This is a Performance Work Statement (PWS) for upgrade and service work to paint booth equipment at Robins Air Force Base, Georgia, dated 24 February 2026.
The contractor shall provide all necessary travel, tools, equipment, personnel, and labor to perform on-site servicing of two pieces of equipment: an AMU (Serial #18906 EVAP) and a Heating & Ventilating Unit (Serial #62408). The contractor must also install two Parts Coils for E4V (Part #E4VE7VSTA0) and one Carel Display Module (Part #EVDIS00EN0), relocate the air flow sensor, test control system function and operation, and examine the sequence and operation of the equipment. The work shall be performed at Building 180 on the Warner Robins Air Logistic Complex for the 402d Maintenance Group (MXSG). The contractor must contact the Government point of contact (Feltrina Harris, 478-222-8909) within 5 days of contract award to schedule services, with all work completed no later than 30 days after award. Normal work hours are 7:00 a.m. to 4:00 p.m. EST, Monday through Friday, though the Government may adjust hours with 48-hour notice. The contractor shall provide a Program Manager within 5 calendar days of award and maintain compliance with security requirements (including Operations Security and visitor protocols), safety standards, environmental management systems training, energy management system training, and affirmative procurement program requirements for EPA-designated and USDA-designated products. Any work discovered during performance that is within the general scope but not covered by line items requires submittal of a work request and proposal to the Contracting Officer for negotiation and contract modification. Payment requests must be submitted via the Procurement Integrated Enterprise Environment (PIEE) through the Wide Area Workflow (WAWF) module.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Paint Booth SSJ_Redacted.pdf | ||
| 80601-CDRL-A001-Environmental Management System-EMS.pdf | ||
| 80601-WR-ALC Appendix C - BAF 80601 Upgrade and Service to Paint Booth.pdf | ||
| 80601-CDRL-A003-Contractors Safety Plan.pdf | ||
| Solicitation - FA857126Q0065-.pdf | ||
| 80601-CDRL-A002-Environmental Management System-EnMS.pdf | ||
| 80601-CDRL-A004-Accident_Incident Report.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Upgrade and Service to Paint Booth Equipment in Bldg. 180
24 February 2026
1.0 DESCRIPTION OF SERVICES. The contractor shall provide all travel, tools, equipment, personnel, and labor necessary to perform on-site service of equipment listed below, install DX AMU parts listed below, relocate the air flow sensor, test the function and operation of the control systems and adjust as necessary, examine and review the sequence and the operation of the equipment in building 180 for the 402d Maintenance Group (MXSG) at Robins Air Force Base, Georgia.
Included items to be serviced:
Description Qty. Serial # or Part #
AMU 1 18906 EVAP
Heating & Ventilating Unit
1 62408
Included items to be installed:
Description Qty. Serial # or Part # Parts Coil for E4V
2 E4VE7VSTA0
Carel Display Module
1 EVDIS00EN0
1.1 Over and Above Work. Work discovered during the course of performance that is:
1.1.1 Within the general scope of the contract, not covered by the line item(s) for the basic work under the contract, and necessary in order to satisfactorily complete the contract.
1.1.2 Upon discovery of the need for over and above work, the Contractor shall prepare and furnish to the Government a work request. Upon request the Contractor shall promptly submit to the Contracting Officer, a proposal for the over and above work. The Government and Contractor will then negotiate a settlement for the over and above work. Contract modifications will be executed to definitize all over and above work.
2.0 SERVICES SUMMARY (SS). None
3.0 GOVERNMENT FURNISHED PROPERTY (GFP).
4.0 GENERAL INFORMATION.
4.1 Government Representatives. The following individuals will serve as the Primary and Alternate Government Representatives as the points of contact through which all contractor-provided services will be requested and accomplished for MXSG. Government Representatives will not supervise the Contractor, and they are not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The following individuals will serve as Government Representatives for MXSG.
4.2 Shipping/Delivery/Period of Performance. The contractor shall contact the Government POC listed in paragraph 4.1 within 5 days after contract award to schedule the on-site service of equipment and installation of parts. The on-site service and installation of parts shall be completed no later than 30 days after contract award.
4.3 Ship To Address.
Attention: Feltrina Harris Unit: 402 MXSG/MXDPM
DODAAC: F3QCBK
Address: 235 Robins Pkwy, Station 15, B321 Robins, AFB, Ga 31098-1621
4.4 Contractor Program Manager. The Contractor shall provide a Program Manager who shall be the single point of contact between the Contractor and the Government. The name and phone number of the Contractor’s Program Manager shall be provided in writing to the Contracting Officer, Government Representatives, and COR no later than five (5) calendar days after contract award date.
4.5 Place of Performance and Hours of Work. On-site contract services shall be performed at the Warner Robins Air Logistic Complex. The work will take place in building 180 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 7:00 am to 4:00 pm
Primary Government Representative Alternate Government Representative Name: Feltrina Harris Name: Reginald Burnette Unit: 402 MXSG/MXDPM Unit: 402 MXSG/MXDPM Phone: 478-222-8909 Phone: 478-222-0655 Email: Feltrina.Harris@us.af.mil Email: reginald.burnette@us.af.mil
(EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel and will provide a 48-hour notice prior to changing any work hours.
4.6 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday.
If the holiday falls on a Sunday, it is observed on Monday.
4.7 Security Requirements.
4.7.1 Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), Department of the Air Force Instruction (DAFI) 31-101, Base Defense Operations.
4.7.2 Contractor Security Clearance. This requirement does not require a security clearance.
The Contractor shall ensure Contractor personnel have a valid security clearance appropriate to the access required for proper accomplishment of contract/order requirements. Contractor personnel shall not be authorized access to classified and/or sensitive, but unclassified, information and/or materials or be permitted to work on classified and/or sensitive, but unclassified, projects and/or programs without a proper security clearance and a need-to-know.
Contractor personnel whose clearances have been suspended or revoked shall immediately be denied access to classified and/or sensitive, but unclassified, information.
4.7.3 Communications Security (COMSEC). The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or sensitive, but unclassified, information in accordance with 32 CFR Part 117.21, National Industrial Security Program Operating Manual (NISPOM).
4.7.4 Visitors Only – No Badging ID. The Air Force has mandated all visitors consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off Watson Boulevard, Robins AFB, GA.
Visitors requiring unescorted access will need their driver’s license or state-issued ID along with insurance and registration if driving on base. The pass issued by the Visitor Control Center authorizes unescorted entry to Robins AFB for the bearer only. For visitors, a short term pass is up to 60 days. Any time greater than 60 days requires a secondary form of ID (Social security card, birth certificate or passport).
4.7.6 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security (OPSEC) Program”, DoD Manual
5205.02 “DoD Operations Security (OPSEC) Program Manual” and AFI 10-701 “Operations Security (OPSEC)” to protect United States (U.S. Government interest). The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.
4.7.7 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.
4.7.8. Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations.
Contractor risk management procedures shall comply with:
DoDI5000.83 DAFI 63-113, Technology and Program Protection to Maintain
Technological Advantage SAE Aerospace Standard AS5553D, Counterfeit Electrical, Electronic, and
Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition, National Institute of Standards and Technology (NIST) Special Publication 800-53 Rev
5, Security and Privacy Controls for Information Systems and Organizations
4.8 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.
4.9 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry.
Information may be obtained by calling the following phone number: Commercial 478-222- 1972.
4.10 Agency Affirmative Procurement Program. In accordance with FAR 23.107-1 and FAR 23.107-2, 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the biobased product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.
4.10.1 The Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated biobased products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the http://www.biopreferred.gov/
Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.
4.11 Environmental Management System (EMS). Environmental Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB. Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) and the Contract Surveillance Management Office (CSMO) POCs to be maintained in the contract file for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.
4.11.1 EMS training is provided by Environmental Management. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. (Front Desk: 478-926-1176)
4.11.2 Option 1: Contractors can register for an account through The Environmental Awareness Course Hub (TEACH), the Air Force training database: https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f Search for Course ID: EMS110UHHZ00293 Directions:
1. Hover your mouse over the Courses and Transcripts tab.
2. Click on Transcripts
3. Click into the TEACH Course Completion Log by clicking the orange Continue or Begin button.
4. When you are on the transcript, click on the blue “Search for Course” button.
5. When the pop up appears enter the course name or course number and press search.
6. Once you find the course you want to add, click on the +Select button to add the course to your transcript.
(Note: TEACH may not supported by Internet Explorer; recommend using Chrome.)
4.11.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training PowerPoint Presentation from Environmental Management. The request should be sent to the Environment Management Office at the following email address, jessica.parker.15@us.af.mil. Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training. (CDRL A001 DI-MGMT-80368A/T, Status Report/EMS Training)
4.12 ISO 50001 – Energy Management System. Due to the WR-ALC being ISO 500001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.
4.12.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f mailto:jessica.parker.15@us.af.mil all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.
4.12.1.1. EnMS training is provided by the Energy Assurance Office. The Contractor shall request the training by sending an email to 402MXSG.MXDEA.EnergyAssurance@us.af.mil.
4.12.2. Notification of training completion shall be sent to the Energy Assurance Office (402MXSG.MXDEA.EnergyAssurance@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training prior to beginning work may result in termination of the contract. (CDRL A002 DI-MGMT- 80368A/T, Status Report/EnMS Training)
4.13 Contractor Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.
4.13.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil.
The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A003, DI-SAFT-82080/T NOT 1, Contractor's Safety Plan).
4.13.2 The Contractor Safety Plan shall address in detail the items listed in the Contract Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.
4.14 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the Robins AFB Safety Office telephonically at (478)327-4862 during duty hours and (478)926- 3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil http://www.osha.gov/dcsp/vpp/index.html mailto:402mxw.se.wf@us.af.mil a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO), CSMO Representative (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Impound Authority Name and Phone Number (as applicable)
g. Nomenclature of equipment and personnel involved in accident/incident
h. Corrective actions (taken or proposed)
i. Other pertinent information
(CDRL A004, DI-SAFT-81563 NOT 2, Accident/Incident Report)
4.15 Essential Services During Crisis. The Services Acquisition Lead (SAL) has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with DFARS 252.237-7023, Continuation of Essential Contractor Services.
4.16 Inspection of Services/Inspection of Supply: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
4.17 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause 252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site: