SOW_2018-01-18_Revised.docx
DOCX document 27 KB Posted
- Attached to
- Gulfstream G-III Aircraft for Parts
- Solicitation number
- 80JSC018Q0001
About this file
Revised Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Signed_SF30_Amendment_002.pdf | ||
| RFP_Revised_01-18-18.pdf | ||
| Question.docx | DOCX document | |
| GIII_Parts_Statement_of_Work.pdf | ||
| SF30_GIII.pdf | ||
| BR3-17-004_GIII_JOFOC.pdf | ||
| 80JSC018Q0001_RFP_12-20-17.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purpose
The government requires a Gulfstream-III aircraft to provide a platform to repair the flying Gulfstream-III aircraft (N992NA) operated by the NASA Johnson Space Center. By far, the single most important component from this parts platform would be the two engines, and these engines would be used to replace those on N992NA that are nearing end-of-life maintenance limits.
Scope of Work The contractor shall deliver a Gulfstream-III aircraft to Ellington Airport in Houston, TX in Houston, TX with the required documentation.
Aircraft Requirements
1) The aircraft shall be capable of being ferried on a single flight to Ellington Airport (KEFD) in Houston, TX.
Parts Requirements
1) Engines
a. The engines shall not have overdue Airworthiness Directives (ADs), mandatory Customer Bulletins, and Alert Customer Bulletins outstanding at the time of delivery.
Documentation
1) Logs and records
a. The complete records of the aircraft history and engine logs with respect to maintenance and modifications since new shall be delivered. The maintenance history shall include overhaul records and appropriate data cards for all accessories.
2) A complete set of current manuals shall include the following, as applicable:
a. Form 337s
b. One complete set of reproducible owner/operator originated modification drawings and schematics
c. List of completed Aircraft Service Changes (ASCs) and ADs Delivery Schedule The aircraft, support equipment, and required documentation shall be delivered to NASA’s Ellington Field facility in Houston, Texas 77058 within 10 business days of contract award.
File details come from the government source that posted it.