This document provides details of a forthcoming solicitation for the Human Space Flight Technical Integration Contract (HSFTIC). NASA/JSC plans to issue a Request for Proposal for technical integration services in support of human space flight programs. The RFP is anticipated for release on or about November 1, 2019, with proposals due on or about December 11, 2019. The NAICS code is 541715 with a small business size standard of 1,250 employees. The procurement is set aside for total small businesses. Offerors should monitor the listed websites for the RFP release and any amendments. All technical questions must be submitted in writing. The Center Ombudsman information is provided.

ISS Cost Changes Status

View the file

Other files for this federal contract opportunity

Other files attached to Human Space Flight Technical Integration Contract (HSFTIC), newest first.
File Type Posted
HSFTIC_J-4_Applicable_and_Reference_Document_List.xlsx XLSX spreadsheet
SSP_50035_Revision_C_Retired.docx DOCX document
SSP_50314-Rev_C.docx DOCX document
SSP41142P2_RD_CD_012045_2.pdf PDF
SSP-50803.doc DOC document
PPD_524_RB_FINAL_MRICB_Charter.docx DOCX document
GPO_Website_Ref.pptx PPTX presentation
SSP_50481-RevC.docx DOCX document
42124_P2_RC_.pdf PDF
SSP_50094-RevB.pdf PDF
SSP_50659_Rev_E.xlsx XLSX spreadsheet
IMPR_Package_Mar_Apr_18.pptx PPTX presentation
SSP_41167-RevJ.docx DOCX document
SSP_50835_Rev_E.doc DOC document
42097P1_RD.pdf PDF
SSP42003_P2_RevC.pdf PDF
Applicable_3.zip ZIP file
MD_101_RA_FINAL.docx DOCX document
SSP_50477-RevC.pdf PDF
SSP_50670-Rev_A-DCN001-Collated_Master.doc DOC document
SSP_50781-RevA-DCN_003.docx DOCX document
PPD_517.pdf PDF
SSP_41002-RevR.docx DOCX document
SSP_50901.docx DOCX document
SSP_54059_54060-Baseline.docx DOCX document
SSP5003.PDF PDF
SSP30559RD-Errata.pdf PDF
SSP_41000-RevCJ.pdf PDF
42137P1_RC_CD_012230.pdf PDF
SSP_41163-Rev_L.docx DOCX document
9.0.zip ZIP file
SSP_42001-RevW.docx DOCX document
SSP_50875.docx DOCX document
SSP41017p2rJ.pdf PDF
41143Pt2RD.pdf PDF
SSP_50489-Rev_G.docx DOCX document
41015P2RH.pdf PDF
SSP_42121_Part_2.pdf PDF
SSP_50309_Part_1.pdf PDF
SSP_50477-RevC_Joint_Crew_Provisioning_Catalog.pdf PDF
JSC_Form_1240.pdf PDF
SSP_41160-RevH.docx DOCX document
Increment_Utilization_Accomplishment_Report_Blank_Book_RevB(March_2019).docx DOCX document
SSP_50102.pdf PDF
SSP_50146-RevB-SSCD_15566.pdf PDF
SSP_50034_Revision_D.DOC DOC document
SSP_50227-RevC.docx DOCX document
SSP_50621-RevF-DCN001-Collated_Master.pdf PDF
SSP41004_P2_RJ.pdf PDF
DRAFT_HSFTIC_Work_Load_Indicators.xlsx XLSX spreadsheet
Show all 50

Human Space Flight Technical Integration Contract (HSFTIC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OL

12345678910
3514714902121241212
SSCNDir Rev NoTitleResponsible BoardForwarding Authorization Approval DateResponsible Board DateEvaluation/ Disposition/ CAM Board
(35 days)SSPCB Board DateSSPCB Presentation
(14 days)Directive SignatureDirective Signature
(7 days)UCA Mod IssuedUCA Mod Issued
(14 Days)Proposal ReceivedProposal Received
(90 Days)TE ReceivedTE Received
(21 Days)PPM FinalizedPPM Finalized
(21 days)Negotiations CompletedNegotiations Completed
(24 days)Final Directive ApprovedFinal Directive Approved
(12 days)Modification FinalizedModification Finalized
(12 days)Overdue Milestone ECDRequested ATP DateContractorCommentsMod Finalized Baseline ScheduleIs UCAStageDisplayFinal Directive ReqdResponsible Board OSBApproving Board OSBOL / UL / In workIs Contract Change requiredInclusionManual ExclusionPIOProcurement Action
161570Request Review of SA CR SA-01844 Rev. Basic, FACB Revise (PCN) JSC 27472 Requirements for Submission of Data Needed for Toxicological Assessment of Chemicals to be Flown on Manned Spacecraft7/12/190FALSE1FALSEFALSEFALSEFALSEIn WorkFALSEFALSEFALSE
161540MAPI Contract Modification:Vehicle Office Supply Chain SupportVCB7/3/199MAPIFALSE3FALSEFALSETRUETRUEIn WorkTRUEFALSEFALSEAuthorize implementation of SSCN 16154, as documented by Directive 16154 and update the Mission and Program Integration Contract
161530MAPI Contract Modification: Vehicle Office Commercial Elements Integration SupportVCB7/3/1998/1/19MAPIFALSE3FALSEFALSETRUETRUEIn WorkTRUEFALSEFALSEAuthorize implementation of SSCN 16153, as documented by Directive 16153 and update the Mission and Program Integration Contract
161520Establish the 60S Return ManifestMIOCB7/3/199MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161510Update SSP 54059_54060, Increment Definition and Requirements Document for Increment 59 and 60 to incorporate Appendix KMIOCB7/1/198/1/1911FALSE1FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
161500MSFC POIC - Provide Support for Sending Hazardous Commands using Ku/LANS-MACB6/28/1914FALSE1FALSEFALSEFALSEFALSEIn WorkFALSEFALSEFALSE
161460Release Revision L to SSP 45012, Part 2 Space Station Control Center To Japan Aerospace Exploration Agency (JAXA) Ground Segment Interface Control DocumentGSCB6/24/1918MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161450Release Revision L to SSP 45012, Part 1 Space Station Control Center To Japan Aerospace Exploration Agency (JAXA) Ground Segment Interface Control DocumentGSCB6/24/1918MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161440Close out Aerojet-Rocketdyne and Establish Depot Capability for the Remote Power Control Module (RPCM), the Main Bus Switching Unit (MBSU) and the Bearing Motor Roll Ring Module (BMRRM)VCB7/9/193BoeingFALSE3FALSEFALSETRUETRUEIn WorkTRUEFALSEFALSE
161420MAPI Contract Modification: Provide Utilization Integration SupportRICB6/27/1915MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSEAuthorize implementation of SSCN 16142, as documented by Directive 16142 and update the Mission and Program Integration Contract
161400Baseline SSP 54061_54062-ANX4, Increment Definition and Requirements Document for Increments 61 and 62, Annex 4: Medical Operations and Environmental MonitoringMIOCB6/21/198/1/1921FALSE1FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
161390Baseline SSP 54061_54062, Increment Definition and Requirements Document for Increments 61 and 62 in Support of Stage Operations Readiness Review (SORR)MIOCB7/3/198/29/199FALSE1FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
161380Revise and Release D684-10177-01, Mission Build Facility Standard Output Definition, Revision U, to Incorporate Approved SCRsASCB6/18/19247/31/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161360Release Revision A to SSP 50013-ANXA, Information Systems Plan Annex A: SharePoint GovernanceOH6/14/1928MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161350Update SSP 50261-01, Generic Groundrules, Requirements and Constraints (GGR&C), Part 1: Strategic and Tactical Planning, Section 7.0 Training, Section 11.6.7.7.1 USOS Crew Care Package - Delivered, Section 14.0 RoboticsMIOCB6/18/198/1/19248/6/19FALSE1FALSEFALSEFALSEFALSEIn WorkFALSEFALSEFALSE
161340Release Revision R to SSP-50254-E1, Operations Nomenclature Annex E, Part 1 NASA SystemsODFCB6/11/1931MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161330ISS Review of SpaceX C1-7 Mission Integration and Operations Management Plan (MIOMP), SPX-000045, Version 17.0 (Non-Restricted Portion)TICB6/13/1929FALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161320Update SSP 50261-01, Generic Groundrules, Requirements and Constraints (GGR&C) Part 1: Strategic and Tactical Planning to provide technical updates to sections associated with Medical, On-board Training and USOS EVA and to provide other non-technical, editorial updatesMIOCB6/7/197/18/19357/23/19FALSE1FALSEFALSEFALSEFALSEIn WorkFALSEFALSEFALSE
161310Revise SSP 50481, Management Plan for Waste Collection and Disposal to Revision EMIOCB7/11/199/12/191FALSE1FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
161300Revise SSP 50168, Debrief Planning and Execution Requirements to Revision BMMIOCB7/2/198/8/1910FALSE1FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
161290Establish the 60S L-1 Month ManifestMIOCB6/20/1922MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSETRUE
161280Update SSP 50837-ANX2 Revision B, Video Graphics Software (VGS) Overlay Configuration File Requirements Annex 2: Generic Visiting Vehicle to Modify Parameter RangesMSEICB6/10/1932FALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161250Release the SSP 54061_54062-ANX 2, Increment Definition and Requirements Document for Increments 61 and 62 Annex 2: On-Orbit Maintenance Plan and Operations SupportMIOCB5/31/198/1/1942BoeingFALSE1FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
161240Delivery of S684-11034-R18 Command & Control (CCS) Software Requirements Specification (SRS)ASCB5/31/19427/2/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161230Revise SSP 50995, ISS/Boeing Commercial Crew Transportation System (CCTS) Joint Integration, Verification and Test Plan to Revision A to reflect changes to Joint Tests 8 and 13TICB7/11/198/8/1918/8/19FALSE1FALSEFALSEFALSEFALSEIn WorkFALSEFALSEFALSE
161210MAPI Contract Modification: Provide Additional ISS Safety Review Panel (ISRP) Support for Technical Writing and Meeting SupportS-MACB5/23/196/11/1919317/8/19MAPIFALSE5TRUEFALSETRUETRUEOLTRUEFALSEFALSEAuthorize implementation of SSCN 16121, as documented by Directive 16121 and update the Mission and Program Integration Contract
161170Retire SSP 51057, Payload Operations Office Certification of Flight Readiness (CoFR) Implementation PlanOH7/9/193FALSE1FALSEFALSEFALSEFALSEIn WorkFALSEFALSEFALSE
161160Baseline SSP 54058-SpX-Demo1, Increment Definition and Requirements Document for Increment 58, Annex 1: Station Manifest, Flight SpX-Demo1, to Reflect the Post-Flight Manifest MilestoneMIOCB6/4/1938MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161150Establish the SpX-18 L-6 Week ManifestMIOCB6/6/1936MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161140Revise SSP 50977, International Space Station (ISS) to SpaceX Dragon 2 Hardware Interface Control Document (ICD), to Revision A to incorporate approved PIRNs.TICB5/31/1942MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161130Establish the 73P L-1 Month ManifestMIOCB5/30/1943MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161090Delivery of D684-10017-01 Revision L, Software Development Plan (SDP), and D684-10056-01 Revision Y, Prime Contractor Software Standards and Procedures Specification (SSPS)ASCB5/7/19667/3/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161080Baseline SSP 54057-NG-10, Increment Definition and Requirements Document for Increment 57, Annex 1: Station Manifest, Flight NG-10, to Reflect the Post Flight Milestone ManifestMIOCB5/8/1965MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161070Release SSP 50421, Revision D, Program Planning & Control (PP&C) Office Certification of Flight Readiness (CoFR) Implementation PlanNASA CM5/7/1966MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
16106072P As Launch ManifestMIOCB5/3/1970MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161050Deliver the Portable Computer System (PCS) Release 21 (R21) Flight Cycle (FC) DocumentationASCB4/26/19775/31/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161040ESA Updates to SSP 50261-02 ISS Generic Groundrules and Constraints Part 2; Execute PlanningExPCP5/7/1966MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161030Release Revision E to SSP 50057, Part 2 Space Station Control Center To Russian Space Agency Ground Segment Interface Control DocumentGSCB4/23/1980MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161010Release Revision F to SSP 45026, Huntsville Operations Support Center to European Space Agency Ground Segment Interface Control DocumentGSCB4/18/1985MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
161000Downgrade SGTRC Super High Frequency Downconverter (SRU from SGTRC S/N 001) and Color Television Cameras (CTVC) Part Number 10033497-1, Serial Numbers 402, 403 and 405, to Class 3 Non-FlightASCB4/24/196/3/194039BoeingFALSE5FALSEFALSETRUETRUEULFALSEFALSEFALSE
160980SAFER Battery Redesign for Thermal Runaway Propagation ToleranceEVA-CCB5/8/196/5/19286/25/1920177/9/19ESOC16098 - CD in signature routing; assigned to SSPCB, on 07/09/19.FALSE3FALSEFALSEFALSEFALSEIn WorkTRUEFALSEFALSEAuthorize implementation of SSCN 16098, as documented by Directive 16098 and update the EVA Space Operations Contract (NNJ10TB01
160960Baseline and Revise Software Interface Control Documents to Support Increment 60PSCP4/15/19885/10/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160930Release Revision M to SSP 50013, Information Systems PlanOH6/14/19MAPIFALSE2FALSEFALSETRUETRUEULFALSEFALSEFALSE
160920Update SSP 54100, Multi-Increment Planning Document, to update flight dates for USOS and RS vehicles in Increments 59 through 62MMIOCB4/10/1993MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSETRUE
160910EMU DCM LCD Design and Procurement 2019EVA-CCB4/19/195/8/19195/14/1965/28/19146/28/1931147/30/19ESOCFALSE6TRUETRUEFALSEFALSEOLTRUEFALSEFALSEAuthorize implementation of SSCN 16091 as documented by Directive 16091 and update EVA Space Operations Contract (ESOC) accordin
160880Lithium Ion Battery Flight Support Equipment (FSE) for the SpaceX DragonVCB4/2/196/3/195/1/19-335/10/199636/4/1938BoeingFALSE11FALSEFALSETRUETRUEULTRUEFALSETRUEAuthorize implementation of SSCN 16088 as documented by Directive 16088 and update the Boeing Contract (NAS15-10000) accordingly
160870Delivery of SP-M-523-R6 S3/P3 Software Requirements Specification (SRS)ASCB4/1/191025/10/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160860Baseline and Release Space Station Program (SSP) 51053, SpaceX Dragon 2 Stage Test Rack to the Software Development and Integration Laboratory Interface Control Document (ICD)ASCB4/2/19101BoeingFALSE1FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
160850Delivery of SP-M-646-R10 External (EXT) Software Requirements Specification (SRS)ASCB3/28/191065/3/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160840Baseline SSP 54057-SpX-16, Increment Definition and Requirements Document for Increment 57, Annex 1: Station Manifest, Flight SpX-16, to Reflect the Post-Flight Manifest MilestoneMIOCB4/26/1977MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE"=IF(AND([@Stage]>=2,[@Stage]<>""),IF(AND([@[SSPCB Board Date]]<>"",[@[Responsible Board Date]]<>""),[@[SSPCB Board Date]]-[@[Responsible Board Date]],IF(AND([@[SSPCB Board Date]]="",[@[Responsible Board Date]]<>""),CurrentDate-[@[Responsible Board Date]],IF(AND([@[SSPCB Board Date]]<>"",[@[SSPCB Board Date]]>CurrentDate,[@[Responsible Board Date]]<>""),CurrentDate-[@[Responsible Board Date]],""))),"")
16083058S As Launch ManifestMIOCB4/10/1993MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160820Revise SSP 50949 Revision A, ISS Configuration Document, to Revision BMSEICB4/8/195/22/194451BoeingFALSE3FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
160820Revise SSP 50949 Revision A, ISS Configuration Document, to Revision BMSEICB4/8/195/22/194451MAPIFALSE3FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
160800Release of S683-72652, Payload Executive Processor Release 15 (PEP R15) Software Requirements Specification (SRS), Revision MASCB3/18/19116BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160790Downgrade WHC Pump-Separator, P/N H50.2.428.01.000VCB4/2/194/19/191784FALSE5FALSEFALSETRUETRUEOLFALSEFALSEFALSE
160780Downgrade WHC Pretreat and Water Pump (aka Dose Pump), P/N 10166.4912.000VCB4/2/195/9/193764BoeingFALSE5FALSEFALSETRUETRUEULFALSEFALSEFALSE
160730Release of S684-10644, Hub Control Software Release 6 (HCS R6) Software Requirements Specification (SRS), Revision UASCB3/1/191333/31/19BoeingFALSE1FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
160690Provide for Integration of UPA Purge Pump and Separator Assy Installation Into WRS2 RackVCB3/15/195/13/19596/5/19235/6/19-30676/6/196/14/19285/31/19BoeingFALSE11FALSEFALSEFALSETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 16069 as documented by Directive 16069 and update the Boeing Contract (NAS15-10000) accordingly
160680Pressurized Mating Adaptor 2 (PMA 2) Micro Meteoroid Orbital Debris (MMOD) BlanketsVCB3/1/191338/9/18Boeing16068 - Boeing presented a summary package of MMOD data to the VMR on 06/28/19; OB (D. Weigel) requested additional MMOD risk information specific to hatch shielding which Boeing is working to provide immediately.FALSE1FALSEFALSEFALSEFALSEIn WorkTRUEFALSEFALSEAuthorize implementation of SSCN 16068 as documented by Directive 16068 and update the Boeing Contract (NAS15-10000) accordingly
160660Delivery of SP-M-616-R13 Guidance, Navigation, and Control (GNC) Software Requirements Specification (SRS)ASCB2/25/191374/8/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160640Baseline and Revise Software Interface Control Documents to Support Increment 59PSCP2/13/191493/1/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160610Update SSP 54100, Multi-Increment Planning Document to Adjust Flight Dates in Increments 58-60 and Move Increments 61/62 into the Tactical TimeframeMMIOCB2/13/191498/9/18MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160600Release S683-70730, Node 2 Systems 2 Release 5 (N2SYS2 R5) Software Requirements Specification (SRS), Revision KASCB2/13/191493/19/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160590Install Additional Edge Router in Lab and Provide Robust Network TopologyASCB3/5/196/26/191137/9/191337/22/19Boeing16059 - CD in signature routing; assigned to SSPCB, on 07/10/19.FALSE3FALSETRUEFALSEFALSEIn WorkTRUEFALSEFALSEAuthorize implementation of SSCN 16059 as documented by Directive 16059 and update the Boeing Contract (NAS15-10000) accordingly
160580MAPI Contract Mod: FY19 Mission and Program Integration (MAPI) Integrated Analysis Support for GatewayGateway PM2/11/193/7/19243/11/1943/22/19113/22/1903/22/191128/9/183/8/19MAPIFALSE11FALSEFALSETRUETRUEIn WorkTRUEFALSEFALSEAuthorize implementation of SSCN 16058, as documented by Directive 16058 and update the Mission and Program Integration Contract
160570New Plan (Payload Data Integrator – PDI) to Simplify Payload Developer (PD) Interaction with ISS ProgramRICB2/25/193/13/19163/19/1964/7/19193/22/19-161124/8/194/10/19934/1/19BoeingFALSE11FALSEFALSEFALSEFALSEULTRUEFALSEFALSEAuthorize implementation of SSCN 16057 as documented by Directive 16057, and update the Boeing Contract (NAS15-10000) accordingl
160570New Plan (Payload Data Integrator – PDI) to Simplify Payload Developer (PD) Interaction with ISS ProgramRICB2/25/193/13/19163/19/1964/7/19194/17/19104/17/1904/23/1964/30/1975/1/19724/1/19MAPIFALSE11FALSEFALSEFALSEFALSEULTRUEFALSEFALSEAuthorize implementation of SSCN 16057 as documented by Directive 16057, and update the Boeing Contract (NAS15-10000) accordingl
160570New Plan (Payload Data Integrator – PDI) to Simplify Payload Developer (PD) Interaction with ISS ProgramRICB2/7/191553/4/19BoeingFALSE1FALSEFALSEFALSEFALSEIn WorkTRUEFALSEFALSE
160550Baseline SSP 54056-HTV7, Increment Definition and Requirements Document for Increment 56, Annex 1: Station Manifest, Flight HTV7, to Reflect the Post Flight Milestone ManifestMIOCB4/15/1988MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160540Deliver the Portable Computer System (PCS) Release 20 (R20) Flight Cycle (FC) Redundant United States Commercial Vehicle (USCV) Comm (RUC) Patch DocumentationASCB1/29/191642/25/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160520Baseline SSP 54353_54354, Post Increment Evaluation Report Increments 53 and 54MMIOCB2/14/191487/17/18MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160500Request Transfer and Downgrade of Failed Pump Package Assembly (PPA) P/N 2353170-2-2 S/N D0007 returning on SpaceX 17 for use in the Supplemental Heat rejection Evaporative Cooler (SHREC) developmental test rig located at Johnson Space Center (JSC) in the building 32 SHREC hardware development lab.VCB1/22/19171FALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160480Revise SSQ 21652, Wire, Electric, Silicone-Insulated, Nickel-Coated Copper, Space QualityVCB1/14/191797/17/183/15/19BoeingFALSE1FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
160470Updates to SSP 50261-02 ISS Generic Groundrules and Constraints Part 2; Execute PlanningExPCP2/4/19158MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160450Update and Release SSP 50892, Ethernet Requirements for Interoperability with the Joint Station LAN (JSL), to Revision BASCB12/19/182052/21/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160450Update and Release SSP 50892, Ethernet Requirements for Interoperability with the Joint Station LAN (JSL), to Revision BASCB12/19/182057/17/182/21/19MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160410MAPI Contract Modification: Add Science Media Launch Support (SLMS) FunctionRICB12/18/182/18/192/26/1983/19/19213/22/1933/22/1903/22/191123/1/19MAPIFALSE11FALSEFALSETRUETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 16041, as documented by Directive 16041 and update the Mission and Program Integration Contract
160370Design, Build, Test and Deliver Four Cell Stack Assemblies for Installation into ISS Oxygen Generation Assembly (OGA) Hydrogen Dome Orbital Replacement Unit (H2 Dome ORU), Provide Cell Stack Test Hardware, and Qualify New SupplierVCB1/9/19184Boeing16037 - Evaluations are being worked; change will require a UCA; Gate 2 completed on 02/01/19, and Pink Team held on 02/14/19; RFP (to supplier) sent on 05/20/19; Supplier proposal is now due on 07/12/19.FALSE1FALSEFALSEFALSEFALSEIn WorkFALSEFALSEFALSE
160360SSP 54059_54060-ANX 2, Increment Definition and Requirements Document for Increments 59 and 60 Annex 2: On-Orbit Maintenance Plan and Operations SupportMIOCB12/6/182/7/1963155BoeingFALSE3FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
160350Build to Print a Quantity of Three EXPRESS Pallet Adapters (ExPA), One Columbus External Payload Adapter (CEPA), and one Small Adapter Plate Assembly (SAPA.)VCB4/17/197/22/19867/30/1910/24/19CMC316035 - VCB, 07/22/19, and SSPCB, 07/30/19.
FALSE1FALSETRUEFALSEFALSEIn WorkTRUEFALSEFALSEAuthorize implementation of SSCN 16035 as documented by Directive 16035 and update the Cargo Mission Contract 80JSC017C0015.
160350Build to Print a Quantity of Three EXPRESS Pallet Adapters (ExPA) and One Columbus External Payload Adapter (CEPA)VCB2/14/194/8/19534/16/198875/6/19CMC316035 - VCB, 07/22/19, and SSPCB, 07/30/19.
FALSE3FALSEFALSEFALSEFALSEIn WorkFALSEFALSEFALSEAuthorize implementation of SSCN 16035 as documented by Directive 16035 and update the Cargo Mission Contract 80JSC017C0015.
160340Baseline SSP 50337, Software Requirements Specification for Mobile Servicing Systems (MSS) Graphical User Interface (GUI) for Volume 1 Revision B, Volume 2 Revision A, and Volume 3 Revision B, Portable Computer System (PCS)MASCB1/14/191794/4/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160340Baseline SSP 50337, Software Requirements Specification for Mobile Servicing Systems (MSS) Graphical User Interface (GUI) for Volume 1 Revision B, Volume 2 Revision A, and Volume 3 Revision B, Portable Computer System (PCS)MASCB12/5/182194/4/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSETRUE
160270MAPI Contract Modification: Additional MAPI IT Support/Integration for ISS ContractsOH12/4/181/17/191/28/19112/7/19102/14/1972/26/19122/26/191361/11/19MAPIFALSE11FALSEFALSETRUETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 16027, as documented by Directive 16027 and update the Mission and Program Integration Contract
160250Revise SSP 50438, International Space Station to H-II Transfer Vehicle Interface Control Document, Part 2 to Revision B to include previously approved PIRNs and SSCNsTICB11/29/18225BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSETRUE
160250Revise SSP 50438, International Space Station to H-II Transfer Vehicle Interface Control Document, Part 2 to Revision B to include previously approved PIRNs and SSCNsTICB11/29/18225MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160230Establish the SpX-Demo1 L-6 Week ManifestMIOCB11/28/182265/2/18MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160220Revise and Release Sustaining Software Interface Control Documents (ICDs) to Incorporate Approved Preliminary Interface Revision Notices (PIRNs)ASCB11/27/182272/5/19BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160210MAPI Contract Modification: Cost/Schedule Analyst SupportOH12/4/181/17/191/28/19112/5/1982/14/1992/26/19122/26/191365/1/182/1/19MAPIFALSE11FALSEFALSETRUETRUEOLTRUEFALSEFALSEAuthorize implementation of SSCN 16021, as documented by Directive 16021 and update the Mission and Program Integration Contract
160190Revise SSP 57015, Payload Software Management Plan, to Revision CPSCP11/13/1824111/29/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160180Revise SSP 50645, International Space Station (ISS) Command and Telemetry Team (ICATT) Standards, Central Document, to Revision DMASCB1/14/191794/3/18FALSE1FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
160170Design, Develop, and Deliver Stowage and Return Hardware for NORS CEBAA and MedO2 ConfigurationsVCB2/14/194/1/19465/28/19573/11/19-781235/29/196/4/19385/9/185/24/19BoeingFALSE11FALSEFALSEFALSETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 16017 as documented by Directive 16017 and update the Cargo Mission Contract 80JSC017C0015.
160170Design, Develop, and Deliver Stowage and Return Hardware for NORS CEBAA and MedO2 ConfigurationsVCB2/14/194/1/19465/28/19575/31/1936/17/19176/18/1916/18/1906/18/19245/24/19CMC3FALSE11FALSEFALSEFALSETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 16017 as documented by Directive 16017 and update the Cargo Mission Contract 80JSC017C0015.
160160Update SSP 50261-01, Generic Groundrules, Requirements and Constraints (GGR&C), Part 1: Strategic and Tactical Planning, Update Section 10.3.8 Free Drift During Vehicle Docking (Requirement)MIOCB1/17/192/7/19212/12/195150MAPIFALSE3FALSEFALSEFALSEFALSEIn WorkFALSEFALSEFALSE
160140Downgrade Liquid Cooling Ventilation Garments (LCVGs) from Class IEVA-CCB11/8/1811/30/182222412/7/18ESOCFALSE5FALSEFALSETRUETRUEULFALSEFALSEFALSE
160130Revise SSP 50223 Revision B, International Space Station Export Control Plan, to Revision COX2/4/19158FALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160120Provisioning Item Order (PIO) 150 for Feedback CCA and DC Snubber CCA SparesVCB11/2/1812/7/185/17/19161565/30/196/17/19186/21/1925BoeingFALSE11FALSETRUETRUETRUEULTRUEFALSEFALSE1
160121Provisioning Item Order (PIO) 150 for Feedback CCA and DC Snubber CCA SparesVCB11/2/186/17/19227256/10/19BoeingFALSE5TRUEFALSETRUETRUEULTRUEFALSEFALSE1Authorize implementation of SSCN 16012 as documented by Directive 16012 R1, and update the Boeing Contract (NAS15-10000) accordi
160100MAPI Contract Modification: Systems Engineering and Integration for the ISS Vehicle Office Payload Facilities, Technology Demonstrations, and Commercial ElementsVCB12/11/182/10/192/19/1993/20/19293/22/1923/22/1903/22/191122/1/19MAPIFALSE11FALSEFALSETRUETRUEOLTRUEFALSEFALSEAuthorize implementation of SSCN 16010, as documented by Directive 16010 and update the Mission and Program Integration Contract
160090Update SSP 50005, ISS Flight Crew Integration Standard (NASA-STD-3000/T) Labeling RequirementsMVCB10/30/18255BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160070Release S684-13182-R4, Integrated Communications Unit (ICU) Software Requirements Specification (SRS), Revision AASCB10/16/1826911/5/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160060Provide Integration Support for the Four Bed Carbon Dioxide Scrubber (4BCO2) On-orbit Technology DemonstrationVCB11/1/182/26/192/11/19-152/13/1921492/28/192/28/191343/1/19BoeingFALSE11FALSEFALSETRUETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 16006 as documented by Directive 16006, and update the Boeing Contract (NAS15-10000) accordingl
160050Revise SSP 50273, Segment Specification for the H-II Transfer Vehicle, to Revision J to incorporate approved NDCs, and SSCNTICB11/29/18225BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160050Revise SSP 50273, Segment Specification for the H-II Transfer Vehicle, to Revision J to incorporate approved NDCs, and SSCNTICB11/29/18225MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
160010Downgrade Urine Processor Assembly (UPA) Distillation Assembly S/N 3 P/N 96M12360-1VCB10/15/1810/26/18112592/9/18FALSE5FALSEFALSETRUETRUEOLFALSEFALSEFALSE
159980Baseline and Revise Software Interface Control Documents to Support Increment 58PSCP10/4/1828110/29/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159950Make Operable Change to Modify the Linear Actuator Controller (LAC), 683-101103-0003, to Correct Loss of Communication IssuesSSPCB10/5/1828010/26/182125910/16/18BoeingFALSE5FALSEFALSEFALSETRUEULFALSEFALSEFALSEAuthorize implementation of SSCN 15995 as documented by Directive 15995, and update the Boeing Contract (NAS15-10000) accordingl
159870MAPI Contract Modification - remove Post Mission Support and add Quantitative Risk Analysis (QRA)MIOCB10/18/1812/11/1812/20/1891/30/19412/12/19132/12/1902/12/192/27/1915012/3/18MAPIFALSE11FALSEFALSETRUETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 15987, as documented by Directive 15987 and update the Mission and Program Integration Contract
159860Update SSP 50261-01, Generic Groundrules, Requirements and Constraints (GGR&C) Part 1: Strategic and Tactical Planning to Update the Sections Associated with Crew Recovery TimeMIOCB9/14/183/21/191884/7/191796MAPIFALSE5FALSEFALSEFALSETRUEULFALSEFALSEFALSE
159840Creating a new Passive Flight Releasable Attachment Mechanism (PFRAM) configuration, same as 1J00520-001 but without the soft-dock feature.VCB9/21/1812/7/1811/19/18-1823512/12/1812/13/1821112/11/18BoeingFALSE11FALSEFALSETRUETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 15984 as documented by Directive 15984, and update the Boeing Contract (NAS15-10000) accordingl
159830Baseline SSP 51078, Joint Implementation Plan for ISS Microbial Sampling, Sharing, and Dissemination ResultsMVCB9/4/183112/9/18FALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159800Retirement of Flight Operations Directorate ISS Program Documents Due to Process Change and Life Cycle EndGSCB12/17/18207FALSE1FALSEFALSEFALSEFALSEIn WorkFALSEFALSEFALSE
159790Update and Release Flight SpX-14, Return Manifest Disposition Plan As-Flown Flight Specific Appendices D, E, F, and GNASA CM9/18/182976/6/18CMC3FALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159760Update SSP 50169, Revision A, ExPCP Planning Data Data Standards - GenericExPCP10/15/182706/11/18FALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159720Design, Develop and Deliver for Launch and Integration New Stowage Platforms for the US Airlock Equipment LockVCB9/5/1810/29/185412/11/184310/4/18-6828111/19/1812/12/182126/11/1812/3/18BoeingFALSE11FALSEFALSEFALSETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 15972 as documented by Directive 15972, and update the Boeing Contract (NAS15-10000) accordingl
159700Provide JSL Gigabit Backbone Between ISS ModulesASCB8/10/1812/19/181311/8/19201/17/1991/18/1911/18/1901751/28/191/28/191651/14/19BoeingFALSE11FALSEFALSEFALSEFALSEULTRUEFALSEFALSEAuthorize implementation of SSCN 15970 as documented by Directive 15970 and update the Boeing Contract (NAS15-10000) accordingly
159640Update SSP 54100, Multi-Increment Planning Document, Rev H to Revise Flight Dates in Increments 56 through 66MMIOCB8/13/18333MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159630Update SSP 50261-01, Generic Groundrules, Requirements, and Constraints Part 1: Strategic and Tactical Planning, Update Section 9 Rules for Dynamic Events, Section 9 Rules for Visiting Vehicle Spacing, Appendices A, D, E, & G and Global Name Update Related to Orbital ATK changing to Northrup GrummanMIOCB8/28/1810/11/184410/16/18510/30/1814255MAPIFALSE5FALSEFALSEFALSEFALSEULFALSEFALSEFALSE
159620Baseline and Revise Software Interface Control Documents to Support Increment 57PSCP8/6/183406/6/188/21/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159610Release of S683-70742, Node 2 Systems 1 Release 4 (N2SYS1 R4) Software Requirements Specification (SRS), Revision JASCB7/31/183469/5/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159590Revise SSP 41174, International Space Station Interface Control Working Group Operating Procedures, to Revision B, and Retire SSP 30459, International Space Station Interface Control PlanMSEICB4/19/19846/6/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSEAuthorize implementation of SSCN 15959 as documented by Directive 15959 and update the Missison and Program Integration Contract
159590Revise SSP 41174, International Space Station Interface Control Working Group Operating Procedures, to Revision B, and Retire SSP 30459, International Space Station Interface Control PlanMSEICB4/19/19847/20/18MAPIFALSE3FALSEFALSETRUETRUEIn WorkTRUEFALSEFALSEAuthorize implementation of SSCN 15959 as documented by Directive 15959 and update the Missison and Program Integration Contract
159590Revise SSP 41174, International Space Station Interface Control Working Group Operating Procedures, to Revision B, and Retire SSP 30459, International Space Station Interface Control PlanMSEICB8/8/183385/22/18FALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSEAuthorize implementation of SSCN 15959 as documented by Directive 15959 and update the Missison and Program Integration Contract
159520Downgrade Helmet/EVVA/LCVG from Class I to Class IIIWEVA-CCB8/9/188/23/18143237/20/189/5/18ESOCFALSE5FALSEFALSETRUETRUEULFALSEFALSEFALSE
159520Downgrade Helmet/EVVA Assembly from Class I to Class IIIWEVA-CCB7/16/183616/6/188/15/18ESOCFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159490Boeing Support for xEMU Demo Development and ISS Airlock ModificationsVCB2/26/196/24/191187/9/191537/19/19Boeing15949 - Change approved at the SSPCB on 07/09/19; CD is in work as updates were required.
FALSE3FALSETRUEFALSEFALSEIn WorkTRUEFALSEFALSEAuthorize implementation of SSCN 15949 as documented by Directive 15949, and update the Boeing Contract (NAS15-10000) accordingl
159460Release of S684-11034-R16 Revision B Command and Control Software (CCS) Software Requirements Specification (SRS)ASCB7/9/183686/14/187/31/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSETRUE
159430Update SSP 50261-01, Generic Groundrules, Requirements, and Constraints Part 1: Strategic and Tactical Planning, Update Section 13.7 ARED Hardware Operable Volume (Requirement) & 13.10.3 ARED Operational Worksite (Groundrule)MIOCB7/11/1810/15/189627010/18/18992677/20/18MAPIFALSE5FALSEFALSEFALSEFALSEULFALSEFALSEFALSE
159410Revise SSP 50438 Revision E International Space Station to H-II Transfer Vehicle Interface Control Document Part 1, to Revision F to incorporate approved PIRNs and SSCNsTICB11/29/18225BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159410Revise SSP 50438 Revision E International Space Station to H-II Transfer Vehicle Interface Control Document Part 1, to Revision F to incorporate approved PIRNs and SSCNsTICB11/29/18225MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159400Update SSP 50261-01, Generic Groundrules, Requirements, and Constraints Part 1: Strategic and Tactical Planning, Update Section 13.0 Interior Volume Configuration sections for Visibility and Access to Critical Equipment and Controls, Hardware Operable Volume, and Counter Measure System Operational WorksitesMIOCB3/25/194/17/19234/30/191373MAPIFALSE5FALSEFALSEFALSETRUEULFALSEFALSETRUE
159380FY18 Annual EVA SparingEVA-CCB7/10/187/18/1888/2/181510/18/187711/14/182711/29/181511/29/18012/18/181912/18/1820610/1/18ESOCFALSE11FALSETRUEFALSETRUEOLTRUEFALSEFALSEAuthorize implementation of SSCN 15938 as documented by Directive 15938 and update the EVA Space Operations Contract (NNJ10TB01C
159381FY18 Annual EVA SparingEVA-CCB7/10/187/18/18812/18/1815320612/12/18ESOCFALSE5FALSEFALSEFALSETRUEOLTRUEFALSETRUEAuthorize implementation of SSCN 15938 as documented by Directive 15938 R1 and update the EVA Space Operations Contract (NNJ10TB
159360SSQ 21635 Hermetic Double Density Style 35 NATC and NZGL ConnectorsVCB6/26/183817/26/18BoeingFALSE1FALSEFALSEFALSETRUEIn WorkFALSEFALSETRUE
159350Administrative Updates To Rev G of Space Station Qualified (SSQ) 21656 Wire and Cable, Electric, Fluoropolymer-Insulated, Nickel Coated Copper or Copper Alloy, General Specification ForVCB6/26/183818/7/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSETRUE
159340Downgrade RAMP items requested by the SVMF for crew training from Class 1 to Class 3VCB8/12/1811/1/1881253FALSE5FALSEFALSETRUETRUEOLFALSEFALSETRUE
159310Release of S683-72652, Payload Executive Processor Release 14 (PEP R14) Software Requirements Specification (SRS), Revision LASCB6/22/183857/20/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSETRUE
159240Design, Build and Deliver Contingency Cabling to enable Backup Intravehicular Activity (IVA) Power Transfer from the United States On-Orbit Segment (USOS) to the Russian Service ModuleVCB7/13/188/23/188/27/1843198/30/188/30/183168/31/18BoeingFALSE11FALSEFALSETRUETRUEULTRUEFALSETRUEAuthorize implementation of SSCN 15924 as documented by Directive 15924, and update the Boeing Contract (NAS15-10000) accordingl
159210Support for Sierra Nevada Corporation (SNC) ExPA Thermal Acceptance Testing and Vacuum Bake-outTICB7/2/188/16/18459/4/18199/10/1869/12/1829/26/181428910/1/1810/1/182848/10/18BoeingFALSE11FALSEFALSEFALSEFALSEULTRUEFALSETRUEAuthorize implementation of SSCN 15921 as documented by Directive 15921, and update the Boeing Contract (NAS15-10000) accordingl
159190Airlock Thermal Cover ImprovementsVCB6/8/188/13/18668/28/18158/8/18-208/27/18193198/29/188/30/183169/21/18BoeingFALSE11FALSEFALSEFALSETRUEULTRUEFALSETRUEAuthorize implementation of SSCN 15919 as documented by Directive 15919, and update the Boeing Contract (NAS15-10000) accordingl
159170Update SSP 50261-01, Generic Groundrules, Requirements, and Constraints Part 1: Strategic and Tactical Planning, Update Section 12.0 Resource Planning for Consumables Reserve Due to Increase in Crew and Update Section 13.6 & 13.6.1 ECLSS GroundrulesMIOCB7/3/189/20/18799/25/18510/8/1813277MAPIFALSE5FALSEFALSEFALSEFALSEULFALSEFALSETRUE
159150Delivery of D684-10017-01 Revision K, Software Development Plan (SDP), and D684-10056-01 Revision W, Prime Contractor Software Standards and Procedures Specification (SSPS)ASCB5/21/184176/29/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSETRUE
159140Test Program to Investigate Dragon 1 Induced External Contamination Measured by SAGE IIISEICB5/21/186/13/186/14/1816/21/1876/21/1806/21/1806/26/183816/15/18BoeingFALSE11FALSEFALSETRUETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 15914 as documented by Directive 15914 and update the Boeing Contract (NAS15-10000) accordingly
159120Provide the Capability to Fault Isolate and Checkout EXpedite the PRocessing of Experiments to Space Station (EXPRESS) Flight and Ground Circuit CardsVCB5/24/187/24/187/26/1828/1/1863458/2/183447/16/18BoeingFALSE11FALSEFALSETRUETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 15912 as documented by Directive 15912, and update the Boeing Contract (NAS15-10000) accordingl
159090Delivery of SP-M-521-R7 S1/P1 Software Requirements Specification (SRS)ASCB5/9/184296/1/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159080FY19 EMU Hardware Requests for Beyond 2020EVA-CCB5/8/185/30/18226/19/18206/20/18110/15/1811711/7/182312/13/18361/29/19472/15/19172/15/1914710/1/18ESOCFALSE11FALSETRUEFALSEFALSEOLTRUEFALSETRUEAuthorize implementation of SSCN 15908 as documented by Directive 15908 and update the EVA Space Operations Contract (NNJ10TB01C
159081FY19 EMU Hardware Requests for Beyond 2020EVA-CCB5/8/185/30/18226/19/18202/15/192411472/8/19ESOCFALSE5TRUETRUEFALSEFALSEOLTRUEFALSEFALSEAuthorize implementation of SSCN 15908 as documented by Directive 15908 R1 and update the EVA Space Operations Contract (NNJ10TB
159082FY19 EMU Hardware Requests for Beyond 2020EVA-CCB5/8/185/30/18226/19/18205/7/193223/13/19-553/21/1984/2/19124/2/1905/7/195/13/19664/16/19ESOCFALSE11FALSEFALSEFALSEFALSEOLTRUEFALSETRUEAuthorize implementation of SSCN 15908 as documented by Directive 15908 R2 and update the EVA Space Operations Contract (NNJ10TB
159060Delivery of S684-10174-R5 Node Control Software (NCS) Software Requirements Specification (SRS)ASCB5/7/184316/1/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159050Delivery of S684-11034-R17 Command & Control (CCS) Software Requirements Specification (SRS)ASCB5/4/184346/14/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159040Provide NDS Pyro Simulator for CST-100 TestingVCB5/4/187/11/187/12/1817/16/1843617/25/183527/6/18BoeingFALSE11FALSEFALSETRUETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 15904 as documented by Directive 15904 and update the Boeing Contract (NAS15-10000) accordingly
159020Update SSP 54100, Multi-Increment Planning Document, Rev H to Bring Increments 59 and 60 into the Tactical TimeframeMIOCB5/29/18409MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
159000Deliver the Portable Computer System (PCS) Release 20 (R20) Flight Cycle (FC) DocumentationASCB5/1/184377/31/185/15/18BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
158990Mission and Program Integration (MAPI) Support to Gateway for FY19SSPCB8/15/189/14/189/19/18510/3/181410/19/181610/19/18011/5/182497/6/1710/1/18MAPIFALSE11FALSEFALSETRUETRUEOLTRUEFALSEFALSEAuthorize implementation of SSCN 15899, as documented by Directive 15899 and update the Mission and Program Integration Contract
158970Revise SSP 57061, Standard Payload Integration Agreement for ISS Payloads, to Revision D and Retire SSP 57072, Standard Payload Integration Agreement for ISS Pressurized PayloadsRICB5/1/189/19/181419/19/180296BoeingFALSE3FALSEFALSEFALSEFALSEIn WorkFALSEFALSEFALSE
158960Baseline and Release SSP 41178-44, Software Interface Control Document Lab Module 3 Multiplexer/Demultiplexer (MDM) to International Space Station (ISS) Book 44, Water Storage System InterfaceASCB4/27/187/10/18743677/6/18BoeingFALSE5FALSEFALSETRUETRUEULFALSEFALSEFALSE
158930Installation of an Additional Utility Outlet Panel (UOP) in Node 2 and in Node 3VCB7/18/1810/22/189611/16/182511/1/18-1525311/27/1812/13/182117/6/1711/9/18BoeingFALSE11FALSEFALSEFALSETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 15893 as documented by Directive 15893, and update the Boeing Contract (NAS15-10000) accordingl
158920Make Operable Change to Solid State Lighting Assemblies (SSLAs) & System Remote Control Assembly (SRCAs) Off-Nominal OperationVCB9/21/182/10/192/10/1902/15/1951472/15/192/15/191471/31/19BoeingFALSE11FALSEFALSETRUETRUEULTRUEFALSEFALSEAuthorize implementation of SSCN 15892 as documented by Directive 15892, and update the Boeing Contract (NAS15-10000) accordingl
158870Provisioning Item Order (PIO) 149A for Remote Power Controller Module Assy (RPCM) Type-I Internal, Common Controller CCA and Power Supply CCA SparesVCB11/2/182/22/19112140BoeingFALSE6FALSETRUETRUETRUEIn WorkTRUEFALSEFALSE1
158870Provisioning Item Order (PIO) 149A for Remote Power Controller Module Assy (RPCM) Type-I Internal, Common Controller CCA and Power Supply CCA SparesVCB5/7/185/11/182/22/192873/5/19111293/20/191143/20/19114BoeingFALSE11FALSETRUETRUETRUEULTRUEFALSEFALSE1
158871Provisioning Item Order (PIO) 149A for Remote Power Controller Module Assy (RPCM) Type-I Internal, Common Controller CCA and Power Supply CCA SparesVCB11/2/183/15/191331193/11/19BoeingFALSE5TRUEFALSETRUETRUEULTRUEFALSEFALSE1Authorize implementation of SSCN 15887 as documented by Directive 15887 R1, and update the Boeing Contract (NAS15-10000) accordi
158800Update SSP 30219 Revision K, Space Station Reference Coordinate System, to Incorporate Three New Vehicle Reference Coordinate SystemsMSEICB4/6/18462BoeingFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
158800Update SSP 30219 Revision K, Space Station Reference Coordinate System, to Incorporate Three New Vehicle Reference Coordinate SystemsMSEICB4/6/18462MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSETRUE
158710Develop, Design, and Deliver Modification Kits to Establish a Demonstration Advanced Oxygen Generation Assembly (OGA) and Oxygen Generation System (OGS) Rack Relocation to US Laboratory ModuleVCB4/10/182/4/193002/12/1982/14/1922/18/1945/31/1910242Boeing15871 - Boeing has responded to all NASA fact-finding questions received to date.TRUE6TRUETRUEFALSEFALSEOLTRUETRUEFALSEAuthorize implementation of SSCN 15871 as documented by Directive 15871, and update the Boeing Contract (NAS15-10000) accordingl
158700Revise SSP 50621 Generic On-Orbit Stowage Capabilities and Requirements: Pressurized Volume to Revision GMIOCB9/6/18309MAPIFALSE3FALSEFALSETRUETRUEIn WorkFALSEFALSEFALSE
158700Revise SSP 50621 Generic On-Orbit Stowage Capabilities and Requirement: Pressurized Volumes to Revision GMIOCB6/22/188/16/1855330FALSE3FALSEFALSEFALSETRUEIn WorkFALSEFALSEFALSE
158690Provisioning Item Order (PIO) 148 for Service and Performance Checkout Unit (SPCU) Heat Exchanger ORU SpareVCB3/23/184/18/1810/10/1817527512/7/1812/7/18012/12/18217BoeingFALSE11FALSETRUETRUETRUEULTRUEFALSEFALSE1