NOC II dRFP Comment Dispositions_Set 2.pdf
PDF 105 KB Posted
- Solicitation number
- 80JSC023NOC02
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOC II dRFP Comment Dispositions_set 1.pdf | ||
| Template_for_Submission_of_Comments.xlsx | XLSX spreadsheet | |
| 80JSC023R0007 NOC II Draft RFP.zip | ZIP file | |
| Industry Day Questions_Set 2.pdf | ||
| Industry Day Questions_Set 1.pdf | ||
| NOC II Interested Parties List.pdf | ||
| NOC II Industry Day Charts.pdf | ||
| NBL Site Visit Request Form .docx | DOCX document | |
| Draft NOC II DRL_DRDs.docx | DOCX document | |
| DRAFT NOC II SOW.docx | DOCX document | |
| NOC DRDs.pdf | ||
| Draft NOC II Sources Sought_RFI.docx | DOCX document | |
| Vendor Capability Matrix.docx | DOCX document | |
| Technical Library Request Form.docx | DOCX document | |
| NOC SOW.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 80JSC023R0007
Procurement Title: Neutral Buoyancy Laboratory (NBL) Operations Contract II (NOC II)
# Category Section Page Number
Type Question/Comment Answer
Other
NBL NOC II
SOW 1.13 C-17 Clarity
SOW 1.13 requires a Quality Plan and Reports (DRD-NOCII- 13). The DRD states the Quality Plan is due with the proposal.
Will the Government consider excluding the Quality Plan from the 65 page limit?
Reference NOC II dRFP Comment Dispositions Set 1, Question 1. Submission of DRD-NOCII-12 Quality Plan and Reports will be due at Contract Start + 30 Days; therefore the page limitation will not apply This update has been incorporated in the Final RFP.
Section L Proposal Instructions
L.15.i, L.21.2.(c) L-11, L-26 Clarity
L.15.i specifies an electronic submission of the proposal using NASA's Enterprise File Sharing and Sync Box (EFSS). However, L.21.2.(c) requires offerors to submit a printed copy of the Attachment L-9, Technical Resources Summary Template (TRST). Please clarify the requirements for TRST submittal.
L.21.2 (c), Resources, has been updated to remove the requirement for submission of a printed copy of the Technical
Resources Summary Template
(TRST). The TRST shall be submitted electronically with the rest of the proposal.
Other Attachment J-6
J-6-2 and J-6- 3 Other
Section 7. IDIQs doesn't have the same subsection requirements of Section 5. Core Projects (Estimating, Mgmt, Implementation) yet the list of
All section 7 IDIQ references to
SOW Section 1.16
Configuration Management, have been consolidated to only reference section 1.16.
required SOW references is even longer for Section 7. Will the Government consider reducing the SOW references for Section 7?
Additionally, section 7.1
Facility Projects and 7.2
Mockup Projects have otherwise been updated to match sections 5.1 Facility
Projects and 5.2 Mockup
Projects, with the only difference being that sections
7.1 and 7.2 also include a reference to SOW Section 3.0
IDIQ.
Other Attachment J-21
J-21.8 thru J-
21.10 Clarity
Standard Labor Categories may have error in identifying Exempt Labor Categories as Non- Exempt. Please clarify the classification of Standard Labor Categories as Exempt or Non- Exempt. The following positions are classified as Non-Exempt but appear to be Exempt positions:
IT II, IT I, Business Specialist II, Business Specialist I, Technical Professional III, Technical Professional II, Technical Professional I”.
The Standard Labor Categories
IT II, IT I, Business Specialist II, Business Specialist I, Technical
Professional III, Technical
Professional II, Technical
Professional I were incorrectly listed as Non-Exempt in the
Draft RFP. They have been corrected to Exempt in the
Final RFP.