriate cell per row indicating whether that Team Member (Program Manager, Prime, Subcontractor, Parent, Affiliate, etc) has Past Performance for the specified SOW Section(s) that it is responsible for. Leave cells "blank" if there is no Past Performance for that Team Member for that contract. Additional rows are columns may be added as necessary. This matrix shall be consistent with Vol II Past Performance narrative information.
File details come from the government source that posted it. Updated .