800-606 - CSF Specifications (Bid - Volume 3)- WATERMARK.pdf

PDF 19 MB Posted

Attached to
Enhanced Treatment and Site Upgrade (ETSU) Program - Campus Solar Facilities
Solicitation number
800-606
Issued by
Alameda County, California

About this file

This is a Project Manual for the Enhanced Treatment Site Upgrade (ETSU) Campus Solar Facilities Project by the Union Sanitary District, located in Union City, California, scheduled for October 2025. The project involves comprehensive construction and upgrade work at the Alvarado Wastewater Treatment Plant, encompassing demolition, environmental remediation, transport, disposal, and multiple technical disciplines including civil, mechanical, process, structural, architectural, HVAC, fire protection, plumbing, and electrical systems. Sealed bids will be received until 2:00 p.m. local time on Tuesday, November 18, 2025, with bidders required to purchase an USB memory drive containing project documents for a non-refundable $75 fee.

The project is funded through multiple sources, including potential Department of Energy involvement, as evidenced by the inclusion of DOE Special Terms and Conditions in the appendices. Additional regulatory compliance is indicated by the presence of Davis-Bacon Prevailing Wage Determinations, California Environmental Quality Act (CEQA) documentation, and Build America, Buy America (BABA) Act requirements. Specialized technical components include photovoltaic (PV) systems, with supporting documentation such as a geotechnical investigation report, pre-renovation hazardous materials survey, and soil and groundwater investigation work plan. The project also includes comprehensive environmental and safety considerations, with appendices covering hazardous materials handling, lockout/tagout procedures, and site-specific environmental assessments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Union Sanitary District

Alvarado Wastewater Treatment Plant

PROJECT MANUAL

FOR

ENHANCED TREATMENT SITE UPGRADE (ETSU)

Campus Solar Facilities Project

October 2025

Issued For Construction

VOLUME 3 OF 3

________________________10/6/2025__

Approved for construction

Richard A. Pipkin P.E.

ETSU Program Manager

Buil de r's Exc ha ng e

Buil de r's Exc ha

SECTION 00001

PROJECT TITLE PAGE

PROJECT MANUAL

FOR

ENHANCED TREATMENT SITE UPGRADE (ETSU)

Campus Solar Facilities Project

October 2025

Professional Engineer Certifications

Amy H. Thurston___, PE __Jack Yao_________, PE ___William Russell____, PE

License No. __6068____ License No. __18390____ License No. ___34743____

Divisions __Structural__ Divisions __Electrical__ Divisions___Architectural_

__Swaid M. Alhajri___, PE __Gregg Cummings_, PE __Chris Portner Jr_______, PE

License No. 34897 License No. __45158____ License No. ___77893____

Divisions _HVAC/Plumb/Fire Divisions __Civil___ Divisions___General______ r's Exc ha r's Exc ha

CAMPUS SOLAR FACILITIES 00002-1 OCTOBER 2025

UNION SANITARY DISTRICT

SECTION 00 01 10

TABLE OF CONTENTS

VOLUME 1 OF 3

DIVISION 00 − PROCUREMENT AND CONTRACTING REQUIREMENTS

Section Title

00010 Notice Inviting Bids

00100 Instruction to Bidders

00200 Supplemental Project Information Available to Bidders

00300 Bid Form

00310 Bid Schedule

00410 Bidder’s Bond

00420 Certification of Bidder’s Experience and Qualifications

00421 Certification of Electrical Subcontractor’s Experience and

Qualifications

00430 Designation of Subcontractors

00440 Site Visit Affidavit

00450 Schedule of Major Equipment and Material Suppliers

00460 Review of Project Affidavit

00470 Acknowledgement of Insurance Requirements

00480 Noncollusion Affidavit

00481 In Use Off Road Diesel Fleet Cert

00485 Iran Contracting Act Certification

00490 Build America, Buy America (BABA) Act Certification

00500 Agreement

00610 Form of Performance Bond

00620 Form of Payment Bond

00630 Escrow Agreement

00650 General Liability Endorsement

00651 Auto Liability Endorsement

Buil de r's Exc ha

CAMPUS SOLAR FACILITIES 00002-2 OCTOBER 2025

00700 General Conditions

00800 Supplementary General Conditions

00810 California Environmental Quality Act (CEQA)

00840 Build America, Buy America (BABA) Act Requirements

DIVISION 01 − GENERAL REQUIREMENTS

01010 Summary of Work

01025 Measurement and Payment

01035 Modification Procedures

01050 Field Engineering

01060 Regulatory Requirements and Permits

01090 References

01200 Project Meetings

01210 Project Control System

01310 Progress Schedules

01340 Shop Drawings

01345 Requests for Information and Clarifications

01400 Quality Control

01510 Temporary Utilities

01560 Temporary Controls

01600 Material and Equipment

01612 Seismic Design Criteria

01614 Wind Design Criteria

01660 Equipment and System Performance and Operational Testing

01710 Final Cleanup

01720 Project Record Documents

01730 Operation and Maintenance Data

01740 Warranties and Bonds

-3

-2 r's Exc ha

CAMPUS SOLAR FACILITIES 00002-3 OCTOBER 2025

Section Title

01750 Spare Parts

VOLUME 2 OF 3

DIVISION 02 − EXISTING CONDITIONS

02 41 00 Site Demolition

02 61 13 Excavation and Handling of Contaminated Material

02 81 00 Hazardous Materials Remediation

02 81 01 Transportation and Disposal of Hazardous Material

DIVISION 03 − CONCRETE

03 15 00 Concrete Accessories

03 15 16 Joints in Concrete

03 31 10 Cast-in-Place Concrete

03 60 00 Grout

DIVISION 05 − METALS

05 05 13 Galvanizing

05 05 23 Metal Fastening

05 10 00 Metal Materials

05 12 00 Structural Steel

05 31 00 Metal Decking

05 50 00 Metal Fabrications

Buil de r's Exc ha

CAMPUS SOLAR FACILITIES 00002-4 OCTOBER 2025

DIVISION 07 − THERMAL AND MOISTURE PROTECTION

07 60 00 Flashing and Sheet Metal

07 61 13 Standing Seam Metal Roofing and Wall Panels

07 84 00 Firestopping

07 90 00 Joint Fillers, Sealants and Caulking

DIVISION 09 − FINISHES

09 90 00 Painting

DIVISION 10 − SPECIALTIES

10 14 00 Identifying Devices

10 22 13 Wire Mesh Partitions

10 44 16 Fire Extinguisher

10 81 13 Bird Control Devices

DIVISION 21 − FIRE SUPPRESSION

21 05 00 Basic Fire Suppression Requirements

21 05 29 Hangers and Supports for Fire Suppression Piping and

Equipment

21 05 48 Vibration and Seismic Controls for Fire Suppression Piping and

Equipment

21 05 53 Identification for Fire Protection, Mechanical Process, and Life

Safety System Equipment

21 07 19 Fire Suppression Piping Insulation

21 08 00 Commissioning of Fire Suppression

Buil de r's Exc ha

CAMPUS SOLAR FACILITIES 00002-5 OCTOBER 2025

21 13 13 Wet Pipe Sprinklers

DIVISION 22 − PLUMBING

22 05 00 Basic Plumbing Requirements

22 05 29 Hangers and Supports for Plumbing Piping and Equipment

22 05 48 Vibration and Seismic Controls for Plumbing Piping and

Equipment

22 05 53 Identification for Plumbing Piping and Equipment

22 07 19 Plumbing Piping Insulation

22 11 13 Facility Water Distribution Piping

22 11 19 Domestic Water Piping Specialties

DIVISION 23 − HVAC

23 00 00 Basic HVAC Requirements

23 05 48 Vibration and Seismic Controls HVAC

23 05 93 HVAC Balancing

23 05 95 HVAC Field Testing

23 09 02 HVAC Automatic Temperature Controls

23 31 13 Metal Ducts and Duct Accessories

23 34 00 HVAC Fans

DIVISION 26 − ELECTRICAL

26 05 00 Basic Electrical Requirements

26 05 13 Medium Voltage Cables

26 05 19 Low-Voltage Conductors and Cables

26 05 26 Grounding and Bonding for Electrical Systems

Buil de r's Exc ha

CAMPUS SOLAR FACILITIES 00002-6 OCTOBER 2025

26 05 29 Hangers and Supports for Electrical Systems

26 05 33.13 Conduit for Electrical Systems

26 05 33.16 Boxes for Electrical Systems

26 05 36 Cable Trays for Electrical Systems

26 05 53 Identification for Electrical Systems

26 05 73 Power System Studies

26 09 16 Electric Controls and Relays

26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers

26 234 13 Low Voltage Switchboards

26 27 26 Wiring Devices

26 43 13 Surge Protective Devices

26 50 00 Lighting

DIVISION 31 − EARTHWORK

31 00 01 Earthwork

31 05 16 Aggregate Materials

31 25 00 Erosion and Sedimentation Control

31 63 29 Drilled Piers

DIVISION 32 − EXTERIOR IMPROVEMENTS

32 10 00 Paving and Surfacing

DIVISION 33 − UTILITIES

33 24 00 Storm Drains and Roof Drains

33 71 19 Underground Electrical

Buil de r's Exc ha

CAMPUS SOLAR FACILITIES 00002-7 OCTOBER 2025

DIVISION 40 − PROCESS INTERCONNECTIONS

40 05 97 Piping and Equipment Identification Systems

DIVISION 48 − ELECTRICAL POWER GENERATION

48 14 03 Photovoltaic (PV) Systems r's Exc ha

CAMPUS SOLAR FACILITIES 00002-8 OCTOBER 2025

VOLUME 3 OF 3

Appendix Title

A Geotechnical Investigation Report Proposed Union

Sanitary District New Administration Building and

Corporation Yard

As prepared by: Kleinfelder, Inc

B Pre-Renovation Hazardous Materials Survey Union Sanitary

District – Covered Storage Structure

As prepared by: Vista Environmental Consulting

C Notice of Exemption / Categorical Exemption

As prepared by: Union Sanitary District (Hazen and Sawyer)

D Lockout/Tagout Procedures for Contractors

As prepared by: Union Sanitary District

E Soil and Shallow Groundwater Investigation Work Plan

As prepared by: Brown and Caldwell

F Department of Energy Special Terms and Conditions

As prepared by: Department of Energy

G Davis-Bacon Prevailing Wage Determination

As prepared by: Department of Labor r's Exc ha

APPENDIX A

Geotechnical Investigation Report Proposed Union Sanitary District New Administration Building and Corporation Yard

Buil de r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha

APPENDIX B

Pre-Renovation Hazardous Materials Survey Union Sanitary District

– Covered Storage Structure

Buil de r's Exc ha

2984 Teagarden Street, San Leandro, CA.94577

Office (510) 346-8860 Fax (888) 296-0271 vista-env.com

September 18, 2024

Trapa Barua, AICP Principal Scientist I Hazan & Sawyer 90 New Montgomery Street, Suite 333, San Francisco, CA 94105 347-768-1480 (cell) tbarua@hazenandsawyer.com

RE: Pre-Renovation Hazardous Materials Survey Union Sanitary District – Covered Storage Structure

5072 Benson Rd, Union City, CA 94587

Dear Trapa Barua:

Executive Summary

At your request, Vista Environmental Consulting (Vista) performed a pre-renoavtion hazardous material survey of the Covered Storage Structure, located at the Union Sanitary District, 5072 Benson Rd, Union

City, CA 94587 (Project Site). The survey was performed to identify and sample accessible suspect asbestos-containing materials (ACM), to identify representative building components for the presence of lead-containing surface coatings/lead-based paints (LCSC/LBP), and to visually identify universal waste

(UW) materials, polychlorinated biphenyls (PCBs) containing devices, devices which contain ozone depleting chemicals, and other hazardous materials. The hazardous materials survey was performed on

September 5, 2024 by Vista employee Christopher Burns and Javier Rocha.

Asbestos

The results of the bulk samples collected for asbestos analysis indicate that detectable concentrations of asbestos are present in the following materials:

No asbestos was detected in the 10 samples collected and analyzed

Lead

The result of the bulk sample collected for lead analysis indicate that detectable concentrations of lead are present in the following materials:

SAMPLE # COMPONENT SUBSTRATE COLOR LOCATION RESULT UNITS

CS-PB03

Doors & Bollards

Metal Blue Exterior 0.25 wt% r's Exc ha

Pre-Renovation Hazardous Material Survey September 18, 2024 Union Sanitary District – Covered Storage Structure Project No. 241261001

Other Hazardous Materials

MATERIAL CONTAMINANT ESTIMATED QUANTITY

Fluorescent Tubes (4' Length) Universal Waste 78

Batteries: Emergency Lights & Exit Signs Universal Waste 2

Light Fixture Ballasts Polychlorinated Biphenyls or E-

Waste

Methodology

Vista performed the hazardous materials survey on September 5, 2024. The hazardous materials survey was conducted by Christopher Burns, a State of California Division of Occupational Safety and Health

(Cal/OSHA) Certified Asbestos Consultant (CAC) #92-0224, and a State of California Department of

Public Health (CDPH) Lead Related Construction Inspector Assessor (LRCIA) LRC-6938. Assisting on the survey was Javier Rocha, a Cal/OSHA Certified Site Surveillance Technician (CSST) #02-3244 and a

CDPH Lead-Related Construction Certified Sampling Technician (LRCST) LRC-00000629.

The pre-renovation asbestos survey was performed generally in accordance with the AHERA protocol (40

CFR Part 763, Subpart E). Visual identification was conducted by assessing visible and accessible structural, architectural, and mechanical components in the path of construction for the presence of suspect asbestos-containing material (ACM) at the Project Site. Each identified suspect ACM was sampled in accordance with procedures established by the United States Environmental Protection

Agency (USEPA).

Suspect ACM samples were delivered under chain-of-custody protocol to SGS Forensic Laboratories

(Forensic) in Hayward, California. Forensic is accredited under the National Voluntary Laboratory

Accreditation Program (NVLAP) and the California Environmental Laboratory Accreditation Program

(Cal-ELAP). The samples were submitted for analysis by Polarized Light Microscopy (PLM) utilizing dispersion staining techniques in accordance with the EPA’s “Method for the Determination of Asbestos in Bulk Building Materials” U.S. EPA/600/R-93/116, Visual Area Estimate, dated July 1993 and adopted by the NVLAP as Test Method Code 18/A01.

The lead bulk samples were collected following United States Department of Housing and Urban

Development (HUD) Appendix 13.2: Paint Chip sampling from the Guidelines for the Evaluation and

Control of Lead-Based Paint Hazards in Housing, June 1995 and was delivered, under proper chain-of-custody protocol, to Forensic. Forensic is accredited under American Industrial Hygiene Association

(AIHA), the Environmental Lead Laboratory Accreditation Program (ELLAP), and the California

Buil de r's Exc ha

Department of Public Health (CDPH) for multiple metals analysis. The samples were prepared and analyzed by method EPA 3050B/7420, Flame Atomic Absorption.

Devices with Potential Hazardous Materials

Devices with potential hazardous materials were visually identified during the survey walk through and their quantities were estimated and recorded. No attempt was made to disassemble devices or sample suspect materials within the devices. For example, fluorescent light fixtures must be presumed to contain

Universal Waste lamps and ballasts which contain PCB oil or are electronic waste, pending removal and disassembly of each unit to determine explicit product specific information that proves otherwise.

Results

The results of the bulk samples collected for asbestos, and analyzed by PLM, or assumed, indicate that detectable concentrations of asbestos are present in the following materials:

No asbestos was detected in the 10 samples collected and analyzed.

The results of the bulk samples collected for asbestos, and analyzed by PLM, indicate that detectable concentrations of asbestos are not present in the following materials:

HOMOGENEOUS ID MATERIAL DESCRIPTION # OF SAMPLES

A Concrete Gray, Fountain 2

B Concrete Gray, Colum Bases 2

C Asphalt Black 2

D Jacket White, Cold Water, Pipe 2

E Concrete Masonry Unit/Mortar Gray/Gray 2

Asbestos analytical results, sample location drawings and bulk sample forms/chain of custody documents can be found attached to this letter report.

For purposes of this survey, and in accordance with Title 8 CCR, Section 1532.1 (8 CCR 1532.1) and

Title 17 of the California Code of Regulations, Section 35001 et. seq. the bulk paint chip sample or XRF direct read instrument results were interpreted as follows:

1. Lead-based paints (LBP) and lead-based materials (LBM) are present when bulk paint chip samples reveal a lead concentration of ≥5,000 milligrams per kilogram (mg/kg) or parts per million (ppm), 0.5% by weight (wt%) or ≥1.0 milligrams per centimeter squared (mg/cm²) via XRF direct read instrument sampling.

Buil de r's Exc ha

2. Lead-containing paints (LCP) and lead-containing materials (LCM) are present when bulk paint chip samples reveal a lead concentration of <5,000 mg/kg or 0.5 wt% down to the analytical detection limit of the analysis, or <1.0 milligrams per centimeter squared (mg/cm²) via XRF direct read instrument sampling down to the detection limit of the device.

3. “No lead detected” was determined when bulk paint chip samples did not reveal a lead concentration above the analytical detection limit of the laboratory or direct read instrument sampling device.

The bulk paint chip results results for this survey indicated that the following building components and respective surface coatings have lead concentrations defining them as LBP, in accordance with Title 17 of the California Code of Regulations, Section 35001 et. seq.:

None

The bulk paint chip sample results results for this survey indicate that the following building components and respective surface coatings have lead concentrations, in excess of the level for compliance with trigger activities, as defined in 8 CCR 1532.1:

SAMPLE # COMPONENT SUBSTRATE COLOR LOCATION RESULT UNITS

CS-PB03

Doors & Bollards

Metal Blue Exterior

0.25 wt%

No lead was detected above the analytical reporting limited in the following samples:

SAMPLE # COMPONENT SUBSTRATE COLOR LOCATION RESULT UNITS

CS-PB01 Structural Metal Yellow Exterior <0.006 wt%

CS-PB02

Gutters &

Down Spouts Metal Brown Exterior <0.007 wt%

CS-PB04 Roof Sheeting Metal White & Brown

Exterior <0.007 wt%

The lead analytical results, sample forms/chain of custody documents can be found attached to this letter report.

Other Hazardous Materials

MATERIAL CONTAMINANT ESTIMATED QUANTITY

Fluorescent Tubes (4' Length) Universal Waste 78

Batteries: Emergency Lights & Exit Signs Universal Waste 2

Light Fixture Ballasts Polychlorinated Biphenyls or E-

Waste r's Exc ha

Conclusions/Recommendations

The results of the survey indicate that asbestos-containing materials are not present at the Project Site.

The results of the lead sampling indicate that lead-containing paint is present at the Project Site.

At present there is no state or federal regulation requiring mandatory lead removal or abatement prior to disturbance of building materials with identified lead paint or coatings. However, there are applicable

Cal/OSHA worker protection and training requirements, Cal/EPA waste disposal requirements, CDPH requirements for public and residential buildings, and SB 460 lead hazard regulations that apply to lead-related construction activities, abatement activities and their associated wastes.

The following is a brief discussion and summary of applicable regulatory requirements:

♦ Cal/OSHA: Title 8, California Code of Regulation (CCR), Section 1532.1 (8 CCR 1532.1) governs occupational exposure to lead. This regulation requires that prior to initiation of certain activities, referred to as “trigger tasks”, workers must be trained, medically evaluated, and properly fitted with respiratory protection, and protective clothing until statistically reliable personal eight-hour time weighted average

(TWA) results indicate lead exposure levels below the Personal Exposure Limit (PEL) for each unique task which disturbs lead-based and lead-containing coatings. This process is known as a Negative

Exposure Assessment or NEA.

If the result of the exposure assessment is above the Action Level (AL) additional monitoring is required and if the result is above the PEL additional exposure monitoring, worker protection (including respirator protection and PPE), training and medical requirements apply. However even where the NEA criteria is met, certain hazard communication training and work practice controls still apply where lead is disturbed.

“Trigger tasks” are tasks that are assumed to exceed the PEL pending an exposure assessment and they encompass the majority of construction activities that disturb surface coatings. Examples of “trigger” tasks range from manual paint scraping as a lower expected exposure up to hot work and abrasive blasting as the highest expected exposures, and include any non-listed task that the employer determines may potentially expose employees to lead levels above the AL.

“OSHA does not consider any method that relies solely on the analysis of bulk materials or surface content of lead (or other toxic material) to be acceptable for safely predicting employee exposure to airborne contaminates. Without air monitoring results or without the benefit of historical or objective data (including air sampling which clearly demonstrates that the employee can not be exposed above the action level during any process, operation, or activity) the analysis of bulk or surface samples can not be used to determine employee exposure.”- OSHA Standard Interpretation May 8, 2000.

Buil de r's Exc ha

OSHA states that these rules apply to “any detectable concentration of lead” without a specified detection level. Due to the Consumer Product Safety Commission currently allowing paint to contain up to 90 parts per million (ppm) or 0.009 wt% of lead, the variation of lead content due to aging and weathering, and the variation of detection limits associated with analysis of bulk materials, such as paint chips and surface content analysis via XRF, it is recommended that all painted or coated surfaces be treated as potentially containing lead. Positive analytical results by either method can be used to indicate that detectable lead is present but negative results cannot be interpreted as conclusively demonstrating the absence of lead.

Analytical data from analysis of bulk materials or surface content of lead can be helpful in evaluation of lead-related environmental risks in general but cannot be used to calculate worker exposures and are not a substitute for employee exposure monitoring. As a result of the above, any employee that works around potential lead-based or lead-containing coatings must have HAZCOM training and personal exposure air monitoring is additionally required for employees that disturb such coatings. Significant additional certification, notification, and work practices are required for materials found to be lead-based.

Any welding, cutting or heating of metal surfaces containing surface coatings should be conducted in accordance with 29 CFR 1926.354 and 8 CCR 1537. These regulations require surfaces covered with toxic preservatives, and in enclosed areas, be stripped of all toxic coatings for a distance of at least 4 inches, in all directions, from the area of heat application prior to the initiation of such heat application.

Vista recommends that the paint is stripped 12 inches, in all directions, from the area of heat application prior to the initiation of such heat application.

♦ Cal/EPA through the Division of Toxic Substance Control (DTSC) regulates disposal of lead hazardous waste (22 CCR Division 4.5, Minimum Standards for Management of Hazardous and Extremely

Hazardous Wastes). DTSC has issued guidance indicating that architectural debris with intact lead paint is normally expected to be handled as general construction waste. However, waste stream segregation and analysis is still required for all lead painted or coated debris regardless of if the paint or coating is intact on a building component or not. The resulting wastes may be hazardous under California and federal

RCRA standards for lead and therefore require proper handling, packaging, labeling, and transportation under a proper manifest to a permitted hazardous waste storage, treatment and disposal facility.

♦ CDPH: The Department of Public Health (CDPH) has specific requirements (Title 17 Sections 35001 thru 36100 et. al.) for hazard assessment and work in public or residential structures in regards to lead-based paint. These regulations require special certifications, work practices, and notification for such activities.

♦ Senate Bill 460 (SB 460): An act to amend Section 1941.1 of the Civil Code, and to amend Sections

17961, 17980, and 124130 of, and to add Sections 17920.10, 105251, 105252, 105253, 105254, 105255, 105256, and 105257 to, the Health and Safety Code, relating to lead abatement. This bill allows for fines and criminal penalties to be levied on any person who is found to have performed lead abatement without

Buil de r's Exc ha containment or created a measurable “lead hazard” based upon current CDPH standards. A “lead hazard” means deteriorated lead-based paint, lead contaminated dust, lead contaminated soil, disturbing lead-based paint or presumed lead-based paint without containment, or any other nuisance which may result in persistent and quantifiable lead exposure.

Vista recommends that all parties that come into contact with paint that has detectable lead content follow all applicable federal, state and local regulations relating to employee health and safety and proper disposal of generated wastes.

Devices with Potential Hazardous Materials

Other hazardous materials are present at the Project Site.

All potential and identified Universal Waste materials (UW) impacted by the work should be removed and recycled or disposed of in accordance with the UW guidelines established by the DTSC, as stated in

22 CCR Sections 66261.9 and 66273.1 thru 66273.90. UW materials include, but are not limited to, non-incandescent lamps and electronic waste.

Vista’s limited visual survey indicated that light fixtures with ballasts that may contain PCB oil are present. However, due to the limited nature of the random spot checks, Vista recommends that all ballasts be visually inspected, prior to disposal, to determine if they contain PCB’s. Those ballasts marked No

PCB’s or PCB Free can be considered as such as should be treated as UW - electronic waste. All PCB-containing devices, including, but not limited to ballasts and transformers, should be removed or have the oils removed and properly handled, collected, stored, transported and recycled or disposed of by an approved recycling or disposal facility in accordance with the requirements of Title 22 CCR 67426.1.

Limitations and Exclusions

The sampling performed was limited to accessible materials and the testing of representative areas.

Destructive testing, demolition, or subsurface investigations were not included as part of this investigation.

r's Exc ha

If you have any questions concerning the information contained in this report, please contact me at (510)

346-8860.

Respectfully Submitted, Vista Environmental Consulting

Christopher R. Burns Senior Project Manager

CAC #92-0224

LRC-6938

Attachments de r's Exc ha

CLOSET

SHOP

STORAGE

5072 BENSON ROAD

USD

UNION CITY, CALIFORNIA

COVERED STORAGED

SAMPLE LOCATION DRAWING

D01

C02 A02

B02

D02 E02

E01 C01

B01

A01

PB04

PB03

PB01

PB02

Buil de r's Exc ha

Final Report

(EPA Method 40CFR, Part 763, Appendix E to Subpart E and EPA 600/R-93-116, Visual Area Estimation)

Bulk Asbestos Analysis NVLAP Lab Code: 101459-0

L1161Client ID:Vista Environmental Consultants B363475Report Number:Chris Bruns

Date Received:2984 Teagarden St.

09/09/24Date Analyzed:

09/09/24Date Printed:San Leandro, CA 94577

First Reported:

L1161241261001; Covered Storage-S SGSFL Job ID:Job ID/Site:

Date(s) Collected: 09/05/2024

10Total Samples Submitted:

Total Samples Analyzed: 10

09/05/24

09/09/24

Sample ID Lab Number Asbestos

Type Percent in

Layer Asbestos AsbestosPercent in Percent in

Type TypeLayer Layer

CS-A01 12767935

Layer: Grey Cementitious Material ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

CS-A02 12767936

Layer: Grey Cementitious Material ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

CS-B01 12767937

Layer: Grey Cementitious Material ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

CS-B02 12767938

Layer: Grey Cementitious Material ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

CS-C01 12767939

Layer: Black Asphalt ND

Asbestos (ND)Total Composite Values of Fibrous Components:

CS-C02 12767940

Layer: Black Asphalt ND

Asbestos (ND)Total Composite Values of Fibrous Components:

CS-D01 12767941

Layer: Yellow Fibrous Material ND

Layer: White Fibrous Material ND

Layer: Foil ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (5 %) Fibrous Glass (90 %)

3777 Depot Road, Suite 409, Hayward, CA 94545 | Phone: 510.887.8828 / 800.827.3274 Fax: 510.887.4218 | https://falaboratories.sgs.com

Buil de r's Exc ha

Report Number: B363475

Date Printed: 09/09/24Client Name: Vista Environmental Consultants

Sample ID Lab Number Asbestos

Type Percent in

Layer Asbestos AsbestosPercent in Percent in

Type TypeLayer Layer

CS-D02 12767942

Layer: Yellow Fibrous Material ND

Layer: White Fibrous Material ND

Layer: Foil ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (5 %) Fibrous Glass (90 %)

CS-E01 12767943

Layer: Grey Cementitious Material ND

Layer: Grey Cementitious Material ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

CS-E02 12767944

Layer: Grey Cementitious Material ND

Asbestos (ND)Total Composite Values of Fibrous Components:

Cellulose (Trace)

Analytical results and reports are generated by SGS Forensic Laboratories (SGSFL) at the request of and for the exclusive use of the person or entity (client) named on such report.

Results, reports or copies of same will not be released by SGSFL to any third party without prior written request from client. This report applies only to the sample(s) tested.

Supporting laboratory documentation is available upon request. This report must not be reproduced except in full, unless approved by SGSFL. The client is solely responsible for the use and interpretation of test results and reports requested from SGSFL. This report must not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. Government. SGSFL is not able to assess the degree of hazard resulting from materials analyzed. SGS Forensic Laboratories reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified. All samples were received in acceptable condition unless otherwise noted.

Note: Limit of Quantification ('LOQ') = 1%. 'Trace' denotes the presence of asbestos below the LOQ. 'ND' = 'None Detected'.

Maria Cosper, Laboratory Supervisor, Hayward Laboratory

3777 Depot Road, Suite 409, Hayward, CA 94545 | Phone: 510.887.8828 / 800.827.3274 Fax: 510.887.4218 | https://falaboratories.sgs.com

Buil de r's Exc ha r's Exc ha

Metals Analysis of Paints Client ID:

Report Number:

Date Received:

M262972

Job ID / Site: 241261001; USD - COVERED STORAGE

Vista Environmental Consultants L1161

SGSFL Job ID:

Date Analyzed:

L1161

Chris Bruns

San Leandro, CA 94577

2984 Teagarden St.

Date Printed: 09/06/24

09/06/24

First Reported: 09/06/24

09/05/24

Final Report

(AIHA-LAP, LLC Accreditation, Lab ID #101762)

Date(s) Collected: 9/5/2024 Total Samples Submitted:

Total Samples Analyzed:

Sample Number Lab Number Result Result Reporting Method

Analyte Units Limit* Reference

EPA 3050B/7000B< 0.006PbCS-PB01 30943948 wt% 0.006

EPA 3050B/7000B< 0.007PbCS-PB02 30943949 wt% 0.007

EPA 3050B/7000B0.25PbCS-PB03 30943950 wt% 0.02

EPA 3050B/7000B< 0.007PbCS-PB04 30943951 wt% 0.007

Analytical results and reports are generated by SGS at the request of and for the exclusive use of the person or entity (client) named on such report. Results, reports or copies of same will not be released by SGS to any third party without prior written request from client. This report applies only to the sample(s) tested. Supporting laboratory documentation is available upon request. This report must not be reproduced except in full, unless approved by SGS. The client is solely responsible for the use and interpretation of test results and reports requested from SGS. SGS is not able to assess the degree of hazard resulting from materials analyzed. SGS reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified. Any modifications that have been made to referenced test methods are documented in SGS Standard Operating Procedures Manual. Sample results have not been blank corrected. Quality control and sample receipt condition were acceptable unless otherwise noted.

Note* Sampling data used in this report was provided by the client as noted on the associated chain of custody form.

* The Reporting Limit represents the lowest amount of analyte that the laboratory can confidently detect in the sample, and is not a regulatory level. The Units for the Reporting Limit are the same as the Units for the Final Results.

Kevin Poon, Laboratory Supervisor, Hayward Laboratory

3777 Depot road, Suite 409, Hayward, CA 94545 | Phone: 510.887.8828 / 800.827.3274 Fax: 510.887.4218 | https://falaboratories.sgs.com

Buil de r's Exc ha r's Exc ha

THIS PAGE INTENTIONALLY LEFT BLANK

de r's Exc ha

APPENDIX C

Notice of Exemption / Categorical Exemption

Buil de r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha r's Exc ha

APPENDIX D

Lockout/Tagout Procedures for Contractors

Buil de r's Exc ha

This Page Intentionally Left Blank

SOP

TREATMENT PLANT & PUMP STATION

LOCKOUT/TAGOUT FOR CONTRACTORS

SOP-SAF105-2 / April 2025

Author: EI SME

Owner: FMC/ Electric Shop

Reviewers: FMC Coach, TPO Coach, EHSS, EC Coach r's Exc ha

Effective date:

April 2025

TREATMENT PLANT & PUMP STATION

SOP-SAF105-2

This Page Intentionally Left Blank de r's Exc ha

TREATMENT PLANT & PUMP STATION

ADMINISTRATIVE

A. Introduction

1. This Standard Operating Procedure (SOP) is a set of instructions or steps that all Affected Employees, Authorized Employees and/or Primary Authorized Employees follow to Lockout/Tagout (LOTO) any equipment in the Treatment Plant or Pump Station. It shall be done safely, with no adverse impact on the environment, meet compliance standards, and in a way that maximizes operational and production requirements.

B. Cancellation

1. Supersedes SOP- SAF105-2, dated June 2021

C. Objectives

1. Upon completion of this SOP, the Affected Employees(s), Authorized Employee(s) and/or Primary Authorized Employee(s) will be able to:

a. Maintain a safe working environment for all personnel.

b. Minimize disruptions in the wastewater treatment processes while facilitating timely completion of Treatment Plant and/or Pump Station maintenance or construction activities.

D. Equipment/Personnel Required

1. PPE – Hard hat, eye protection, steel-toe boots and gloves

E. Terminology

NOTE shall be used when information is available that can assist the Operator in accomplishing his or her task.

CAUTION shall be used when special cautions must be taken by the Operator. Failure to following prescribed steps may cause serious bodily injury and damage equipment.

WARNING shall be used when special cautions must be taken by the Operator. Failure to follow prescribed steps will cause loss of life or limb and severely damage equipment.

F. Employee Responsibility

Employees are responsible to follow District policies and procedures for the safe and effective operation of the District equipment and systems.

G. Management Responsibility

1. Management is responsible to provide employees adequate education and training to safely and effectively operate District equipment and systems.

Buil de r's Exc ha

TREATMENT PLANT & PUMP STATION

DEFINITIONS

Activation/Energizing:

set machinery into motion by starting, switching, pushing, moving, or otherwise engaging power sources for such equipment. To provide a flow of electricity or complete a circuit that is the main power source for the machinery/equipment.

Affected Employee:

Any employee or contractor whose job requires him or her to operate or use a machine or equipment on which cleaning, repairing, servicing, setting-up or adjusting operations are being performed under lockout or tagout, or whose job requires the employee or contractor to work in an area in which such activities are being performed under lockout or tagout.

Authorized Employee:

Any employee or contractor identified to have Lockout/Tagout knowledge and skills attained through training and experience, and who is recognized and authorized to shut down and safety lock and tagout systems and equipment. An Affected Employee becomes an Authorized Employee when that employee's or contractor’s duties include performing cleaning, repairing, servicing, setting-up, and adjusting operations covered under this section.

Energy-isolating devices:

Handles, switches, levers, actuators, valves, valve wheels and other devices that are used to operate or control the flow of electricity, air, water, or other energy sources.

Fabrication, Maintenance and Construction (FMC):

The District Personnel that provides professional installation, service, and repair of Treatment Plant and Pump Station equipment.

Group Lock Box:

Container used to hold keys and locks of individuals involved in a complex or large group LOTO.

Lockout:

The practice of using individually keyed or multiple security devices ("locks") to prevent the unwanted activation of any energized, pressurized system or, mechanical and/or electrical equipment.

LOTO (Lockout and Tagout):

The process of de-energizing and securing equipment or machinery prior to working on it

Primary Authorized Employee:

de r's Exc ha

TREATMENT PLANT & PUMP STATION

A representative who is designated by the contractor to have overall responsibility for a specific project or task. This representative is responsible for ensuring that each Authorized Employee involved in the task is protected by a single energy control device to the same extent as they would be by an individual energy control devices.

Tagout:

The practice of using a LOTO tag only is allowed when an energized system or device is not capable of being locked out. Tagout devices will be of the non-reusable type, attachable by hand, self-locking, and non-releasable with a minimum breaking strength of no less than 50 pounds.

r's Exc ha

TREATMENT PLANT & PUMP STATION

PROCEDURES

1. Treatment Plant or Pump Station Lockout/Tagout

1.1 Planning the Work

Step 1: Prior to any work being commenced, the District and Contractor shall meet and review the District’s LOTO SOP which shall be the minimum standard operating procedure for all of Contractor’s and its subcontractors’ LOTO procedures while working in the District’s Plant or Pump Station. If an equipment specific LOTO SOP does not exist for the piece of equipment to be worked on an SOP must be developed prior to commencing the shutdown and LOTO. The Non-Routine LOTO SOP Checklist at the end of this SOP should be used by a qualified operator/pump station mechanic to develop the LOTO SOP for the subject work.

Step 2: Outside employer/contractor shall inform their subcontractors of both the District’s and their own LOTO procedures

Step 3: Contractor shall inform the District in writing who will be the Authorized Employee(s) or Primary Authorized Employee for each LOTO.

1.2 Prior to Starting Work

Each Authorized Employee or the Primary Authorized Employee shall:

Step 1: Before a machine or piece of equipment is turned off, review and follow at a minimum the individual equipment LOTO SOP (if applicable).

This equipment LOTO SOP is information for the contractor only.

Step 2: Make sure that the Authorized and Affected Employees know all of the following:

Type and magnitude of the energy

Hazards of the energy to be controlled

Method or means to control the energy

Point of attachment for the lockout device

Who the Affected Employees are

Step 3: Establish two-way communication by making a positive contact with a Plant Operator or Pump Station Mechanic prior to the initial start of a job in the Treatment Plant or Pump Station

Step 4: Notify Affected Employees that a lockout or tagout system is going to be utilized and specify the equipment and the reason for the lockout

Step 5: Survey the area to locate and identify all isolating devices to be certain which switch(es), valve(s), or other energy-isolating devices apply to the equipment to be locked or tagged out.

More than one energy source may be involved (electrical, mechanical, stored energy, or others).

Buil de r's Exc ha

TREATMENT PLANT & PUMP STATION

1.3 Shutting Down the Equipment

Step 1: When requested in advance, in writing (following the system outage request procedures as outlined in Section 01010 of the contract specifications), a Plant Operator or Pump Station Mechanic will remove equipment from service for maintenance work.

Step 2: The Plant Operator or Pump Station Mechanic will turn off or shut down the machine or equipment using established procedures as detailed in the equipment-specific LOTO SOP (e.g. depress stop button, open toggle switch, etc.)

1.4 Isolating the Energy Source

Each Authorized Employee or the Primary Authorized Employee shall:

Step 1: After the machine or equipment has been turned off, completely isolate the machine or equipment from its energy sources

Use the appropriate energy-isolating devices (i.e. breakers, valves, disconnects)

CAUTION

Only District Personnel shall shut down or turn on District equipment.

CAUTION

In addition to operating the switch, valve, or other energy-isolating device(s) so that the equipment is isolated from its energy source(s), stored energy (such as that in springs, elevated machine members, rotating flywheels, hydraulic systems, and air, gas, steam, or water pressure, etc.) must be released or restrained by methods such as repositioning, blocking, bleeding down, etc..

Buil de r's Exc ha

TREATMENT PLANT & PUMP STATION

Step 2: When necessary a District Mechanic or Electrician will perform the following:

Open the appropriate circuit breaker or mechanical system

Disconnect the wires from the power source and or control panels and at the local panel adjacent to the equipment and/or blank

Disconnect any identified or associated mechanical systems or piping

Step 3: Lockout / Tagout the energy-isolating devices with proper lock(s) and tag(s)

Step 4: Make sure a lockout tag is applied for each energy-isolating device

Step 5: Make sure lockout devices hold the energy-isolating device in a “safe” or “off” position

Step 6: Make sure a tag is put on an energy-isolating device so it clearly shows that moving the energy-isolating device from the “safe” or “off” position is prohibited

Step 7: If the Plant Operator or Pump Station Mechanic himself/herself would be exposed to hazardous energy by the work, he/she will place and control lock(s) and tag(s) in addition to the lock(s) and tag(s) used by the contractor.

If the Plant Operator or Pump Station Mechanic is not exposed by the work he/she will place locks and tags when requested but his/her name will not be included on any of the lockout tags.

Only the name of the Primary Authorized Employee or Authorized Employee(s) will be written on the lockout tags

Step 8: If the Plant Operator or Pump Station Mechanic will not be exposed by the work but wants to ensure Operations or Fabrication, Maintenance and Construction (FMC) control of the equipment for process reasons he/she may add a process notice tag or FMC Notice tag to the individual equipment or group lockout box.

NOTE

The Plant Operator or Pump Station Mechanic will make entries into a daily log at field locations for notification of District employees on subsequent shifts, noting the: date, time, specific name of the equipment being locked or tagged out of service, and the time and date that it is expected to return to service.

NOTE

When using a group lockout box to lockout multiple equipment the individual tags on each piece of equipment will not have a name on it. The tag will contain a date, description, and the ID of the lockout box being used. The locks and tags placed on the lockout box itself will have the name of the Authorized Employee(s) or the Primary Authorized Employee on the tag along with the date and description.

Buil de r's Exc ha

TREATMENT PLANT & PUMP STATION

This process notice tag or FMC Notice tag will NOT be a substitute for the locks and tags of each or any exposed personnel.

Any District Operator is authorized to remove a blue District process notice tag

Any FMC Personnel is authorized to remove a yellow District FMC Notice tag

1.5 Confirmation and Testing

Step 1: When required, a District Mechanic and/or electrician will verify and test at the equipment, to insure that there is no electrical or mechanical energy

WARNING

Once the source has been de-energized, the system must be tested to ensure it will not operate and to verify that it is de-energized.

CAUTION

Prior to any work being performed on the system, each Authorized Employee or Primary Authorized Employee shall confirm and test (with the Operator or Pump Station Mechanic when requested) the proper lockout of each piece of equipment that needs to be LOTO for his/her work and then add his/her lock and tag to the equipment or group lockout box.

Buil de r's Exc ha

TREATMENT PLANT & PUMP STATION

The contractor and/or subcontractors should be present throughout this process since they will need to confirm and test

Step 2: On the day/night of the work, the contractor will provide the appropriate personnel (i.e., an electrician to verify the isolation of electrical energy) to go through the same verification process that District employees completed earlier

Step 3: The contractor and/or subcontractors will add their locks at the appropriate locations

Each Authorized Employee or the Primary Authorized Employee shall:

Step 4: Ensure that no personnel are exposed and verify that the energy sources have been disconnected by operating the start button or other normal operating controls, to make certain the equipment will not operate.

Step 5: Make sure all potentially hazardous stored and residual energy is relieved, disconnected, restrained, blocked, or otherwise rendered safe after the lockout or tagout devices have been put on the energy-isolating devices

Step 6: Monitor the isolation of machines and equipment that could re-accumulate stored energy to a hazardous level until:

Service or maintenance is completed, and

The possibility of re-accumulating hazardous energy doesn't exist

CAUTION

Ensure that drain line is not blocked with rags or debris

CAUTION

Return operating control(s) to neutral or off position after the test.

Buil de r's Exc ha

TREATMENT PLANT & PUMP STATION

1.6 Conducting the Maintenance or Repair Work

Step 1: The contractor may proceed with their work after:

The Equipment has been verified to be isolated and all appropriate equipment has been locked out/tagged out by the contractor

The contractor has verified and tested sources to be de-energized.

1.7 Preparing to Re-energize the Equipment

Each Authorized Employee or the Primary Authorized Employee shall:

Step 1: After the servicing and/or maintenance are complete and equipment is ready for operation:

Ensure that all guards are in place

Inspect the work area to make sure that tools and nonessential items have been removed

Check the area around the machines or equipment to ensure that no one is exposed to danger

CAUTION

Prior to any work being performed on the system each Authorized Employee or Primary Authorized Employee is obligated to confirm and test (with the Operator or Pump Station Mechanic when requested) the proper lockout of each piece of equipment that needs to be LOTO for his/her work and then add his/her lock and tag to the equipment or group lockout box.

CAUTION

If the contractor needs to perform work on equipment with an undisrupted energy supply, then the contractor shall coordinate a specific work plan with District Representative.

CAUTION

If during the course of the work, the equipment needs to be test run:

The contractor shall notify the District Representative The District Representative shall inform the appropriate

Operator or Pump Station Mechanic An Operator or Pump Station Mechanic will start the equipment to test run the equipment.

Buil de r's Exc ha

TREATMENT PLANT & PUMP STATION

Verify that the machine or equipment is in proper working condition and ready to be energized

Step 2: Check that employees in the area are at a safe distance away from the machine or equipment to be energized

Step 3: When work is complete and the equipment is ready to be returned to service, notify the appropriate Operator or Pump Station Mechanic

1.8 Removing LOTO Devices

Each Authorized Employee or the Primary Authorized Employee shall:

Step 1: Notify the District Representative that LOTO devices are ready to be removed

Step 2: District Representative will notify Plant Operations or FMC Personnel

Step 3: Verify that all devices have been removed from all sources as appropriate

Step 4: The Plant Operator or Pump Station Mechanic will record the removal of the LOTO devices in the daily log at the field location

1.9 Restoring the Energy Source

Step 1: After removal of all lockout or tagout devices, the Plant Operator or Pump Station Mechanic will operate the energy-isolating devices to restore energy to the machine or equipment

Step 2: The Plant Operator or Pump Station Mechanic will restart the machine or equipment using established procedures as detailed in the equipment-specific LOTO SOP (if applicable)

1.10 Daily Log Entries

Step 1: When equipment in the Plant or Pump Station is locked out or tagged out, the details are to be written down in the daily log at the field location where the locks/tags are placed on the equipment by the Plant Operator or Pump Station Mechanic.

Step 2: Plant Operators will enter summary LOTO information for the whole Plant in the main Plant logbook that is kept in the Data Logger room.

This logbook is used to share information at each shift turnover of lockouts that extend into the next shift

CAUTION

Under no circumstances will the contractor take equipment on or off line or alter process settings.

NOTE

The following steps 2 and 3 only apply to LOTO of Treatment Plant.

Buil de r's Exc ha

TREATMENT PLANT & PUMP STATION

Step 3: Plant Operators will write which major equipment that is out-of-service on a grease board, where shift turnover meetings are held, in order to provide a long-term reference

This is helpful to someone that has been away for several days

Step 4: Task complete r's Exc ha

TREATMENT PLANT & PUMP STATION

Non-Routine LOTO SOP Checklist Form 2/2025

1. Equipment to be worked on (Name & Hansen ID)

2. Authorized Person

3. Person at risk if Different than authorized person

4. Affected Persons

5. Type of energy present (circle all that apply)

Electrical Hydraulic Pneumatic Steam Thermal Chemical Kinetic Gravity Other

6. Shut Down Equipment (attach separate sheet if needed) step 1:

step 2:

step 3:

step 4:

step 5:

step 6:

7. Points of attachment for Locks and Tags (attach separate sheet if…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .