Appendix_F.pdf

PDF 286 KB Posted

Attached to
Research Support Building (RSB) Construction Draft RFP Federal contract opportunity
Solicitation number
80GRC018R0009
Issued by
National Aeronautics and Space Administration Glenn Research Center

About this file

Appendix F

View the file

Other files for this federal contract opportunity

Other files attached to Research Support Building (RSB) Construction Draft RFP, newest first.
File Type Posted
Source_Selection_Statement.pdf PDF
Amendment_4_-_Proposal_Due_Date_Extension.pdf PDF
Amendment_3_-_Questions_and_Answers.pdf PDF
Appendix_A.pdf PDF
Final_RFP_-_Attachment_F-Price_Breakdown_Form.pdf PDF
Appendix_H.pdf PDF
Appendix_D.pdf PDF
B21_Photos.pdf PDF
Amendment_3_-_Specifications_Binder.pdf PDF
Appendix_G.pdf PDF
Appendix_J.pdf PDF
Appendix_C.pdf PDF
Amendment_3_-_Drawings_Binder.pdf PDF
Amendment_3_-_Questions_and_Clarifications_-_SF30.pdf PDF
Amendment_3_-_Clarifications.pdf PDF
Questions_and_Answers.pdf PDF
149767_CF_01_-.tif TIF image
Amendment_2_-_Questions_and_Answers_-_SF30.pdf PDF
149761_CF_01_A.TIF TIF image
Amendment_1_-_Proposal_Due_Date_Extension.pdf PDF
Research_Support_Building_(RSB)_-_Request_for_Proposals.pdf PDF
Attachment_E_-_Davis_Bacon_Wage_Rate_Determination.pdf PDF
RSB_Industry_Day_Questions_and_Answers.pdf PDF
Attachment_F_-_Price_Breakdown_Form.pdf PDF
Attachment_B_-_Drawings.pdf PDF
Attachment_C_-_PPQ.pdf PDF
Attachment_G_-_Staff_Qualifications.pdf PDF
Attachment_D_-_Small_Business_Plan.pdf PDF
Attachment_A_-_Specifications.pdf PDF
RSB_Industry_Day_FINAL_as_Presented.pdf PDF
Industry_Day_Attendance_List.pdf PDF
Research_Support_Building_Draft_RFP.pdf PDF
Draft_RFP_Attachment_C-PPQ-16009.pdf PDF
Draft_RFP_Attachment_F-Price_Breakdown_Form-16009.pdf PDF
Draft_RFP_Attachment_D-Small_Business-16009.pdf PDF
Draft_RFP_Attachment_A-Specifications-16009.pdf PDF
Draft_RFP_Attachment_B-Drawings-16009-18_0220.pdf PDF
One_on_One_Attendance_Form.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESEARCH SUPPORT BUILDING 16009

UPDATED: 5/16/18

Appendix F:

LEED Checklist

LEED 2009 for New Construction and Major Renovations NASA Glenn Research Center

14 0 12 Possible Points: 26 Y ? N Y ? N

Y Prereq 1 1 1 Credit 4 1 to 2 1 Credit 1 1 1 1 Credit 5 1 to 2

5 Credit 2 5 1 Credit 6 Rapidly Renewable Materials 1 1 Credit 3 Brownfield Redevelopment 1 1 Credit 7 1

6 Credit 4.1 6 1 Credit 4.2 1 11 0 4 Possible Points: 15 3 Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3 2 Credit 4.4 2 Y Prereq 1

1 Credit 5.1 Site Development—Protect or Restore Habitat 1 Y Prereq 2

1 Credit 5.2 Site Development—Maximize Open Space 1 1 Credit 1 1 1 Credit 6.1 Stormwater Design—Quantity Control 1 1 Credit 2 1 1 Credit 6.2 Stormwater Design—Quality Control 1 1 Credit 3.1 1

1 Credit 7.1 Heat Island Effect—Non-roof 1 1 Credit 3.2 1 1 Credit 7.2 1 1 Credit 4.1 1 1 Credit 8 Light Pollution Reduction 1 1 Credit 4.2 1

1 Credit 4.3 1 6 0 4 Possible Points: 10 1 Credit 4.4 1

1 Credit 5 1 Y Prereq 1 1 Credit 6.1 Controllability of Systems—Lighting 1 4 Credit 1 Water Efficient Landscaping 2 to 4 1 Credit 6.2 1

2 Credit 2 Innovative Wastewater Technologies 2 1 Credit 7.1 1 2 2 Credit 3 2 to 4 1 Credit 7.2 Thermal Comfort—Verification 1

1 Credit 8.1 1 17 0 18 Possible Points: 35 1 Credit 8.2 1

Y Prereq 1 6 Possible Points: 6 Y Prereq 2

Y Prereq 3 1 Credit 1.1 1 3 1 to 19 1 Credit 1.2 1 7 0 Credit 2 1 to 7 1 Credit 1.3 1 2 Credit 3 2 1 Credit 1.4 1 2 Credit 4 2 1 Credit 1.5 1 1 2 Credit 5 3 1 Credit 2 1 2 Credit 6 2

4 0 Possible Points: 4 5 0 9 Possible Points: 14

1 Credit 1.1 1 Y Prereq 1 1 Credit 1.2 1

3 Credit 1.1 1 to 3 1 Credit 1.3 1 1 Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1 1 Credit 1.4 1

2 Credit 2 1 to 2 2 Credit 3 1 to 2 63 0 47 Possible Points: 110

Regional Priority: SSc6.1 - Stormwater Design - Qty Control Regional Priority: SSc6.2 - Stormwater Design - Qlty Control Regional Priority: SSc7.2 - Heat Island Effect, Roof Regional Priority: EAc2 - On-Site Renewable Energy (1%)

Measurement and Verification

Innovation in Design: Pest Management Innovation in Design: Education Program Innovation in Design: Green Cleaning Program Innovation in Design: EP - Maximize Open Space Innovation in Design: EP - Construction Waste Management

Materials Reuse

Storage and Collection of Recyclables

Materials and Resources

Fundamental Commissioning of Building Energy Systems

Total Construction Waste Management

Enhanced Commissioning On-Site Renewable Energy

Enhanced Refrigerant Management

Construction IAQ Management Plan—Before Occupancy

Materials and Resources, Continued

Water Efficiency

Building Reuse—Maintain Existing Walls, Floors, and Roof

Alternative Transportation—Parking Capacity

Heat Island Effect—Roof

Recycled Content Regional Materials

Certified Wood

Alternative Transportation—Bicycle Storage and Changing Rooms

Sustainable Sites

Alternative Transportation—Public Transportation Access

Site Selection Development Density and Community Connectivity

Construction Activity Pollution Prevention

Low-Emitting Materials—Adhesives and Sealants Low-Emitting Materials—Paints and Coatings

Optimize Energy Performance

Energy and Atmosphere

Water Use Reduction—20% Reduction

Low-Emitting Materials—Composite Wood and Agrifiber Products Low-Emitting Materials—Flooring Systems

Indoor Chemical and Pollutant Source Control

Thermal Comfort—Design Controllability of Systems—Thermal Comfort

Green Power

Water Use Reduction

Minimum Energy Performance Fundamental Refrigerant Management

Daylight and Views—Views

LEED Accredited Professional

Daylight and Views—Daylight

Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110

Construction IAQ Management Plan—During Construction

Outdoor Air Delivery Monitoring

Indoor Environmental Quality

Minimum Indoor Air Quality Performance Environmental Tobacco Smoke (ETS) Control

Increased Ventilation

Regional Priority Credits

Innovation and Design Process

NASA Glenn Research Center

05/16/18

0 0

File details come from the government source that posted it.