Enclosure 2 - ADOBE CONV .pdf
PDF 128 KB Posted
- Attached to
- Wallops Multiple Award Construction (WMAC) II RFP Federal contract opportunity
- Solicitation number
- 80GSFC21R0028
About this file
This document provides details for a request for proposal for multiple award construction contracts II from the National Aeronautics and Space Administration Goddard Space Flight Center. The RFP seeks proposals for new construction, modification, demolition, or rehabilitation of facilities at Wallops Flight Facility and Langley Research Center locations. Services may include structural, electrical, mechanical, environmental, and fire protection work on buildings as well as civil site work and underground and surface utility systems. Proposals are due no later than July 19, 2021 with an anticipated award of multiple indefinite delivery/indefinite quantity fixed price contracts for a five year ordering period. This is a 100% small business set-aside for 8(a) firms serviced by the SBA Richmond office with a NAICS code of 236220 and size standard of $39.5M annually.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENCLOSURE 2
RFQ # 80GSFC21R0028
ENCLOSURE 2
ADOBE ACROBAT DC CONVERSION INSTRUCTIONS
The Pricing Exhibits provided in the RFQ are in Portable Document Format (PDF). Prior to completing the Pricing Exhibits, you must convert the .PDF file to Microsoft Office Excel either using Adobe Acrobat DC or manually recreate each individual exhibit. To convert the exhibits using Adobe Acrobat DC use the following steps:
1) Open the Pricing Exhibits .PDF file in Adobe Acrobat DC.
2) Click on the Export PDF tool in the right pane.
3) Choose spreadsheet as your export format, and then select Microsoft Excel Workbook.
a. Under the “Save As XLSX Settings” window, ensure that following selections are made:
i. Under Excel Workbook Settings ensure “Create Worksheet for each Page” is selected.
ii. Under Numeric Settings ensure “Detect decimal and thousands separators using regional settings.”
iii. Under Text Recognition Settings ensure “Recognize text if needed” is selected.
1. Ensure “English” is the selected language.
b. Click “OK”
4) Click Export.
Name the Excel file and save it in a desired location.
File details come from the government source that posted it. Updated .