Draft_RFP_Attachment_A-Specifications-16009.pdf
PDF 35 MB Posted
- Attached to
- Research Support Building (RSB) Construction Draft RFP Federal contract opportunity
- Solicitation number
- 80GRC018R0009
About this file
Attachment A - SOW/Specifications
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A:
SPECIFICATIONS FOR
RESEARCH SUPPORT BUILDING
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
GLENN RESEARCH CENTER
21000 BROOKPARK ROAD, CLEVELAND, OHIO 44135
16009 February 1, 2018
DRAFT
RESEARCH SUPPORT BUILDING 16009
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
00 62 35.98 RECYCLED / RECOVERED MATERIALS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.98 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 30 00.98 ADMINISTRATIVE REQUIREMENTS
01 31 19.98 PROJECT MEETINGS
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26.98 GENERAL SAFETY REQUIREMENTS
01 35 43.98 ENVIRONMENTAL PROTECTION PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.98 QUALITY CONTROL
01 45 33.01 98 CODE REQUIRED SPECIAL INSPECTIONS AND PROCEDURES FOR
WELDING OF PRESSURE PIPING
01 45 35 SPECIAL INSPECTIONS
01 50 00.98 TEMPORARY FACILITIES AND CONTROLS
01 57 23.98 TEMPORARY STORM WATER POLLUTION CONTROL
01 60 00.98 PRODUCT REQUIREMENTS
01 75 00.98 STARTING AND ADJUSTING
01 78 00.98 CLOSEOUT SUBMITTALS
01 78 23.98 OPERATION AND MAINTENANCE DATA
01 86 12.07 98 RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL SYSTEMS
01 91 00.00 98 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 61 00.98 REMOVAL AND DISPOSAL OF CONTAMINATED SOILS
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.11 98 CAST-IN-PLACE CONCRETE UNDERSLAB VAPOR RETARDER
03 30 00.98 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 35 43 POLISHED CONCRETE TOPPING AND FINISHING
03 39 00.00 10 CONCRETE CURING
03 45 00 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
PROJECT TABLE OF CONTENTS Page 1
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
05 72 00 DECORATIVE METAL SPECIALTIES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
06 84 00 FIBERGLASS REINFORCED PLASTIC (FRP) COLUMN COVERS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 13 FOAM PLASTIC BOARD INSULATION
07 21 16 MINERAL FIBER INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 42 13 METAL WALL PANELS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 53 23.98 ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
07 60 00 FLASHING AND SHEET METAL
07 71 00.98 ROOF SPECIALTIES
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00.98 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 11 74.98 SLIDING METAL GRILLES
08 14 00 WOOD DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 36 13.98 BIFOLD VERTICAL LIFT DOORS
08 41 13.13 98 FIRE-RATED ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 42 33.98 REVOLVING DOOR ENTRANCES
08 44 23.98 STRUCTURAL-SEALANT-GLAZED CURTAIN WALLS
08 60 45 SKYLIGHTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00.98 GYPSUM BOARD
09 30 00 TILING
09 51 00 ACOUSTICAL CEILINGS
09 66 23 RESINOUS MATRIX TERRAZZO FLOORING
09 67 23 RESINOUS FLOORING
09 68 00.00 98 CARPET
09 72 00 WALLCOVERINGS
09 90 00.00 98 PAINTING AND COATING
09 96 00 HIGH-PERFORMANCE COATINGS
DIVISION 10 - SPECIALTIES
PROJECT TABLE OF CONTENTS Page 2
10 21 13 TOILET COMPARTMENTS
10 22 19 DEMOUNTABLE MOVABLE PARTITIONS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 36 00 COUNTERTOPS
12 48 16 ENTRANCE FLOOR GRILLES
12 59 00 SYSTEMS FURNITURE
DIVISION 14 - CONVEYING EQUIPMENT
14 24 00 HYDRAULIC ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 00.98 FIRE SPRINKLER SYSTEMS
21 23 00.98 WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET
DIVISION 22 - PLUMBING
22 00 00.98 PLUMBING, GENERAL PURPOSE
22 07 19.00 98 PLUMBING INSULATION
22 08 00 COMMISSIONING OF PLUMBING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00.00 98 GENERAL MECHANICAL PROVISIONS
23 03 00.00 98 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93.98 TESTING, ADJUSTING AND BALANCING
23 07 00.98 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 98 COMMISSIONING OF HVAC SYSTEMS
23 09 23.98 DIRECT DIGITAL CONTROL (EMCS) FOR HVAC AND OTHER BUILDING
SYSTEMS
23 11 25.00 98 FACILITY GAS PIPING SYSTEMS
23 21 13.98 PUMPS: HYDRONIC, CENTRIFUGAL
23 22 26.00 98 STEAM AND STEAM CONDENSATE SYSTEMS
23 23 00.98 REFRIGERANT PIPING SYSTEMS
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 31 13.98 METAL DUCTS, AND DUCTWORK COMPONENTS (LOW AND MEDIUM
PRESSURE)
23 34 23.98 HVAC POWER VENTILATORS
23 36 00.98 AIR TERMINAL UNITS
23 37 13.98 DIFFUSERS, REGISTERS, AND GRILLES
23 57 10.98 HEATING HOT WATER SYSTEMS
23 64 26.00 98 CHILLED AND CONDENSER WATER PIPING SYSTEMS
23 73 13.98 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITS
23 82 00.00 20 TERMINAL HEATING AND COOLING UNITS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
23 82 19.98 FAN COIL UNITS
DIVISION 26 - ELECTRICAL
PROJECT TABLE OF CONTENTS Page 3
26 05 00.00 98 BASIC ELECTRICAL MATERIALS, METHODS, AND PROVISIONS
26 05 01.98 BASIC ELECTRICAL REQUIREMENTS
26 05 26.98 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 71.00 40 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES
26 08 00 COMMISSIONING OF ELECTRICAL
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 09 43.98 PROGRAMMABLE LIGHTING CONTROL SYSTEM
26 22 14.98 DISTRIBUTION TRANSFORMERS
26 24 16.00 40 PANELBOARDS
26 27 39.98 ELEVATOR POWER MODULE AND WIRING
26 28 16.98 DISCONNECT SWITCHES
26 29 23.98 VARIABLE-FREQUENCY MOTOR CONTROLLERS FOR HVAC
26 41 01.00 98 LIGHTNING PROTECTION SYSTEM
26 43 13.98 SURGE PROTECTIVE DEVICES (SPD’S) FOR LOW-VOLTAGE
ELECTRICAL POWER CIRCUITS
26 50 01.98 LIGHTING
26 52 00.98 EMERGENCY LIGHTING
26 53 00.00 98 EXIT LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 13 23.00 40 COMMUNICATIONS OPTICAL BACKBONE CABLING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 00.98 FIRE-ALARM SYSTEMS
DIVISION 31 - EARTHWORK
31 00 00.98 EARTHWORK
31 23 01.98 EXCAVATING, BACKFILLING, AND COMPACTING FOR STRUCTURES
31 23 02.98 EXCAVATION, BACKFILLING, AND COMPACTING FOR UTILITIES
31 23 23.33 98 FLOWABLE FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33.98 LANDSCAPE ESTABLISHMENT
32 12 17.98 HOT MIX BITUMINOUS PAVEMENT
32 16 13.98 EXTERIOR CONCRETE SLABS, WALKS, AND CURBS
32 17 24.98 PAVEMENT MARKINGS
32 92 00.98 TURF AND GRASSES
32 92 19.98 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00.98 WATER DISTRIBUTION
33 30 00.98 SANITARY SEWERS
33 40 00.98 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE SYSTEM
33 49 23 STORM DRAINAGE WATER DETENTION STRUCTURES
33 61 13 PRE-ENGINEERED UNDERGROUND HEAT DISTRIBUTION SYSTEM
33 70 02.00 98 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
33 71 26.98 DISTRIBUTION TRANSFORMERS
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
PROJECT TABLE OF CONTENTS Page 4
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING NO. TITLE
CE-0164-COF16009-G-001 COVER
CE-0164-COF16009-G-002 SURVEY
CE-0164-COF16009-G-003 ENVIRONMENTAL, HEALTH AND SAFETY NOTES
CE-0164-COF16009-G-004 FOUNDATION OVERLAY
CE-0164-COF16009-G-101 LIFE SAFETY PLANS
CE-0164-COF16009-CD-101 LAYOUT DEMOLITION
CE-0164-COF16009-CD-102 UTILITY DEMOLITION
CE-0164-COF16009-C-001 SOIL DETERMINATION PLAN
CE-0164-COF16009-C-101 GRADING
CE-0164-COF16009-C-102 LAYOUT
CE-0164-COF16009-C-103 UTILITY
CE-0164-COF16009-C-104 STORMWATER POLLUTION PREVENTION PLAN
CE-0164-COF16009-C-301 PROFILES
CE-0164-COF16009-C-302 PROFILES
CE-0164-COF16009-C-303 PROFILES
CE-0164-COF16009-C-304 PROFILES
CE-0164-COF16009-C-401 SCHEDULES
CE-0164-COF16009-C-501 STORMWATER POLLUTION PREVENTION PLAN
CE-0164-COF16009-C-502 STORMWATER POLLUTION PREVENTION PLAN DETAILS
CE-0164-COF16009-C-503 STORMWATER POLLUTION PREVENTION PLAN
CE-0164-COF16009-C-504 STORMWATER POLLUTION PREVENTION PLAN DETAILS
CE-0164-COF16009-C-505 SITE NOTES
CE-0164-COF16009-C-506 SITE DETAILS
CE-0164-COF16009-C-507 SITE DETAILS
CE-0164-COF16009-L-001 GENERAL NOTES
CE-0164-COF16009-L-101 SITE PLAN WITH UTILITIES
CE-0164-COF16009-L-101.1 SITE MATERIALS PLAN
CE-0164-COF16009-L-102 TREE PLANTING PLAN & PLANT SCHEDULE
CE-0164-COF16009-L-401 SITE ENLARGEMENTS
CE-0164-COF16009-L-501 FINISH & MATERIALS DETAILS
CE-0164-COF16009-L-502 FINISH & MATERIALS & PLANTING DETAILS
CE-0164-COF16009-S-001 GENERAL NOTES 1
CE-0164-COF16009-S-010 LOAD MAPS
CE-0164-COF16009-S-101 LEVEL 01 FOUNDATION PLAN PART A
CE-0164-COF16009-S-102 LEVEL 01 FOUNDATION PLAN PART B
CE-0164-COF16009-S-103 LEVEL 02 FRAMING PLAN PART A
CE-0164-COF16009-S-104 LEVEL 02 FRAMING PLAN PART B
CE-0164-COF16009-S-105 ROOF FRAMING PLAN PART A
CE-0164-COF16009-S-106 ROOF FRAMING PLAN PART B
DOCUMENT 00 01 15 Page 1
DRAWING NO. TITLE
CE-0164-COF16009-S-201 BRACE ELEVATIONS 1
CE-0164-COF16009-S-202 BRACE ELEVATIONS 2
CE-0164-COF16009-S-203 TRUSS ELEVATIONS
CE-0164-COF16009-S-501 TYPICAL CONCRETE DETAILS
CE-0164-COF16009-S-510 FOUNDATION DETAILS 1
CE-0164-COF16009-S-511 FOUNDATION DETAILS 2
CE-0164-COF16009-S-512 FOUNDATION DETAILS 3
CE-0164-COF16009-S-515 TYPICAL SLAB ON GRADE
CE-0164-COF16009-S-520 COLUMN DETAILS
CE-0164-COF16009-S-530 STEEL DETAILS 1
CE-0164-COF16009-S-531 STEEL DETAILS 2
CE-0164-COF16009-S-532 STEEL DETAILS 3
CE-0164-COF16009-S-533 STEEL DETAILS 4
CE-0164-COF16009-S-540 TRUSS DETAILS
CE-0164-COF16009-S-550 TYPICAL DECK DETAILS 1
CE-0164-COF16009-S-551 TYPICAL DECK DETAILS 2
CE-0164-COF16009-A-001 ARCHITECTURAL SYMBOLS, MATERIALS, ABBREVIATIONS,
& MASONRY NOTES
CE-0164-COF16009-A-002 PARTITION TYPES
CE-0164-COF16009-A-101 SITE PLAN
CE-0164-COF16009-A-102 LEVEL 01 PLAN
CE-0164-COF16009-A-103 LEVEL 01 PART A
CE-0164-COF16009-A-104 LEVEL 01 PART B
CE-0164-COF16009-A-105 LEVEL 02 PLAN
CE-0164-COF16009-A-106 LEVEL 02 PART A
CE-0164-COF16009-A-107 LEVEL 02 PART B
CE-0164-COF16009-A-108 ROOF PLAN
CE-0164-COF16009-A-109 LEVEL 01 RCP PART A
CE-0164-COF16009-A-110 LEVEL 01 RCP PART B
CE-0164-COF16009-A-111 LEVEL 02 RCP PART A
CE-0164-COF16009-A-112 LEVEL 02 RCP PART B
CE-0164-COF16009-A-201 EWS AXONS
CE-0164-COF16009-A-202 ELEVATIONS
CE-0164-COF16009-A-301 BUILDING SECTIONS
CE-0164-COF16009-A-302 BUILDING SECTIONS
CE-0164-COF16009-A-401 EWS-A - BAR ENLARGED PLANS & DETAILS
CE-0164-COF16009-A-402 EWS-A - BAR ENLARGED PLANS & DETAILS
CE-0164-COF16009-A-403 EWS-A - BAR SECTIONS
CE-0164-COF16009-A-404 EWS-A - EAST PORTICO ENLARGED PLANS & DETAILS
CE-0164-COF16009-A-405 EWS-A - N/S OFFICE GLAZING ENLARGED PLANS &
DETAILS
CE-0164-COF16009-A-406 EWS-B - ENLARGED PLANS & DETAILS
CE-0164-COF16009-A-407 EWS-B - WEST PORTICO ENLARGED PLANS & DETAILS
CE-0164-COF16009-A-408 EWS-B - ENLARGED ELEVATIONS & SECTIONS
CE-0164-COF16009-A-409 EWS-B - ENLARGED ELEVATIONS & SECTIONS
CE-0164-COF16009-A-410 EWS-B/C - ENLARGED BREAKROOM & VESTIBULE PLANS &
DETAILS
CE-0164-COF16009-A-411 EWS-C - SERVICE BAR ENLARGED PLANS & DETAILS
CE-0164-COF16009-A-412 EWS-D PART A - ENLARGED PLANS & ELEVATIONS
CE-0164-COF16009-A-413 EWS-D PART B - ENLARGED PLANS & ELEVATIONS
CE-0164-COF16009-A-414 EWS-D PART C - ENLARGED PLANS & ELEVATIONS
CE-0164-COF16009-A-415 EWS-D - TYPICAL RESOURCE WALL SECTIONS, PLANS,
AND ELEVATION
CE-0164-COF16009-A-420 TRASH ENCLOSURE PLANS & DETAILS
CE-0164-COF16009-A-421 TRI COLUMN PLANS & DETAILS
CE-0164-COF16009-A-430 ENLARGED ROOF PLANS & DETAILS
CE-0164-COF16009-A-431 TYPICAL SKYLIGHT DETAILS
DOCUMENT 00 01 15 Page 2
CE-0164-COF16009-A-440 ENLARGED RESTROOM PLANS
CE-0164-COF16009-A-441 RESTROOM ELEVATIONS & DETAILS
CE-0164-COF16009-A-442 ENLARGED PLANS
CE-0164-COF16009-A-501 EWS-A DETAILS
CE-0164-COF16009-A-502 EWS-A DETAILS
CE-0164-COF16009-A-503 EWS-B DETAILS
CE-0164-COF16009-A-504 EWS-B DETAILS
CE-0164-COF16009-A-505 EWS-B & CONNECTION DETAILS
CE-0164-COF16009-A-506 EWS-C DETAILS
CE-0164-COF16009-A-507 EWS-D DETAILS - N/S STAIR
CE-0164-COF16009-A-508 EWS-D DETAILS - RESOURCE WALL
CE-0164-COF16009-A-509 OUTDOOR DINING DETAILS
CE-0164-COF16009-A-520 MISC. ROOF DETAILS
CE-0164-COF16009-A-530 CEILING DETAILS
CE-0164-COF16009-A-601 DOOR SCHEDULE
CE-0164-COF16009-A-701 ENLARGED STAIR S001 PLANS & SECTIONS
CE-0164-COF16009-A-702 ENLARGED STAIR S002 PLANS & SECTION
CE-0164-COF16009-A-703 ENLARGED STAIR S003 PLANS & SECTIONS
CE-0164-COF16009-A-704 ENLARGED STAIR S004 PLANS AND SECTIONS
CE-0164-COF16009-A-705 STAIR S001/S002 SUPPORTING CONSTRUCTION
FIREPROOFING DIAGRAMS
CE-0164-COF16009-A-706 LOBBY ELEVATOR PLANS & SECTION
CE-0164-COF16009-A-707 SERVICE ELEVATOR PLANS & SECTION
CE-0164-COF16009-I-101 LEVEL 01 PART A FINISH PLAN
CE-0164-COF16009-I-102 LEVEL 01 PART B FINISH PLAN
CE-0164-COF16009-I-103 LEVEL 02 PART A FINISH PLAN
CE-0164-COF16009-I-104 LEVEL 02 PART B FINISH PLAN
CE-0164-COF16009-I-105 LEVEL 01 FURNITURE PLAN
CE-0164-COF16009-I-106 LEVEL 01 PART A FURNITURE PLAN
CE-0164-COF16009-I-107 LEVEL 01 PART B FURNITURE PLAN
CE-0164-COF16009-I-108 LEVEL 02 FURNITURE PLAN
CE-0164-COF16009-I-109 LEVEL 02 PART A FURNITURE PLAN
CE-0164-COF16009-I-110 LEVEL 02 PART B FURNITURE PLAN
CE-0164-COF16009-I-201 LOBBY AND GALLERY ELEVATIONS
CE-0164-COF16009-I-202 VESTIBULE AND EXCHANGE STORE ELEVATIONS
CE-0164-COF16009-I-203 SERVERY & PANTRY ELEVATIONS
CE-0164-COF16009-I-204 TYPICAL CORRIDOR ELEVATIONS
CE-0164-COF16009-I-205 TYPICAL OFFICE/WORKSPACE ELEVATIONS
CE-0164-COF16009-I-206 TYPICAL OFFICE & MEETING ROOM ELEVATIONS
CE-0164-COF16009-I-207 CAS & COMPASS ELEVATIONS
CE-0164-COF16009-I-401 MILLWORK PLANS, ELEVATIONS, & SECTIONS
CE-0164-COF16009-I-402 MILLWORK PLANS, ELEVATIONS, & SECTIONS
CE-0164-COF16009-I-601 INTERIOR FINISH SCHEDULE
CE-0164-COF16009-I-602 ROOM FINISH SCHEDULE
CE-0164-COF16009-I-603 DEMOUNTABLE PARTITION SYSTEMS SCHEDULE
CE-0164-COF16009-M-001 HVAC LEGEND, SYMBOLS, & DRAWING INDEX
CE-0164-COF16009-M-101 HVAC FIRST FLOOR PLAN
CE-0164-COF16009-M-102 HVAC FIRST FLOOR PLAN
CE-0164-COF16009-M-103 HVAC SECOND FLOOR PLAN
CE-0164-COF16009-M-104 HVAC SECOND FLOOR PLAN
CE-0164-COF16009-M-105 HVAC ROOF PLAN
CE-0164-COF16009-M-106 HVAC ROOF PLAN
CE-0164-COF16009-M-107 HVAC - FIRST FLOOR PLAN PIPING
CE-0164-COF16009-M-108 HVAC - FIRST FLOOR PLAN PIPING
CE-0164-COF16009-M-109 HVAC - SECOND FLOOR PLAN PIPING
CE-0164-COF16009-M-110 HVAC - SECOND FLOOR PLAN PIPING
CE-0164-COF16009-M-111 HVAC - RADIANT FLOOR PLAN - DINING BAR
DOCUMENT 00 01 15 Page 3
CE-0164-COF16009-M-112 HVAC - RADIANT FLOOR PLAN - WEST CORRIDOR
CE-0164-COF16009-M-401 FIRST FLOOR ENLARGED MECHANICAL ROOMS
CE-0164-COF16009-M-402 SECOND FLOOR ENLARGED MECHANICAL ROOMS
CE-0164-COF16009-M-501 HVAC PIPING SCHEMATICS
CE-0164-COF16009-M-502 HVAC DETAILS
CE-0164-COF16009-M-503 HVAC DETAILS
CE-0164-COF16009-M-504 HVAC DETAILS
CE-0164-COF16009-M-601 HVAC SCHEDULES
CE-0164-COF16009-M-602 HVAC SCHEDULES
CE-0164-COF16009-M-700 CONTROLS SEQUENCES
CE-0164-COF16009-M-701 CONTROL SCHEMATICS
CE-0164-COF16009-P-001 LEGEND & INDEX
CE-0164-COF16009-P-101 PLUMBING & FIRE SUPPRESSION SITE UTILITY PLAN
CE-0164-COF16009-P-102 FOUNDATION PLANS
CE-0164-COF16009-P-103 PLUMBING LEVEL 01 FLOOR PLAN - 1A
CE-0164-COF16009-P-104 PLUMBING LEVEL 01 FLOOR PLAN - 1B
CE-0164-COF16009-P-105 PLUMBING LEVEL 02 FLOOR PLAN - 2A
CE-0164-COF16009-P-106 PLUMBING LEVEL 02 FLOOR PLAN - 2B
CE-0164-COF16009-P-301 PLUMBING SECTIONS
CE-0164-COF16009-P-401 ENLARGED FLOOR PLANS AND PARTIAL ROOF PLAN
CE-0164-COF16009-P-402 ENLARGED FLOOR PLANS
CE-0164-COF16009-P-500 DETAILS
CE-0164-COF16009-P-601 SCHEDULES & NOTES
CE-0164-COF16009-P-901 SANITARY DIAGRAMS
CE-0164-COF16009-P-902 SANITARY DIAGRAMS
CE-0164-COF16009-P-903 SANITARY DIAGRAMS
CE-0164-COF16009-P-904 SANITARY DIAGRAMS
CE-0164-COF16009-P-905 WATER DIAGRAMS
CE-0164-COF16009-P-906 WATER DIAGRAMS
CE-0164-COF16009-P-907 NATURAL GAS DIAGRAM
CE-0164-COF16009-F-001 LEGEND & INDEX - FIRE SUPRESSION
CE-0164-COF16009-F-002 DETAILS - FIRE SUPRESSION
CE-0164-COF16009-F-101 FIRE SUPRESSION LEVEL 01 FLOOR PLAN - 1A
CE-0164-COF16009-F-102 FIRE SUPRESSION LEVEL 01 FLOOR PLAN - 1B
CE-0164-COF16009-F-103 FIRE SUPRESSION LEVEL 02 FLOOR PLAN - 2A
CE-0164-COF16009-F-104 FIRE SUPRESSION LEVEL 02 FLOOR PLAN - 2B
CE-0164-COF16009-FA-001 LEGEND & INDEX - FIRE ALARM
CE-0164-COF16009-FA-002 DETAILS - FIRE ALARM
CE-0164-COF16009-FA-101 FIRE ALARM LEVEL 01 FLOOR PLAN - 1A
CE-0164-COF16009-FA-102 FIRE ALARM LEVEL 01 FLOOR PLAN - 1B
CE-0164-COF16009-FA-103 FIRE ALARM LEVEL 02 FLOOR PLAN - 2A
CE-0164-COF16009-FA-104 FIRE ALARM LEVEL 02 FLOOR PLAN - 2B
CE-0164-COF16009-E-001 LEGEND & INDEX
CE-0164-COF16009-E-002 SINGLE LINE AND SCHEDULES
CE-0164-COF16009-E-004 EXISTING SINGLE LINE
CE-0164-COF16009-E-007 ELECTRICAL DETAILS
CE-0164-COF16009-E-008 LUMINARE SCHEDULE AND DETAILS
CE-0164-COF16009-E-009 MOTOR STARTER SCHEDULE
CE-0164-COF16009-E-010 ELECTRICAL SITE PLAN
CE-0164-COF16009-E-011 MANHOLE 48 DETAIL
CE-0164-COF16009-E-012 MANHOLE 41 DETAIL
CE-0164-COF16009-E-101A POWER LEVEL 01 FLOOR PLAN - SECTOR A
CE-0164-COF16009-E-101B POWER LEVEL 01 FLOOR PLAN - SECTOR B
CE-0164-COF16009-E-102A POWER LEVEL 02 FLOOR PLAN - SECTOR A
CE-0164-COF16009-E-102B POWER LEVEL 02 FLOOR PLAN - SECTOR B
CE-0164-COF16009-E-103A POWER LEVEL 03 ROOF PLAN - SECTOR A
CE-0164-COF16009-E-103B POWER LEVEL 03 ROOF PLAN - SECTOR B
DOCUMENT 00 01 15 Page 4
CE-0164-COF16009-E-201A LIGHTING LEVEL 01 FLOOR PLAN - SECTOR A
CE-0164-COF16009-E-201B LIGHTING LEVEL 01 FLOOR PLAN - SECTOR B
CE-0164-COF16009-E-202A LIGHTING LEVEL 02 FLOOR PLAN - SECTOR A
CE-0164-COF16009-E-202B LIGHTING LEVEL 02 FLOOR PLAN - SECTOR B
CE-0164-COF16009-E-301 KITCHEN
CE-0164-COF16009-E-402 PANELBOARD SCHEDULES
CE-0164-COF16009-E-403 PANELBOARD SCHEDULES
CE-0164-COF16009-E-404 PANELBOARD SCHEDULES
CE-0164-COF16009-E-501 GROUNDING PLAN
CE-0164-COF16009-E-502 LIGHTNING PROTECTION PLAN
CE-0164-COF16009-T-001 TECHNOLOGY LEGEND
CE-0164-COF16009-T-002 TECHNOLOGY ONE-LINE DIAGRAMS
CE-0164-COF16009-T-003 TELECOMMUNICATIONS MANHOLE ELEVATIONS
CE-0164-COF16009-T-004 SECURITY DIAGRAMS AND DETAILS
CE-0164-COF16009-T-100 TECHNOLOGY SITE PLAN
CE-0164-COF16009-T-101A TECHNOLOGY LEVEL 01 FLOOR PLAN - SECTOR A
CE-0164-COF16009-T-101B TECHNOLOGY LEVEL 01 FLOOR PLAN - SECTOR B
CE-0164-COF16009-T-102A TECHNOLOGY LEVEL 02 FLOOR PLAN - SECTOR A
CE-0164-COF16009-T-102B TECHNOLOGY LEVEL 02 FLOOR PLAN - SECTOR B
CE-0164-COF16009-T-201 ENLARGED FIRST FLOOR 1TRA (TCO) TELEPHONE CENTRAL
OFFICE LAYOUT
CE-0164-COF16009-T-202 ENLARGED FIRST FLOOR 1TRB AND 1TRC LAYOUTS AND
ELEVATIONS
CE-0164-COF16009-T-203 ENLARGED SECOND FLOOR 2TRA LAYOUT AND ELEVATIONS
CE-0164-COF16009-T-204 ENLARGED PLANS AND ELEVATIONS
CE-0164-COF16009-T-205 ENLARGED PLANS AND ELEVATIONS
CE-0164-COF16009-T-501 TECHNOLOGY OUTLET DETAILS
CE-0164-COF16009-QF-101 FOODSERVICE EQUIPMENT PLAN AND SCHEDULE
CE-0164-COF16009-QF-102 FOODSERVICE EQUIPMENT MECHANICAL SPOT CONNECTION
PLAN
CE-0164-COF16009-QF-103 FOODSERVICE EQUIPMENT ELECTRICAL SPOT CONNECTION
PLAN
CE-0164-COF16009-QF-104 FOODSERVICE EQUIPMENT SPECIAL CONDITIONS PLAN
CE-0164-COF16009-QF-105 FOODSERVICE EQUIPMENT UTILITY LOAD SCHEDULE
CE-0164-COF16009-QF-106 FOODSERVICE EQUIPMENT UTILITY LOAD SCHEDULE
CE-0164-COF16009-QF-107 FOODSERVICE EQUIPMENT UTILITY LOAD SCHEDULE
CE-0164-COF16009-QF-108 FOODSERVICE EQUIPMENT UTILITY LOAD SCHEDULE
CE-0164-COF16009-QF-109 FOODSERVICE EQUIPMENT ELEVATION PLAN
CE-0164-COF16009-QF-201 EXHAUST HOOD DRAWING
CE-0164-COF16009-QF-202 EXHAUST HOOD DRAWING
CE-0164-COF16009-QF-203 EXHAUST HOOD DRAWING
CE-0164-COF16009-QF-204 FIRE SUPPRESSION SYSTEM DRAWING
CE-0164-COF16009-QF-301 REFRIGERATION DRAWING
CE-0164-COF16009-QF-401 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-402 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-403 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-404 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-405 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-406 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-407 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-408 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-409 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-410 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-411 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-412 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-413 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
CE-0164-COF16009-QF-414 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS
DOCUMENT 00 01 15 Page 5
-- End of Document --
DOCUMENT 00 01 15 Page 6
SECTION 00 62 35.98
RECYCLED / RECOVERED MATERIALS
04/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials
1.2 OBJECTIVES
Government procurement policy is to acquire, in a cost effective manner, items containing the highest percentage of recycled and recovered materials practicable consistent with maintaining a satisfactory level of competition without adversely affecting performance requirements or exposing suppliers' employees to undue hazards from the recovered materials. The Environmental Protection Agency (EPA) has designated certain items which must contain a specified percent range of recovered or recycled materials. EPA designated products specified in this contract comply with the stated policy and with the EPA guidelines. The Contractor shall make all reasonable efforts to use recycled and recovered materials in providing the EPA designated products and in otherwise utilizing recycled and recovered materials in the execution of the work.
1.3 EPA DESIGNATED ITEMS INCORPORATED IN THE WORK
Various sections of the specifications contain requirements for materials that have been designated by EPA as being products which are or can be made with recovered or recycled materials. These items, when incorporated into the work under this contract, shall contain at least the specified percentage of recycled or recovered materials unless adequate justification (non-availability) for non-use is provided. When a designated item is specified as an option to a non-designated item, the designated item requirements apply only if the designated item is used in the work.
1.4 EPA PROPOSED ITEMS INCORPORATED IN THE WORK
Products other than those designated by EPA are still being researched and are being considered for future Comprehensive Procurement Guideline (CPG) designation. It is recommended that these items, when incorporated in the work under this contract, contain the highest practicable percentage of recycled or recovered materials, provided specified requirements are also met.
DOCUMENT 00 62 35.98 Page 1
1.5 EPA LISTED ITEMS USED IN CONDUCT OF THE WORK BUT NOT INCORPORATED IN
THE WORK
There are many products listed in 40 CFR 247 which have been designated or proposed by EPA to include recycled or recovered materials that may be used by the Contractor in performing the work but will not be incorporated into the work. These products include office products, temporary traffic control products, and pallets. It is recommended that these non-construction products, when used in the conduct of the work, contain the highest practicable percentage of recycled or recovered materials and that these products be recycled when no longer needed.
-- End of Section --
DOCUMENT 00 62 35.98 Page 2
SECTION 01 11 00.98
SUMMARY OF WORK
08/14
PART 1 GENERAL
1.1 SUMMARY
The work to be performed under this project consists of providing the labor, equipment, and materials necessary to construct the new 64,000+ GSF Research Support Building (RSB) at NASA Glenn Research Center (GRC), Cleveland, Ohio. The building will be constructed on the site of the previously demolished Building 21 on the GRC campus. The new two story steel structure contains open office areas; private offices; conference and work rooms; Training Rooms, Collaborative Engineering Rooms; collaboration work spaces with light wells; a cafeteria with supporting kitchen and dining spaces; and typical support spaces. The interiors are consistent with modern open office architecture. The exterior is clad in painted metal panels and transparent glazing curtain wall systems. Support facility construction includes, but is not limited to: the removal of existing paved surfaces; removal of certain underground utilities; site preparation;
caissons for foundation support; curbs and roadways; parking areas;
pedestrian walkways; landscaping. Supporting utilities to the site include the extension of potable water; non potable chilled water from an existing chilled water plant; high pressure steam; natural gas; sanitary and storm sewers; high voltage electrical cable through existing manhole and new underground duct bank; communications cabling through existing and new communications duct banks and manholes. Refer to each contract design drawing for specific construction requirements. This project is required to be LEED Silver Certifiable under the USGBC LEED-NC version 2009 Rating System.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Upon receipt of Government Furnished Equipment, the Contractor shall submit records in accordance with the paragraph entitled, "Government Furnished Property," of this section.
Submit the following items to the Contracting Officer:
Site Specific Health and Safety Plan (HASP) G Utility Outages G Confined Space Permits G Connection Requests G Digging, Excavating, and Trenching Permits G Soil Relocation Form Permits G Hot Work Permits G
1.3 CONTRACT DRAWINGS
See Section 00 01 15 and drawing CE-0164-COF16009-G-001 for a list of
SECTION 01 11 00.98 Page 1 drawings which are a part of this contract. Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.
Contractors shall purchase drawings from vendor. Reference publications will not be furnished.
1.4 OPTIONS
The following summarizes the options for this project:
1.4.1 Option No. 1: Outfitting
Furnish and install the following items, as specified and shown on drawing:
- All FF&E (furniture, fixtures, and equipment; which are movable furniture, fixtures, or other equipment that have no permanent connection to the structure of a building or utilities). This excludes systems furniture and demountable partitions, which are in Base scope.
- Lateral Files
- Furniture Storage and Delivery Services
- Trash/Recycling Receptacles
- Janitorial Storage Shelving
- Break Room / Common Areas Appliances
- Lenel Access Control System
- Security Surveillance System (CCTV)
- Interior Finish Upgrades: Art or Equivalent
- Office-level cleaning
- Misc. Interior Equipment (Bulletin boards, white boards,clocks, mail slots, coat hangers)
- Exchange Modular Counters/Display (not permanently installed)
- Exchange Racking and Shelving (not permanently installed)
- Exchange Signage / Display Boards
- Food Service Equipment
- Café Signage / Display Boards
- Exterior Signage Package
- Interior Signage Package
PLEASE NOTE: Infrastructure required for all items shown above, such as conduit systems, circuits, ductbanks, cable tray, etc., is NOT outfitting and shall be in the Base scope.
1.4.2 Option No. 2: Photovoltaic (PV) Array
Furnish and install a Photovoltaic Array system, and all associated components as specified and shown on the drawings, to provide 115 kW.
System should be ballasted mounted with panels at a 5 degree tilt.
1.4.3 Option No. 3: Dining Bar Expanded Metal Mesh Ceiling
Furnish and install the expanded metal mesh ceiling on Level 2, as specified and shown on the drawings as 'M-ACT'. There is no ceiling in place of this option in the base scope.
1.4.4 Option No. 4: Terrazzo Flooring
Furnish and install the Terrazzo Flooring on Level 1 and 2, as specified and shown on the drawings as 'TRZ-1'. The base scope should include a Polished Concrete Topping.
SECTION 01 11 00.98 Page 2
1.4.5 Option No. 5: MIC Connector
Furnish and install structure and roofing associated with canopy over walkway connecting the south end of the RSB to the adjacent Mission Integration Center (MIC) building.
1.4.6 Option No. 6: Exterior Pavers
Furnish and install decorative site pavers on the west and east side of building, as specified and shown on Landscape drawings. The base scope is to include a 4" concrete walk.
1.4.7 Option No. 7: Food Service
Furnish and install food service equipment as shown on the drawings and specified in Appendix G to this specification.
PLEASE NOTE: Infrastructure required for the food service equipment, such as conduit systems, circuits, plumbing, etc., is NOT part of Option No. 7 and shall be in the Base scope.
1.5 IMPLEMENTATION
See Appendix A for detailed Implementation Plan.
1.6 WASTE STORAGE/DISPOSAL/RECYCLING INSTRUCTIONS
GRC has specific manifesting procedures for waste disposal and recycling.
See Appendix B for instructions.
1.7 GEOTECHNICAL REPORT
See Appendix C for the Geotechnical Report. All references to the Geotechnical Report shall also include the addition to the report, "DVL Job No. C.7287A" dated November 16, 2017, also included in this Appendix.
1.8 SUBMITTAL REGISTER
See Appendix D for the Submittal Register.
1.9 NASA LOGO
See Appendix E for information regarding the NASA Logo and the use of NASA standard colors.
1.10 LEED CHECKLIST
See Appendix F for LEED checklist for this project.
1.11 FOODSERVICE SPECIFICATION
See Appendix G for foodservice specifications for this project.
1.12 FURNITURE SPECIFICATIONS
See Appendix H for furniture specifications for this project.
SECTION 01 11 00.98 Page 3
1.13 SCHEDULE OF SPECIAL INSPECTIONS
See Appendix I for the Schedule of Special Inspections to be used in accordance with Section 01 45 35 SPECIAL INSPECTIONS.
1.14 WORK RESCHEDULING
Contractor shall allow for a maximum of 5 days where construction activity is prohibitive. Further allowance for 5 days of excavation and subsurface activity abeyance shall be imposed where other construction activities are permitted. Government will provide 24 hour notification each time the restrictions are invoked.
The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the work by the contractor. Labor or materials which are necessary to produce the desired result, even though not specifically mentioned in the Contract Documents, shall be included in the work.
Contractor shall immediately check furnished drawings and notify the government of any discrepancies.
Normal duty hours for work shall be from 7 a.m. to 3:30 p.m., Monday through Friday. Requests for additional work shall require written approval from the Contracting Officer 7 days in advance of the proposed work period. Special permission will be given in other circumstances on a case by case basis.
1.15 PROJECT ENVIRONMENTAL GOALS
Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is the produce a building that meets the functional program needs and incorporates the principles of sustainability. Specifically:
a. Preservce and restore the site ecosystem and biodiversity; avoid site degradaion and erosion. Minimize offsite environmental impact.
b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.
c. Use environmentally preferable products and decrease toxicity level of materials used.
d. Use renewable energy and material resources.
e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.
Consider the durability, maintainability, and flexibility of building systems.
f. Manage construction site and storage of materials to ensure no negative impact on the indoor environment quality of the building.
g. Reduce construction waste through reuse, recycling, and supplier take-back.
1.15.1 Independent Verification
1.15.1.1 US Green Building Council (USGBC)-- LEED (tm) Rating System
Provide complete project in compliance with USGBC LEED-NC (tm) 2009 (LEED
SECTION 01 11 00.98 Page 4
NC), level silver requirements.
1.16 ON-SITE PERMITS
1.16.1 Utility Outages and Connection Requests
Work shall be scheduled to hold outages to a minimum.
Utility outages and connections required during the prosecution of work that affect existing systems shall be arranged for at the convenience of the Government and shall be scheduled outside the regular working hours or on weekends.
Contractor shall not be entitled to additional payment for utility outages and connections required to be performed outside the regular work hours.
Requests for utility outages and connections shall be made in writing to the Contracting Officer at least 15 working days in advance of the time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.
1.16.2 Hot Work, Excavation and Confined Space Permits
ACTIVITY SUBMISSION DATE SUBMISSION FORM
Hot Work Permits 7 days prior to work NASA Form C-7A & NASA Form C-7B Confined Space 14 days prior to work NASA Form C-199 Excavation Permit 21 days prior to work NASA Form C-927 Crane Permits 30 days prior to work Crane Permit
Permits shall be posted at a conspicuous location in the construction area.
Burning of trash or rubbish is not permitted.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 11 00.98 Page 5
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G
Personnel List; G
Vehicle List; G
Statement of Acknowledgement Form SF 1413; G
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing Glenn Research Center (GRC) operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
d. Permission to interrupt any activity roads, and/or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the project become familiar with and obey GRC regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials shall be outside peak traffic hours (6:30 to 9:00 a.m. and 3:00 to 5:00 p.m.)
unless otherwise approved by the contracting officer. The GRC Main Gate will be accessible off Brookpark Rd. Commercial vehicles over 12'-6" and/or over 80,000 lbs are to use the West Gate to access GRC's main campus via West Area Road. All delivery personnel shall wear hard hats in designated construction areas and shall not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall also be conspicuously marked with identification and are to be held to the same delivery restrictions as materials entering GRC.
SECTION 01 14 00 Page 1
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 Identification Badges
Identification badges will be furnished without charge. Application for and use of badges will be as directed. Immediately report instances of lost or stolen badges to the Contracting Officer.
Identification badges will be issued to the Contractor and his employees in accordance with the NASA Security Regulations. A copy of the security regulations may be obtained from the security office. All badges must be returned or accounted for to the Office upon expiration of the badge or contract, or termination of the employee.
1.3.1.3 Personnel Entry Approval
Failure to obtain entry approval will not affect the contract price or time of completion.
1.3.1.4 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.3.2 Emergency Response Requirement
The contractor shall institute a requirement for all personnel to take shelter for personal safety in the event of certain emergencies. This policy includes Contractors, Subcontractors, and any person who is employed by the Contractor.
Personnel shall immediately seek shelter while an assessment is made of the threat and determinations are being made regarding subsequent actions such as "all clear" or selected building evacuations.
1.3.3 Working Hours
Regular working hours must consist of an 8 1/2 hour hour period, between 7 a.m. and 3:30 p.m., excluding Government holidays.
1.3.4 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal
SECTION 01 14 00 Page 2 working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.3.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone/data service, electric service, air conditioning, heating, fire alarm, compressed air, natural gas, steam, and chilled water shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours."
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in all utilities systems. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving 15 calendar days advance notice when such operation is required.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 14 00 Page 3
SECTION 01 30 00.98
ADMINISTRATIVE REQUIREMENTS
12/12
PART 1 GENERAL
1.1 SUMMARY
A. This section includes:
1. Project management and coordination.
2. Construction progress documentation.
3. Submittal procedures and general requirements for Submittals.
1.2 PROJECT MANAGEMENT AND COORDINATION - ENVIRONMENTAL, HEALTH AND SAFETY
A. Contractor's Environmental Manager: Designate a party responsible for overseeing the Contractor's conformance to environmental goals for the project and implementing procedures for environmental protection.
1. Qualifications: Minimum 5 years construction experience on projects of similar size and scope; minimum 3 years experience with environmental procedures similar to those of this project; familiarity with Environmental Management Systems (EMS's) such as ISO 14001; familiarity with environmental regulations applicable to construction operations.
2. Responsibilities: Responsibilities shall include:
a. Compliance with applicable Federal, State and local environmental regulations, including maintaining required documentation.
b. Implementation of the Waste Management Plan.
c. Implementation of the IAQ Management Plan.
d. Implementation of the Environmental Protection Plan.
e. Training for Contractor personnel in accordance with their position requirements.
f. Monitoring and documentation of environmental procedures.
B. Occupational Health and Safety Professional: The Safety Professional is considered essential to the work being performed under this contract. They shall have at least five (05) years of experience as an Occupational Health and Safety Professional. This shall include in the field experience as well as in the office putting together Health and Safety Plans. They shall have at least the OSHA 30 Hour training. They shall have completed industrial hygiene coursework, such as AIHA training in Fundamentals of Industrial Hygiene or equivalent. They also shall have knowledge of OSHA Excavation, Trenching, Shoring, Fall Protection, Fall Arrest Systems, Scaffolding, Steel Erection Safety, Cranes, Lead Abatement, Mold, Indoor Air Quality, Respiratory Protection, and identifying job site exposures.
The Contractor shall identify the Safety Professional in writing to the Contracting Officer's representative (COR) prior to the preconstruction conference. This Safety Professional shall be dedicated solely to this contract and shall be on site full time whenever work is being performed under this contract.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
SECTION 01 30 00.98 Page 1 submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Qualifications of Project Manager; G
Qualifications of Superintendent; G
Qualifications of Occupational Health and Safety Professional; G
List of contact personnel; G
View location map; G
1.4 CONTRACTOR PERSONNEL REQUIREMENTS
1.4.1 Subcontractors and Personnel
Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.4.2 Identification Badges
Temporary identification badges, if required, will be furnished without charge. Application for and use of badges will be as directed. Immediately report instances of lost or stolen badges to the Contracting Officer. All badges must be returned to NASA upon expiration of the badge or contact, or termination of the employee. Immediately report instances of lost or stolen badges to the Contracting Officer.
1.5 PERSONNEL LIST
Submit for approval, at least 15 days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:
a. Name
b. Date and place of birth
c. Citizenship
d. Home address
1.6 SUPERVISION
Provide at least one (1) qualified Project Manager and one (1) on-site Project Superintendent. These roles cannot be performed by the same person.
The Project Manager must have a minimum 5 years experience as a Project Manager or Superintendent on projects like this contract or similar in size, type, and complexity. The Project Manager shall be full time, dedicated solely to this contract.
SECTION 01 30 00.98 Page 2
The Project Superintendent must have a minimum of 10 years experience as a Superintendent on projects similar in size, type, and complexity. The Superintendent shall be dedicated solely to this contract and shall be on-site full time whenever work is being performed under this contract.
The Project Manager in this context shall mean the individual with the responsibility for the overall management of the project and the Project Superintendent shall mean the individual with the responsibility for quality and production. Both the Project Manager and Project Superintendent are subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion. Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders shall be made the subject of claim for extension of time for excess costs or damages by the Contractor.
1.7 PRECONSTRUCTION CONFERENCE
After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule prices, shop drawings, and other submittals, scheduling programming, and prosecution of the work.
Major subcontractors who will engage in the work shall also attend.
1.8 FACILITY TURNOVER PLANNING MEETINGS
Key personnel will meet to identify strategies to ensure the project is carried to expeditious closure and turnover to the Client. Start the turnover process at the Pre Construction Conference meeting and convene the Facility Turnover Meetings once the project has reached approximately 75% completion or three to six months prior to Beneficial Occupancy Date (BOD), whichever comes first. The Contracting Officer's Representative will lead the meetings and guide discussions based on an agenda provided by the Government. The facility Turnover effort shall include the following:
a. Facility Turnover Meetings
1. Fill in the Checklist including Contractor, Client, and NASA Checklist Items and assign a person responsible for each item and a due date. The Contractor's Representative will facilitate the assignment of responsibilities and fill out the NASA Checklist.
2. Review the Contractor's updated schedule. The Contractor shall develop a plan for the completion of all Contractor, Client, and NASA Checklist items.
3. Confirm that all Checklist items will be completed on time for the scheduled Facility Turnover.
1.9 PARTNERING
LEVEL C PARTNERING: To most effectively accomplish this contract, the Government requires the formation of a cohesive partnership with the Contractor and its subcontractors. The partnership will draw on the strength of each organization in an effort to achieve a quality project
SECTION 01 30 00.98 Page 3 done right the first time, within budget, on schedule, and without any safety mishaps. This level of partnering discusses partnering concepts and benefits and should become a part of the preconstruction conference. The senior Government representative and senior Contractor representative present will jointly host the partnering sessions. The partners will determine the frequency of the follow-on sessions. Partnering sessions should be held at or near the location of the activity contracting office.
The participants shall bear their own costs for meals, lodging, and transportation associated with partnering.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 30 00.98 Page 4
SECTION 01 31 19.98
PROJECT MEETINGS
12/12
PART 1 GENERAL
1.1 SUMMARY
The requirements of this Section apply to, and are a component part of, each section of the specifications.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submmit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
A Project Submittal Schedule shall be submitted in accordance with paragraph entitled, "Project Meetings," of this section.
1.3 PRECONSTRUCTION CONFERENCE
The Contractor shall attend a preconstruction conference scheduled by the Contracting Officer. Work shall not commence prior to the conference.
Subcontractor representatives shall attend.
Discussion shall address project orientation, personnel contact, safety issues, permits, deficiencies, and the location of the Contractor's office.
1.4 PROJECT MEETINGS
The Contractor shall attend weekly project meetings scheduled by the Government. Subcontractor representatives shall attend.
Prepare a Two-Week Planning Schedule for each weekly project meeting.
highlighting utility outages, material deliveries, subcontractors onsite, equipment on site, coordination issues and updates to the master schedule described in Section 01 33 00, "Submittal Procedures".
Meeting Minutes shall be kept by the Quality Assurance Specialist (QA) and distributed after concurrence by the Project Manager.
A Monthly Progress Report shall be submitted by the contractor to NASA which addresses the progress schedule, potential factors of delay, deficiencies, material delivery schedules, submittals, and safety issues.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of…