RESEARCH SUPPORT BUILDING 16009
Appendix D:
Submittal Register
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 117 PAGES
RESEARCH SUPPORT BUILDING
01 11 00.98 SD-01 Preconstruction Submittals GSite Specific Health and Safety
Plan (HASP)
1.17.1 GUtility Outages
GConfined Space Permits
1.17.1 GConnection Requests
GDigging, Excavating, and Trenching Permits
GSoil Relocation Form Permits
1.17.2 GHot Work Permits
01 14 00 SD-01 Preconstruction Submittals
1.3.1.1 GList of Contact Personnel
GPersonnel List GVehicle List GStatement of Acknowledgement
Form SF 1413 01 30 00.98 SD-01 Preconstruction Submittals
GQualifications of Project Manager GQualifications of Superintendent GQualifications of Occupational
Health and Safety Professional
1.4.1 GList of contact personnel
GView location map 01 33 29 SD-01 Preconstruction Submittals
SLEED Implementation Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 117 PAGES
01 33 29 SMR Credit 2 and ID Credit 1.5 Waste Management Plan-95
SEQ Credit 3.1 Construction IAQ Management Plan (During Construction)
SEQ Credit 3.2 Construction IAQ Management Plan (Before Occupancy)
SD-02 Shop Drawings SMR Credit 4: Recycled Content SMR Credit 5: Regional Materials SMR Credit 6: Rapidly Renewable
Materials SMR Credit 7: Certified Wood, 50 SEQ Credit 4.1: Low-Emitting
Materials, Adhesives and Sealants SEQ Credit 4.2: Low-Emitting
Materials, Paints and Coatings SEQ Credit 4.3: Low-Emitting
Materials, Flooring Systems SEQ Credit 4.4: Low-Emitting
Materials, Composite Wood & Agrifiber Products
SD-06 Test Reports SEQ Credit 3.1: Construction IAQ
Management Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 117 PAGES
01 33 29 SEQ Credit 3.2: Construction IAQ Management Plan
Progress Reports SSS Prerequisite 1: Construction
Activity Pollution Prevention SMR Credit 2 and ID Credit 1.5:
Waste Management Plan-95 SMR Credit 4: Recycled Content SMR Credit 5: Regional Material SMR Credit 6: Rapidly Renewable
Materials SMR Credit 7: Certified Wood, 50
SD-07 Certificates SMR Credit 7: Certified Wood
SD-11 Closeout Submittals SMR Credit 2 and ID Credit 1.5:
Construction Waste Management-95
SMR Credit 4: Recycled Content SMR Credit 5: Regional Materials SMR Credit 6: Rapidly Renewable
Materials SEQ Credit 3.1: Construction IAQ
Management Plan, during construction
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 117 PAGES
01 33 29 SEQ Credit 3.2: Construction IAQ Management Plan, before Occupancy
SEQ Credit 4.1: Low -Emitting Materials, Adhesives and Sealants
SEQ Credit 4.2: Low-Emitting Materials, Paints and Coatings
SEQ Credit 4.3: Low-Emitting Materials, Flooring Systems
SEQ Credit 4.4: Low-Emitting Materials, Composite Wood and Agrifiber Products
01 35 26.98 SD-06 Test Reports 1.14Gas Protection
SD-07 Certificates
1.3.1 GSite Specific Health and Safety
Plan
1.3.2 GProtection Plan
GConstruction Project Training Summary Report
GTraining certifications for fall protection competent person
GSteel Erection Plan GCritical Lift Plans as Required under 29 CFR 1926, Subpart CC 01 35 43.98 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 117 PAGES
01 35 43.98 Environmental protection plan Dirt and dust control plan ; G Hazardous Materials Inventories Statement
Safety Data Sheets Hazard Communication Written Program
SD-06 Test Reports Site Inspection Checklists RCRA 90-Day Waste Accumulation Site Inspection Checklists
Laboratory analysis Disposal Requirements
SD-07 Certificates 3.5.1TSDF Letter of Acceptance and
Hazardous Waste Manifests SD-11 Closeout Submittals Preconstruction survey Waste determination documentation
Disposal documentation for solid, hazardous, and regulated waste
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 117 PAGES
01 35 43.98 Contractor employee training records in compliance with 40
CFR 265.16, 29 CFR 1910.120,
29 CFR 1910.1200 and 40 CFR 82.
Regulatory notification Erosion and sediment control inspection reports
Solid waste disposal report Contractor Hazardous Material Inventory Log
Hazardous Waste/Debris Management
01 45 00.98 SD-01 Preconstruction Submittals GQuality Assurance (QA) Plan
SD-06 Test Reports
1.2.2 GQuality Control Data
1.2.2 GQuality Control Coordinating
Actions
1.2.2 GQuality Control Training
1.2.2 GInspection Records
GLetters of Authority or Delegation
1.2.2 GField Tests
1.2.2 GFactory Tests
01 45 33.01 98 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 117 PAGES
01 45 33.01 98 Contractor Welding Quality Assurance Program
Welding Lot Size - identified on a marked drawing
SD-07 Certificates Certified Welding Procedure Specifications
Certified Procedure Qualification Records
Certified Welder Performance Qualifications
SD-11 Closeout Submittals Completed Weld Request Form (if required)
Final Welder's Continuity Log 01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
3.1.1 GProject Manual
3.1.1Written Practices 3.1.3Written Practices 3.1.1NDT Procedures and Equipment
Calibration Records 3.1.3NDT Procedures and Equipment
Calibration Records SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 117 PAGES
01 45 35 3.1.1Daily Reports 3.1.3Daily Reports 3.1.3Daily Reports 3.1.1Biweekly Reports 3.1.2Biweekly Reports
SD-07 Certificates 2.1Fabrication Plant 2.1AC472 Accreditation 2.1Certified Plant 2.1Certificate of Compliance
1.5.14 GSpecial Inspector of Record
1.5 GSpecial Inspector
3.1.1Qualification Records 3.1.3Qualification Records
SD-11 Closeout Submittals 3.1.1Interim Final Report 3.1.3Interim Final Report
3.1.1 GComprehensive Final Report
3.1.3 GComprehensive Final Report
01 50 00.98 SD-01 Preconstruction Submittals GTemporary Power and Lighting
Plans and Drawings GDust Control Plan
01 57 23.98 SD-07 Certificates Mill Certificate or Affidavit
01 75 00.98 SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 117 PAGES
01 75 00.98 1.2.2Factory Tests 1.2.3Functional Test 1.2.4Final Acceptance Test 1.2.5Test Procedures
01 78 00.98 SD-01 Preconstruction Submittals Reproducible Drawings CAD System Drawings
SD-02 Shop Drawings As-Built Drawings
SD-03 Product Data Spare Parts Data
SD-07 Certificates Work Plan
SD-08 Manufacturer’s Instructions Preventative Maintenance Condition Monitoring (Predictive Testing)
Inspection Posted Instructions
SD-10 Operation and Maintenance Data
3.1Operation and Maintenance Manuals
01 86 12.07 98 SD-01 Preconstruction Submittals
1.5 GQuality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 117 PAGES
01 86 12.07 98 2.1 GMaterial, Equipment, and Fixture Lists
SD-02 Shop Drawings 3.1Connection Diagrams 2.1.1Bearing Layout 2.1.1Fabrication Drawings 3.1Installation Drawings
SD-03 Product Data
2.1.1 GManufacturer's Catalog Data
2.1.1 GEquipment Foundation Data
2.1.3 GSpecific Equipment Data
2.1.4 GSpare Parts List
1.6 GWarranty
SD-05 Design Data
1.4 GDesign Analysis and Calculations
SD-06 Test Reports
3.3.1 GAlignment Test
3.3.1 GBalancing Test
GBorescope Inspection Test
3.3.1 GCode and Requirements
Verification Test
3.3.1 GCold Starting Test
GCooling System Evaluation Test
3.3.1 GDuctwork Leakage Test
GExhaust Emissions Test
3.3.1 GFlux Analysis Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 117 PAGES
01 86 12.07 98 GHigh Voltage Test GHydraulic Oil Test
3.3.1 GHydrostatic Test
GInfrared Thermography Test
3.3.1 GInsulation Power Factor Test
GInsulation Resistance Test
3.3.1 GLubricating Oil Test
GMechanical Performance Test
3.3.1 GMotor Circuit Evaluation Test
GNoise Level Acceptance Test
3.3.1 GOperational Fire Damper Test
GPerformance Test GPower/Output Test
3.3.1 GThermodynamic Performance
Test
3.3.1 GUltrasonic (Airborne) Test
GUltrasonic (Pulse) Test
3.3.1 GVibration Analysis Test
3.2 GVisual Inspection
GWarranty Test SD-07 Certificates
2.1.2 GCertificates
SD-08 Manufacturer’s Instructions
3.1 GManufacturer's Instructions
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 117 PAGES
01 86 12.07 98 3.4 GOperations and Maintenance Manuals
SD-11 Closeout Submittals
3.1 GRecord Drawings
3.5 GAcceptance Documentation
01 91 00.00 98 SD-01 Preconstruction Submittals
2.2.1 GCommissioning Plan
2.2.1 GCommissioning Schedule
SD-05 Design Data
1.7 GBasis of Design
SD-06 Test Reports
3.2.5 GFunctional Performance Testing
Results
3.1 GSeasonal Testing
3.3 GShort-Term Diagnostic Testing
3.1 GDeficiency Report and Resolution
Record SD-07 Certificates
1.6 GCommissioning Agents
Qualifications
SD-10 Operation and Maintenance Data
3.5 GOperations and Maintenance
Manuals
3.5 GTraining Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 117 PAGES
01 91 00.00 98 3.5 GOperations and Maintenance Database
SD-11 Closeout Submittals
3.1 GFinal Commissioning Report
3.6 GLEED™ Documentation
GGreen Globes - US Documentation
3.1 GWarranty
02 61 00.98 SD-07 Certificates
1.2.1 GSite Specific Health and Safety
Plan
1.2.2 GSite Specific Work Plan
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 GFormwork
3.1.1 GFormwork
2.2.1 GForm Removal Schedule
SD-03 Product Data 2.2Form Materials
SD-04 Samples
1.3 GSample Panels
2.2.4 GFiber Voids
SD-05 Design Data 2.1Calculations
SD-06 Test Reports 3.2Inspection
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 117 PAGES
03 11 13.00 10 2.2.4Fiber Voids 03 15 00.00 10 SD-02 Shop Drawings
2.4 GWaterstops
SD-03 Product Data
2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops
SD-04 Samples 2.3.2Lubricant for Preformed
Compression Seals 2.3.3Field-Molded Type 2.4Waterstops
GSplicing Waterstops SD-07 Certificates
2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops
03 20 00.00 10 SD-01 Preconstruction Submittals
3.1.3.2 GButt-Splices
SD-02 Shop Drawings
3.1 GReinforcement
SD-03 Product Data
2.3.1 GMechanical Butt-Splices
2.3 GReinforcing Steel
SD-04 Samples Epoxy-Coated Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 117 PAGES
03 20 00.00 10 SD-06 Test Reports
2.8 GTests, Inspections, and
Verifications SD-07 Certificates
2.3Reinforcing Steel 1.4.1Qualified Welders 1.4.2Qualification of Steel Bar
Butt-Splicers 03 30 00.11 98 SD-03 Product Data
2.1.1 GVapor Retarder
2.1.2 GAccessories
SD-04 Samples 2.1.2Accessories 2.1.1Vapor Retarder
03 30 00.98 SD-02 Shop Drawings 1.6.2.1Fabrication Drawings 1.6.2.2Formwork 1.6.2.2Formwork 1.6.2.1Column Forms 1.6.2.1Wall Forms 1.6.2.1Floor Forms 1.6.2.1Ceiling Forms 1.6.2.1Special Construction
1.6.2.3 GReinforcing steel
SD-03 Product Data 2.4.7Materials for curing concrete
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 117 PAGES
03 30 00.98 2.4.10 SJoint sealants
2.4.9 SJoint filler
2.1.2Plastic Forms 2.1.3Carton Forms
SRecycled Aggregate Materials
2.4.1 SCement
2.4.1.3Portland Cement 2.3.2Ready-Mix Concrete
Vapor retarder and Vapor barrier 2.6Bonding Materials 2.7Floor Finish Materials 2.3.3Concrete Curing Materials
2.5 SReinforcement
1.6.2.1Reinforcement Materials 2.7.1Liquid Chemical Floor Hardener 2.4.11Epoxy bonding compound 2.5.5Synthetic reinforcing fibers 2.2.1Waterstops 2.4.10.3Waterstops 3.14.2Waterstops 2.1.1Wood Forms
1.8.1 SLocal/Regional Materials
2.4.12Biodegradable Form Release
Agent SD-04 Samples
1.6.5.1Slab finish sample
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 117 PAGES
03 30 00.98 2.4.10.3Dumbbell Type 2.4.10.3Rubber 2.4.10.3Polyvinylchloride (PVC)
SD-05 Design Data 2.3.1mix design 1.6.1.1Calculations
SD-06 Test Reports
1.6.4.1 GConcrete mix design
1.6.4.2Fly ash 1.6.4.2Pozzolan 1.6.4.3Ground granulated blast-furnace slag 1.6.4.4Aggregates 1.6.4.5Fiber-reinforced concrete 3.10.2.1Tolerance report 3.12.2.3Compressive strength tests 3.12.2.5Unit weight of structural lightweight concrete 3.12.2.6Ion concentration 3.12.2.4Air Content 2.8.4Slump 2.8.1Air Entrainment
SD-07 Certificates 1.6.3.1Curing concrete elements 1.6.3.2Pumping concrete 1.6.3.3Finishing plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 117 PAGES
03 30 00.98 1.6.3.4Form removal schedule 2.4.12Biodegradable Form Release
Agent 1.6.3.5VOC Content for form release agents, curing compounds, and concrete penetrating sealers
1.6.3.6Material Safety Data Sheets 1.8.2Forest Stewardship Council
(FSC) Certification SD-08 Manufacturer’s Instructions
1.6.4.2Fly ash 1.6.4.3Ground granulated blast-furnace slag 1.10Welding Procedures 1.10Welding Procedures 2.5.8Steel Bar 1.10Welder Qualifications
03 35 00.00 10 SD-03 Product Data Part 2 SRecycled Content Products
SD-04 Samples 1.3.1Field Test Panels 1.3.1.1Sample Wall Panels 1.3.1.2Slab Panels
SD-08 Manufacturer’s Instructions Dry Shake Finish
03 35 43 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 117 PAGES
03 35 43 1.5.1Installer Qualifications SD-02 Shop Drawings
2.1 GPolishing Plan
SD-03 Product Data
2.2.2 GPrimer
2.3.3 GLeveling And Patching
Compound
2.2.1 GPortland Cement Based, Self-Leveling, Polishable Overlay
2.2.4 GSealer
2.3.1 GMetal Edge Strips
2.3.4Joint Fillers
SD-04 Samples
2.1 GSamples for Initial Selection
1.5.2 GMockups
SD-06 Test Reports 2.1.3Finished Surface Friction
SD-07 Certificates 2.2.3Liquid Floor Treatments
03 39 00.00 10 SD-03 Product Data 2.1Curing Materials
SD-06 Test Reports 3.2Testing and Inspection for CQC
SD-08 Manufacturer’s Instructions 2.1Curing Compound
03 45 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 117 PAGES
03 45 00 1.12.5Pre-Installation Meeting SD-02 Shop Drawings
1.12.1 GPrecast Drawings
SD-03 Product Data
2.3 GCast-In Embedded Items And
Connectors
GConnection Devices 2.2.6Admixtures 2.5Gasket
Thin Brick Veneer 2.6Bearing Pads
SD-04 Samples
1.12.2 GConcrete Wall Panel Surface
Finish 1.12.4Mock-up
Brick Color Chips Form Liner
1.12.2Full Size Sample Wall Panel SD-05 Design Data
1.5.4 GDesign Calculations
2.1.1 GContractor-Furnished Mix Design
2.4.9 GRepair of Surface Defects
1.5.5 GThermal Calculations
SD-06 Test Reports
1.11.2 GStrength Tests
1.11.2Slump
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 117 PAGES
03 45 00 1.11.2Air Content 1.11.1Test for Concrete Materials 2.2.7Water 3.6.4Testing Precast Units for
Strength SD-07 Certificates
1.4 GManufacturer's Qualifications
1.8.1Fabricator Quality Certifications 1.9Erector Certification 1.10Erector's Post Audit Declaration
SD-08 Manufacturer’s Instructions
3.3 GInstallation
3.8 GCleaning
Thin Brick SD-11 Closeout Submittals
1.12.3 GBatch Ticket Information
2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled Content for Silica Fume
04 20 00 SD-02 Shop Drawings GCut CMU Drawings GReinforcementDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 117 PAGES
04 20 00 1.5.2 GCold Weather Procedures
2.3.1.2 GCement
2.3.1.1 GCementitious Materials
SD-04 Samples
2.1.2.1 GConcrete Masonry Units (CMU)
2.3.1.3 GAdmixtures for Masonry Mortar
2.5.2 GAnchors, Ties, and Bar
Positioners
2.5.3 GJoint Reinforcement
SD-05 Design Data
2.1.2.1.5 GMasonry Compressive Strength
2.1.2.2 GFire-Rated Concrete Masonry
Units
3.2.4 GBracing Calculations
SD-06 Test Reports 2.1.2.2Fire-Rated Concrete Masonry
Units 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout
SD-07 Certificates 2.1.2.1Concrete Masonry Units (CMU) 2.3.1.1Cementitious Materials 2.3.1.3Admixtures for Masonry Mortar 2.3.2.2Admixtures for Grout 2.5.2.1Bar Positioners 2.5.3Joint Reinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 117 PAGES
04 20 00 SD-08 Manufacturer’s Instructions 2.3.1.3Admixtures for Masonry Mortar 2.3.2.2Admixtures for Grout
SD-10 Operation and Maintenance Data
3.8Take-Back Program SD-11 Closeout Submittals
2.1.2.1.1Recycled Content 05 05 23.16 SD-01 Preconstruction Submittals
3.2Welding Quality Assurance Plan SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.5Welder, Welding Operator, and
Tacker Qualification 1.3.6Inspector Qualification 1.3.2Previous Qualifications 1.3.3Pre-Qualified Procedures 2.2Welding Electrodes and Rods
SD-06 Test Reports 3.3Nondestructive Testing
SD-07 Certificates 1.3.1Certified Welding Procedure
Specifications (WPS) 1.3.1Certified Brazing Procedure
Specifications (BPS)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 117 PAGES
05 05 23.16 1.3.1Certified Procedure Qualification Records (PQR)
1.3.1Certified Welder Performance Qualifications (WPQ)
1.3.1Certified Brazer Performance Qualifications (BPQ)
05 12 00 SD-01 Preconstruction Submittals 1.4.1.1Erection Drawings
G Fabricator's Internal Quality Control Program Submittal Schedule Erection Procedure; G Connection Design Calculations;
G
SD-02 Shop Drawings
1.4.2 GFabrication drawings
SD-03 Product Data 2.6.2Shop primer 2.4.1Welding electrodes and rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.3Tension control bolts
SD-06 Test Reports 2.6.2Class B coating 2.3Bolts, nuts, and washers 3.7.1.2Weld Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 117 PAGES
05 12 00 3.7.2.1Direct Tension Indicator Washer Inspection Reports
3.7.3.1Bolt Testing Reports 3.7.4Embrittlement Test Reports
SD-07 Certificates 2.2Steel 2.3Bolts, nuts, and washers 2.5Galvanizing 1.3AISC Fabrication Plant Quality
Certification 1.3AISC Erector Quality Certification 1.4.3.1Welding procedures and qualifications 2.4.1Welding electrodes and rods
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.6Galvanizing Repair Paint 2.2.17Mechanical Fasteners 2.1.6Touch-up Paint
Sound Absorbing Materials 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 117 PAGES
05 30 00 2.1.1Metal Roof Deck Units 2.1.3Cellular Metal Floor Deck Units 2.2.4Flexible Closure Strips
Acoustical Material SD-05 Design Data
GDesign Calculations Deck Units SD-07 Certificates
1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance 1.3.1Manufacturer's Certificate 2.2.12Stud Manufacture's Certification 2.2.12Stud Manufacture's Test Reports
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products 05 40 00 SD-02 Shop Drawings
1.6.1Framing Components SD-03 Product Data
2.1Studs, Joists SD-05 Design Data
1.6.2Metal Framing Calculations SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 117 PAGES
05 40 00 1.4Load-Bearing Cold-Formed Metal Framing
3.2.1Welds SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 50 13 SD-02 Shop Drawings
2.6 Gangles and plates
2.5Guard Posts (Bollards/Pipe
Guards)
2.4 GAccess Doors And Panels
2.6Lintels 2.6Sill Angles 2.6Miscellaneous Mountings And
Frames SD-11 Closeout Submittals
2.1 SRecycled Content
2.1 SCertificates Of Compliance
05 51 00 SD-02 Shop Drawings
2.17 GMetal Stair System
2.3 GIron And Steel Hardware
2.3 GSteel Shapes, Plates, Bars And
Strips SD-03 Product Data
2.18 GProtective Coating
2.19.6 GSteel Stairs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 117 PAGES
05 51 00 SD-05 Design Data
1.3.1 GCalculations
SD-07 Certificates 1.3.2Welding Procedures 1.3.2Welder Qualification
05 51 33 SD-02 Shop Drawings 2.3Ladders
Ship's ladder SD-03 Product Data
2.3Ladders Ship's ladder
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
1.2.1 GIron and Steel Hardware
3.2 GIron and Steel Hardware
1.2.1 GSteel Shapes, Plates, Bars and
Strips
3.2 GSteel Shapes, Plates, Bars and
Strips
1.2.1 GSteel Railings And Handrails
2.2.4 GSteel Railings And Handrails
1.2.1 GAnchorage And Fastening
Systems
1.2.1 GAnchorage And Fastening
Systems SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 117 PAGES
05 52 00 1.2.1Concrete Inserts 1.2.1Masonry Anchorage Devices 1.2.1Protective Coating 2.1.2Protective Coating 1.2.1Anchorage And Fastening
Systems 1.2.1Anchorage And Fastening
Systems SD-07 Certificates
1.4.2Welding Procedures 1.4.2Welder Qualification
05 72 00 SD-02 Shop Drawings
2.1 GOrnamental Metal Items
2.1 GInstallation Drawings
2.1 GShop and Field Connections
2.1 GConstruction Details
SD-03 Product Data 2.1Materials 2.1Ornamental Metal Items
SD-04 Samples
2.6.1 GStainless steel Finishes
2.4 GAnchorage Devices and
Fasteners
2.6.2.1 GArchitectural Metal Items
2.6.2.1 GAluminum Finishes
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 117 PAGES
05 72 00 1.3.2Welding Procedures 1.3.2Welder Qualifications
SD-08 Manufacturer’s Instructions 3.3Cleaning Materials 3.3Preventative Maintenance and
Inspection 3.4Maintenance Instructions
06 10 00 SD-03 Product Data 2.5.1Gypsum Sheathing Panels 1.8Fire-retardant Treatment 2.5.1.1High Density Polyisocyanurate
Panels 2.5.2Adhesives
SD-06 Test Reports 1.4.3Preservative-treated
SD-07 Certificates
2.1.1 GCertified Sustainably Harvested
Wood 1.7Preservative Treatment 1.9.3Indoor Air Quality 1.9.1Certificates Of Grade
SD-11 Closeout Submittals
1.9.2 SCertified Sustainably Harvested
Lumber
2.5.2 SIndoor Air Quality for Aerosol
Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 117 PAGES
06 10 00 2.5.2 SIndoor Air Quality For Non-Aerosol Adhesives
06 20 00 SD-02 Shop Drawings
3.1.2 GWall Base
SD-04 Samples
2.1.3 GWood Trim
SD-07 Certificates 1.3Certificates of grade 1.3Certificates of compliance
06 41 16.00 10 SD-02 Shop Drawings
1.5.2 GShop Drawings
2.11 GShop Drawings
3.1 GInstallation
SD-03 Product Data 2.1Wood Materials 1.5.3Certification 2.9Wood Finishes 2.11.8.3Finish Schedule
SD-04 Samples
2.3 GPlastic Laminates
2.6 GCabinet Hardware
SD-07 Certificates 1.5Quality Assurance 2.9Laminate Clad Casework 3.1Laminate Clad Casework
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 117 PAGES
06 41 16.00 10 SLEED Documentation 06 61 16 SD-02 Shop Drawings
1.5.2 GDetail Drawings
3.1 GInstallation
SD-03 Product Data 2.2Solid Polymer Material 1.5.1Qualifications 2.4Fabrications
SD-04 Samples
2.2 GMaterial
SD-06 Test Reports 2.2Solid Polymer Material
SD-07 Certificates 2.4Fabrications 1.5.1Qualifications
SD-10 Operation and Maintenance Data
3.2Clean-up SD-11 Closeout Submittals
SLEED Documentation 06 84 00 SD-01 Preconstruction Submittals
1.3.1Qualifications of Manufacturer 1.3.1Manufacturer's Sample Warranty 1.3.1Qualified Professional Engineer
SD-02 Shop Drawings
1.3.2 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 117 PAGES
06 84 00 SD-03 Product Data 2.1.3Anchorage Materials 2.1.3Adhesives 2.1.3Resins 2.1.3Hardeners
SD-06 Test Reports 2.1.5Ultraviolet Test Reports 2.1.5Thermal Expansion Test Reports 2.1.5Flame Spread Test Reports
SD-08 Manufacturer’s Instructions 3.2.2Manufacturer's Instructions
SD-09 Manufacturer’s Field Reports
3.1Manufacturer's Certification of Installation
SD-11 Closeout Submittals 3.2.1Manufacturer's Warranty
07 13 53 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.3 GElastomeric Waterproofing Sheet
Material
1.4 GProtection Board
2.6 GProtection Board
1.4 GPrimers, Adhesives, and Mastics
2.3 GPrimers, Adhesives, and Mastics
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 117 PAGES
07 13 53 2.3 GElastomeric Waterproofing Sheet Material
3.7Field Quality Control SD-07 Certificates
2.3Elastomeric Waterproofing Sheet Material
1.4Primers, Adhesives, and Mastics 2.3Primers, Adhesives, and Mastics 1.8Special Warranties 1.8Special Warranties
SD-08 Manufacturer’s Instructions 1.4Primers, Adhesives, and Mastics 2.3Primers, Adhesives, and Mastics
SD-11 Closeout Submittals 2.2.1Certificates Of Compliance 2.2.2Certificates Of Compliance
07 14 00 SD-03 Product Data
2.2.2 GFluid-Applied Membrane
2.2.2.1 GMembrane Primer
2.2.3.1 GInsulation Adhesive
2.2.3.2 GInsulation Cover Board
2.1.1.1Sbs Modified Bitumen Base Ply 2.2.1Sbs Modified Bitumen Base Ply
2.2.4.1 GPaver Supports
2.2.4 GPlaza-Deck Pavers
2.2.3 GInsulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 117 PAGES
07 14 00 2.2.1.1Asphalt Primer 2.2.2.2Membrane-Reinforcing Fabric 3.11.1Moisture Meter
SD-11 Closeout Submittals 1.6Warranty 3.13Information Card 3.12Instructions To Government
Personnel 07 21 13 SD-03 Product Data
2.1 GBlock or board insulation
2.3Protection board or coating 2.4Accessories
SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.4.1Adhesive
07 21 16 SD-03 Product Data
2.3 GBlanket Insulation
2.2.1 GPressure Sensitive Tape
2.4 GAccessories
2.2 GSemi-Rigid Mineral-Wool Board
SD-08 Manufacturer’s Instructions 3.3.1Insulation
SD-11 Closeout Submittals
2.1.1 SRecycled Content for Insulation
Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 117 PAGES
07 21 16 2.1.2 SReduce Volatile Organic Compounds (VOC)
07 27 10.00 10 SD-04 Samples
3.1.2 GMock-Up
SD-06 Test Reports
1.7 GDesign Review Report
3.1.3 GTesting and Inspection
SD-07 Certificates 1.6Air Barrier Inspector
07 27 19.01 SD-01 Preconstruction Submittals 1.8.1Qualifications of Manufacturer 1.8.2Qualifications of Installer
SD-02 Shop Drawings
1.4 GSelf-adhering Air Barrier
SD-03 Product Data
1.4 GSelf-adhering Air Barrier
2.3 GPrimers, Adhesives, and Mastics
1.4.2Safety Data Sheets
SD-04 Samples
1.4 GSelf-adhering Air Barrier
SD-06 Test Reports
1.6 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
1.4.4 GFlame Spread and Smoke
Developed Index Ratings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 117 PAGES
07 27 19.01 3.4.1Site Inspections and Testing SD-07 Certificates
1.4Self-adhering Air Barrier 1.8.1Qualifications of Manufacturer 1.8.2Qualifications of Installer
SD-08 Manufacturer’s Instructions 1.4Self-adhering Air Barrier 2.3Primers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1 SVolatile Organic Compound
(VOC) Content 07 42 13 SD-01 Preconstruction Submittals
1.5.3 GQualification of Manufacturer
1.5.4 GQualification of Installation
Contractor
1.8 GWarranty
SD-02 Shop Drawings
1.5.1.1 GInstallation Drawings
SD-03 Product Data
2.2 SRecycled Content;
2.3.1 GWall Panels
2.3.2Factory Color Finish 1.5.5Closure Materials 2.6.4.4Pressure Sensitive Tape 2.6.4.1Sealants and Caulking 1.5.3.1Galvanizing Repair Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 117 PAGES
07 42 13 1.5.3.1Enamel Repair Paint 1.5.5Accessories 2.6Accessories
SD-04 Samples
2.3.1 GWall Panels
1.5.3.1 GFasteners
2.6.3 GMetal Closure Strips
SD-05 Design Data
1.5.1.2 GWind load design analysis
SD-06 Test Reports
3.7.2 GLeakage Tests
1.3.2 GWind Load Tests
2.3.2.5 GCoating
2.3.2.5 GChalking
SD-07 Certificates
1.5.3.1 GCoil Stock
1.5.3.1 GFasteners
1.5.3.1 GGalvanizing Repair Paint
1.5.3.1 GEnamel Repair Paint
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-09 Manufacturer’s Field Reports
3.8.1 GManufacturer's Field Reports
SD-11 Closeout Submittals
1.8 GWarranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 117 PAGES
07 42 13 1.5.6 GMaintenance Instructions
1.8.120 year 'No Dollar Limit' warranty for labor and material 07 42 63 SD-01 Preconstruction Submittals
1.5.3Qualification of Manufacturer 1.5.4Qualification of Installer 1.5.4.1Qualifications for Welding Work
SD-02 Shop Drawings 1.5.1Fabrication and Installation drawings 1.5.1Wall Panel Assemblies 1.5.1Flashing and Accessories 1.5.1Anchorage Systems
SD-03 Product Data 1.5.1sustainable acquisition 1.5.1Manufacturer's catalog data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes 1.5.1Closure Materials 1.5.1Insulation 1.5.1Pressure Sensitive Tape 2.5.4.1Sealants and Caulking 1.5.1Rated Wall Assembly 1.5.1Accessories
SD-04 Samples 1.5.1Wall Panel Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 117 PAGES
07 42 63 1.5.1Fasteners 1.5.1Metal Closure Strips 1.5.1Insulation 1.5.1manufacturer's color charts and chips SD-05 Design Data
1.5.1wind design analysis SD-06 Test Reports
3.7.2Leakage Tests 1.3.2wind load tests 1.3.2seismic tests 1.5.1Factory Color Finish
SD-07 Certificates 1.5.1Fasteners 1.5.3Qualification of Manufacturer 1.5.4Qualification of Installer 1.5.1wall system assembly wind load and fire rating classification listings SD-08 Manufacturer’s Instructions
1.5.1Installation of Wall panels SD-11 Closeout Submittals
1.8Warranty 1.5.1Instructions 1.5.1Material Safety Data Sheets
1.5.120 year 'No-Dollar-Limit' warranty
07 53 23.98 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 117 PAGES
07 53 23.98 GRoof plans, sections, details, and attachments to other work
SD-03 Product Data GProduct Data GProduct Data for adhesives and sealants SD-04 Samples
GSamples for Verification SD-05 Design Data
GWind Uplift Resistance SD-06 Test Reports
GProduct Test Reports for roof materials
Product Test Reports for components of roof membrane and insulation
SD-07 Certificates Qualification of Manufacturer Qualification of Installer Performance Requirement Certificate from Manufacturer
Special Warranty Certificate from Manufacturer
Sample Warranties SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 117 PAGES
07 53 23.98 Maintenance Data SD-11 Closeout Submittals Warranty
07 60 00 SD-02 Shop Drawings
3.1.17 GCovering on flat, sloped, or
curved surfaces
3.1.14 GGravel stops and fascias
3.1.16 GFlashing for roof drains
3.1.11 GCounterflashing
3.1.18 GFlashing at roof penetrations
3.1.12 GReglets
3.1.20 GCopings
3.1.15 GDrip edge
2.2.1 GExposed Sheet Metal
SD-07 Certificates
2.1 GCertificates Of Compliance
SD-11 Closeout Submittals 3.5Quality Control Plan
2.1 SRecycled Content
07 71 00.98 SD-01 Preconstruction Submittals 1.5.1Manufacturer Qualification Data
SD-02 Shop Drawings
2.1.1 GRoof Specialties
SD-03 Product Data
2.2.1 GMetal Coping
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 117 PAGES
07 71 00.98 2.3.1 GCanted Roof-Edge Fascia And Gravel Stop
2.3.2 GRoof-Edge Fascia
2.3.3One-Piece Gravel Stops 2.4.1Parapet Scuppers 2.5.1Reglets 2.5.2Counterflashings 2.5.3Flexible-Flashing Retainer
SD-04 Samples
2.9 GFinish Samples
2.9 GSamples for Verification
SD-06 Test Reports 2.1.2Product Test Reports
SD-11 Closeout Submittals 1.8.1Warranty
07 81 00 SD-03 Product Data
3.3 GFireproofing Material
SD-04 Samples
2.1 GSpray-Applied Fireproofing
SD-06 Test Reports
1.2.2 GFire Resistance Rating
3.6 GField Tests
1.2.3 GEvaluation Reports
SD-07 Certificates
1.4.1 GInstaller Qualifications
3.1Surface Preparation Report
SUBMITTAL REGISTER
CONTR…