Appendix_D.pdf

PDF 549 KB Posted

Attached to
Research Support Building (RSB) Construction Draft RFP Federal contract opportunity
Solicitation number
80GRC018R0009
Issued by
National Aeronautics and Space Administration Glenn Research Center

About this file

Appendix D

View the file

Other files for this federal contract opportunity

Other files attached to Research Support Building (RSB) Construction Draft RFP, newest first.
File Type Posted
Source_Selection_Statement.pdf PDF
Amendment_4_-_Proposal_Due_Date_Extension.pdf PDF
Appendix_J.pdf PDF
Appendix_C.pdf PDF
Amendment_3_-_Drawings_Binder.pdf PDF
Amendment_3_-_Questions_and_Answers.pdf PDF
Appendix_A.pdf PDF
Final_RFP_-_Attachment_F-Price_Breakdown_Form.pdf PDF
Appendix_F.pdf PDF
Appendix_H.pdf PDF
B21_Photos.pdf PDF
Amendment_3_-_Specifications_Binder.pdf PDF
Appendix_G.pdf PDF
Amendment_3_-_Questions_and_Clarifications_-_SF30.pdf PDF
Amendment_3_-_Clarifications.pdf PDF
Questions_and_Answers.pdf PDF
149767_CF_01_-.tif TIF image
Amendment_2_-_Questions_and_Answers_-_SF30.pdf PDF
149761_CF_01_A.TIF TIF image
Amendment_1_-_Proposal_Due_Date_Extension.pdf PDF
Research_Support_Building_(RSB)_-_Request_for_Proposals.pdf PDF
Attachment_E_-_Davis_Bacon_Wage_Rate_Determination.pdf PDF
RSB_Industry_Day_Questions_and_Answers.pdf PDF
Attachment_F_-_Price_Breakdown_Form.pdf PDF
Attachment_B_-_Drawings.pdf PDF
Attachment_C_-_PPQ.pdf PDF
Attachment_G_-_Staff_Qualifications.pdf PDF
Attachment_D_-_Small_Business_Plan.pdf PDF
Attachment_A_-_Specifications.pdf PDF
RSB_Industry_Day_FINAL_as_Presented.pdf PDF
Industry_Day_Attendance_List.pdf PDF
Draft_RFP_Attachment_A-Specifications-16009.pdf PDF
Research_Support_Building_Draft_RFP.pdf PDF
Draft_RFP_Attachment_C-PPQ-16009.pdf PDF
Draft_RFP_Attachment_F-Price_Breakdown_Form-16009.pdf PDF
Draft_RFP_Attachment_D-Small_Business-16009.pdf PDF
Draft_RFP_Attachment_B-Drawings-16009-18_0220.pdf PDF
One_on_One_Attendance_Form.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESEARCH SUPPORT BUILDING 16009

Appendix D:

Submittal Register

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 117 PAGES

RESEARCH SUPPORT BUILDING

01 11 00.98 SD-01 Preconstruction Submittals GSite Specific Health and Safety

Plan (HASP)

1.17.1 GUtility Outages

GConfined Space Permits

1.17.1 GConnection Requests

GDigging, Excavating, and Trenching Permits

GSoil Relocation Form Permits

1.17.2 GHot Work Permits

01 14 00 SD-01 Preconstruction Submittals

1.3.1.1 GList of Contact Personnel

GPersonnel List GVehicle List GStatement of Acknowledgement

Form SF 1413 01 30 00.98 SD-01 Preconstruction Submittals

GQualifications of Project Manager GQualifications of Superintendent GQualifications of Occupational

Health and Safety Professional

1.4.1 GList of contact personnel

GView location map 01 33 29 SD-01 Preconstruction Submittals

SLEED Implementation Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 117 PAGES

01 33 29 SMR Credit 2 and ID Credit 1.5 Waste Management Plan-95

SEQ Credit 3.1 Construction IAQ Management Plan (During Construction)

SEQ Credit 3.2 Construction IAQ Management Plan (Before Occupancy)

SD-02 Shop Drawings SMR Credit 4: Recycled Content SMR Credit 5: Regional Materials SMR Credit 6: Rapidly Renewable

Materials SMR Credit 7: Certified Wood, 50 SEQ Credit 4.1: Low-Emitting

Materials, Adhesives and Sealants SEQ Credit 4.2: Low-Emitting

Materials, Paints and Coatings SEQ Credit 4.3: Low-Emitting

Materials, Flooring Systems SEQ Credit 4.4: Low-Emitting

Materials, Composite Wood & Agrifiber Products

SD-06 Test Reports SEQ Credit 3.1: Construction IAQ

Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 117 PAGES

01 33 29 SEQ Credit 3.2: Construction IAQ Management Plan

Progress Reports SSS Prerequisite 1: Construction

Activity Pollution Prevention SMR Credit 2 and ID Credit 1.5:

Waste Management Plan-95 SMR Credit 4: Recycled Content SMR Credit 5: Regional Material SMR Credit 6: Rapidly Renewable

Materials SMR Credit 7: Certified Wood, 50

SD-07 Certificates SMR Credit 7: Certified Wood

SD-11 Closeout Submittals SMR Credit 2 and ID Credit 1.5:

Construction Waste Management-95

SMR Credit 4: Recycled Content SMR Credit 5: Regional Materials SMR Credit 6: Rapidly Renewable

Materials SEQ Credit 3.1: Construction IAQ

Management Plan, during construction

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 117 PAGES

01 33 29 SEQ Credit 3.2: Construction IAQ Management Plan, before Occupancy

SEQ Credit 4.1: Low -Emitting Materials, Adhesives and Sealants

SEQ Credit 4.2: Low-Emitting Materials, Paints and Coatings

SEQ Credit 4.3: Low-Emitting Materials, Flooring Systems

SEQ Credit 4.4: Low-Emitting Materials, Composite Wood and Agrifiber Products

01 35 26.98 SD-06 Test Reports 1.14Gas Protection

SD-07 Certificates

1.3.1 GSite Specific Health and Safety

Plan

1.3.2 GProtection Plan

GConstruction Project Training Summary Report

GTraining certifications for fall protection competent person

GSteel Erection Plan GCritical Lift Plans as Required under 29 CFR 1926, Subpart CC 01 35 43.98 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 117 PAGES

01 35 43.98 Environmental protection plan Dirt and dust control plan ; G Hazardous Materials Inventories Statement

Safety Data Sheets Hazard Communication Written Program

SD-06 Test Reports Site Inspection Checklists RCRA 90-Day Waste Accumulation Site Inspection Checklists

Laboratory analysis Disposal Requirements

SD-07 Certificates 3.5.1TSDF Letter of Acceptance and

Hazardous Waste Manifests SD-11 Closeout Submittals Preconstruction survey Waste determination documentation

Disposal documentation for solid, hazardous, and regulated waste

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 117 PAGES

01 35 43.98 Contractor employee training records in compliance with 40

CFR 265.16, 29 CFR 1910.120,

29 CFR 1910.1200 and 40 CFR 82.

Regulatory notification Erosion and sediment control inspection reports

Solid waste disposal report Contractor Hazardous Material Inventory Log

Hazardous Waste/Debris Management

01 45 00.98 SD-01 Preconstruction Submittals GQuality Assurance (QA) Plan

SD-06 Test Reports

1.2.2 GQuality Control Data

1.2.2 GQuality Control Coordinating

Actions

1.2.2 GQuality Control Training

1.2.2 GInspection Records

GLetters of Authority or Delegation

1.2.2 GField Tests

1.2.2 GFactory Tests

01 45 33.01 98 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 117 PAGES

01 45 33.01 98 Contractor Welding Quality Assurance Program

Welding Lot Size - identified on a marked drawing

SD-07 Certificates Certified Welding Procedure Specifications

Certified Procedure Qualification Records

Certified Welder Performance Qualifications

SD-11 Closeout Submittals Completed Weld Request Form (if required)

Final Welder's Continuity Log 01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

3.1.1 GProject Manual

3.1.1Written Practices 3.1.3Written Practices 3.1.1NDT Procedures and Equipment

Calibration Records 3.1.3NDT Procedures and Equipment

Calibration Records SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 117 PAGES

01 45 35 3.1.1Daily Reports 3.1.3Daily Reports 3.1.3Daily Reports 3.1.1Biweekly Reports 3.1.2Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1AC472 Accreditation 2.1Certified Plant 2.1Certificate of Compliance

1.5.14 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1Qualification Records 3.1.3Qualification Records

SD-11 Closeout Submittals 3.1.1Interim Final Report 3.1.3Interim Final Report

3.1.1 GComprehensive Final Report

3.1.3 GComprehensive Final Report

01 50 00.98 SD-01 Preconstruction Submittals GTemporary Power and Lighting

Plans and Drawings GDust Control Plan

01 57 23.98 SD-07 Certificates Mill Certificate or Affidavit

01 75 00.98 SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 117 PAGES

01 75 00.98 1.2.2Factory Tests 1.2.3Functional Test 1.2.4Final Acceptance Test 1.2.5Test Procedures

01 78 00.98 SD-01 Preconstruction Submittals Reproducible Drawings CAD System Drawings

SD-02 Shop Drawings As-Built Drawings

SD-03 Product Data Spare Parts Data

SD-07 Certificates Work Plan

SD-08 Manufacturer’s Instructions Preventative Maintenance Condition Monitoring (Predictive Testing)

Inspection Posted Instructions

SD-10 Operation and Maintenance Data

3.1Operation and Maintenance Manuals

01 86 12.07 98 SD-01 Preconstruction Submittals

1.5 GQuality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 117 PAGES

01 86 12.07 98 2.1 GMaterial, Equipment, and Fixture Lists

SD-02 Shop Drawings 3.1Connection Diagrams 2.1.1Bearing Layout 2.1.1Fabrication Drawings 3.1Installation Drawings

SD-03 Product Data

2.1.1 GManufacturer's Catalog Data

2.1.1 GEquipment Foundation Data

2.1.3 GSpecific Equipment Data

2.1.4 GSpare Parts List

1.6 GWarranty

SD-05 Design Data

1.4 GDesign Analysis and Calculations

SD-06 Test Reports

3.3.1 GAlignment Test

3.3.1 GBalancing Test

GBorescope Inspection Test

3.3.1 GCode and Requirements

Verification Test

3.3.1 GCold Starting Test

GCooling System Evaluation Test

3.3.1 GDuctwork Leakage Test

GExhaust Emissions Test

3.3.1 GFlux Analysis Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 117 PAGES

01 86 12.07 98 GHigh Voltage Test GHydraulic Oil Test

3.3.1 GHydrostatic Test

GInfrared Thermography Test

3.3.1 GInsulation Power Factor Test

GInsulation Resistance Test

3.3.1 GLubricating Oil Test

GMechanical Performance Test

3.3.1 GMotor Circuit Evaluation Test

GNoise Level Acceptance Test

3.3.1 GOperational Fire Damper Test

GPerformance Test GPower/Output Test

3.3.1 GThermodynamic Performance

Test

3.3.1 GUltrasonic (Airborne) Test

GUltrasonic (Pulse) Test

3.3.1 GVibration Analysis Test

3.2 GVisual Inspection

GWarranty Test SD-07 Certificates

2.1.2 GCertificates

SD-08 Manufacturer’s Instructions

3.1 GManufacturer's Instructions

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 117 PAGES

01 86 12.07 98 3.4 GOperations and Maintenance Manuals

SD-11 Closeout Submittals

3.1 GRecord Drawings

3.5 GAcceptance Documentation

01 91 00.00 98 SD-01 Preconstruction Submittals

2.2.1 GCommissioning Plan

2.2.1 GCommissioning Schedule

SD-05 Design Data

1.7 GBasis of Design

SD-06 Test Reports

3.2.5 GFunctional Performance Testing

Results

3.1 GSeasonal Testing

3.3 GShort-Term Diagnostic Testing

3.1 GDeficiency Report and Resolution

Record SD-07 Certificates

1.6 GCommissioning Agents

Qualifications

SD-10 Operation and Maintenance Data

3.5 GOperations and Maintenance

Manuals

3.5 GTraining Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 117 PAGES

01 91 00.00 98 3.5 GOperations and Maintenance Database

SD-11 Closeout Submittals

3.1 GFinal Commissioning Report

3.6 GLEED™ Documentation

GGreen Globes - US Documentation

3.1 GWarranty

02 61 00.98 SD-07 Certificates

1.2.1 GSite Specific Health and Safety

Plan

1.2.2 GSite Specific Work Plan

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 GFormwork

3.1.1 GFormwork

2.2.1 GForm Removal Schedule

SD-03 Product Data 2.2Form Materials

SD-04 Samples

1.3 GSample Panels

2.2.4 GFiber Voids

SD-05 Design Data 2.1Calculations

SD-06 Test Reports 3.2Inspection

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 117 PAGES

03 11 13.00 10 2.2.4Fiber Voids 03 15 00.00 10 SD-02 Shop Drawings

2.4 GWaterstops

SD-03 Product Data

2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops

SD-04 Samples 2.3.2Lubricant for Preformed

Compression Seals 2.3.3Field-Molded Type 2.4Waterstops

GSplicing Waterstops SD-07 Certificates

2.2Preformed Expansion Joint Filler 2.3Sealant 2.4Waterstops

03 20 00.00 10 SD-01 Preconstruction Submittals

3.1.3.2 GButt-Splices

SD-02 Shop Drawings

3.1 GReinforcement

SD-03 Product Data

2.3.1 GMechanical Butt-Splices

2.3 GReinforcing Steel

SD-04 Samples Epoxy-Coated Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 117 PAGES

03 20 00.00 10 SD-06 Test Reports

2.8 GTests, Inspections, and

Verifications SD-07 Certificates

2.3Reinforcing Steel 1.4.1Qualified Welders 1.4.2Qualification of Steel Bar

Butt-Splicers 03 30 00.11 98 SD-03 Product Data

2.1.1 GVapor Retarder

2.1.2 GAccessories

SD-04 Samples 2.1.2Accessories 2.1.1Vapor Retarder

03 30 00.98 SD-02 Shop Drawings 1.6.2.1Fabrication Drawings 1.6.2.2Formwork 1.6.2.2Formwork 1.6.2.1Column Forms 1.6.2.1Wall Forms 1.6.2.1Floor Forms 1.6.2.1Ceiling Forms 1.6.2.1Special Construction

1.6.2.3 GReinforcing steel

SD-03 Product Data 2.4.7Materials for curing concrete

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 117 PAGES

03 30 00.98 2.4.10 SJoint sealants

2.4.9 SJoint filler

2.1.2Plastic Forms 2.1.3Carton Forms

SRecycled Aggregate Materials

2.4.1 SCement

2.4.1.3Portland Cement 2.3.2Ready-Mix Concrete

Vapor retarder and Vapor barrier 2.6Bonding Materials 2.7Floor Finish Materials 2.3.3Concrete Curing Materials

2.5 SReinforcement

1.6.2.1Reinforcement Materials 2.7.1Liquid Chemical Floor Hardener 2.4.11Epoxy bonding compound 2.5.5Synthetic reinforcing fibers 2.2.1Waterstops 2.4.10.3Waterstops 3.14.2Waterstops 2.1.1Wood Forms

1.8.1 SLocal/Regional Materials

2.4.12Biodegradable Form Release

Agent SD-04 Samples

1.6.5.1Slab finish sample

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 117 PAGES

03 30 00.98 2.4.10.3Dumbbell Type 2.4.10.3Rubber 2.4.10.3Polyvinylchloride (PVC)

SD-05 Design Data 2.3.1mix design 1.6.1.1Calculations

SD-06 Test Reports

1.6.4.1 GConcrete mix design

1.6.4.2Fly ash 1.6.4.2Pozzolan 1.6.4.3Ground granulated blast-furnace slag 1.6.4.4Aggregates 1.6.4.5Fiber-reinforced concrete 3.10.2.1Tolerance report 3.12.2.3Compressive strength tests 3.12.2.5Unit weight of structural lightweight concrete 3.12.2.6Ion concentration 3.12.2.4Air Content 2.8.4Slump 2.8.1Air Entrainment

SD-07 Certificates 1.6.3.1Curing concrete elements 1.6.3.2Pumping concrete 1.6.3.3Finishing plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 117 PAGES

03 30 00.98 1.6.3.4Form removal schedule 2.4.12Biodegradable Form Release

Agent 1.6.3.5VOC Content for form release agents, curing compounds, and concrete penetrating sealers

1.6.3.6Material Safety Data Sheets 1.8.2Forest Stewardship Council

(FSC) Certification SD-08 Manufacturer’s Instructions

1.6.4.2Fly ash 1.6.4.3Ground granulated blast-furnace slag 1.10Welding Procedures 1.10Welding Procedures 2.5.8Steel Bar 1.10Welder Qualifications

03 35 00.00 10 SD-03 Product Data Part 2 SRecycled Content Products

SD-04 Samples 1.3.1Field Test Panels 1.3.1.1Sample Wall Panels 1.3.1.2Slab Panels

SD-08 Manufacturer’s Instructions Dry Shake Finish

03 35 43 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 117 PAGES

03 35 43 1.5.1Installer Qualifications SD-02 Shop Drawings

2.1 GPolishing Plan

SD-03 Product Data

2.2.2 GPrimer

2.3.3 GLeveling And Patching

Compound

2.2.1 GPortland Cement Based, Self-Leveling, Polishable Overlay

2.2.4 GSealer

2.3.1 GMetal Edge Strips

2.3.4Joint Fillers

SD-04 Samples

2.1 GSamples for Initial Selection

1.5.2 GMockups

SD-06 Test Reports 2.1.3Finished Surface Friction

SD-07 Certificates 2.2.3Liquid Floor Treatments

03 39 00.00 10 SD-03 Product Data 2.1Curing Materials

SD-06 Test Reports 3.2Testing and Inspection for CQC

SD-08 Manufacturer’s Instructions 2.1Curing Compound

03 45 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 117 PAGES

03 45 00 1.12.5Pre-Installation Meeting SD-02 Shop Drawings

1.12.1 GPrecast Drawings

SD-03 Product Data

2.3 GCast-In Embedded Items And

Connectors

GConnection Devices 2.2.6Admixtures 2.5Gasket

Thin Brick Veneer 2.6Bearing Pads

SD-04 Samples

1.12.2 GConcrete Wall Panel Surface

Finish 1.12.4Mock-up

Brick Color Chips Form Liner

1.12.2Full Size Sample Wall Panel SD-05 Design Data

1.5.4 GDesign Calculations

2.1.1 GContractor-Furnished Mix Design

2.4.9 GRepair of Surface Defects

1.5.5 GThermal Calculations

SD-06 Test Reports

1.11.2 GStrength Tests

1.11.2Slump

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 117 PAGES

03 45 00 1.11.2Air Content 1.11.1Test for Concrete Materials 2.2.7Water 3.6.4Testing Precast Units for

Strength SD-07 Certificates

1.4 GManufacturer's Qualifications

1.8.1Fabricator Quality Certifications 1.9Erector Certification 1.10Erector's Post Audit Declaration

SD-08 Manufacturer’s Instructions

3.3 GInstallation

3.8 GCleaning

Thin Brick SD-11 Closeout Submittals

1.12.3 GBatch Ticket Information

2.2.1 SRecycled Content for Fly Ash and

Pozzolan

2.2.1 SRecycled Content for Ground Iron

Blast-Furnace Slag

2.2.1 SRecycled Content for Silica Fume

04 20 00 SD-02 Shop Drawings GCut CMU Drawings GReinforcementDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 117 PAGES

04 20 00 1.5.2 GCold Weather Procedures

2.3.1.2 GCement

2.3.1.1 GCementitious Materials

SD-04 Samples

2.1.2.1 GConcrete Masonry Units (CMU)

2.3.1.3 GAdmixtures for Masonry Mortar

2.5.2 GAnchors, Ties, and Bar

Positioners

2.5.3 GJoint Reinforcement

SD-05 Design Data

2.1.2.1.5 GMasonry Compressive Strength

2.1.2.2 GFire-Rated Concrete Masonry

Units

3.2.4 GBracing Calculations

SD-06 Test Reports 2.1.2.2Fire-Rated Concrete Masonry

Units 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout

SD-07 Certificates 2.1.2.1Concrete Masonry Units (CMU) 2.3.1.1Cementitious Materials 2.3.1.3Admixtures for Masonry Mortar 2.3.2.2Admixtures for Grout 2.5.2.1Bar Positioners 2.5.3Joint Reinforcement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 117 PAGES

04 20 00 SD-08 Manufacturer’s Instructions 2.3.1.3Admixtures for Masonry Mortar 2.3.2.2Admixtures for Grout

SD-10 Operation and Maintenance Data

3.8Take-Back Program SD-11 Closeout Submittals

2.1.2.1.1Recycled Content 05 05 23.16 SD-01 Preconstruction Submittals

3.2Welding Quality Assurance Plan SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.5Welder, Welding Operator, and

Tacker Qualification 1.3.6Inspector Qualification 1.3.2Previous Qualifications 1.3.3Pre-Qualified Procedures 2.2Welding Electrodes and Rods

SD-06 Test Reports 3.3Nondestructive Testing

SD-07 Certificates 1.3.1Certified Welding Procedure

Specifications (WPS) 1.3.1Certified Brazing Procedure

Specifications (BPS)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 117 PAGES

05 05 23.16 1.3.1Certified Procedure Qualification Records (PQR)

1.3.1Certified Welder Performance Qualifications (WPQ)

1.3.1Certified Brazer Performance Qualifications (BPQ)

05 12 00 SD-01 Preconstruction Submittals 1.4.1.1Erection Drawings

G Fabricator's Internal Quality Control Program Submittal Schedule Erection Procedure; G Connection Design Calculations;

G

SD-02 Shop Drawings

1.4.2 GFabrication drawings

SD-03 Product Data 2.6.2Shop primer 2.4.1Welding electrodes and rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.3Tension control bolts

SD-06 Test Reports 2.6.2Class B coating 2.3Bolts, nuts, and washers 3.7.1.2Weld Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 117 PAGES

05 12 00 3.7.2.1Direct Tension Indicator Washer Inspection Reports

3.7.3.1Bolt Testing Reports 3.7.4Embrittlement Test Reports

SD-07 Certificates 2.2Steel 2.3Bolts, nuts, and washers 2.5Galvanizing 1.3AISC Fabrication Plant Quality

Certification 1.3AISC Erector Quality Certification 1.4.3.1Welding procedures and qualifications 2.4.1Welding electrodes and rods

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.6Galvanizing Repair Paint 2.2.17Mechanical Fasteners 2.1.6Touch-up Paint

Sound Absorbing Materials 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 117 PAGES

05 30 00 2.1.1Metal Roof Deck Units 2.1.3Cellular Metal Floor Deck Units 2.2.4Flexible Closure Strips

Acoustical Material SD-05 Design Data

GDesign Calculations Deck Units SD-07 Certificates

1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance 1.3.1Manufacturer's Certificate 2.2.12Stud Manufacture's Certification 2.2.12Stud Manufacture's Test Reports

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products 05 40 00 SD-02 Shop Drawings

1.6.1Framing Components SD-03 Product Data

2.1Studs, Joists SD-05 Design Data

1.6.2Metal Framing Calculations SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 117 PAGES

05 40 00 1.4Load-Bearing Cold-Formed Metal Framing

3.2.1Welds SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 50 13 SD-02 Shop Drawings

2.6 Gangles and plates

2.5Guard Posts (Bollards/Pipe

Guards)

2.4 GAccess Doors And Panels

2.6Lintels 2.6Sill Angles 2.6Miscellaneous Mountings And

Frames SD-11 Closeout Submittals

2.1 SRecycled Content

2.1 SCertificates Of Compliance

05 51 00 SD-02 Shop Drawings

2.17 GMetal Stair System

2.3 GIron And Steel Hardware

2.3 GSteel Shapes, Plates, Bars And

Strips SD-03 Product Data

2.18 GProtective Coating

2.19.6 GSteel Stairs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 117 PAGES

05 51 00 SD-05 Design Data

1.3.1 GCalculations

SD-07 Certificates 1.3.2Welding Procedures 1.3.2Welder Qualification

05 51 33 SD-02 Shop Drawings 2.3Ladders

Ship's ladder SD-03 Product Data

2.3Ladders Ship's ladder

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

1.2.1 GIron and Steel Hardware

3.2 GIron and Steel Hardware

1.2.1 GSteel Shapes, Plates, Bars and

Strips

3.2 GSteel Shapes, Plates, Bars and

Strips

1.2.1 GSteel Railings And Handrails

2.2.4 GSteel Railings And Handrails

1.2.1 GAnchorage And Fastening

Systems

1.2.1 GAnchorage And Fastening

Systems SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 117 PAGES

05 52 00 1.2.1Concrete Inserts 1.2.1Masonry Anchorage Devices 1.2.1Protective Coating 2.1.2Protective Coating 1.2.1Anchorage And Fastening

Systems 1.2.1Anchorage And Fastening

Systems SD-07 Certificates

1.4.2Welding Procedures 1.4.2Welder Qualification

05 72 00 SD-02 Shop Drawings

2.1 GOrnamental Metal Items

2.1 GInstallation Drawings

2.1 GShop and Field Connections

2.1 GConstruction Details

SD-03 Product Data 2.1Materials 2.1Ornamental Metal Items

SD-04 Samples

2.6.1 GStainless steel Finishes

2.4 GAnchorage Devices and

Fasteners

2.6.2.1 GArchitectural Metal Items

2.6.2.1 GAluminum Finishes

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 117 PAGES

05 72 00 1.3.2Welding Procedures 1.3.2Welder Qualifications

SD-08 Manufacturer’s Instructions 3.3Cleaning Materials 3.3Preventative Maintenance and

Inspection 3.4Maintenance Instructions

06 10 00 SD-03 Product Data 2.5.1Gypsum Sheathing Panels 1.8Fire-retardant Treatment 2.5.1.1High Density Polyisocyanurate

Panels 2.5.2Adhesives

SD-06 Test Reports 1.4.3Preservative-treated

SD-07 Certificates

2.1.1 GCertified Sustainably Harvested

Wood 1.7Preservative Treatment 1.9.3Indoor Air Quality 1.9.1Certificates Of Grade

SD-11 Closeout Submittals

1.9.2 SCertified Sustainably Harvested

Lumber

2.5.2 SIndoor Air Quality for Aerosol

Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 117 PAGES

06 10 00 2.5.2 SIndoor Air Quality For Non-Aerosol Adhesives

06 20 00 SD-02 Shop Drawings

3.1.2 GWall Base

SD-04 Samples

2.1.3 GWood Trim

SD-07 Certificates 1.3Certificates of grade 1.3Certificates of compliance

06 41 16.00 10 SD-02 Shop Drawings

1.5.2 GShop Drawings

2.11 GShop Drawings

3.1 GInstallation

SD-03 Product Data 2.1Wood Materials 1.5.3Certification 2.9Wood Finishes 2.11.8.3Finish Schedule

SD-04 Samples

2.3 GPlastic Laminates

2.6 GCabinet Hardware

SD-07 Certificates 1.5Quality Assurance 2.9Laminate Clad Casework 3.1Laminate Clad Casework

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 117 PAGES

06 41 16.00 10 SLEED Documentation 06 61 16 SD-02 Shop Drawings

1.5.2 GDetail Drawings

3.1 GInstallation

SD-03 Product Data 2.2Solid Polymer Material 1.5.1Qualifications 2.4Fabrications

SD-04 Samples

2.2 GMaterial

SD-06 Test Reports 2.2Solid Polymer Material

SD-07 Certificates 2.4Fabrications 1.5.1Qualifications

SD-10 Operation and Maintenance Data

3.2Clean-up SD-11 Closeout Submittals

SLEED Documentation 06 84 00 SD-01 Preconstruction Submittals

1.3.1Qualifications of Manufacturer 1.3.1Manufacturer's Sample Warranty 1.3.1Qualified Professional Engineer

SD-02 Shop Drawings

1.3.2 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 117 PAGES

06 84 00 SD-03 Product Data 2.1.3Anchorage Materials 2.1.3Adhesives 2.1.3Resins 2.1.3Hardeners

SD-06 Test Reports 2.1.5Ultraviolet Test Reports 2.1.5Thermal Expansion Test Reports 2.1.5Flame Spread Test Reports

SD-08 Manufacturer’s Instructions 3.2.2Manufacturer's Instructions

SD-09 Manufacturer’s Field Reports

3.1Manufacturer's Certification of Installation

SD-11 Closeout Submittals 3.2.1Manufacturer's Warranty

07 13 53 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.3 GElastomeric Waterproofing Sheet

Material

1.4 GProtection Board

2.6 GProtection Board

1.4 GPrimers, Adhesives, and Mastics

2.3 GPrimers, Adhesives, and Mastics

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 117 PAGES

07 13 53 2.3 GElastomeric Waterproofing Sheet Material

3.7Field Quality Control SD-07 Certificates

2.3Elastomeric Waterproofing Sheet Material

1.4Primers, Adhesives, and Mastics 2.3Primers, Adhesives, and Mastics 1.8Special Warranties 1.8Special Warranties

SD-08 Manufacturer’s Instructions 1.4Primers, Adhesives, and Mastics 2.3Primers, Adhesives, and Mastics

SD-11 Closeout Submittals 2.2.1Certificates Of Compliance 2.2.2Certificates Of Compliance

07 14 00 SD-03 Product Data

2.2.2 GFluid-Applied Membrane

2.2.2.1 GMembrane Primer

2.2.3.1 GInsulation Adhesive

2.2.3.2 GInsulation Cover Board

2.1.1.1Sbs Modified Bitumen Base Ply 2.2.1Sbs Modified Bitumen Base Ply

2.2.4.1 GPaver Supports

2.2.4 GPlaza-Deck Pavers

2.2.3 GInsulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 117 PAGES

07 14 00 2.2.1.1Asphalt Primer 2.2.2.2Membrane-Reinforcing Fabric 3.11.1Moisture Meter

SD-11 Closeout Submittals 1.6Warranty 3.13Information Card 3.12Instructions To Government

Personnel 07 21 13 SD-03 Product Data

2.1 GBlock or board insulation

2.3Protection board or coating 2.4Accessories

SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.4.1Adhesive

07 21 16 SD-03 Product Data

2.3 GBlanket Insulation

2.2.1 GPressure Sensitive Tape

2.4 GAccessories

2.2 GSemi-Rigid Mineral-Wool Board

SD-08 Manufacturer’s Instructions 3.3.1Insulation

SD-11 Closeout Submittals

2.1.1 SRecycled Content for Insulation

Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 117 PAGES

07 21 16 2.1.2 SReduce Volatile Organic Compounds (VOC)

07 27 10.00 10 SD-04 Samples

3.1.2 GMock-Up

SD-06 Test Reports

1.7 GDesign Review Report

3.1.3 GTesting and Inspection

SD-07 Certificates 1.6Air Barrier Inspector

07 27 19.01 SD-01 Preconstruction Submittals 1.8.1Qualifications of Manufacturer 1.8.2Qualifications of Installer

SD-02 Shop Drawings

1.4 GSelf-adhering Air Barrier

SD-03 Product Data

1.4 GSelf-adhering Air Barrier

2.3 GPrimers, Adhesives, and Mastics

1.4.2Safety Data Sheets

SD-04 Samples

1.4 GSelf-adhering Air Barrier

SD-06 Test Reports

1.6 GField Peel Adhesion Test

1.4.4 GFlame Propagation of Wall

Assemblies

1.4.4 GFlame Spread and Smoke

Developed Index Ratings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 117 PAGES

07 27 19.01 3.4.1Site Inspections and Testing SD-07 Certificates

1.4Self-adhering Air Barrier 1.8.1Qualifications of Manufacturer 1.8.2Qualifications of Installer

SD-08 Manufacturer’s Instructions 1.4Self-adhering Air Barrier 2.3Primers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1 SVolatile Organic Compound

(VOC) Content 07 42 13 SD-01 Preconstruction Submittals

1.5.3 GQualification of Manufacturer

1.5.4 GQualification of Installation

Contractor

1.8 GWarranty

SD-02 Shop Drawings

1.5.1.1 GInstallation Drawings

SD-03 Product Data

2.2 SRecycled Content;

2.3.1 GWall Panels

2.3.2Factory Color Finish 1.5.5Closure Materials 2.6.4.4Pressure Sensitive Tape 2.6.4.1Sealants and Caulking 1.5.3.1Galvanizing Repair Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 117 PAGES

07 42 13 1.5.3.1Enamel Repair Paint 1.5.5Accessories 2.6Accessories

SD-04 Samples

2.3.1 GWall Panels

1.5.3.1 GFasteners

2.6.3 GMetal Closure Strips

SD-05 Design Data

1.5.1.2 GWind load design analysis

SD-06 Test Reports

3.7.2 GLeakage Tests

1.3.2 GWind Load Tests

2.3.2.5 GCoating

2.3.2.5 GChalking

SD-07 Certificates

1.5.3.1 GCoil Stock

1.5.3.1 GFasteners

1.5.3.1 GGalvanizing Repair Paint

1.5.3.1 GEnamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-09 Manufacturer’s Field Reports

3.8.1 GManufacturer's Field Reports

SD-11 Closeout Submittals

1.8 GWarranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 117 PAGES

07 42 13 1.5.6 GMaintenance Instructions

1.8.120 year 'No Dollar Limit' warranty for labor and material 07 42 63 SD-01 Preconstruction Submittals

1.5.3Qualification of Manufacturer 1.5.4Qualification of Installer 1.5.4.1Qualifications for Welding Work

SD-02 Shop Drawings 1.5.1Fabrication and Installation drawings 1.5.1Wall Panel Assemblies 1.5.1Flashing and Accessories 1.5.1Anchorage Systems

SD-03 Product Data 1.5.1sustainable acquisition 1.5.1Manufacturer's catalog data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes 1.5.1Closure Materials 1.5.1Insulation 1.5.1Pressure Sensitive Tape 2.5.4.1Sealants and Caulking 1.5.1Rated Wall Assembly 1.5.1Accessories

SD-04 Samples 1.5.1Wall Panel Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 117 PAGES

07 42 63 1.5.1Fasteners 1.5.1Metal Closure Strips 1.5.1Insulation 1.5.1manufacturer's color charts and chips SD-05 Design Data

1.5.1wind design analysis SD-06 Test Reports

3.7.2Leakage Tests 1.3.2wind load tests 1.3.2seismic tests 1.5.1Factory Color Finish

SD-07 Certificates 1.5.1Fasteners 1.5.3Qualification of Manufacturer 1.5.4Qualification of Installer 1.5.1wall system assembly wind load and fire rating classification listings SD-08 Manufacturer’s Instructions

1.5.1Installation of Wall panels SD-11 Closeout Submittals

1.8Warranty 1.5.1Instructions 1.5.1Material Safety Data Sheets

1.5.120 year 'No-Dollar-Limit' warranty

07 53 23.98 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 117 PAGES

07 53 23.98 GRoof plans, sections, details, and attachments to other work

SD-03 Product Data GProduct Data GProduct Data for adhesives and sealants SD-04 Samples

GSamples for Verification SD-05 Design Data

GWind Uplift Resistance SD-06 Test Reports

GProduct Test Reports for roof materials

Product Test Reports for components of roof membrane and insulation

SD-07 Certificates Qualification of Manufacturer Qualification of Installer Performance Requirement Certificate from Manufacturer

Special Warranty Certificate from Manufacturer

Sample Warranties SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 117 PAGES

07 53 23.98 Maintenance Data SD-11 Closeout Submittals Warranty

07 60 00 SD-02 Shop Drawings

3.1.17 GCovering on flat, sloped, or

curved surfaces

3.1.14 GGravel stops and fascias

3.1.16 GFlashing for roof drains

3.1.11 GCounterflashing

3.1.18 GFlashing at roof penetrations

3.1.12 GReglets

3.1.20 GCopings

3.1.15 GDrip edge

2.2.1 GExposed Sheet Metal

SD-07 Certificates

2.1 GCertificates Of Compliance

SD-11 Closeout Submittals 3.5Quality Control Plan

2.1 SRecycled Content

07 71 00.98 SD-01 Preconstruction Submittals 1.5.1Manufacturer Qualification Data

SD-02 Shop Drawings

2.1.1 GRoof Specialties

SD-03 Product Data

2.2.1 GMetal Coping

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 117 PAGES

07 71 00.98 2.3.1 GCanted Roof-Edge Fascia And Gravel Stop

2.3.2 GRoof-Edge Fascia

2.3.3One-Piece Gravel Stops 2.4.1Parapet Scuppers 2.5.1Reglets 2.5.2Counterflashings 2.5.3Flexible-Flashing Retainer

SD-04 Samples

2.9 GFinish Samples

2.9 GSamples for Verification

SD-06 Test Reports 2.1.2Product Test Reports

SD-11 Closeout Submittals 1.8.1Warranty

07 81 00 SD-03 Product Data

3.3 GFireproofing Material

SD-04 Samples

2.1 GSpray-Applied Fireproofing

SD-06 Test Reports

1.2.2 GFire Resistance Rating

3.6 GField Tests

1.2.3 GEvaluation Reports

SD-07 Certificates

1.4.1 GInstaller Qualifications

3.1Surface Preparation Report

SUBMITTAL REGISTER

CONTR…