80GSFC23B0001 Amendment One - Signed.pdf

PDF 305 KB Posted

Attached to
Wallops Flight Facility Restoration of Main Base Electrical Infrastructure – Phase 2 Federal contract opportunity
Solicitation number
80GSFC23B0001
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This solicitation requests proposals for the restoration of electrical infrastructure at Wallops Flight Facility. NASA Goddard Space Flight Center is seeking to replace approximately 20,000 linear feet of direct burial cable and 5 air switches with safer and more reliable equipment. This will create looped circuits for improved resiliency and flexibility during outages. The work includes replacing cables, switches, transformers and related components that make up the existing 15 kV electrical system throughout the main base.

This is a 100% small business set-aside for firms certified in the SBA's 8(a) program located within the SBA's Richmond District Office jurisdiction. The NAICS code is 236220 with a $39.5M size standard. NASA will award a firm-fixed-price contract for a one year period of performance beginning in March 2023. Proposals are due February 16, 2023. An optional site visit will be held on February 2. The solicitation requests standard proposal content in accordance with FAR provisions and NASA FAR supplements.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.

is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to update section J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016).

See Continuation Pages

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

1/20/2023

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NUMBER

One (1)

PAGE OF PAGES

1 2

5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 174 7. ADMINISTERED BY (If other than Item 6) CODE

NASA/Goddard Space Flight Center/Wallops Flight Facility Code 210.I, Office for Institutional Program Wallops Island, VA 23337

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER

All Potential Offerors 80GSFC23B0001

9B. DATED (SEE ITEM 11)

01/20/2023

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

(X)

4. REQUISITION/PURCHASE REQUISITION NUMBER

N/A

3. EFFECTIVE DATE

01/20/2023

1. CONTRACT ID CODE

80GSFC23B0001

Amendment One

The purpose of this amendment is to update section J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016).

A. Section J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016), is revised to delete in its entirety and replace Attachment C.

Attachment

Description

Date

No. of Pages

(including the cover page)

A WFF Restoration of Main Base Electrical Infrastructure Phase 2 SOW 09/13/2022 6

B NASA Wallops Restoration of Main Base Electrical Infrastructure Phase 2 Specifications

02/14/2022 257

C NASA Wallops Restoration of Main Base Electrical Infrastructure Phase 2 Construction Drawings Numbers 20236 through 20278

(Please see notes on top right corner of pages 7 through 28 to distinguish between the base bid and bid option one)

02/14/2022 44

D Contractor’s Daily Report, Form WI 452 Not Dated 3

E Safety and Health Plan TBS* TBS*

F Davis Bacon Wage Rate Determination - Construction General Decision No.

VA20220007

08/26/2022 6

G

Wallops Restoration of Main Base Electrical Infrastructure – Phase 2 Specification/Drawing Supplemental Clarification

04/07/2022

C. All other terms and conditions remain unchanged.

-END OF AMENDMENT ONE-