80GSFC23B0001 Attachment D - Contractors Daily Report Form.pdf
PDF 40 KB Posted
- Attached to
- Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2 Federal contract opportunity
- Solicitation number
- 80GSFC23B0001
About this file
This solicitation seeks proposals for the restoration of electrical infrastructure at the Wallops Flight Facility in Virginia. The National Aeronautics and Space Administration Goddard Space Flight Center will replace approximately 20,000 linear feet of direct burial cable with new electrical power feeders in conduit, as well as five air switches with safer SF6 gas switches. Loop circuits will also be created to improve flexibility and resilience. Offerors must be small businesses certified through the Small Business Administration's 8(a) Program and have a place of business in the SBA's Richmond District Office. The North American Industry Classification System code is 236220 and the size standard is $39.5 million. The contract will be a firm fixed price awarded through best value determination. The period of performance is 365 days with an anticipated award date of February 2023 and notice to proceed of March 2023. The work will be onsite at Wallops Flight Facility. Proposals are due no later than February 16, 2023.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 80GSFC23B0001 Amendment Two Page 2.pdf | ||
| 80GSFC23B0001 Amendment Two SF30.pdf | ||
| 80GSFC23B0001 RFP - FINAL Rev1.pdf | ||
| 80GSFC23B0001 SF1442 Updated 02152023.pdf | ||
| 80GSFC23B0001 Amendment Two QandA.pdf | ||
| 80GSFC23B0001 Amendment One - Signed.pdf | ||
| 80GSFC23B0001 Attachment C- Phase 2 Drawings - Revised 09132022.pdf | ||
| 80GSFC23B0001 Attachment F - DB Wage Determination.pdf | ||
| 80GSFC23B0001 Attachment G - Drawing Suppl.pdf | ||
| 80GSFC23B0001 Attachment C- Phase 2 Drawings - Revised 09132022.pdf | ||
| 80GSFC23B0001 Attachment B - Specs.pdf | ||
| 80GSFC23B0001 Attachment A - SOW - Revised 09132022.pdf | ||
| 80GSFC23B0001 Attachment E - Safety and Health Plan.pdf | ||
| 80GSFC23B0001 RFP - FINAL 1.19.pdf | ||
| SF 1442.pdf | ||
| Cover Letter - Signed.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D
80GSFC23B0001
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
GODDARD SPACE FLIGHT CENTER
WALLOPS FLIGHT FACILITY
WALLOPS ISLAND, VA 23337
CONTRACTORS DAILY REPORT
FORM WI 452
FOR
Wallops Restoration of Main Base Electrical Infrastructure
LOCATED
AT
NASA GSFC/WALLOPS FLIGHT FACILITY
WALLOPS ISLAND, VIRGINIA
NASA WI-452
DAILY CONSTRUCTION REPORT
Contract No. ___________ Date: ______________ Report No. ____________
Description and Location of Work: ________________________________________________
Weather: (Clear) (P. Cloudy) (Cloudy) Temperature ______ Min: ______ Max: _______ Rainfall: __________ inches.
Contractor/Subcontractors and Area of Responsibility with Labor Count for Each:
a. __________________________________ d. __________________________________
b. __________________________________ e. __________________________________
c. __________________________________ f. __________________________________
Equipment Data: (Indicate items of construction equipment, other than hand tools, at the job site, and whether or not used.)
1. Work Performed Today: (Indicate location and description or work performed. Refer to work performed by prime and/or subcontractors by letter in Table above.)
NASA WI-452
2. Result of Surveillance: (Include satisfactory work completed, or deficiencies with action to be taken.)
3. Test Required by Plans and/or Specifications Performed and Results of Tests:
4. Verbal Instruction Received: (List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with action to be taken.)
5. Remarks: (Cover any conflicts in plans, specifications, or instructions on any delay to the job attributable to weather conditions.)
6. Results of Safety Inspections: (Include safety violations and corrective actions taken.)
CONTRACTOR’S VERIFICATION: The above report is complete and correct and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.
(Contractor’s Approved Authorized Representative)
(NASA Inspector)