NOC II dRFP Comment Dispositions_Set 2.pdf

PDF 105 KB Posted

Attached to
Neutral Buoyancy Laboratory (NBL) Operations Contract II (NOC II) Sources Sought Synopsis/Request for Information (RFI)
Solicitation number
80JSC023NOC02
Issued by

View the file

Other files

File Type Posted
NOC II dRFP Comment Dispositions_set 1.pdf PDF
Template_for_Submission_of_Comments.xlsx XLSX spreadsheet
80JSC023R0007 NOC II Draft RFP.zip ZIP file
Industry Day Questions_Set 2.pdf PDF
Industry Day Questions_Set 1.pdf PDF
NOC II Interested Parties List.pdf PDF
NOC II Industry Day Charts.pdf PDF
NBL Site Visit Request Form .docx DOCX document
Draft NOC II DRL_DRDs.docx DOCX document
DRAFT NOC II SOW.docx DOCX document
NOC DRDs.pdf PDF
Draft NOC II Sources Sought_RFI.docx DOCX document
Vendor Capability Matrix.docx DOCX document
Technical Library Request Form.docx DOCX document
NOC SOW.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: 80JSC023R0007

Procurement Title: Neutral Buoyancy Laboratory (NBL) Operations Contract II (NOC II)

# Category Section Page Number

Type Question/Comment Answer

Other

NBL NOC II

SOW 1.13 C-17 Clarity

SOW 1.13 requires a Quality Plan and Reports (DRD-NOCII- 13). The DRD states the Quality Plan is due with the proposal.

Will the Government consider excluding the Quality Plan from the 65 page limit?

Reference NOC II dRFP Comment Dispositions Set 1, Question 1. Submission of DRD-NOCII-12 Quality Plan and Reports will be due at Contract Start + 30 Days; therefore the page limitation will not apply This update has been incorporated in the Final RFP.

Section L Proposal Instructions

L.15.i, L.21.2.(c) L-11, L-26 Clarity

L.15.i specifies an electronic submission of the proposal using NASA's Enterprise File Sharing and Sync Box (EFSS). However, L.21.2.(c) requires offerors to submit a printed copy of the Attachment L-9, Technical Resources Summary Template (TRST). Please clarify the requirements for TRST submittal.

L.21.2 (c), Resources, has been updated to remove the requirement for submission of a printed copy of the Technical

Resources Summary Template

(TRST). The TRST shall be submitted electronically with the rest of the proposal.

Other Attachment J-6

J-6-2 and J-6- 3 Other

Section 7. IDIQs doesn't have the same subsection requirements of Section 5. Core Projects (Estimating, Mgmt, Implementation) yet the list of

All section 7 IDIQ references to

SOW Section 1.16

Configuration Management, have been consolidated to only reference section 1.16.

required SOW references is even longer for Section 7. Will the Government consider reducing the SOW references for Section 7?

Additionally, section 7.1

Facility Projects and 7.2

Mockup Projects have otherwise been updated to match sections 5.1 Facility

Projects and 5.2 Mockup

Projects, with the only difference being that sections

7.1 and 7.2 also include a reference to SOW Section 3.0

IDIQ.

Other Attachment J-21

J-21.8 thru J-

21.10 Clarity

Standard Labor Categories may have error in identifying Exempt Labor Categories as Non- Exempt. Please clarify the classification of Standard Labor Categories as Exempt or Non- Exempt. The following positions are classified as Non-Exempt but appear to be Exempt positions:

IT II, IT I, Business Specialist II, Business Specialist I, Technical Professional III, Technical Professional II, Technical Professional I”.

The Standard Labor Categories

IT II, IT I, Business Specialist II, Business Specialist I, Technical

Professional III, Technical

Professional II, Technical

Professional I were incorrectly listed as Non-Exempt in the

Draft RFP. They have been corrected to Exempt in the

Final RFP.