PEMSS Industry Day Q and A Spreadsheet.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Project Engineering, Manufacturing, and Science Services (PEMSS)
Solicitation number
80ARC027R0001-ID
Issued by

About this file

This file is a Questions and Answers spreadsheet template from a PEMSS Market Research Industry Day held on August 13, 2026. The document is a template designed to organize and catalog questions received during the industry day event, with columns for linking questions to specific sections of the Performance Work Statement (PWS). The spreadsheet includes a comprehensive data sheet listing all PWS sections and subsections relevant to the Project Engineering, Manufacturing, and Science Services (PEMSS) contract opportunity.

The PWS sections covered in this template span contract management, technical requirements, and phase-in/phase-out activities across multiple NASA Ames Research Center support areas. Key technical areas referenced include Mission Design Center support, Science Programmatic Support (covering strategic program integration, project support, engineering systems management, and communications), Project Records and Documents Support, Technical Writing, Configuration Management, Proposal and Solicitation Support (encompassing thermal systems, fluid mechanics, cryogenics, electrical/electronics, sensors and instrumentation, and various applications), Assembly Integration and Test, Operations Sustainment and Closeout, Engineering Support (systems engineering, design and development, mechanical systems), and Science Support (scientific research, laboratory operations, and safety compliance). The template structure facilitates categorization of industry day questions by PWS section to support the government's market research efforts for determining appropriate small business subcontracting goals and acquisition strategy for the PEMSS contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PEMSS Q&A

PEMSS Market Research Industry Day Q&A (August 13, 2026)
Questions ReceivedRelated PWS SectionAnswer/Response
1Select from drop down
2Select from drop down
3Select from drop down
4Select from drop down
5Select from drop down
6Select from drop down
7Select from drop down
8Select from drop down
9Select from drop down
10Select from drop down
11Select from drop down
12Select from drop down
13Select from drop down
14Select from drop down
15Select from drop down
16Select from drop down
17Select from drop down
18Select from drop down
19Select from drop down
20Select from drop down
21Select from drop down
22Select from drop down
23Select from drop down
24Select from drop down
25Select from drop down
26Select from drop down
27Select from drop down
28Select from drop down
29Select from drop down
30Select from drop down
31Select from drop down
32Select from drop down
33Select from drop down
34Select from drop down
35Select from drop down
36Select from drop down
37Select from drop down
38Select from drop down
39Select from drop down
40Select from drop down
41Select from drop down
42Select from drop down
43Select from drop down
44Select from drop down
45Select from drop down
46Select from drop down
47Select from drop down
48Select from drop down
49Select from drop down
50Select from drop down
51Select from drop down
52Select from drop down
53Select from drop down
54Select from drop down
55Select from drop down
56Select from drop down
57Select from drop down
58Select from drop down
59Select from drop down
60Select from drop down
61Select from drop down
62Select from drop down
63Select from drop down
64Select from drop down
65Select from drop down
66Select from drop down
67Select from drop down
68Select from drop down
69Select from drop down
70Select from drop down
71Select from drop down
72Select from drop down
73Select from drop down
74Select from drop down
75Select from drop down
76Select from drop down
77Select from drop down
78Select from drop down
79Select from drop down
80Select from drop down
81Select from drop down
82Select from drop down
83Select from drop down
84Select from drop down
85Select from drop down
86Select from drop down
87Select from drop down
88Select from drop down
89Select from drop down
90Select from drop down
91Select from drop down
92Select from drop down
93Select from drop down
94Select from drop down
95Select from drop down
96Select from drop down
97Select from drop down
98Select from drop down
99Select from drop down
100Select from drop down
101Select from drop down
102Select from drop down
103Select from drop down
104Select from drop down
105Select from drop down
106Select from drop down
107Select from drop down
108Select from drop down
109Select from drop down
110Select from drop down
111Select from drop down
112Select from drop down
113Select from drop down
114Select from drop down
115Select from drop down
116Select from drop down
117Select from drop down
118Select from drop down
119Select from drop down
120Select from drop down
121Select from drop down
122Select from drop down
123Select from drop down
124Select from drop down
125Select from drop down
126Select from drop down
127Select from drop down
128Select from drop down
129Select from drop down
130Select from drop down
131Select from drop down
132Select from drop down
133Select from drop down
134Select from drop down
135Select from drop down
136Select from drop down
137Select from drop down
138Select from drop down
139Select from drop down
140Select from drop down
141Select from drop down
142Select from drop down
143Select from drop down
144Select from drop down
145Select from drop down
146Select from drop down
147Select from drop down
148Select from drop down

Data Sheet

PWS Sections
Select from drop down
Full
NAICS Code
Set-Aside
1.0 Introduction/Background
2.0 Scope
3.0 Contract Management
3.1 General
3.1.1 Contractor-Furnished Equipment
3.2 Technical Requirements management
3.3 Foreign Travel Management
3.4 Management Meetings
3.5 Training
3.6 Software Management
3.6.1 Use of Off-th-shelf, Reused, or Open-source Software
3.6.2 Automatic Generation of Software Source Code
3.6.3 Software Cybersecurity
3.6.4 IT Security Control
3.6.5 Use of Artificial Intelligence (AI During contract Performance
4.0 Technical Requirements
4.1 Support of NASA Programs and Projects
4.1.1 Mission Design Center (MDC)
4.1.1.1 Desig Tools Development
4.1.1.2 Proposal Development
4.1.2 Science Programmatic Support
4.1.2.1 Strategic Program Integration & Management
4.1.2.1.1 Program Oversight & Performance Evaluation
4.1.2.1.2 Scientific Working Group & Event Management
4.1.2.1.3 Strategic Partnerships & Complex Initiatives
4.1.2.2 Science Project Support & Technical Leadership
4.1.2.2.1 Scientific Portfolio & Subject Matter Expertise
4.1.2.2.2 Exploration Science & Data Visualization
4.1.2.2.3 Scientific Asset & Resource Management
4.1.2.2.4 Scientific Content Development & Strategic Communications
4.1.2.3 Engineering and Technical Systems Management
4.1.2.3.1 Engineering Initiatives & Facility Safety Management
4.1.2.3.2 Digital Systems & Platform Management
4.1.2.3.3 Technical Infrastructure & Systems Integration
4.1.2.4 Virtual Communications and Collaboration Support
4.1.3 Project Records and Documents Support
4.1.4 Data Document Management and Archival Support
4.1.5 Technical Writing
4.1.6 Configuration Management
4.1.7 Proposal and Solicitation Support
4.1.7.1 Thermal Systems Design and Analysis
4.1.7.2 Fluid Mechanics Systems Design and Analysis
4.1.7.3 Cryogenic Systems Design and Analysis
4.1.7.4 Electrical/Electronics
4.1.7.5 ensors and Instrumentation Development
4.1.7.5.1 Embedded Computational Systems Development
4.1.7.5.2 Power Systems Design and Development
4.1.7.5.3 Control Systems Design and Development
4.1.7.5.4 High-Performance Servo Systems Applications
4.1.7.5.5 Wind Tunnels Applications
4.1.7.5.6 Motion Simulators and Centrifuges Applications
4.1.7.5.7 Autonomous Robotic Systems Applications
4.1.7.5.8 Environmental Control Systems Applications
4.1.7.5.9 Micro-Propulsion Systems Applications
4.1.7.5.10 Ames Power Monitoring System (APMS) Applications
4.1.7.5.11 Data Acquisition Systems Design and Development
4.1.7.5.12 Communication Systems Design and Development
4.1.7.5.13 Software and Firmware Systems Design and Development
4.1.7.6 Chemical, Biological, Biomedical and Radioactive Systems
4.1.8 Assembly, Integration, and Test (AI&T)
4.1.9 Operations, Sustainment, and Closeout
4.1.10 Project Technical Review and Compliance
4.1.11 Engineering Support and Support for Technology Development Responsibilities
4.1.12 Flight Project and Mission Operations Information Technology Support
4.1.13 Engineering Evaluation Laboratory (EEL)
4.1.14 Flight Processing Center (FPC)
4.1.15 Metal Fabrication, Machining, and Instrumentation
4.1.16 Mechanical Hardware
4.1.17 Electronics
4.1.18 Inspection Services
4.1.19 Production Planning and Scheduling
4.1.20 Space Shop
4.2 Engineering Support
4.2.1 Systems Engineering
4.2.2 Design and Development
4.2.3 Mechanical
4.2.3.1 System Design
4.2.3.2 Structural Design and Analysis
4.3 Science Support
4.3.1 Scientific Research and Laboratory Operations
4.3.1.1 Applied Science & Investigations:
4.3.1.2 Biosciences & Veterinary Operations:
4.3.1.3 Biospecimen & Scientific Asset Management:
4.3.1.4 Mission Science Integration:
4.3.2 Laboratory Safety and Controlled Space Compliance
4.3.2.1 Laboratory & Clean Room Safety Programs:
4.3.2.2 Scientific Workspace Compliance & Hazard Management:
5.0 Phase-In /Phase-out
5.1 Phase-in
5.2 Phase-out
6.0 ACRONYMS
7.0 APPENDICES
7.1 Standards and Codes
7.2 Potential Contract Documentation Requirements/Deliverables
7.2.1 or Contract Management
7.2.2 For Technical Requirements

File details come from the government source that posted it. Updated .