Draft_RFP_Attachment_A-Specifications-16009.pdf

PDF 35 MB Posted

Attached to
Research Support Building (RSB) Construction Draft RFP Federal contract opportunity
Solicitation number
80GRC018R0009
Issued by
National Aeronautics and Space Administration Glenn Research Center

About this file

Attachment A - SOW/Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Research Support Building (RSB) Construction Draft RFP, newest first.
File Type Posted
Source_Selection_Statement.pdf PDF
Amendment_4_-_Proposal_Due_Date_Extension.pdf PDF
Appendix_D.pdf PDF
B21_Photos.pdf PDF
Amendment_3_-_Specifications_Binder.pdf PDF
Appendix_G.pdf PDF
Amendment_3_-_Questions_and_Answers.pdf PDF
Appendix_A.pdf PDF
Final_RFP_-_Attachment_F-Price_Breakdown_Form.pdf PDF
Appendix_F.pdf PDF
Appendix_H.pdf PDF
Appendix_J.pdf PDF
Appendix_C.pdf PDF
Amendment_3_-_Drawings_Binder.pdf PDF
Amendment_3_-_Questions_and_Clarifications_-_SF30.pdf PDF
Amendment_3_-_Clarifications.pdf PDF
149767_CF_01_-.tif TIF image
Questions_and_Answers.pdf PDF
Amendment_2_-_Questions_and_Answers_-_SF30.pdf PDF
149761_CF_01_A.TIF TIF image
Amendment_1_-_Proposal_Due_Date_Extension.pdf PDF
Attachment_B_-_Drawings.pdf PDF
Attachment_C_-_PPQ.pdf PDF
Attachment_G_-_Staff_Qualifications.pdf PDF
Attachment_D_-_Small_Business_Plan.pdf PDF
Attachment_A_-_Specifications.pdf PDF
Research_Support_Building_(RSB)_-_Request_for_Proposals.pdf PDF
Attachment_E_-_Davis_Bacon_Wage_Rate_Determination.pdf PDF
RSB_Industry_Day_Questions_and_Answers.pdf PDF
Attachment_F_-_Price_Breakdown_Form.pdf PDF
RSB_Industry_Day_FINAL_as_Presented.pdf PDF
Industry_Day_Attendance_List.pdf PDF
Draft_RFP_Attachment_D-Small_Business-16009.pdf PDF
Research_Support_Building_Draft_RFP.pdf PDF
Draft_RFP_Attachment_C-PPQ-16009.pdf PDF
Draft_RFP_Attachment_F-Price_Breakdown_Form-16009.pdf PDF
Draft_RFP_Attachment_B-Drawings-16009-18_0220.pdf PDF
One_on_One_Attendance_Form.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A:

SPECIFICATIONS FOR

RESEARCH SUPPORT BUILDING

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

GLENN RESEARCH CENTER

21000 BROOKPARK ROAD, CLEVELAND, OHIO 44135

16009 February 1, 2018

DRAFT

RESEARCH SUPPORT BUILDING 16009

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 LIST OF DRAWINGS

00 62 35.98 RECYCLED / RECOVERED MATERIALS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.98 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 30 00.98 ADMINISTRATIVE REQUIREMENTS

01 31 19.98 PROJECT MEETINGS

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26.98 GENERAL SAFETY REQUIREMENTS

01 35 43.98 ENVIRONMENTAL PROTECTION PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.98 QUALITY CONTROL

01 45 33.01 98 CODE REQUIRED SPECIAL INSPECTIONS AND PROCEDURES FOR

WELDING OF PRESSURE PIPING

01 45 35 SPECIAL INSPECTIONS

01 50 00.98 TEMPORARY FACILITIES AND CONTROLS

01 57 23.98 TEMPORARY STORM WATER POLLUTION CONTROL

01 60 00.98 PRODUCT REQUIREMENTS

01 75 00.98 STARTING AND ADJUSTING

01 78 00.98 CLOSEOUT SUBMITTALS

01 78 23.98 OPERATION AND MAINTENANCE DATA

01 86 12.07 98 RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL SYSTEMS

01 91 00.00 98 COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 61 00.98 REMOVAL AND DISPOSAL OF CONTAMINATED SOILS

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.11 98 CAST-IN-PLACE CONCRETE UNDERSLAB VAPOR RETARDER

03 30 00.98 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 35 43 POLISHED CONCRETE TOPPING AND FINISHING

03 39 00.00 10 CONCRETE CURING

03 45 00 PRECAST ARCHITECTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

PROJECT TABLE OF CONTENTS Page 1

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

05 72 00 DECORATIVE METAL SPECIALTIES

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

06 84 00 FIBERGLASS REINFORCED PLASTIC (FRP) COLUMN COVERS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 14 00 FLUID-APPLIED WATERPROOFING

07 21 13 FOAM PLASTIC BOARD INSULATION

07 21 16 MINERAL FIBER INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 42 13 METAL WALL PANELS

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 53 23.98 ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

07 60 00 FLASHING AND SHEET METAL

07 71 00.98 ROOF SPECIALTIES

07 81 00 SPRAY-APPLIED FIREPROOFING

07 84 00.98 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 11 74.98 SLIDING METAL GRILLES

08 14 00 WOOD DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 36 13.98 BIFOLD VERTICAL LIFT DOORS

08 41 13.13 98 FIRE-RATED ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 42 33.98 REVOLVING DOOR ENTRANCES

08 44 23.98 STRUCTURAL-SEALANT-GLAZED CURTAIN WALLS

08 60 45 SKYLIGHTS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00.98 GYPSUM BOARD

09 30 00 TILING

09 51 00 ACOUSTICAL CEILINGS

09 66 23 RESINOUS MATRIX TERRAZZO FLOORING

09 67 23 RESINOUS FLOORING

09 68 00.00 98 CARPET

09 72 00 WALLCOVERINGS

09 90 00.00 98 PAINTING AND COATING

09 96 00 HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

PROJECT TABLE OF CONTENTS Page 2

10 21 13 TOILET COMPARTMENTS

10 22 19 DEMOUNTABLE MOVABLE PARTITIONS

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 36 00 COUNTERTOPS

12 48 16 ENTRANCE FLOOR GRILLES

12 59 00 SYSTEMS FURNITURE

DIVISION 14 - CONVEYING EQUIPMENT

14 24 00 HYDRAULIC ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 00.98 FIRE SPRINKLER SYSTEMS

21 23 00.98 WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET

DIVISION 22 - PLUMBING

22 00 00.98 PLUMBING, GENERAL PURPOSE

22 07 19.00 98 PLUMBING INSULATION

22 08 00 COMMISSIONING OF PLUMBING

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00.00 98 GENERAL MECHANICAL PROVISIONS

23 03 00.00 98 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93.98 TESTING, ADJUSTING AND BALANCING

23 07 00.98 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 98 COMMISSIONING OF HVAC SYSTEMS

23 09 23.98 DIRECT DIGITAL CONTROL (EMCS) FOR HVAC AND OTHER BUILDING

SYSTEMS

23 11 25.00 98 FACILITY GAS PIPING SYSTEMS

23 21 13.98 PUMPS: HYDRONIC, CENTRIFUGAL

23 22 26.00 98 STEAM AND STEAM CONDENSATE SYSTEMS

23 23 00.98 REFRIGERANT PIPING SYSTEMS

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 31 13.98 METAL DUCTS, AND DUCTWORK COMPONENTS (LOW AND MEDIUM

PRESSURE)

23 34 23.98 HVAC POWER VENTILATORS

23 36 00.98 AIR TERMINAL UNITS

23 37 13.98 DIFFUSERS, REGISTERS, AND GRILLES

23 57 10.98 HEATING HOT WATER SYSTEMS

23 64 26.00 98 CHILLED AND CONDENSER WATER PIPING SYSTEMS

23 73 13.98 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITS

23 82 00.00 20 TERMINAL HEATING AND COOLING UNITS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

23 82 19.98 FAN COIL UNITS

DIVISION 26 - ELECTRICAL

PROJECT TABLE OF CONTENTS Page 3

26 05 00.00 98 BASIC ELECTRICAL MATERIALS, METHODS, AND PROVISIONS

26 05 01.98 BASIC ELECTRICAL REQUIREMENTS

26 05 26.98 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 71.00 40 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES

26 08 00 COMMISSIONING OF ELECTRICAL

26 09 23.00 40 LIGHTING CONTROL DEVICES

26 09 43.98 PROGRAMMABLE LIGHTING CONTROL SYSTEM

26 22 14.98 DISTRIBUTION TRANSFORMERS

26 24 16.00 40 PANELBOARDS

26 27 39.98 ELEVATOR POWER MODULE AND WIRING

26 28 16.98 DISCONNECT SWITCHES

26 29 23.98 VARIABLE-FREQUENCY MOTOR CONTROLLERS FOR HVAC

26 41 01.00 98 LIGHTNING PROTECTION SYSTEM

26 43 13.98 SURGE PROTECTIVE DEVICES (SPD’S) FOR LOW-VOLTAGE

ELECTRICAL POWER CIRCUITS

26 50 01.98 LIGHTING

26 52 00.98 EMERGENCY LIGHTING

26 53 00.00 98 EXIT LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 13 23.00 40 COMMUNICATIONS OPTICAL BACKBONE CABLING

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 00.98 FIRE-ALARM SYSTEMS

DIVISION 31 - EARTHWORK

31 00 00.98 EARTHWORK

31 23 01.98 EXCAVATING, BACKFILLING, AND COMPACTING FOR STRUCTURES

31 23 02.98 EXCAVATION, BACKFILLING, AND COMPACTING FOR UTILITIES

31 23 23.33 98 FLOWABLE FILL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 33.98 LANDSCAPE ESTABLISHMENT

32 12 17.98 HOT MIX BITUMINOUS PAVEMENT

32 16 13.98 EXTERIOR CONCRETE SLABS, WALKS, AND CURBS

32 17 24.98 PAVEMENT MARKINGS

32 92 00.98 TURF AND GRASSES

32 92 19.98 SEEDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00.98 WATER DISTRIBUTION

33 30 00.98 SANITARY SEWERS

33 40 00.98 STORM DRAINAGE UTILITIES

33 46 16 SUBDRAINAGE SYSTEM

33 49 23 STORM DRAINAGE WATER DETENTION STRUCTURES

33 61 13 PRE-ENGINEERED UNDERGROUND HEAT DISTRIBUTION SYSTEM

33 70 02.00 98 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 71 26.98 DISTRIBUTION TRANSFORMERS

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

PROJECT TABLE OF CONTENTS Page 4

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 5

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

DRAWING NO. TITLE

CE-0164-COF16009-G-001 COVER

CE-0164-COF16009-G-002 SURVEY

CE-0164-COF16009-G-003 ENVIRONMENTAL, HEALTH AND SAFETY NOTES

CE-0164-COF16009-G-004 FOUNDATION OVERLAY

CE-0164-COF16009-G-101 LIFE SAFETY PLANS

CE-0164-COF16009-CD-101 LAYOUT DEMOLITION

CE-0164-COF16009-CD-102 UTILITY DEMOLITION

CE-0164-COF16009-C-001 SOIL DETERMINATION PLAN

CE-0164-COF16009-C-101 GRADING

CE-0164-COF16009-C-102 LAYOUT

CE-0164-COF16009-C-103 UTILITY

CE-0164-COF16009-C-104 STORMWATER POLLUTION PREVENTION PLAN

CE-0164-COF16009-C-301 PROFILES

CE-0164-COF16009-C-302 PROFILES

CE-0164-COF16009-C-303 PROFILES

CE-0164-COF16009-C-304 PROFILES

CE-0164-COF16009-C-401 SCHEDULES

CE-0164-COF16009-C-501 STORMWATER POLLUTION PREVENTION PLAN

CE-0164-COF16009-C-502 STORMWATER POLLUTION PREVENTION PLAN DETAILS

CE-0164-COF16009-C-503 STORMWATER POLLUTION PREVENTION PLAN

CE-0164-COF16009-C-504 STORMWATER POLLUTION PREVENTION PLAN DETAILS

CE-0164-COF16009-C-505 SITE NOTES

CE-0164-COF16009-C-506 SITE DETAILS

CE-0164-COF16009-C-507 SITE DETAILS

CE-0164-COF16009-L-001 GENERAL NOTES

CE-0164-COF16009-L-101 SITE PLAN WITH UTILITIES

CE-0164-COF16009-L-101.1 SITE MATERIALS PLAN

CE-0164-COF16009-L-102 TREE PLANTING PLAN & PLANT SCHEDULE

CE-0164-COF16009-L-401 SITE ENLARGEMENTS

CE-0164-COF16009-L-501 FINISH & MATERIALS DETAILS

CE-0164-COF16009-L-502 FINISH & MATERIALS & PLANTING DETAILS

CE-0164-COF16009-S-001 GENERAL NOTES 1

CE-0164-COF16009-S-010 LOAD MAPS

CE-0164-COF16009-S-101 LEVEL 01 FOUNDATION PLAN PART A

CE-0164-COF16009-S-102 LEVEL 01 FOUNDATION PLAN PART B

CE-0164-COF16009-S-103 LEVEL 02 FRAMING PLAN PART A

CE-0164-COF16009-S-104 LEVEL 02 FRAMING PLAN PART B

CE-0164-COF16009-S-105 ROOF FRAMING PLAN PART A

CE-0164-COF16009-S-106 ROOF FRAMING PLAN PART B

DOCUMENT 00 01 15 Page 1

DRAWING NO. TITLE

CE-0164-COF16009-S-201 BRACE ELEVATIONS 1

CE-0164-COF16009-S-202 BRACE ELEVATIONS 2

CE-0164-COF16009-S-203 TRUSS ELEVATIONS

CE-0164-COF16009-S-501 TYPICAL CONCRETE DETAILS

CE-0164-COF16009-S-510 FOUNDATION DETAILS 1

CE-0164-COF16009-S-511 FOUNDATION DETAILS 2

CE-0164-COF16009-S-512 FOUNDATION DETAILS 3

CE-0164-COF16009-S-515 TYPICAL SLAB ON GRADE

CE-0164-COF16009-S-520 COLUMN DETAILS

CE-0164-COF16009-S-530 STEEL DETAILS 1

CE-0164-COF16009-S-531 STEEL DETAILS 2

CE-0164-COF16009-S-532 STEEL DETAILS 3

CE-0164-COF16009-S-533 STEEL DETAILS 4

CE-0164-COF16009-S-540 TRUSS DETAILS

CE-0164-COF16009-S-550 TYPICAL DECK DETAILS 1

CE-0164-COF16009-S-551 TYPICAL DECK DETAILS 2

CE-0164-COF16009-A-001 ARCHITECTURAL SYMBOLS, MATERIALS, ABBREVIATIONS,

& MASONRY NOTES

CE-0164-COF16009-A-002 PARTITION TYPES

CE-0164-COF16009-A-101 SITE PLAN

CE-0164-COF16009-A-102 LEVEL 01 PLAN

CE-0164-COF16009-A-103 LEVEL 01 PART A

CE-0164-COF16009-A-104 LEVEL 01 PART B

CE-0164-COF16009-A-105 LEVEL 02 PLAN

CE-0164-COF16009-A-106 LEVEL 02 PART A

CE-0164-COF16009-A-107 LEVEL 02 PART B

CE-0164-COF16009-A-108 ROOF PLAN

CE-0164-COF16009-A-109 LEVEL 01 RCP PART A

CE-0164-COF16009-A-110 LEVEL 01 RCP PART B

CE-0164-COF16009-A-111 LEVEL 02 RCP PART A

CE-0164-COF16009-A-112 LEVEL 02 RCP PART B

CE-0164-COF16009-A-201 EWS AXONS

CE-0164-COF16009-A-202 ELEVATIONS

CE-0164-COF16009-A-301 BUILDING SECTIONS

CE-0164-COF16009-A-302 BUILDING SECTIONS

CE-0164-COF16009-A-401 EWS-A - BAR ENLARGED PLANS & DETAILS

CE-0164-COF16009-A-402 EWS-A - BAR ENLARGED PLANS & DETAILS

CE-0164-COF16009-A-403 EWS-A - BAR SECTIONS

CE-0164-COF16009-A-404 EWS-A - EAST PORTICO ENLARGED PLANS & DETAILS

CE-0164-COF16009-A-405 EWS-A - N/S OFFICE GLAZING ENLARGED PLANS &

DETAILS

CE-0164-COF16009-A-406 EWS-B - ENLARGED PLANS & DETAILS

CE-0164-COF16009-A-407 EWS-B - WEST PORTICO ENLARGED PLANS & DETAILS

CE-0164-COF16009-A-408 EWS-B - ENLARGED ELEVATIONS & SECTIONS

CE-0164-COF16009-A-409 EWS-B - ENLARGED ELEVATIONS & SECTIONS

CE-0164-COF16009-A-410 EWS-B/C - ENLARGED BREAKROOM & VESTIBULE PLANS &

DETAILS

CE-0164-COF16009-A-411 EWS-C - SERVICE BAR ENLARGED PLANS & DETAILS

CE-0164-COF16009-A-412 EWS-D PART A - ENLARGED PLANS & ELEVATIONS

CE-0164-COF16009-A-413 EWS-D PART B - ENLARGED PLANS & ELEVATIONS

CE-0164-COF16009-A-414 EWS-D PART C - ENLARGED PLANS & ELEVATIONS

CE-0164-COF16009-A-415 EWS-D - TYPICAL RESOURCE WALL SECTIONS, PLANS,

AND ELEVATION

CE-0164-COF16009-A-420 TRASH ENCLOSURE PLANS & DETAILS

CE-0164-COF16009-A-421 TRI COLUMN PLANS & DETAILS

CE-0164-COF16009-A-430 ENLARGED ROOF PLANS & DETAILS

CE-0164-COF16009-A-431 TYPICAL SKYLIGHT DETAILS

DOCUMENT 00 01 15 Page 2

CE-0164-COF16009-A-440 ENLARGED RESTROOM PLANS

CE-0164-COF16009-A-441 RESTROOM ELEVATIONS & DETAILS

CE-0164-COF16009-A-442 ENLARGED PLANS

CE-0164-COF16009-A-501 EWS-A DETAILS

CE-0164-COF16009-A-502 EWS-A DETAILS

CE-0164-COF16009-A-503 EWS-B DETAILS

CE-0164-COF16009-A-504 EWS-B DETAILS

CE-0164-COF16009-A-505 EWS-B & CONNECTION DETAILS

CE-0164-COF16009-A-506 EWS-C DETAILS

CE-0164-COF16009-A-507 EWS-D DETAILS - N/S STAIR

CE-0164-COF16009-A-508 EWS-D DETAILS - RESOURCE WALL

CE-0164-COF16009-A-509 OUTDOOR DINING DETAILS

CE-0164-COF16009-A-520 MISC. ROOF DETAILS

CE-0164-COF16009-A-530 CEILING DETAILS

CE-0164-COF16009-A-601 DOOR SCHEDULE

CE-0164-COF16009-A-701 ENLARGED STAIR S001 PLANS & SECTIONS

CE-0164-COF16009-A-702 ENLARGED STAIR S002 PLANS & SECTION

CE-0164-COF16009-A-703 ENLARGED STAIR S003 PLANS & SECTIONS

CE-0164-COF16009-A-704 ENLARGED STAIR S004 PLANS AND SECTIONS

CE-0164-COF16009-A-705 STAIR S001/S002 SUPPORTING CONSTRUCTION

FIREPROOFING DIAGRAMS

CE-0164-COF16009-A-706 LOBBY ELEVATOR PLANS & SECTION

CE-0164-COF16009-A-707 SERVICE ELEVATOR PLANS & SECTION

CE-0164-COF16009-I-101 LEVEL 01 PART A FINISH PLAN

CE-0164-COF16009-I-102 LEVEL 01 PART B FINISH PLAN

CE-0164-COF16009-I-103 LEVEL 02 PART A FINISH PLAN

CE-0164-COF16009-I-104 LEVEL 02 PART B FINISH PLAN

CE-0164-COF16009-I-105 LEVEL 01 FURNITURE PLAN

CE-0164-COF16009-I-106 LEVEL 01 PART A FURNITURE PLAN

CE-0164-COF16009-I-107 LEVEL 01 PART B FURNITURE PLAN

CE-0164-COF16009-I-108 LEVEL 02 FURNITURE PLAN

CE-0164-COF16009-I-109 LEVEL 02 PART A FURNITURE PLAN

CE-0164-COF16009-I-110 LEVEL 02 PART B FURNITURE PLAN

CE-0164-COF16009-I-201 LOBBY AND GALLERY ELEVATIONS

CE-0164-COF16009-I-202 VESTIBULE AND EXCHANGE STORE ELEVATIONS

CE-0164-COF16009-I-203 SERVERY & PANTRY ELEVATIONS

CE-0164-COF16009-I-204 TYPICAL CORRIDOR ELEVATIONS

CE-0164-COF16009-I-205 TYPICAL OFFICE/WORKSPACE ELEVATIONS

CE-0164-COF16009-I-206 TYPICAL OFFICE & MEETING ROOM ELEVATIONS

CE-0164-COF16009-I-207 CAS & COMPASS ELEVATIONS

CE-0164-COF16009-I-401 MILLWORK PLANS, ELEVATIONS, & SECTIONS

CE-0164-COF16009-I-402 MILLWORK PLANS, ELEVATIONS, & SECTIONS

CE-0164-COF16009-I-601 INTERIOR FINISH SCHEDULE

CE-0164-COF16009-I-602 ROOM FINISH SCHEDULE

CE-0164-COF16009-I-603 DEMOUNTABLE PARTITION SYSTEMS SCHEDULE

CE-0164-COF16009-M-001 HVAC LEGEND, SYMBOLS, & DRAWING INDEX

CE-0164-COF16009-M-101 HVAC FIRST FLOOR PLAN

CE-0164-COF16009-M-102 HVAC FIRST FLOOR PLAN

CE-0164-COF16009-M-103 HVAC SECOND FLOOR PLAN

CE-0164-COF16009-M-104 HVAC SECOND FLOOR PLAN

CE-0164-COF16009-M-105 HVAC ROOF PLAN

CE-0164-COF16009-M-106 HVAC ROOF PLAN

CE-0164-COF16009-M-107 HVAC - FIRST FLOOR PLAN PIPING

CE-0164-COF16009-M-108 HVAC - FIRST FLOOR PLAN PIPING

CE-0164-COF16009-M-109 HVAC - SECOND FLOOR PLAN PIPING

CE-0164-COF16009-M-110 HVAC - SECOND FLOOR PLAN PIPING

CE-0164-COF16009-M-111 HVAC - RADIANT FLOOR PLAN - DINING BAR

DOCUMENT 00 01 15 Page 3

CE-0164-COF16009-M-112 HVAC - RADIANT FLOOR PLAN - WEST CORRIDOR

CE-0164-COF16009-M-401 FIRST FLOOR ENLARGED MECHANICAL ROOMS

CE-0164-COF16009-M-402 SECOND FLOOR ENLARGED MECHANICAL ROOMS

CE-0164-COF16009-M-501 HVAC PIPING SCHEMATICS

CE-0164-COF16009-M-502 HVAC DETAILS

CE-0164-COF16009-M-503 HVAC DETAILS

CE-0164-COF16009-M-504 HVAC DETAILS

CE-0164-COF16009-M-601 HVAC SCHEDULES

CE-0164-COF16009-M-602 HVAC SCHEDULES

CE-0164-COF16009-M-700 CONTROLS SEQUENCES

CE-0164-COF16009-M-701 CONTROL SCHEMATICS

CE-0164-COF16009-P-001 LEGEND & INDEX

CE-0164-COF16009-P-101 PLUMBING & FIRE SUPPRESSION SITE UTILITY PLAN

CE-0164-COF16009-P-102 FOUNDATION PLANS

CE-0164-COF16009-P-103 PLUMBING LEVEL 01 FLOOR PLAN - 1A

CE-0164-COF16009-P-104 PLUMBING LEVEL 01 FLOOR PLAN - 1B

CE-0164-COF16009-P-105 PLUMBING LEVEL 02 FLOOR PLAN - 2A

CE-0164-COF16009-P-106 PLUMBING LEVEL 02 FLOOR PLAN - 2B

CE-0164-COF16009-P-301 PLUMBING SECTIONS

CE-0164-COF16009-P-401 ENLARGED FLOOR PLANS AND PARTIAL ROOF PLAN

CE-0164-COF16009-P-402 ENLARGED FLOOR PLANS

CE-0164-COF16009-P-500 DETAILS

CE-0164-COF16009-P-601 SCHEDULES & NOTES

CE-0164-COF16009-P-901 SANITARY DIAGRAMS

CE-0164-COF16009-P-902 SANITARY DIAGRAMS

CE-0164-COF16009-P-903 SANITARY DIAGRAMS

CE-0164-COF16009-P-904 SANITARY DIAGRAMS

CE-0164-COF16009-P-905 WATER DIAGRAMS

CE-0164-COF16009-P-906 WATER DIAGRAMS

CE-0164-COF16009-P-907 NATURAL GAS DIAGRAM

CE-0164-COF16009-F-001 LEGEND & INDEX - FIRE SUPRESSION

CE-0164-COF16009-F-002 DETAILS - FIRE SUPRESSION

CE-0164-COF16009-F-101 FIRE SUPRESSION LEVEL 01 FLOOR PLAN - 1A

CE-0164-COF16009-F-102 FIRE SUPRESSION LEVEL 01 FLOOR PLAN - 1B

CE-0164-COF16009-F-103 FIRE SUPRESSION LEVEL 02 FLOOR PLAN - 2A

CE-0164-COF16009-F-104 FIRE SUPRESSION LEVEL 02 FLOOR PLAN - 2B

CE-0164-COF16009-FA-001 LEGEND & INDEX - FIRE ALARM

CE-0164-COF16009-FA-002 DETAILS - FIRE ALARM

CE-0164-COF16009-FA-101 FIRE ALARM LEVEL 01 FLOOR PLAN - 1A

CE-0164-COF16009-FA-102 FIRE ALARM LEVEL 01 FLOOR PLAN - 1B

CE-0164-COF16009-FA-103 FIRE ALARM LEVEL 02 FLOOR PLAN - 2A

CE-0164-COF16009-FA-104 FIRE ALARM LEVEL 02 FLOOR PLAN - 2B

CE-0164-COF16009-E-001 LEGEND & INDEX

CE-0164-COF16009-E-002 SINGLE LINE AND SCHEDULES

CE-0164-COF16009-E-004 EXISTING SINGLE LINE

CE-0164-COF16009-E-007 ELECTRICAL DETAILS

CE-0164-COF16009-E-008 LUMINARE SCHEDULE AND DETAILS

CE-0164-COF16009-E-009 MOTOR STARTER SCHEDULE

CE-0164-COF16009-E-010 ELECTRICAL SITE PLAN

CE-0164-COF16009-E-011 MANHOLE 48 DETAIL

CE-0164-COF16009-E-012 MANHOLE 41 DETAIL

CE-0164-COF16009-E-101A POWER LEVEL 01 FLOOR PLAN - SECTOR A

CE-0164-COF16009-E-101B POWER LEVEL 01 FLOOR PLAN - SECTOR B

CE-0164-COF16009-E-102A POWER LEVEL 02 FLOOR PLAN - SECTOR A

CE-0164-COF16009-E-102B POWER LEVEL 02 FLOOR PLAN - SECTOR B

CE-0164-COF16009-E-103A POWER LEVEL 03 ROOF PLAN - SECTOR A

CE-0164-COF16009-E-103B POWER LEVEL 03 ROOF PLAN - SECTOR B

DOCUMENT 00 01 15 Page 4

CE-0164-COF16009-E-201A LIGHTING LEVEL 01 FLOOR PLAN - SECTOR A

CE-0164-COF16009-E-201B LIGHTING LEVEL 01 FLOOR PLAN - SECTOR B

CE-0164-COF16009-E-202A LIGHTING LEVEL 02 FLOOR PLAN - SECTOR A

CE-0164-COF16009-E-202B LIGHTING LEVEL 02 FLOOR PLAN - SECTOR B

CE-0164-COF16009-E-301 KITCHEN

CE-0164-COF16009-E-402 PANELBOARD SCHEDULES

CE-0164-COF16009-E-403 PANELBOARD SCHEDULES

CE-0164-COF16009-E-404 PANELBOARD SCHEDULES

CE-0164-COF16009-E-501 GROUNDING PLAN

CE-0164-COF16009-E-502 LIGHTNING PROTECTION PLAN

CE-0164-COF16009-T-001 TECHNOLOGY LEGEND

CE-0164-COF16009-T-002 TECHNOLOGY ONE-LINE DIAGRAMS

CE-0164-COF16009-T-003 TELECOMMUNICATIONS MANHOLE ELEVATIONS

CE-0164-COF16009-T-004 SECURITY DIAGRAMS AND DETAILS

CE-0164-COF16009-T-100 TECHNOLOGY SITE PLAN

CE-0164-COF16009-T-101A TECHNOLOGY LEVEL 01 FLOOR PLAN - SECTOR A

CE-0164-COF16009-T-101B TECHNOLOGY LEVEL 01 FLOOR PLAN - SECTOR B

CE-0164-COF16009-T-102A TECHNOLOGY LEVEL 02 FLOOR PLAN - SECTOR A

CE-0164-COF16009-T-102B TECHNOLOGY LEVEL 02 FLOOR PLAN - SECTOR B

CE-0164-COF16009-T-201 ENLARGED FIRST FLOOR 1TRA (TCO) TELEPHONE CENTRAL

OFFICE LAYOUT

CE-0164-COF16009-T-202 ENLARGED FIRST FLOOR 1TRB AND 1TRC LAYOUTS AND

ELEVATIONS

CE-0164-COF16009-T-203 ENLARGED SECOND FLOOR 2TRA LAYOUT AND ELEVATIONS

CE-0164-COF16009-T-204 ENLARGED PLANS AND ELEVATIONS

CE-0164-COF16009-T-205 ENLARGED PLANS AND ELEVATIONS

CE-0164-COF16009-T-501 TECHNOLOGY OUTLET DETAILS

CE-0164-COF16009-QF-101 FOODSERVICE EQUIPMENT PLAN AND SCHEDULE

CE-0164-COF16009-QF-102 FOODSERVICE EQUIPMENT MECHANICAL SPOT CONNECTION

PLAN

CE-0164-COF16009-QF-103 FOODSERVICE EQUIPMENT ELECTRICAL SPOT CONNECTION

PLAN

CE-0164-COF16009-QF-104 FOODSERVICE EQUIPMENT SPECIAL CONDITIONS PLAN

CE-0164-COF16009-QF-105 FOODSERVICE EQUIPMENT UTILITY LOAD SCHEDULE

CE-0164-COF16009-QF-106 FOODSERVICE EQUIPMENT UTILITY LOAD SCHEDULE

CE-0164-COF16009-QF-107 FOODSERVICE EQUIPMENT UTILITY LOAD SCHEDULE

CE-0164-COF16009-QF-108 FOODSERVICE EQUIPMENT UTILITY LOAD SCHEDULE

CE-0164-COF16009-QF-109 FOODSERVICE EQUIPMENT ELEVATION PLAN

CE-0164-COF16009-QF-201 EXHAUST HOOD DRAWING

CE-0164-COF16009-QF-202 EXHAUST HOOD DRAWING

CE-0164-COF16009-QF-203 EXHAUST HOOD DRAWING

CE-0164-COF16009-QF-204 FIRE SUPPRESSION SYSTEM DRAWING

CE-0164-COF16009-QF-301 REFRIGERATION DRAWING

CE-0164-COF16009-QF-401 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-402 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-403 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-404 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-405 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-406 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-407 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-408 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-409 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-410 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-411 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-412 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-413 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

CE-0164-COF16009-QF-414 FOODSERVICE EQUIPMENT SS SHOP DRAWINGS

DOCUMENT 00 01 15 Page 5

-- End of Document --

DOCUMENT 00 01 15 Page 6

SECTION 00 62 35.98

RECYCLED / RECOVERED MATERIALS

04/06

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials

1.2 OBJECTIVES

Government procurement policy is to acquire, in a cost effective manner, items containing the highest percentage of recycled and recovered materials practicable consistent with maintaining a satisfactory level of competition without adversely affecting performance requirements or exposing suppliers' employees to undue hazards from the recovered materials. The Environmental Protection Agency (EPA) has designated certain items which must contain a specified percent range of recovered or recycled materials. EPA designated products specified in this contract comply with the stated policy and with the EPA guidelines. The Contractor shall make all reasonable efforts to use recycled and recovered materials in providing the EPA designated products and in otherwise utilizing recycled and recovered materials in the execution of the work.

1.3 EPA DESIGNATED ITEMS INCORPORATED IN THE WORK

Various sections of the specifications contain requirements for materials that have been designated by EPA as being products which are or can be made with recovered or recycled materials. These items, when incorporated into the work under this contract, shall contain at least the specified percentage of recycled or recovered materials unless adequate justification (non-availability) for non-use is provided. When a designated item is specified as an option to a non-designated item, the designated item requirements apply only if the designated item is used in the work.

1.4 EPA PROPOSED ITEMS INCORPORATED IN THE WORK

Products other than those designated by EPA are still being researched and are being considered for future Comprehensive Procurement Guideline (CPG) designation. It is recommended that these items, when incorporated in the work under this contract, contain the highest practicable percentage of recycled or recovered materials, provided specified requirements are also met.

DOCUMENT 00 62 35.98 Page 1

1.5 EPA LISTED ITEMS USED IN CONDUCT OF THE WORK BUT NOT INCORPORATED IN

THE WORK

There are many products listed in 40 CFR 247 which have been designated or proposed by EPA to include recycled or recovered materials that may be used by the Contractor in performing the work but will not be incorporated into the work. These products include office products, temporary traffic control products, and pallets. It is recommended that these non-construction products, when used in the conduct of the work, contain the highest practicable percentage of recycled or recovered materials and that these products be recycled when no longer needed.

-- End of Section --

DOCUMENT 00 62 35.98 Page 2

SECTION 01 11 00.98

SUMMARY OF WORK

08/14

PART 1 GENERAL

1.1 SUMMARY

The work to be performed under this project consists of providing the labor, equipment, and materials necessary to construct the new 64,000+ GSF Research Support Building (RSB) at NASA Glenn Research Center (GRC), Cleveland, Ohio. The building will be constructed on the site of the previously demolished Building 21 on the GRC campus. The new two story steel structure contains open office areas; private offices; conference and work rooms; Training Rooms, Collaborative Engineering Rooms; collaboration work spaces with light wells; a cafeteria with supporting kitchen and dining spaces; and typical support spaces. The interiors are consistent with modern open office architecture. The exterior is clad in painted metal panels and transparent glazing curtain wall systems. Support facility construction includes, but is not limited to: the removal of existing paved surfaces; removal of certain underground utilities; site preparation;

caissons for foundation support; curbs and roadways; parking areas;

pedestrian walkways; landscaping. Supporting utilities to the site include the extension of potable water; non potable chilled water from an existing chilled water plant; high pressure steam; natural gas; sanitary and storm sewers; high voltage electrical cable through existing manhole and new underground duct bank; communications cabling through existing and new communications duct banks and manholes. Refer to each contract design drawing for specific construction requirements. This project is required to be LEED Silver Certifiable under the USGBC LEED-NC version 2009 Rating System.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Upon receipt of Government Furnished Equipment, the Contractor shall submit records in accordance with the paragraph entitled, "Government Furnished Property," of this section.

Submit the following items to the Contracting Officer:

Site Specific Health and Safety Plan (HASP) G Utility Outages G Confined Space Permits G Connection Requests G Digging, Excavating, and Trenching Permits G Soil Relocation Form Permits G Hot Work Permits G

1.3 CONTRACT DRAWINGS

See Section 00 01 15 and drawing CE-0164-COF16009-G-001 for a list of

SECTION 01 11 00.98 Page 1 drawings which are a part of this contract. Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.

Contractors shall purchase drawings from vendor. Reference publications will not be furnished.

1.4 OPTIONS

The following summarizes the options for this project:

1.4.1 Option No. 1: Outfitting

Furnish and install the following items, as specified and shown on drawing:

- All FF&E (furniture, fixtures, and equipment; which are movable furniture, fixtures, or other equipment that have no permanent connection to the structure of a building or utilities). This excludes systems furniture and demountable partitions, which are in Base scope.

- Lateral Files

- Furniture Storage and Delivery Services

- Trash/Recycling Receptacles

- Janitorial Storage Shelving

- Break Room / Common Areas Appliances

- Lenel Access Control System

- Security Surveillance System (CCTV)

- Interior Finish Upgrades: Art or Equivalent

- Office-level cleaning

- Misc. Interior Equipment (Bulletin boards, white boards,clocks, mail slots, coat hangers)

- Exchange Modular Counters/Display (not permanently installed)

- Exchange Racking and Shelving (not permanently installed)

- Exchange Signage / Display Boards

- Food Service Equipment

- Café Signage / Display Boards

- Exterior Signage Package

- Interior Signage Package

PLEASE NOTE: Infrastructure required for all items shown above, such as conduit systems, circuits, ductbanks, cable tray, etc., is NOT outfitting and shall be in the Base scope.

1.4.2 Option No. 2: Photovoltaic (PV) Array

Furnish and install a Photovoltaic Array system, and all associated components as specified and shown on the drawings, to provide 115 kW.

System should be ballasted mounted with panels at a 5 degree tilt.

1.4.3 Option No. 3: Dining Bar Expanded Metal Mesh Ceiling

Furnish and install the expanded metal mesh ceiling on Level 2, as specified and shown on the drawings as 'M-ACT'. There is no ceiling in place of this option in the base scope.

1.4.4 Option No. 4: Terrazzo Flooring

Furnish and install the Terrazzo Flooring on Level 1 and 2, as specified and shown on the drawings as 'TRZ-1'. The base scope should include a Polished Concrete Topping.

SECTION 01 11 00.98 Page 2

1.4.5 Option No. 5: MIC Connector

Furnish and install structure and roofing associated with canopy over walkway connecting the south end of the RSB to the adjacent Mission Integration Center (MIC) building.

1.4.6 Option No. 6: Exterior Pavers

Furnish and install decorative site pavers on the west and east side of building, as specified and shown on Landscape drawings. The base scope is to include a 4" concrete walk.

1.4.7 Option No. 7: Food Service

Furnish and install food service equipment as shown on the drawings and specified in Appendix G to this specification.

PLEASE NOTE: Infrastructure required for the food service equipment, such as conduit systems, circuits, plumbing, etc., is NOT part of Option No. 7 and shall be in the Base scope.

1.5 IMPLEMENTATION

See Appendix A for detailed Implementation Plan.

1.6 WASTE STORAGE/DISPOSAL/RECYCLING INSTRUCTIONS

GRC has specific manifesting procedures for waste disposal and recycling.

See Appendix B for instructions.

1.7 GEOTECHNICAL REPORT

See Appendix C for the Geotechnical Report. All references to the Geotechnical Report shall also include the addition to the report, "DVL Job No. C.7287A" dated November 16, 2017, also included in this Appendix.

1.8 SUBMITTAL REGISTER

See Appendix D for the Submittal Register.

1.9 NASA LOGO

See Appendix E for information regarding the NASA Logo and the use of NASA standard colors.

1.10 LEED CHECKLIST

See Appendix F for LEED checklist for this project.

1.11 FOODSERVICE SPECIFICATION

See Appendix G for foodservice specifications for this project.

1.12 FURNITURE SPECIFICATIONS

See Appendix H for furniture specifications for this project.

SECTION 01 11 00.98 Page 3

1.13 SCHEDULE OF SPECIAL INSPECTIONS

See Appendix I for the Schedule of Special Inspections to be used in accordance with Section 01 45 35 SPECIAL INSPECTIONS.

1.14 WORK RESCHEDULING

Contractor shall allow for a maximum of 5 days where construction activity is prohibitive. Further allowance for 5 days of excavation and subsurface activity abeyance shall be imposed where other construction activities are permitted. Government will provide 24 hour notification each time the restrictions are invoked.

The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the work by the contractor. Labor or materials which are necessary to produce the desired result, even though not specifically mentioned in the Contract Documents, shall be included in the work.

Contractor shall immediately check furnished drawings and notify the government of any discrepancies.

Normal duty hours for work shall be from 7 a.m. to 3:30 p.m., Monday through Friday. Requests for additional work shall require written approval from the Contracting Officer 7 days in advance of the proposed work period. Special permission will be given in other circumstances on a case by case basis.

1.15 PROJECT ENVIRONMENTAL GOALS

Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is the produce a building that meets the functional program needs and incorporates the principles of sustainability. Specifically:

a. Preservce and restore the site ecosystem and biodiversity; avoid site degradaion and erosion. Minimize offsite environmental impact.

b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.

c. Use environmentally preferable products and decrease toxicity level of materials used.

d. Use renewable energy and material resources.

e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.

Consider the durability, maintainability, and flexibility of building systems.

f. Manage construction site and storage of materials to ensure no negative impact on the indoor environment quality of the building.

g. Reduce construction waste through reuse, recycling, and supplier take-back.

1.15.1 Independent Verification

1.15.1.1 US Green Building Council (USGBC)-- LEED (tm) Rating System

Provide complete project in compliance with USGBC LEED-NC (tm) 2009 (LEED

SECTION 01 11 00.98 Page 4

NC), level silver requirements.

1.16 ON-SITE PERMITS

1.16.1 Utility Outages and Connection Requests

Work shall be scheduled to hold outages to a minimum.

Utility outages and connections required during the prosecution of work that affect existing systems shall be arranged for at the convenience of the Government and shall be scheduled outside the regular working hours or on weekends.

Contractor shall not be entitled to additional payment for utility outages and connections required to be performed outside the regular work hours.

Requests for utility outages and connections shall be made in writing to the Contracting Officer at least 15 working days in advance of the time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.

1.16.2 Hot Work, Excavation and Confined Space Permits

ACTIVITY SUBMISSION DATE SUBMISSION FORM

Hot Work Permits 7 days prior to work NASA Form C-7A & NASA Form C-7B Confined Space 14 days prior to work NASA Form C-199 Excavation Permit 21 days prior to work NASA Form C-927 Crane Permits 30 days prior to work Crane Permit

Permits shall be posted at a conspicuous location in the construction area.

Burning of trash or rubbish is not permitted.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 11 00.98 Page 5

SECTION 01 14 00

WORK RESTRICTIONS

11/11

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G

Personnel List; G

Vehicle List; G

Statement of Acknowledgement Form SF 1413; G

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing Glenn Research Center (GRC) operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.

d. Permission to interrupt any activity roads, and/or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the project become familiar with and obey GRC regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials shall be outside peak traffic hours (6:30 to 9:00 a.m. and 3:00 to 5:00 p.m.)

unless otherwise approved by the contracting officer. The GRC Main Gate will be accessible off Brookpark Rd. Commercial vehicles over 12'-6" and/or over 80,000 lbs are to use the West Gate to access GRC's main campus via West Area Road. All delivery personnel shall wear hard hats in designated construction areas and shall not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment shall also be conspicuously marked with identification and are to be held to the same delivery restrictions as materials entering GRC.

SECTION 01 14 00 Page 1

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 Identification Badges

Identification badges will be furnished without charge. Application for and use of badges will be as directed. Immediately report instances of lost or stolen badges to the Contracting Officer.

Identification badges will be issued to the Contractor and his employees in accordance with the NASA Security Regulations. A copy of the security regulations may be obtained from the security office. All badges must be returned or accounted for to the Office upon expiration of the badge or contract, or termination of the employee.

1.3.1.3 Personnel Entry Approval

Failure to obtain entry approval will not affect the contract price or time of completion.

1.3.1.4 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.3.2 Emergency Response Requirement

The contractor shall institute a requirement for all personnel to take shelter for personal safety in the event of certain emergencies. This policy includes Contractors, Subcontractors, and any person who is employed by the Contractor.

Personnel shall immediately seek shelter while an assessment is made of the threat and determinations are being made regarding subsequent actions such as "all clear" or selected building evacuations.

1.3.3 Working Hours

Regular working hours must consist of an 8 1/2 hour hour period, between 7 a.m. and 3:30 p.m., excluding Government holidays.

1.3.4 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal

SECTION 01 14 00 Page 2 working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.3.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in the paragraph "Work Outside Regular Hours."

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone/data service, electric service, air conditioning, heating, fire alarm, compressed air, natural gas, steam, and chilled water shall be considered utility cutovers pursuant to the paragraph entitled "Work Outside Regular Hours."

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in all utilities systems. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving 15 calendar days advance notice when such operation is required.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 14 00 Page 3

SECTION 01 30 00.98

ADMINISTRATIVE REQUIREMENTS

12/12

PART 1 GENERAL

1.1 SUMMARY

A. This section includes:

1. Project management and coordination.

2. Construction progress documentation.

3. Submittal procedures and general requirements for Submittals.

1.2 PROJECT MANAGEMENT AND COORDINATION - ENVIRONMENTAL, HEALTH AND SAFETY

A. Contractor's Environmental Manager: Designate a party responsible for overseeing the Contractor's conformance to environmental goals for the project and implementing procedures for environmental protection.

1. Qualifications: Minimum 5 years construction experience on projects of similar size and scope; minimum 3 years experience with environmental procedures similar to those of this project; familiarity with Environmental Management Systems (EMS's) such as ISO 14001; familiarity with environmental regulations applicable to construction operations.

2. Responsibilities: Responsibilities shall include:

a. Compliance with applicable Federal, State and local environmental regulations, including maintaining required documentation.

b. Implementation of the Waste Management Plan.

c. Implementation of the IAQ Management Plan.

d. Implementation of the Environmental Protection Plan.

e. Training for Contractor personnel in accordance with their position requirements.

f. Monitoring and documentation of environmental procedures.

B. Occupational Health and Safety Professional: The Safety Professional is considered essential to the work being performed under this contract. They shall have at least five (05) years of experience as an Occupational Health and Safety Professional. This shall include in the field experience as well as in the office putting together Health and Safety Plans. They shall have at least the OSHA 30 Hour training. They shall have completed industrial hygiene coursework, such as AIHA training in Fundamentals of Industrial Hygiene or equivalent. They also shall have knowledge of OSHA Excavation, Trenching, Shoring, Fall Protection, Fall Arrest Systems, Scaffolding, Steel Erection Safety, Cranes, Lead Abatement, Mold, Indoor Air Quality, Respiratory Protection, and identifying job site exposures.

The Contractor shall identify the Safety Professional in writing to the Contracting Officer's representative (COR) prior to the preconstruction conference. This Safety Professional shall be dedicated solely to this contract and shall be on site full time whenever work is being performed under this contract.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

SECTION 01 30 00.98 Page 1 submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Qualifications of Project Manager; G

Qualifications of Superintendent; G

Qualifications of Occupational Health and Safety Professional; G

List of contact personnel; G

View location map; G

1.4 CONTRACTOR PERSONNEL REQUIREMENTS

1.4.1 Subcontractors and Personnel

Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.4.2 Identification Badges

Temporary identification badges, if required, will be furnished without charge. Application for and use of badges will be as directed. Immediately report instances of lost or stolen badges to the Contracting Officer. All badges must be returned to NASA upon expiration of the badge or contact, or termination of the employee. Immediately report instances of lost or stolen badges to the Contracting Officer.

1.5 PERSONNEL LIST

Submit for approval, at least 15 days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:

a. Name

b. Date and place of birth

c. Citizenship

d. Home address

1.6 SUPERVISION

Provide at least one (1) qualified Project Manager and one (1) on-site Project Superintendent. These roles cannot be performed by the same person.

The Project Manager must have a minimum 5 years experience as a Project Manager or Superintendent on projects like this contract or similar in size, type, and complexity. The Project Manager shall be full time, dedicated solely to this contract.

SECTION 01 30 00.98 Page 2

The Project Superintendent must have a minimum of 10 years experience as a Superintendent on projects similar in size, type, and complexity. The Superintendent shall be dedicated solely to this contract and shall be on-site full time whenever work is being performed under this contract.

The Project Manager in this context shall mean the individual with the responsibility for the overall management of the project and the Project Superintendent shall mean the individual with the responsibility for quality and production. Both the Project Manager and Project Superintendent are subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion. Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders shall be made the subject of claim for extension of time for excess costs or damages by the Contractor.

1.7 PRECONSTRUCTION CONFERENCE

After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule prices, shop drawings, and other submittals, scheduling programming, and prosecution of the work.

Major subcontractors who will engage in the work shall also attend.

1.8 FACILITY TURNOVER PLANNING MEETINGS

Key personnel will meet to identify strategies to ensure the project is carried to expeditious closure and turnover to the Client. Start the turnover process at the Pre Construction Conference meeting and convene the Facility Turnover Meetings once the project has reached approximately 75% completion or three to six months prior to Beneficial Occupancy Date (BOD), whichever comes first. The Contracting Officer's Representative will lead the meetings and guide discussions based on an agenda provided by the Government. The facility Turnover effort shall include the following:

a. Facility Turnover Meetings

1. Fill in the Checklist including Contractor, Client, and NASA Checklist Items and assign a person responsible for each item and a due date. The Contractor's Representative will facilitate the assignment of responsibilities and fill out the NASA Checklist.

2. Review the Contractor's updated schedule. The Contractor shall develop a plan for the completion of all Contractor, Client, and NASA Checklist items.

3. Confirm that all Checklist items will be completed on time for the scheduled Facility Turnover.

1.9 PARTNERING

LEVEL C PARTNERING: To most effectively accomplish this contract, the Government requires the formation of a cohesive partnership with the Contractor and its subcontractors. The partnership will draw on the strength of each organization in an effort to achieve a quality project

SECTION 01 30 00.98 Page 3 done right the first time, within budget, on schedule, and without any safety mishaps. This level of partnering discusses partnering concepts and benefits and should become a part of the preconstruction conference. The senior Government representative and senior Contractor representative present will jointly host the partnering sessions. The partners will determine the frequency of the follow-on sessions. Partnering sessions should be held at or near the location of the activity contracting office.

The participants shall bear their own costs for meals, lodging, and transportation associated with partnering.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 30 00.98 Page 4

SECTION 01 31 19.98

PROJECT MEETINGS

12/12

PART 1 GENERAL

1.1 SUMMARY

The requirements of this Section apply to, and are a component part of, each section of the specifications.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. Submmit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

A Project Submittal Schedule shall be submitted in accordance with paragraph entitled, "Project Meetings," of this section.

1.3 PRECONSTRUCTION CONFERENCE

The Contractor shall attend a preconstruction conference scheduled by the Contracting Officer. Work shall not commence prior to the conference.

Subcontractor representatives shall attend.

Discussion shall address project orientation, personnel contact, safety issues, permits, deficiencies, and the location of the Contractor's office.

1.4 PROJECT MEETINGS

The Contractor shall attend weekly project meetings scheduled by the Government. Subcontractor representatives shall attend.

Prepare a Two-Week Planning Schedule for each weekly project meeting.

highlighting utility outages, material deliveries, subcontractors onsite, equipment on site, coordination issues and updates to the master schedule described in Section 01 33 00, "Submittal Procedures".

Meeting Minutes shall be kept by the Quality Assurance Specialist (QA) and distributed after concurrence by the Project Manager.

A Monthly Progress Report shall be submitted by the contractor to NASA which addresses the progress schedule, potential factors of delay, deficiencies, material delivery schedules, submittals, and safety issues.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of…