80GSFC23B0001 Attachment D - Contractors Daily Report Form.pdf

PDF 40 KB Posted

Attached to
Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2 Federal contract opportunity
Solicitation number
80GSFC23B0001
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This solicitation seeks proposals for the restoration of electrical infrastructure at the Wallops Flight Facility in Virginia. The National Aeronautics and Space Administration Goddard Space Flight Center will replace approximately 20,000 linear feet of direct burial cable with new electrical power feeders in conduit, as well as five air switches with safer SF6 gas switches. Loop circuits will also be created to improve flexibility and resilience. Offerors must be small businesses certified through the Small Business Administration's 8(a) Program and have a place of business in the SBA's Richmond District Office. The North American Industry Classification System code is 236220 and the size standard is $39.5 million. The contract will be a firm fixed price awarded through best value determination. The period of performance is 365 days with an anticipated award date of February 2023 and notice to proceed of March 2023. The work will be onsite at Wallops Flight Facility. Proposals are due no later than February 16, 2023.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT D

80GSFC23B0001

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

GODDARD SPACE FLIGHT CENTER

WALLOPS FLIGHT FACILITY

WALLOPS ISLAND, VA 23337

CONTRACTORS DAILY REPORT

FORM WI 452

FOR

Wallops Restoration of Main Base Electrical Infrastructure

LOCATED

AT

NASA GSFC/WALLOPS FLIGHT FACILITY

WALLOPS ISLAND, VIRGINIA

NASA WI-452

DAILY CONSTRUCTION REPORT

Contract No. ___________ Date: ______________ Report No. ____________

Description and Location of Work: ________________________________________________

Weather: (Clear) (P. Cloudy) (Cloudy) Temperature ______ Min: ______ Max: _______ Rainfall: __________ inches.

Contractor/Subcontractors and Area of Responsibility with Labor Count for Each:

a. __________________________________ d. __________________________________

b. __________________________________ e. __________________________________

c. __________________________________ f. __________________________________

Equipment Data: (Indicate items of construction equipment, other than hand tools, at the job site, and whether or not used.)

1. Work Performed Today: (Indicate location and description or work performed. Refer to work performed by prime and/or subcontractors by letter in Table above.)

NASA WI-452

2. Result of Surveillance: (Include satisfactory work completed, or deficiencies with action to be taken.)

3. Test Required by Plans and/or Specifications Performed and Results of Tests:

4. Verbal Instruction Received: (List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with action to be taken.)

5. Remarks: (Cover any conflicts in plans, specifications, or instructions on any delay to the job attributable to weather conditions.)

6. Results of Safety Inspections: (Include safety violations and corrective actions taken.)

CONTRACTOR’S VERIFICATION: The above report is complete and correct and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

(Contractor’s Approved Authorized Representative)

(NASA Inspector)

File details come from the government source that posted it. Updated .