The documents are final construction drawings for the Enhanced Treatment and Site Upgrade Program's Campus Solar Facilities project, prepared by Hazen and Sawyer for the Union Sanitary District (USD) in Union City, California. The project involves constructing a new covered storage facility with solar panel installations, spanning approximately 225 feet long by 60 feet wide, and includes comprehensive electrical, structural, fire protection, and mechanical systems. The project is scheduled for construction in October 2025, with detailed design documents covering solar photovoltaic system installation, electrical infrastructure, site modifications, and associated support structures.
The project includes a minimum 200 kW DC solar photovoltaic system to be installed across the entire roof area, with associated electrical equipment such as inverters, switchboards, and cable trays. The solar system will connect to existing electrical infrastructure, specifically using a spare medium voltage breaker in the SWGR-SE building. The estimated project budget is not explicitly stated, but the comprehensive drawings suggest a significant infrastructure investment. The design incorporates future-proofing elements, including provisions for electric vehicle charging stations and cable tray installations that can accommodate additional future electrical systems. The project is being funded through the Union Sanitary District's Enhanced Treatment and Site Upgrade Program, with the solar facilities representing Phase 1A of the broader campus improvement efforts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
UNION SANITARY DISTRICT
LOCATION MAP
ENHANCED TREATMENT AND SITE UPGRADE PROGRAM
PHASE 1A - CAMPUS SOLAR FACILITIES
DRAWINGS
VOLUME 1 OF 1
NOT TO SCALE
HAZEN AND SAWYER
101 MONTGOMERY STREET, SUITE 1500
SAN FRANCISCO, CA 94104FINAL DRAWINGS - ISSUED FOR CONSTRUCTION
UNION CITY, CALIFORNIA
USD PROJECT NO. 800-606
OCTOBER 2025
BOARD OF DIRECTORS:
MANNY FERNANDEZ
PAT KITE
MARTY KLUDJIAN
ANJALI LATHI
JENNIFER TOY
GENERAL MANAGER / DISTRICT ENGINEER
PAUL R. ELDREDGE
HAZEN NO.:
CONTRACT NO.:
DRAWING
NUMBER:
20118-014
SHEET
NUMBER:
APPROVED FOR CONSTRUCTION:
RIC PIPKIN, P.E. DATE
ETSU PROGRAM MANAGER
SUBMITTED BY:
CHRISTOPHER G. PORTNER, P.E. DATE
PROJECT MANAGER
G01
PLANT LOCATION
Buil de r's Exc ha ng e cportner Text Box 10/03/2025 cportner Text Box 10/03/2025 cportner Image cportner Image cportner Image cportner Text Box 10/06/2025
DESIGNED BY:
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
HAZEN NO.:
USD NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
800-606
REV ISSUED FOR DATE BY
ENHANCED TREATMENT
AND SITE UPGRADE
PROGRAM
CAMPUS SOLAR
FACILITIES
C. PORTNER
0 1/2" 1"
FINAL DRAWINGS - ISSUED FOR CONSTRUCTION
OCTOBER 2025
20118-014
SHEET
NUMBER:
HAZEN AND SAWYER
101 MONTGOMERY STREET, SUITE 1500
SAN FRANCISCO, CA 94104
A u to d e s k D o c s /2
-0
U S
D C a m p u s S o la r F a c ili ti e s /2
-0
-S
IT
E
.r v t
/2 /2
:0 :4
P
M
G02
S. HAKONSON
C. PORTNER
C. PORTNER
GENERAL
INDEX OF DRAWINGS
STRUCTURAL
DRAWING NO SHEET NAME
GENERAL
S1 STRUCTURAL NOTES - SHEET 1
S2 STRUCTURAL NOTES - SHEET 2
COVERED STORAGE
S100 DEMOLITION BOTTOM PLAN
S101 DEMOLITION ROOF FRAMING BOTTOM CHORD
PLAN @ EL 14.00
S102 DEMOLITION ROOF FRAMING TOP CHORD PLAN
S103 DEMOLITION SECTIONS
S104 FOUNDATION PLAN
S105 BOTTOM PLAN
S106 LOWER ROOF FRAMING PLAN
S107 UPPER ROOF FRAMING PLAN
S108 SECTIONS
S109 SECTIONS AND DETAILS
S110 SECTIONS AND DETAILS
S111 SECTIONS AND DETAILS
STRUCTURAL STANDARD DETAILS
SD1 SHEET 1
SD2 SHEET 2
ARCHITECTURAL
DRAWING NO SHEET NAME
GENERAL
A1 ABBREVIATIONS, LEGENDS, SYMBOLS AND
GENERAL NOTES
COVERED STORAGE
A100 LIFE SAFETY PLAN AND CODE INFORMATION
A101 FLOOR PLAN & ROOF PLAN
A102 BUILDING ELEVATIONS
A103 BUILDING SECTIONS
A104 WALL SECTIONS
A105 DETAILS
PLUMBING
DRAWING NO SHEET NAME
GENERAL
P1 NOTES, SYMBOLS, LEGEND AND ABBREVIATIONS
COVERED STORAGE
P100 DEMOLITION FLOOR PLAN
P101 FLOOR PLAN AND RISER DIAGRAM
STANDARD DETAILS
PD1 SHEET 1
FIRE PROTECTION
DRAWING NO SHEET NAME
SITE
FP10 PARTIAL SITE PLAN
COVERED STORAGE
FP100 OVERALL PLAN - DEMOLITION
FP101 FLOOR PLAN AND GENERAL NOTES
STANDARD DETAILS
FPD1 SHEET 1
HVAC
DRAWING NO SHEET NAME
GENERAL
H1 NOTES, SYMBOLS, LEGEND AND ABBREVIATIONS
H2 SCHEDULES AND AIRFLOW DIAGRAMS
COVERED STORAGE
H100 DEMOLITION FLOOR PLAN
H101 ENLARGED PLAN AND SECTION - DEMOLITION
H102 FLOOR PLAN
H103 ENLARGED PLAN AND SECTION
H104 SECTION B
STANDARD DETAILS
HD1 SHEET 1
ELECTRICAL
DRAWING NO SHEET NAME
GENERAL
E1 LEGEND AND SYMBOLS
E2 NOTES AND ABBREVIATIONS
SITE
E10 OVERALL PLAN
COVERED STORAGE
E100 DEMOLITION PLAN
E101 PARTIAL SITE LIGHTING PLAN
E102 POWER PLAN
E103 ROOF SOLAR PLAN
E104 EQUIPMENT LAYOUT PLAN
E105 SWITCHGEAR-SE SINGLE LINE DIAGRAM
E106 EV CHARGING SINGLE LINE DIAGRAM AND
ELEVATIONS
E107 SCHEDULES
ELECTRICAL STANDARD DETAILS
ED1 SHEET 1
ED2 SHEET 2
CIVIL
DRAWING NO SHEET NAME
GENERAL
CO1 GENERAL NOTES AND LEGEND
SITE PLAN
C10 OVERALL DEMOLITION PLAN
SITE PLAN
C20 OVERALL PLAN
C26 PARTIAL PLAN - AREA 6
C27 PARTIAL PLAN - AREA 7
STANDARD DETAILS
CD01 CIVIL DETAILS
GENERAL
DRAWING NO SHEET NAME
G01 COVER SHEET
G02 INDEX OF DRAWINGS
G03 LEGEND, SYMBOLS AND ABBREVIATIONS
G04 EXISTING CONDITIONS
G05 PROPOSED CONDITIONS
1 CONSTRUCTION 10/25 CGP
Buil de r's Exc ha ng e cportner Snapshot
M
S
A
A6
A
A3
ROOM NAME
ABBREVIATIONS
LINETYPES
SYMBOLS
SECTION AND DETAIL KEYING
ROOM NAME LABEL ELEVATION CALL OUT
MATERIALS
LEGEND
PROPOSED ITEMS
EXISTING ITEMS
HIDDEN ITEMS
CENTER LINE
DEMOLITION ITEMSDRAWING WHERE SECTION IS SHOWN
DRAWINGS ARE CROSS REFERENCED IN THE FOLLOWING METHOD:
(A) A SECTION CUT ON DRAWING A3 IS IDENTIFIED AS FOLLOWS:
REFERENCED ITEM
REFERENCED ITEM
AND ARE SHOWN ON THE CONTRACT DRAWINGS BY ONE OF TWO METHODS:
STANDARD DETAILS ARE REFERENCED BY A UNIQUE SEVEN DIGIT NUMBER
ARE IDENTIFIED BY A SQUARE WITH A NUMBER IN THE UPPER HALF.
DETAILS ARE CROSS REFERENCED IN A SIMILAR MANNER, EXCEPT DETAILS
(B) THE SECTION SHOWN ON DRAWING A6 IS IDENTIFIED AS FOLLOWS:
DRAWING FROM WHERE SECTION WAS TAKEN
SEE M-40-0100
OR:
SECTION LETTER
SECTION LETTER
MATCH LINE
BRICK
CHECKERED PLATE
WOOD BLOCKING
GLASS
CONCRETE
GRAVEL
ASPHALT PAVING
GRADE OR EARTH
INSULATION
WATER SURFACE
GRATING
CAST IRON
STEEL
CONCRETE FILL
OR GROUT
CONCRETE
MASONRY UNIT
M-40-0100
ROOM NAME
ROOM NUMBER
ELEVATION #
DRAWING #
DIRECTION OF VIEW
GENERAL
A###
A/C AIR CONDITIONER
AB ANCHOR BOLT
AC ASBESTOS CEMENT
ACP AIR COMPRESSOR
ACT-MR ACOUSTICAL CEILING TILE,
MOISTURE RESISTANT
AD AREA DRAIN
ADH ADHESIVE
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AGGR AGGREGATE
AH AIR HEATER
AHU AIR HANDLING UNIT
AL, ALUM ALUMINUM
ALLOW ALLOWANCE/ALLOWABLE
ALT ALTERNATE
APPROX APPROXIMATE
AR AIR RECEIVER
ARCH ARCHITECTURAL
ASB ASBESTOS
ASPH ASPHALT
AT ASPHALT TILE
ATF AIR TERMINAL UNIT (FAN
POWERED)
ATS AUTOMATIC TRANSFER
SWITCH
ATU AIR TERMINAL UNIT
B BORING
BC BOILER CHEMICALS
BD BOARD
BDD BACKDRAFT DAMPER
BF BLIND FLANGE
BFE BOTTOM OF FITTING ELEV
BH BASEBOARD HEATER
BITUM BITUMINOUS
BL BUILDING LINE
BLDG BUILDING
BLK BLOCK
BLW BLOWER
BM BENCH MARK
BOC BACK OF CURB
BOM BOTTOM OF MASONRY
BOT BOTTOM
BRC BRIDGE CRANE
BRG BEARING
BRK BRICK
BRL BUILDING RESTRICTION
LINE
BRZ BRONZE
BT BOLT
CB CATCH BASIN
CBD COUNTERBALANCE
BACKDRAFT DAMPER
CC COOLING COIL
C/C CENTER TO CENTER
CCP CIRCULATING PUMP
CD CONTROL DAMPER
CDWP CONDENSER WATER PUMP
CE CONSTRUCTION EASEMENT
CEM CEMENT
CER CERAMIC
CF CUBIC FEET
CFM CUBIC FEET PER MINUTE
CL CENTERLINE
CLKG CAULKING
CPLG COUPLING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CON CONCENTRIC
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS,
CONTINUATION
CONTR CONTRACTOR
CORP CORPORATION
CP CONCRETE PLANK OR
CONTROL PANEL, OR
CONTROL POINT
CPT CONTROL POWER
TRANSFORMER
CR CONTROL RELAY
CRS COURSE
CSP CHEMICAL SERVICE PUMP
CSSP CHEMICAL SERVICE SUMP
PUMP
CST CHEMICAL STORAGE TANK
CT CERAMIC TILE
CTJ CONTROL JOINT
CU COPPER OR CONDENSING
UNIT
CY CUBIC YARD
DAD DESICCANT AIR DRYER
DD DESICCANT DRYER
DEC DECANT
DEH DEHUMIDIFIER
DEM DEMISTER
DET DETAIL
DF DUCT FAN OR DRINKING
FOUNTAIN
DIA OR Ø DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISC DISCONNECT
DISCH DISCHARGE
DIST DISTRIBUTION
DJ DISMANTLING JOINT
DKC DOOR OPERATOR (ELECTRIC)
DL DEAD LOAD
DN DOWN
DOZ DOZEN
DP DISTRIBUTION PANEL
DS DISCONNECT SWITCH
D/S DOWNSTREAM
DT DAY TANK
DWG(S) DRAWING(S)
DWL DOWEL
EA EACH
ECC ECCENTRIC
ECH ELECTRIC CABINET HEATER
ED EQUIPMENT DRAIN
EDH ELECTRIC DUCT HEATER
EDP EMERGENCY DISTRIBUTION
PANEL
EE EACH END
EEW EMERGENCY EYE WASH
EF EACH FACE OR EXHAUST FAN
EFF EFFLUENT
EHH ELECTRICAL HANDHOLE
EL ELEVATION
ELEC ELECTRICAL
ELP EMERGENCY LIGHTING
PANEL
EMH ELECTRICAL MANHOLE
ENGR ENGINEER
ENT ENTRANCE
EOG EDGE OF GRAVEL
EOP EDGE OF PAVEMENT
EPP EMERGENCY POWER PANEL
EPX EPOXY
EQ EQUAL
EQPT EQUIPMENT
ERH ELECTRIC WIRE ROPE HOIST
ES EMERGENCY SHOWER OR
EMERGENCY SWITCH
ES/EEW EMERGENCY SHOWER AND
EYEWASH
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST/EX EXISTING
EXC EXCAVATE
EXH EXHAUST
EXP EXPANSION
EXP JT EXPANSION JOINT
EXT EXTERIOR
F FAN
FAB FABRICATE
F&C FRAME AND COVER
F&G FRAME AND GRATE
FC FLUSHING CONNECTION
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER/FLOW
ELEMENT
FEF FUME EXHAUST FAN
FH FIRE HYDRANT
FIG FIGURE
FIN FINISH
FIX FIXTURE
FL FLOOR
FLEX FLEXIBLE
FLG FLANGE
FLXC FLEXIBLE CONNECTION
FM FLOW METER
FOC FIBER OPTICS CABLE
FPRF FIREPROOF
FS FLOW SWITCH
FSD FIRE/SMOKE DAMPER
FT FEET OR FIN TUBE HEATER
FTG FITTING
FURR FURRING OR FURRED
G GATE
GA GAUGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GIH GAS INFRARED HEATER
GPM GALLONS PER MINUTE
GR GRADE
GRTG GRATING
GUH GAS UNIT HEATER
GW GUY WIRE
GWH GAS WATER HEATER
GYP GYPSUM
HB HOSE BIBB
HC HEATING COIL
HCP HORIZONTAL END SUCTION
CENTRIFUGAL PUMP
HDW HARDWARE
HE HEAT EXCHANGER
HEX HEXAGONAL
HFCA HARNESSED FLANGED
COUPLING ADAPTER
HHRG HYBRID HIGH RESISTANCE
GROUNDING
HORIZ HORIZONTAL
HP HORSEPOWER OR HEAT
PUMP
HPT HIGH POINT
HRU HEAT RECOVERY UNIT
HRG HIGH RESISTANCE
GROUNDING
HSCP HORIZONTAL SPLIT CASE
PUMP
HUM HUMIDIFIER
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
HW HEADWALL
HWB HEATING WATER BOILER
HWCH HEATING WATER CABINET
HEATER
HWL HIGH WATER LEVEL
HWP HEATING WATER PUMP
HWY HIGHWAY
HYD HYDRAULIC
I IRON
I&C INSTRUMENTATION AND
CONTROLS
ID INSIDE DIAMETER
IF INSIDE FACE
IN INCH
INCL INCLUDED
INF INFLUENT
INSUL INSULATION
INT INTERIOR
INV INVERT
IPP INSTRUMENT POWER PANEL
JB JUNCTION BOX
JCT JUNCTION
JT JOINT
L LENGTH/ANGLE
LA LINE AHEAD
LAB LABORATORY
LAM LAMINATED
LAT LATERAL
LAV LAVATORY
LB POUND OR LINE BACK
LD COMBINATION
LOUVER/DAMPER
LF LINEAR FEET
LG LONG
LI LEVEL INDICATOR
LIP LIGHTING INDICATING
PANEL
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LP LIGHTING PANEL
LPT LOW POINT
LRG LOW RESISTANCE
GROUNDING
LS LEVEL SWITCH
LTG LIGHTING
LVR LOUVER
LWL LOW WATER LEVEL
MAINT MAINTENANCE
MANUF MANUFACTURER
MATL MATERIAL
MAU MAKE UP AIR HANDLING
UNIT
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
MCLU MOTOR CONTROL LINE-UP
MECH MECHANICAL
MET METAL
MFR MANUFACTURER
MFM MAGNETIC FLOW METER
MG MILLION GALLONS
MGD MILLION GALLONS PER DAY
MJ MECHANICAL JOINT
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOLDING
MO MASONRY OPENING
MOD MODIFY OR MODIFIED
MON MONUMENT
MOPO MAINTENANCE OF PLANT
OPERATIONS
MOV MOTOR OPERATED VALVE
MTD MOUNTED
MTG MOUNTING
MULT MULTIPLE
N NORTH
NA NOT APPLICABLE
NAD '83 NORTH AMERICAN DATUM OF
NAVD '88 NORTH AMERICAN VERTICAL
DATUM OF 1988
NC NORMALLY CLOSED
NF NEAR FACE
NGVD '29 NATIONAL GEODETIC
VERTICAL DATUM OF 1929
NIC NOT IN CONTRACT
No. NUMBER
NO NORMALLY OPEN
NOM NOMINAL
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER OR
OVERHEAD DOOR
OF OUTSIDE FACE
OHE OVERHEAD ELECTRIC
OML OIL MIST LUBRICATOR
OPER OPERATOR
OPNG OPENING
OPP OPPOSITE
ORF OIL REMOVAL FILTER
ORIG ORIGINAL
P&ID PROCESS AND
INSTRUMENTAION DIAGRAM
PAC PACKAGED AIR
CONDITIONING UNIT
PAR PARALLEL
PC POINT OF CURVE OR PIECE
OR PERSONAL COMPUTER
PCC POINT OF COMPOUND CURVE
PCF POUNDS PER CUBIC FOOT
PE PLAIN END
PERF PERFORATED
PERP PERPENDICULAR
PF PROPELLER FAN
PI POINT OF INTERSECTION
PL PROPERTY LINE OR PLATE
PLC PROGRAMMABLE LOGIC
CONTROLLER
PLMB PLUMBING
PNL PANEL
PP POWER PANEL OR POWER
POLE
PREFAB PREFABRICATED
PROP PROPOSED
PRVN POWER ROOF VENTILATOR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSU POWER SUPPLY UNIT
PVMT PAVEMENT
QTY QUANTITY
RAD RADIUS
RECIR RECIRCULATION
RECT RECTANGULAR
RED REDUCER
REF REFERENCE
REG REGISTER
REINF REINFORCING
REM REMOVE
REQD REQUIRED
REST RESTRAINED
REV REVISE
RFD REFRIGERANT AIR DRYER
RH ROOF HOOD
RIO REMOTE INPUT/OUTPUT
RJ RESTRAINED JOINT
RM ROOM
RND ROUND
RO ROUGH OPENING
RPM REVOLUTIONS PER MINUTE
RPZ REDUCED PRESSURE ZONE
ASSEMBLY
RR RAILROAD
RT RIGHT
RTU REMOTE TERMINAL UNIT
R/W OR ROW RIGHT OF WAY
S SOUTH OR SLOPE
SB SOIL BORING
SBL SURVEY BASELINE
SBMP SODIUM BISULFITE
METERING PUMP
SCH SCHEDULE
SCG SLUICE GATE
SCR SELECTIVE CATALYTIC
REDUCTION
SDG SLIDE GATE
SECT SECTION
SERV SERVICE
SF SQUARE FEET
SG SWITCH GEAR
SHT(S) SHEET(S)
SI SQUARE INCH
SIL SILENCER
SIM SIMILAR
SMH STORM MANHOLE
SP SUMP PUMP
SPEC SPECIFICATION
SQ SQUARE
SSP SUBMERSIBLE SUMP PUMP
SST STAINLESS STEEL
STA STATION OR STACK
STD STANDARD
STG STORAGE OR STOP GATE
(LOG)
STIR STIRRUP
STL STEEL
STRU STRUCTURAL
SUB SUBSTITUTE
SUCT SUCTION
SUPT SUPERINTENDENT
SUR SURFACE
SUSP SUSPENDED
SWD SIDE WATER DEPTH
SYM SYMMETRICAL
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TAN TANGENT
TBA TO BE ABANDONED
TBCN TRAVELING BRIDGE CRANE
TBM TEMPORARY BENCH MARK
TC TOP OF CURB
TCP TEMPERATURE CONTROL
PANEL
TDH TOTAL DYNAMIC HEAD
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE
TG TEMPERED GLASS
THD THREADED
THK THICK
THRU THROUGH
TOC TOP OF CONCRETE
TOD TOP OF DECK
TOF TOP OF FOOTING
TOM TOP OF MASONRY/MANHOLE
TOS TOP OF SLAB/ TOP OF STEEL
TOW TOP OF WALL
TOL TOLERANCE
TYP TYPICAL
UG UNDERGROUND
UGE UNDERGROUND ELECTRIC
UGG UNDERGROUND GAS
UH UNIT HEATER
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER
SUPPLY
U/S UPSTREAM
UTIL UTILITY
VAC VACUUM
VACP VACUUM PUMP
VAP VAPORIZER
VAV VARIABLE AIR VOLUME UNIT
VCD VOLUME CONTROL DAMPER
VEL VELOCITY
VENT VENTILATING OR
VENTILATION
VERT VERTICAL
VF VANE AXIAL FAN
VOL VOLUME
VTR VENT THROUGH ROOF
W WEST OR WIDTH
W/ WITH
WF WALL FAN
WG WIRE GLASS
WH WALL HYDRANT OR WALL
HEATER
WL WATER LEVEL
WM WATER METER
W/O WITHOUT
WP WATERPROOF
WPFG WATER PROOFING
WSE WATER SURFACE ELEVATION
WSP WEATHER STRIP
WT WEIGHT
WV WATER VALVE
WWF WELDED WIRE FABRIC
WWTP WASTEWATER TREATMENT
PLANT
XFMR TRANSFORMER
XMH EXISTING MANHOLE
YH YARD HYDRANT
YI YARD INLET
YD YARD
YR YEAR
PROCESS PIPING
ABBREVIATION DESCRIPTION
CA COMPRESSED AIR
CW COLD WATER
QUICK CONNECT COUPLING
FLUSHING CONNECTION
HOSE BIBB
BUTTERFLY VALVE
SWING CHECK VALVE
DIAPHRAGM VALVE
BALL CHECK VALVE
BALL VALVE
GLOBE VALVE
PINCH VALVE
PLUG VALVE
GATE VALVE
PRESSURE REDUCING REGULATOR
UNION
PRESSURE RELIEF VALVE
MOTOR OPERATED VALVE
CONTROL VALVE
SOLENOID VALVE
STRAINER
PRESSURE
RELIEF/VACUUM BREAKER VALVE
PARTITION TYPE
DOOR SCHEDULE
LOUVER TYPE
HARNESSED SLEEVE TYPE
SLEEVE TYPE COUPLING
EXPANSION JOINT
HARNESSED FLANGED
COUPLING
ADAPTER
WELDED JOINT
FLANGED JOINT
MECHANICAL, PUSH-ON OR
MECHANICAL COUPLING
WALL PENETRATION
RESTRAINED JOINT
FLEXIBLE HOSE
SINGLE LINE DRAWINGS
DOUBLE LINE DRAWINGS
FIRE EXTINGUISHER
ES/EEW
DISMANTLING JOINT
FE
L#
CHECK VALVE
NEEDLE VALVE
PRESSURE GAUGE
WITH/WITHOUT DIAPHRAGM SEAL
REDUCER
THREE WAY VALVE
PIPING MATERIALS
CIP CAST IRON PIPE
CMP CORRUGATED METAL PIPE
CPP CORRUGATED PLASTIC PIPE
CU COPPER PIPE
DIP DUCTILE IRON PIPE
ERCP ELLIPTICAL REINFORCED
CONCRETE PIPE
FRP FIBERGLASS REINFORCED
PIPE
GSP GALVANIZED STEEL PIPE
HDPE HIGH DENSITY
POLYETHYLENE
PE LINING POLYETHYLENE LINING
RCP REINFORCED CONCRETE
PIPE
SSP STAINLESS STEEL PIPE
IPS IRON PIPE SIZE
PVC POLYVINYLCHLORIDE
PCCP PRESTRESSED CONCRETE
CYLINDER PIPE
VCP VITRIFIED CLAY PIPE
GENERAL NOTES
1. ELEVATIONS OF EXISTING COVERED STORAGE SLAB, STORMWATER STRUCTURES, AND STORMWATER PIPES CONSTRUCTED PRIOR TO 1999 WERE SURVEYED USING THE NGVD29 VERTICAL DATUM. A CONVERSION FACTOR
OF +2.38 WAS USED TO CORRECT TO NAVD88. THESE ELEVATIONS ARE FOR REFERENCE ONLY.
DESIGNED BY:
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
DATE:
HAZEN NO.:
USD NO.:
DRAWING
NUMBER:
PROJECT
ENGINEER:
DRAWN BY:
CHECKED BY:
800-606
REV ISSUED FOR DATE BY
ENHANCED TREATMENT
AND SITE UPGRADE
PROGRAM
CAMPUS SOLAR
FACILITIES
C. PORTNER
0 1/2" 1"
FINAL DRAWINGS - ISSUED FOR CONSTRUCTION
OCTOBER 2025
20118-014
SHEET
NUMBER:
HAZEN AND SAWYER
101 MONTGOMERY STREET, SUITE 1500
SAN FRANCISCO, CA 94104
A u to d e s k D o c s /2
-0
U S
D C a m p u s S o la r F a c ili ti e s /2
-0
-S
IT
E
.r v t
/2 /2
:0 :4
P
M
G03
S. HAKONSON
C. PORTNER
C. PORTNER
GENERAL
LEGEND, SYMBOLS AND
ABBREVIATIONS
1 CONSTRUCTION 10/25 CGP
Buil de r's Exc ha ng e cportner
X
X
XX
X
X X
X
XX
X
X
X
X
X
XXXX
X
X
XXX
X X
X
XX
X X X
X X X X X X X X X X X X X
X
XXXX
X X X
X
X X
X
X
X
XXXXX
X X
W
W
W
W
WW
W
W
W W W W
W
W W
W
WW W
W
W
W W
W
GAS
GAS
X X
X X
XX
X X
X X
X X
XX
G
AS
G
AS
G
AS
G
AS
W
W
W W
W
W
W W
W
W W
W
W
W
W
G
AS
GAS
G
AS
G
AS
GAS
W
FOC
FOC FOC FOC
STOP
ST
OP
ST
OP
YIELDYIELD
STOP
ST
OP
OOO
O
O
O O
O O
O O
O O
O
O
O
O
O
O
O
O
O O
O O
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
O O
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LO
D
LODLODLOD
LO
D
OOO
O
O
O O
O O
O O
O O
O
O
O
O
O
O
O
O
O O
O O
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
O O
CONCRETE
VALLEY GUTTERC-32-0531CONCRETE CURB
AND GUTTERC-32-0530
STOP
STOP
X
X
X
X
O H
E O
H E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
NOTES:
1. SEE DRAWING C10 FOR SURVEY CONTROL POINTS AND BENCHMARKS.
2. SEE DRAWING C01 FOR SURVEY NOTES.
SCALE: 1" = 60'
PLAN
PL
O
T D
AT
E:
0/
3/
1:
A
B
Y:
H
JO
N
ES
Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\2
-0
_U
SD
C
AM
PU
S
SO
LA
R
F
AC
IL
IT
IE
S\
PR
O
JE
C
T
FI
LE
S\
_D
ES
IG
N \C
IV
IL
\G
EN
ER
AL
SI
TE
P
LA
N
\2
-0
G
E
XI
ST
IN
G
C O
N D
IT
IO
N S av ed b y
H
JO
N
ES
S av e da te : 1
0/ 2/
:0
PM
CAMPUS SOLAR
FACILITIES
ENHANCED TREATMENT
AND SITE UPGRADE
PROGRAM
20118-014
800-606
C. PORTNER
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
USD NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
101 MONTGOMERY STREET, SUITE 1500
SAN FRANCISCO, CA 94104
SHEET
NUMBER:
FINAL DRAWINGS - ISSUED FOR CONSTRUCTION
OCTOBER 2025
1 CONSTRUCTION 10/25 CGP
L. SALEEBY
W. CARRAWAY
G04
GENERAL - SITE PLAN
EXISTING CONDITIONSG. CUMMINGS
AREA 1 (NOT INCLUDED IN THIS CONTRACT)
AREA 4 (NOT INCLUDED IN THIS CONTRACT)AREA 2 (NOT INCLUDED IN THIS CONTRACT)
AREA 7
AREA 3 (NOT INCLUDED IN THIS CONTRACT)
AREA 6
AREA 5 (NOT INCLUDED IN THIS CONTRACT)
AERATION
BASINS 5-8
AERATION
BASINS 1-4 SECONDARY
CLARIFIERS 5 & 6
FIELD OPERATIONS
BUILDING
COVERED STORAGE
SOLAR PANELS
COVERED
STORAGE
HEAT/MIX
BUILDING 4
PRIMARY
DIGESTER 6
MAINTENANCE
SHOP
GENERATOR
BUILDING 1
PRIMARY
DIGESTER 5
PRIMARY
DIGESTER 4
GENERATOR
BUILDING 3
PRIMARY
DIGESTER 3
PRIMARY
DIGESTER 1
PRIMARY
DIGESTER 2
THICKENER
ELECTRICAL
BUILDING
THICKENER 1
THICKENER 2
THICKENER 3
THICKENER 4
THICKENER
CONTROL
BUILDING
SECONDARY
DIGESTER 1
SECONDARY
DIGESTER 2
GBT
DEGRITTER
BUILDING
COGEN
ALVARADO
INFLUENT
PUMP STATION
EAST BLOWER
BUILDING
WEST
BLOWER
BUILDING
SECONDARY
CLARIFIER 1
CHLORINE
CONTACT
TANK
SECONDARY
CLARIFIER 1
CAMPUS
SECONDARY
CLARIFIER 2
SECONDARY
CLARIFIER 3
SECONDARY
CLARIFIER 4
THICKENER
ELECTRICAL
BUILDING
PRIMARY
DIGESTER 7
EFFLUENT
FACILITY
SECONDARY
CLARIFIER 2
SECONDARY
CLARIFIER 3
SECONDARY
CLARIFIER 4
RAS/WAS
PUMP
STATION
CONTROL
BOX 4
SLUDGE PUMP
ROOM 4
SLUDGE
PUMP
ROOM 2
CONTROL
BOX 3
MW2
MW-1
UNDERGROUND
FUEL TANKS
SWITCHGEAR SE
MATERIAL BUNKERS
STORM DRAIN
PUMP STATION
MW-3
WATER BLAST
WASH EQUIPMENT ROOM
WASH RACK
FMC STORAGE AREA
CS STORAGE AREA
STORAGE
FUEL ISLAND
SECURE
STORAGE
Buil de r's Exc ha ng e lsaleeby Layout1 lsaleeby Image lsaleeby
10/3/2025
X
XX
X
X X
X
XX
X
X
X
X
X
XXXX
X
X
XXX
X X
X
XX
X X X
X X X X X X X X X X X X X
X
XXXX
X X X
X
X X
X
X
X
XXXXX
X X
W
W
W
W
WW
W
W
W W W W
W
W W
W
WW W
W
W
W W
W
GAS
GAS
X X
X X
XX
X X
X X
X X
XX
G
AS
G
AS
G
AS
G
AS
W
W
W W
W
W
W W
W
W W
W
W
W
W
G
AS
GAS
G
AS
G
AS
GAS
W
FOC
FOC FOC FOC
STOP
ST
OP
ST
OP
YIELDYIELD
STOP
ST
OP
OOO
O
O
O O
O O
O O
O O
O
O
O
O
O
O
O
O
O O
O O
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
O O
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LO
D
LODLODLOD
LO
D
OOO
O
O
O O
O O
O O
O O
O
O
O
O
O
O
O
O
O O
O O
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
O O
CONCRETE
VALLEY GUTTERC-32-0531CONCRETE CURB
AND GUTTERC-32-0530
STOP
STOP
X
X
X
X
O H
E O
H E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
NOTES:
1. SEE DRAWING C10 FOR SURVEY CONTROL POINTS AND BENCHMARKS.
2. SEE DRAWING C01 FOR SURVEY NOTES.
3. CONTRACTOR TO PROTECT MONITORING WELL 2 AND MAINTAIN
DISTRICT ACCESS TO WELLS FOR SAMPLING ACTIVITIES.
SCALE: 1" = 60'
PLAN
PL
O
T D
AT
E:
0/
3/
1:
H
JO
N
ES
Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\2
-0
_U
SD
C
AM
PU
S
SO
LA
R
F
AC
IL
IT
IE
S\
PR
O
JE
C
T
FI
LE
S\
_D
ES
IG
N \C
IV
IL
\G
EN
ER
AL
SI
TE
P
LA
N
\2
-0
G
P
R O
PO
SE
D C
O N
D
IT
IO
N
S Sa ve d by H
JO
N
ES
S av e da te
: 1 0/
3/
0:
A M
CAMPUS SOLAR
FACILITIES
ENHANCED TREATMENT
AND SITE UPGRADE
PROGRAM
20118-014
800-606
C. PORTNER
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
USD NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
101 MONTGOMERY STREET, SUITE 1500
SAN FRANCISCO, CA 94104
SHEET
NUMBER:
FINAL DRAWINGS - ISSUED FOR CONSTRUCTION
OCTOBER 2025
1 CONSTRUCTION 10/25 CGP
L. SALEEBY
W. CARRAWAY
G05
GENERAL - SITE PLAN
PROPOSED CONDITIONSG. CUMMINGS
AREA 1 (NOT INCLUDED IN THIS CONTRACT)
AREA 4 (NOT INCLUDED IN THIS CONTRACT)AREA 2 (NOT INCLUDED IN THIS CONTRACT)
AREA 7
AREA 3 (NOT INCLUDED IN THIS CONTRACT)
AREA 6
AREA 5 (NOT INCLUDED IN THIS CONTRACT)
AERATION
BASINS 5-8
AERATION
BASINS 1-4 SECONDARY
CLARIFIERS 5 & 6
FIELD OPERATIONS
BUILDING
COVERED STORAGE
SOLAR PANELS
COVERED
STORAGE
HEAT/MIX
BUILDING 4
PRIMARY
DIGESTER 6
MAINTENANCE
SHOP
GENERATOR
BUILDING 1
PRIMARY
DIGESTER 5
PRIMARY
DIGESTER 4
GENERATOR
BUILDING 3
PRIMARY
DIGESTER 3
PRIMARY
DIGESTER 1
PRIMARY
DIGESTER 2
THICKENER
ELECTRICAL
BUILDING
THICKENER 1
THICKENER 2
THICKENER 3
THICKENER 4
THICKENER
CONTROL
BUILDING
SECONDARY
DIGESTER 1
SECONDARY
DIGESTER 2
GBT
DEGRITTER
BUILDING
COGEN
ALVARADO
INFLUENT
PUMP STATION
EAST BLOWER
BUILDING
WEST
BLOWER
BUILDING
SECONDARY
CLARIFIER 1
CHLORINE
CONTACT
TANK
SECONDARY
CLARIFIER 1
CAMPUS
SECONDARY
CLARIFIER 2
SECONDARY
CLARIFIER 3
SECONDARY
CLARIFIER 4
THICKENER
ELECTRICAL
BUILDING
PRIMARY
DIGESTER 7
EFFLUENT
FACILITY
SECONDARY
CLARIFIER 2
SECONDARY
CLARIFIER 3
SECONDARY
CLARIFIER 4
RAS/WAS
PUMP
STATION
CONTROL
BOX 4
SLUDGE PUMP
ROOM 4
SLUDGE
PUMP
ROOM 2
CONTROL
BOX 3
MW2, SEE
NOTE 3
MW-3
MW-1
WATER BLAST
UNDERGROUND
FUEL TANKS
SWITCHGEAR SE
MATERIAL BUNKERS
STORM DRAIN
PUMP STATION
FUEL ISLAND
CONTRACTORS
ENTRANCE
WASH EQUIPMENT ROOM
WASH RACK
FMC STORAGE AREA
CS STORAGE AREA
STORAGE
SECURE
STORAGE
CS STORAGE AREA
APPROXIMATELY 6900 SF
POWER VAULT
Buil de r's Exc ha ng e lsaleeby Layout1 lsaleeby Image lsaleeby
GENERAL NOTES:
1. THIS PROJECT IS LOCATED IN UNION CITY, CALIFORNIA, IS GENERALLY DESCRIBED IN SECTION 01010 SUMMARY OF WORK AND
INCLUDES: UPGRADES TO COVERED STORAGE AREA.
2. BUILDING BASE PLANS WERE COMPILED FROM AVAILABLE RECORD DRAWINGS. LOCATIONS OF EQUIPMENT ARE APPROXIMATE
(SHOWN FOR REFERENCE ONLY).
3. LOCATIONS OF PROPERTY LINES AND RIGHTS OF WAY ARE APPROXIMATE AND SHOWN FOR REFERENCE ONLY UNLESS NOTED
OTHERWISE, AND ARE NOT INTENDED TO REPRESENT LEGAL BOUNDARIES.
4. PROPERLY PROTECT AND DO NOT DISTURB PROPERTY CORNER AND BENCHMARK MONUMENTS. IF DISTURBED, THE PROPERTY MONUMENT WILL BE RESET AND RECORD OF SURVEY FILED AT THE CONTRACTOR'S EXPENSE, BY A CALIFORNIA
REGISTERED PROFESSIONAL LAND SURVEYOR AS APPROVED BY THE ENGINEER.
5. COMPLETE WORK IN ACCORDANCE WITH THE APPLICABLE FEDERAL, STATE AND LOCAL CODES. LAY OUT PROPOSED WORK AS SHOWN ON DRAWINGS. FIELD VERIFY UTILITY LOCATIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION.
6. PROTECT, REMOVE OR RELOCATE EXISTING ITEMS, AREAS AND SURFACES. REPLACE, RESTORE AND REPAIR ITEMS, AREAS AND SURFACES, FACILITIES AND IMPROVEMENTS DISTURBED OR DAMAGED BY CONTRACTORS OPERATIONS TO ORIGINAL CONDITION OR TO MATCH IN KIND, UNLESS NOTED OTHERWISE ON THE DRAWINGS, AT NO ADDITIONAL COST TO OWNER. THIS APPLIES TO DEMOLITION IN ONLY THOSE AREAS WHERE REQUIRED OR AS SHOWN ON THE DRAWINGS.
7. TAKE NECESSARY PRECAUTIONS TO PREVENT EQUIPMENT FLUIDS FROM LEAKING OR REACHING ANY WATER COURSE.
IMMEDIATELY CLEAN UP FLUID DISCHARGES USING ALL MEANS NECESSARY, AS DETERMINED AND/OR APPROVED BY THE
ENGINEER.
8. SAFETY IS THE RESPONSIBILITY OF THE CONTRACTOR. PERFORM ALL WORK IN ACCORDANCE WITH SAFETY STANDARDS OF APPLICABLE LAWS, BUILDING AND CONSTRUCTION CODES, THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" PUBLISHED BY THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA, THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, AND THE REQUIREMENTS OF TITLE 9 OF THE CODE OF FEDERAL REGULATIONS, PART 1926, "SAFETY
AND HEALTH REGULATIONS FOR CONSTRUCTION".
9. ALLOWABLE WORK HOURS FOR THE PROJECT SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING THE SITE. THE ENTIRETY OF THE WWTP SHALL REMAIN SECURE
THROUGHOUT THE DURATION OF THE PROJECT.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING THE DEBRIS IN A LAWFUL MANNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION, DISPOSAL AND NEW WORK.
12. CONTRACTOR IS RESPONSIBLE TO PROVIDE RECORD DRAWINGS TO THE ENGINEER UPON COMPLETION OF THE PROJECT IN
ACCORDANCE WITH SPECIFICATION SECTION 01720 - PROJECT RECORD DOCUMENTS.
13. THE WASTE WATER TREATMENT SYSTEMS THROUGHOUT THE PROJECT AREA ARE ACTIVE AND THE CONTRACTOR SHALL MAINTAIN SERVICE OF UNIT PROCESSES WITHIN THE WWTP AT ALL TIMES. ALLOWABLE INTERRUPTIONS OR SHUT DOWNS OF
UNIT PROCESSES HAVE BEEN INDICATED IN DIVISION O1 AND ON THE DRAWINGS.
14. ITEMS SHOWN IN GRAY SCALE AND LABELED N.I.C. (NOT IN CONTRACT) ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY
AND ARE NOT PART OF THIS CONTRACT SCOPE OF WORK.
15. WHERE PAYMENTS MAY BE MADE FOR REMOVING EXISTING MATERIALS THE CONTRACTOR SHALL NOTIFY THE ENGINEER SO THAT INSPECTION OF THE MATERIALS CAN BE CONDUCTED PRIOR TO REMOVAL. THE ENGINEER SHALL BE NOTIFIED IN ADVANCE. THE CONTRACTOR SHALL NOT PROCEED UNTIL MEASUREMENTS HAVE BEEN TAKEN. THE ENGINEER SHALL WITNESS THE MEASUREMENTS AND SHALL APPROVE THE RECORD OF MEASUREMENTS. ALL MATERIALS REMOVED WITHOUT CONFORMING TO THE ABOVE PROCEDURES AND WHICH ENGINEER CANNOT VERIFY OR SUBSTANTIATE, WILL NOT BE PAID FOR.
MEASUREMENTS SHALL BE CONDUCTED IN PLACE PRIOR TO EXCAVATION WITHIN PAY LIMITS SHOWN ON THE DRAWINGS OR
AS INDICATED IN THE CONTRACT DOCUMENTS.
16. AT ALL UTILITY CROSSINGS GREATER THAN 12-INCHES UNDER EXISTING WATER MAINS OR EXISTING UTILITIES WHERE COMPACTION AND TESTING OF BACKFILL IS NOT FEASIBLE. BACKFILL SHALL BE COMPACTED 3/4-INCH CRUSHED STONE TO THE
MID-POINT OF THE WATER MAIN.
DEMOLITION GENERAL NOTES:
1. REFER TO THE INDIVIDUAL DISCIPLINE DEMOLITION DRAWINGS FOR ADDITIONAL DETAILS, REQUIREMENTS AND LIMITS OF WORK IN EACH AREA.
2. LOCATION OF ALL UNDERGROUND UTILITIES (EXISTING PIPE, STRUCTURES, ELECTRICAL, ETC.) IS APPROXIMATE. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL LOCATIONS AND
DIMENSIONS PRIOR TO START OF CONSTRUCTION.
3. AS PART OF THIS PROJECT THE OWNER RESERVES THE RIGHT TO SALVAGE ALL DEMOLISHED ITEMS OR PORTIONS THEREOF. COORDINATE AND VERIFY WHETHER DEMOLISHED ITEMS WILL BE SALVAGED BY THE OWNER PRIOR TO DISPOSAL OR TRANSPORT TO DESIGNATED STOCKPILE AREA. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR DEMOLITION OF ALL ITEMS, EQUIPMENT, STRUCTURES, PIPING,
APPURTENANCES, ETC., AS INDICATED IN THE CONTRACT DOCUMENTS. PROVIDE TRANSPORTATION OF ALL DEMOLISHED ITEMS TO AREAS DESIGNATED BY THE OWNER. FIELD VERIFY THE LOCATION OF
STORED DEMOLISHED ITEMS WITH THE ENGINEER AND OWNER PRIOR TO TRANSPORT AND
STOCKPILING. DEMOLISHED ITEMS WHICH THE OWNER DOES NOT WISH TO SALVAGE SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE PROJECT SITE AND DISPOSED OF
IN A PROPER AND LAWFUL MANNER.
4. DIMENSIONS AND LOCATIONS OF EXISTING EQUIPMENT, APPURTENANCES AND STRUCTURES HAVE BEEN OBTAINED AND SHOWN FROM EXISTING RECORD DRAWINGS. FIELD VERIFY ALL DIMENSIONS PRIOR TO
COMMENCEMENT OF DEMOLITION WORK.
5. EXISTING EQUIPMENT, APPURTENANCES, AND STRUCTURES NOT DIRECTLY RELATED TO THE WORK TO BE PERFORMED AS PART OF THE CONTRACT HAVE BEEN OMITTED FOR CLARITY. IT IS NOT WARRANTED THAT THE LOCATIONS AND DIMENSIONS OF EXISTING EQUIPMENT, APPURTENANCES, AND STRUCTURES ARE EXACT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD VERIFICATION OF EXISTING DIMENSIONS, CONDITIONS, LOCATIONS OF PIPING, LOCATIONS OF EQUIPMENT, ELECTRICAL CONDUITS, ETC. FOR THE DEMOLITION WORK TO BE CONDUCTED AS PART OF THIS CONTRACT.
6. THE DEMOLITION, MODIFICATION OR ALTERATION OF EXISTING STRUCTURES, EQUIPMENT AND RELATED
APPURTENANCES SHALL BE PERFORMED IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL
CODES/REGULATIONS.
7. ALL PENETRATIONS CUT FOR NEW PIPING OR EQUIPMENT THROUGH EXISTING CONCRETE OR MASONRY WALLS, FLOORS, SLABS, ETC. SHALL BE CORE DRILLED. STRUCTURAL MEMBERS SHALL NOT BE CUT OR
ALTERED WITHOUT WRITTEN APPROVAL FROM THE ENGINEER.
8. WHERE PIPING IS TO BE REMOVED OR ABANDONED IN PLACE, ISOLATE ALL REMAINING PIPING SEGMENTS AND PROVIDE WATER TIGHT BLIND FLANGES, CAPS, OR NON-SHRINK GROUT MASONRY
PLUGS AS INDICATED OR AS DIRECTED BY THE ENGINEER.
9. THE TERM "ABANDON" SHALL BE DEFINED AS EXISTING PIPING, EQUIPMENT OR AN APPURTENANCE TO
BE TAKEN OUT OF SERVICE AND LEFT IN PLACE.
10. THE TERM "DEMOLISH" SHALL BE DEFINED AS THE REMOVAL AND LAWFUL DISPOSAL OF AN ITEM AND
ALL RELATED APPURTENANCES COMPLETELY BACK TO THE SOURCE.
11. THE TERM "REMOVE" SHALL BE DEFINED AS EXISTING PIPING, EQUIPMENT OR AN APPURTENANCE WHICH
IS TO BE TAKEN OUT OF SERVICE, REMOVED AND LAWFULLY DISPOSED OF.
12. THE TERM "RELOCATE" SHALL BE DEFINED AS REMOVAL OF EXISTING EQUIPMENT. PIPING OR RELATED APPURTENANCES AS INDICATED IN THE CONTRACT DOCUMENTS OR AS DIRECTED BY THE ENGINEER.
PROVIDE CLEANING, FLUSHING, DRAINING AND DISPOSAL OF ALL CONTENTS OF ALL ITEMS TO BE
RELOCATED. PROVIDE INSTALLATION OF RELOCATED ITEMS AS INDICATED IN THE CONTRACT
DOCUMENTS OR AS DIRECTED BY THE ENGINEER.
13. THE TERM "EXISTING" SHALL BE DEFINED AS EQUIPMENT, PIPING AND RELATED APPURTENANCES TO
REMAIN IN SERVICE UNLESS OTHERWISE INDICATED IN THE CONTRACT DOCUMENTS. PIPING,
EQUIPMENT AND APPURTENANCES MAY BE DISCONNECTED TEMPORARILY TO ALLOW FOR
CONSTRUCTION OF NEW WORK. REFER TO THE CONTRACT DOCUMENTS AND SEQUENCE OF
CONSTRUCTION FOR ADDITIONAL DETAILS AND REQUIREMENTS.
14. WHERE PARTIAL DEMOLITION OF PIPING IS REQUIRED, PROVIDE NEW PIPING SUPPORTS FOR ALL EXISTING PIPING TO REMAIN. REMOVAL OF PIPING SHALL BE TO LIMITS AS INDICATED IN THE CONTRACT
DOCUMENTS AND AS DIRECTED BY THE ENGINEER.
15. ALL ITEMS WITH A HATCHED, BOLD DESIGNATION SHALL INDICATE EXISTING ITEMS TO BE DEMOLISHED.
ALL ITEMS INDICATED FOR DEMOLITION SHALL BE REMOVED COMPLETELY BACK TO THE SOURCE. ALL ASSOCIATED HARDWARE, CONDUIT BOXES, WIRING TROUGHS, WIRE, CABLE, HANGERS, ETC. SHALL
ALSO BE REMOVED. PROVIDE WATERTIGHT CAPS FOR ALL ABANDONED ELECTRICAL CONDUITS.
16. ALL ITEMS WHICH ARE EMBEDDED IN OR PENETRATE CONCRETE SHALL BE CUT FLUSH TO THE EXISTING SURFACE. PROVIDE A GAS TIGHT SEAL FOR ALL DEMOLISHED PENETRATIONS. REPAIR AND PATCH THE EXISTING SURFACE TO MATCH THE EXISTING SURROUNDING CONDITIONS. PROVIDE A SMOOTH FINISH FREE FROM ANY IRREGULARITIES. IF THE SURROUNDING SURFACES ARE FINISHED, PROVIDE NEW
COATINGS TO MATCH EXISTING CONDITIONS.
CENTER LINE
HIDDEN ITEMS
EXISTING ITEMS
PROPOSED ITEMS
DEMOLITION ITEMS
MATCH LINE
LINETYPES
EXISTING CONTOUR
PROPOSED CONTOUR
SF SILT FENCE
LOD LIMITS OF DISTURBANCE
X FENCE
PROPERTY LINE
ASPHALT PAVEMENT
CONCRETE PAVEMENT
DEMOLITION AREA
C-XX-XXXX CIVIL DETAIL NUMBER
ASPHALT PAVEMENT
(RESURFACE ONLY)
STONE AGGREGATE
L. SALEEBY
W. CARRAWAY
C01
CIVIL - SITE PLAN
GENERAL NOTES AND LEGENDG. CUMMINGS
SURVEY NOTES:
1. AERIAL SURVEYS PREPARED BY:
AERIAL PHOTOMAPPING SERVICES
2921 LARKIN AVE
CLOVIS, CA 93612
559-291-0147
JOB # 201818
AERIAL MAPPING FLIGHT DATE: 04/13/2018
2. GROUND SURVEYS PREPARED BY:
KJELDSEN, SINNOCK & NEUDECK, INC. (KSN)
CIVIL ENGINEERS AND LAND SURVEYORS
711 N. PERSHING AVENUE
STOCKTON, CALIFORNIA 95203
(209) 946-0268 KSN JOB # 2378-0030
3. THIS DRAWING IS DEFINED WITH SURVEY FEET UNITS USING AUTOCAD CIVIL 3D 2020. ENSURE THAT UNITS ARE COMPATIBLE
WITH OTHER DRAWINGS BEFORE USING ANY EXTERNAL REFERENCES.
4. THIS AERIAL MAPPING IS BASED ON STEREO PHOTOGRAPHY OBTAINED ON APRIL 13, 2018.
5. IN OPEN, UNOBSTRUCTED AREAS, THIS MAP CONFORMS TO NATIONAL MAPPING ACCURACY STANDARDS FOR 1"=20' MAPPING WITH 1' CONTOURS. IN AREAS OF DENSE VEGETATION OR WHERE OVERHEAD STRUCTURES OBSCURE THE GROUND FROM CLEAR VIEW IN THE AERIAL PHOTOGRAPHY, CONTOURS MAY DEVIATE FROM THEIR CORRECT ELEVATION AND PLANIMETRIC
FEATURES MAY NOT BE INCLUDED.
6. INFILL GROUND SURVEYS MAY BE NECESSARY TO CONFIRM FEATURES AND ELEVATIONS AT CRITICAL LOCATIONS TO BE
DETERMINED BY THE DESIGN TEAM.
7. UNDERGROUND UTILITIES ARE NOT SHOWN HEREIN.
8. MAPPING WAS SUPPLEMENTED WITH GROUND SURVEYS ON 8/6/2020 AT THE PROPOSED NEW ADMIN BUILDING LOCATION.
PL
O
T D
AT
E:
0/
3/
1:
H
JO
N
ES
Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\2
-0
_U
SD
C
AM
PU
S
SO
LA
R
F
AC
IL
IT
IE
S\
PR
O
JE
C
T
FI
LE
S\
_D
ES
IG
N \C
IV
IL
\C
IV
IL
SI
TE
P
LA
N (1
S
ER
IE
S)
\2
-0
C
G
EN
ER
AL
N
O
TE
S
AN
D L
EG
EN
D S av ed b y
H
JO
N
ES
S av e da te : 9
/2 4/
:3
PM
CAMPUS SOLAR
FACILITIES
ENHANCED TREATMENT
AND SITE UPGRADE
PROGRAM
20118-014
800-606
C. PORTNER
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
USD NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
101 MONTGOMERY STREET, SUITE 1500
SAN FRANCISCO, CA 94104
SHEET
NUMBER:
FINAL DRAWINGS - ISSUED FOR CONSTRUCTION
OCTOBER 2025
1 CONSTRUCTION 10/25 CGP
Buil de r's Exc ha ng e lsaleeby Layout1 lsaleeby Image lsaleeby
X
XX
X
X X
X
XX
X
X
X
X
X
XXXX
X
X
XXXX
X X
X X
X X
X X
X X
X
XX
X X X X X
X X
X
X X X X X X X X X X X X X X
X
XXXX
X X X
X
X X
X
X
X
XXXXX
X X
W
W
W
W
WW
W
W
W W W W
W
W W
W
WW W
W
W
W W
W
GAS
GAS
X X
X X
XX
X X
X X
X X
XX
G
AS
G
AS
G
AS
G
AS
W
W
W W
W
W
W W
W
W W
W
W
W
W
G
AS
GAS
G
AS
G
AS
GAS
W
FOC
FOC FOC FOC
STOP
ST
OP
ST
OP
YIELDYIELD
STOP
ST
OP
OOO
O
O
O O
O O
O O
O O
O
O
O
O
O
O
O
O
O O
O O
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
O O
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LO
D
LODLODLOD
LO
D
OOO
O
O
O O
O O
O O
O O
O
O
O
O
O
O
O
O
O O
O O
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
O O
CONCRETE
VALLEY GUTTERC-32-0531CONCRETE CURB
AND GUTTERC-32-0530
STOP
STOP
X
X
X
X
2018-B
EL 8.33 BDISK
2IN USD BM
2018-A
EL 8.55
SET BDISK
2IN USD BM
EL 8.33
PAINTED PX -
NAIL AND SHINER
EL 10.07
KSN PRIMARY CONTROL -
PK NAIL WITH SHINER,
PRIMARY CONTROL POINT
AND PHOTO CONTROL
TARGET
O H
E O
H E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OOO
O
O
O O
O O
O O
O O
O
O
O
O
O
O
O
O
O O
O O
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
O O
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LO
D
LODLODLOD
LO
D
OOO
O
O
O O
O O
O O
O O
O
O
O
O
O
O
O
O
O O
O O
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
O O
EL 7.98
KSN CONTROL - REBAR
WITH
YELLOW CAP MARKED
KSN CONTROL, PRIMARY
CONTROL POINT
SCALE: 1" = 60'
PLAN
PL
O
T D
AT
E:
0/
3/
1:
H
JO
N
ES
Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\2
-0
_U
SD
C
AM
PU
S
SO
LA
R
F
AC
IL
IT
IE
S\
PR
O
JE
C
T
FI
LE
S\
_D
ES
IG
N \C
IV
IL
\C
IV
IL
SI
TE
P
LA
N (1
S
ER
IE
S)
\2
-0
C
O
VE
R
AL
L
D
EM
O
LI
TI
O
N P
LA
N
S av ed b y H
JO
N
ES
S av e da te
: 1 0/
3/
0:
A M
CAMPUS SOLAR
FACILITIES
ENHANCED TREATMENT
AND SITE UPGRADE
PROGRAM
20118-014
800-606
C. PORTNER
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
USD NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
101 MONTGOMERY STREET, SUITE 1500
SAN FRANCISCO, CA 94104
SHEET
NUMBER:
FINAL DRAWINGS - ISSUED FOR CONSTRUCTION
OCTOBER 2025
1 CONSTRUCTION 10/25 CGP
L. SALEEBY
W. CARRAWAY
C10
CIVIL - SITE PLAN
OVERALL DEMOLITION PLANG. CUMMINGS
DEMOLISH PORTIONS OF
COVERED STORAGE, SEE
STRUCTURAL AND
ELECTRICAL SHEETS
AREA 1 (NOT INCLUDED IN THIS CONTRACT) AREA 3 (NOT INCLUDED IN THIS CONTRACT)
AREA 6
AREA 4 (NOT INCLUDED IN THIS CONTRACT)AREA 2 (NOT INCLUDED IN THIS CONTRACT)
AREA 5 (NOT INCLUDED IN THIS CONTRACT)
AREA 7
AERATION
BASINS 5-8
AERATION
BASINS 1-4 SECONDARY
CLARIFIERS 5 & 6
FIELD OPERATIONS
BUILDING
COVERED STORAGE
SOLAR PANELS
COVERED
STORAGE
HEAT/MIX
BUILDING 4
PRIMARY
DIGESTER 6
MAINTENANCE
SHOP
GENERATOR
BUILDING 1
PRIMARY
DIGESTER 5
PRIMARY
DIGESTER 4
GENERATOR
BUILDING 3
PRIMARY
DIGESTER 3
PRIMARY
DIGESTER 1
PRIMARY
DIGESTER 2
THICKENER
ELECTRICAL
BUILDING
THICKENER 1
THICKENER 2
THICKENER 3
THICKENER 4
THICKENER
CONTROL
BUILDING
SECONDARY
DIGESTER 1
SECONDARY
DIGESTER 2
GBT
DEGRITTER
BUILDING
COGEN
ALVARADO
INFLUENT
PUMP
STATION
EAST BLOWER
BUILDING
WEST
BLOWER
BUILDING
SECONDARY
CLARIFIER 1
CHLORINE
CONTACT
TANK
SECONDARY
CLARIFIER 2
SECONDARY
CLARIFIER 3
SECONDARY
CLARIFIER 4
THICKENER
ELECTRICAL
BUILDING
PRIMARY
DIGESTER 7
CONTROL
BOX 4
SLUDGE PUMP
ROOM 4
SLUDGE
PUMP
ROOM 2
CONTROL
BOX 3
CAMPUS
SURVEY CONTROL STATEMENT:
COORDINATES, BEARINGS, AND DISTANCES ARE BASED ON THE NORTH AMERICAN
DATUM OF 1983 (NAD83) CONVERTED TO THE CALIFORNIA COORDINATE SYSTEM OF 1983,
ZONE 3, SURVEY FEET UNITS. AS REFERENCED BY AVAILABLE CITY OF UNION CITY
CONTROL MONUMENTS PER RECORD OF SURVEY NO 2318, BOOK 35 OF SURVEYS, PAGES
44-87, ALAMEDA COUNTY. ALL COORDINATES ARE GRID WITH A 2007.00 EPOCH DATE
ADJUSTMENT. GROUND DISTANCES MUST BE MULTIPLIED BY 0.99993387 TO OBTAIN GRID
DISTANCES, MULTIPLY GRID DISTANCES BY 1.00006613 TO OBTAIN GROUND DISTANCES.
ELEVATIONS SHOWN ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM OF 1988
(NAVD88), AS PER SAID RECORD OF SURVEY.
SECONDARY
CLARIFIER 1
EFFLUENT
FACILITY
SECONDARY
CLARIFIER 2
SECONDARY
CLARIFIER 3
SECONDARY
CLARIFIER 4
RAS/WAS
PUMP
STATION
MW2
MW-1 UNDERGROUND
FUEL TANKS
SWITCHGEAR SE
MATERIAL BUNKERS
MW-3
WATER BLAST
STORM DRAIN
PUMP STATION
FUEL ISLAND
ASPHALT PAVEMENT
CUT
SURVEY CONTROL (SEE SURVEY NOTES, SHEET C-01)
POINT NUMBER NORTHING EASTING ELEVATION DESCRIPTION
306 2040933.96 6100663.88 10.07 KSN PRIMARY CONTROL - PK NAIL WITH SHINER, PRIMARY CONTROL POINT AND PHOTO CONTROL TARGET.
307 2041304.24 6100992.34 8.33 PAINTED PX - NAIL AND SHINER
501 2042273.04 6101120.89 7.98 KSN CONTROL - REBAR WITH YELLOW CAP MARKED KSN CONTROL, PRIMARY CONTROL POINT.
2018-A 2042101.72 6100552.41 8.55 BDISK 2IN USD BM
2018-B 2042577.09 6100939.02 8.33 BDISK 2IN USD BM
SURVEY CONTROL POINT (SEE TABLE BELOW)
NOTES:
1. SEE SECTION 02 81 00 FOR THE FINDINGS OF THE HAZARDOUS MATERIAL SURVEY
CONDUCTED ON THE COVERED STORAGE AREA AND THE HANDLING AND DISPOSAL OF
HAZARDOUS MATERIALS.
2. SEE SECTION 01600 FOR A LIST OF EQUIPMENT TO BE SALVAGED AND TURNED OVER TO
THE DISTRICT.
3. RECOMMENDED BORING LOCATIONS SHOWN. AT LEAST 2 BORINGS SHALL BE TAKEN. ONE
SHALL BE OUTSIDE OF THE REMEDIATION AREA SHOWN IN THE GEOTECHNICAL REPORT
AND ONE SHALL BE INSIDE THE REMEDIATION AREA. BORINGS SHALL BE LEFT OPEN FOR
OBSERVATION FOR A MINIMUM OF 24 HOURS.
WASH EQUIPMENT ROOM
WASH RACK
FMC STORAGE AREA
CS STORAGE AREA
STORAGE
SECURE
STORAGE
~6900 SF STAGING AREA
SUGGESTED
BORING
LOCATION 1
SEE NOTE 3
SUGGESTED BORING LOCATION 1
SEE NOTE 3
POWER VAULT
Buil de r's Exc ha ng e lsaleeby Layout1 lsaleeby Image lsaleeby
X
X
X
XX
X
X X
X
XX
X
X
X
X
X
XXXX
X
X
XXX
X X
X
XX
X X X
X X X X X X X X X X X X X
X
XXXX
X X X
X
X X
X
X
X
XXXXX
X X
W
W
W
W
WW
W
W
W W W W
W
W W
W
WW W
W
W
W W
W
GAS
GAS
X X
X X
XX
X X
X X
X X
XX
G
AS
G
AS
G
AS
G
AS
W
W
W W
W
W
W W
W
W W
W
W
W
W
G
AS
GAS
G
AS
G
AS
GAS
W
FOC
FOC FOC FOC
STOP
ST
OP
ST
OP
YIELDYIELD
STOP
ST
OP
SD
UGCUGC
U G
C
SDSD
SD
SD
UGC UGC UGCUGC UGC UGC
UGC
U G
C U
G C
U G
C U
G C
U G
C
U G
C
U G
C
SD
G
AS
GAS
GAS
GAS
STOP
STOP
X
X
X
X
O H
E O
H E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OOO
O
O
O O
O O
O O
O O
O
O
O
O
O
O
O
O
O O
O O
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
O O
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LOD
LO
D
LODLODLOD
LO
D
OOO
O
O
O O
O O
O O
O O
O
O
O
O
O
O
O
O
O O
O O
OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
O O
NOTES:
1. SEE DRAWING C10 FOR SURVEY CONTROL POINTS AND BENCHMARKS.
2. CONTRACTOR TO PROTECT MONITORING WELL IN PLACE AND MAINTAIN DISTRICT ACCESS TO WELLS FOR ANNUAL SAMPLING
ACTIVITIES.
3. ASSUME ALL EXCAVATED MATERIAL SHALL BE REQUIRED TO BE DISPOSED AT A CLASS I LANDFILL. SEE SECTION 02 61 13 FOR
REQUIREMENTS FOR HANDLING CONTAMINATED SOILS.
4. SEE SECTION 00810 FOR REQUIREMENTS RELATED TO CEQA COMPLIANCE.
5. WASH RACK TO REMAIN OPERATIONAL DURING CONSTRUCTION. MAINTAIN ACCESS AND PROVIDE TEMPORARY UTILITY CONNECTIONS
AS REQUIRED. SEE SECTION 01010 FOR WORK RESTRICTIONS.
6. FIELD LOCATE WASH WATER LINE FROM FUEL ISLAND AND KEEP IN SERVICE DURING CONSTRUCTION. MAINTAIN ACCESS AND PROVIDE TEMPORARY UTILITY CONNECTIONS AS REQUIRED. SEE SECTION 01010 FOR WORK RESTRICTIONS
SCALE: 1" = 60'
PLAN
PL
O
T D
AT
E:
0/
3/
1:
H
JO
N
ES
Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\2
-0
_U
SD
C
AM
PU
S
SO
LA
R
F
AC
IL
IT
IE
S\
PR
O
JE
C
T
FI
LE
S\
_D
ES
IG
N \C
IV
IL
\C
IV
IL
SI
TE
P
LA
N (2
S
ER
IE
S)
\2
-0
C
O
VE
R
AL
L
PL
AN
S av ed b y H
JO
N
ES
S av e da te
: 1 0/
3/
0:
A M
CAMPUS SOLAR
FACILITIES
ENHANCED TREATMENT
AND SITE UPGRADE
PROGRAM
20118-014
800-606
C. PORTNER
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
USD NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
101 MONTGOMERY STREET, SUITE 1500
SAN FRANCISCO, CA 94104
SHEET
NUMBER:
FINAL DRAWINGS - ISSUED FOR CONSTRUCTION
OCTOBER 2025
1 CONSTRUCTION 10/25 CGP
L. SALEEBY
W. CARRAWAY
C20
CIVIL - SITE PLAN
OVERALL PLANG. CUMMINGS
AREA 1 (NOT INCLUDED IN THIS CONTRACT)
AREA 4 (NOT INCLUDED IN THIS CONTRACT)AREA 2 (NOT INCLUDED IN THIS CONTRACT)
AREA 7
AREA 3 (NOT INCLUDED IN THIS CONTRACT)
AREA 6
AREA 4
AREA 5 (NOT INCLUDED IN THIS CONTRACT)
AERATION
BASINS 5-8
AERATION
BASINS 1-4 SECONDARY
CLARIFIERS 5 & 6
FIELD OPERATIONS
BUILDING
COVERED STORAGE
SOLAR PANELS
HEAT/MIX
BUILDING 4
PRIMARY
DIGESTER 6
MAINTENANCE
SHOP
GENERATOR
BUILDING 1
PRIMARY
DIGESTER 5
PRIMARY
DIGESTER 4
GENERATOR
BUILDING 3
PRIMARY
DIGESTER 3
PRIMARY
DIGESTER 1
PRIMARY
DIGESTER 2
THICKENER
ELECTRICAL
BUILDING
THICKENER 1
THICKENER 2
THICKENER 3
THICKENER 4
THICKENER
CONTROL
BUILDING
SECONDARY
DIGESTER 1
SECONDARY
DIGESTER 2
GBT
DEGRITTER
BUILDING
COGEN
ALVARADO
INFLUENT
PUMP STATION
EAST BLOWER
BUILDING
WEST
BLOWER
BUILDING
SECONDARY
CLARIFIER 1
CHLORINE
CONTACT
TANK
SECONDARY
CLARIFIER 1
CAMPUS
SECONDARY
CLARIFIER 2
SECONDARY
CLARIFIER 3
SECONDARY
CLARIFIER 4
THICKENER
ELECTRICAL
BUILDING
PRIMARY
DIGESTER 7
EFFLUENT
FACILITY
SECONDARY
CLARIFIER 2
SECONDARY
CLARIFIER 3
SECONDARY
CLARIFIER 4
RAS/WAS
PUMP
STATION
CONTROL
BOX 4
SLUDGE PUMP
ROOM 4
SLUDGE
PUMP
ROOM 2
CONTROL
BOX 3
MW2, SEE
NOTE 2
MW-1
UNDERGROUND
FUEL TANKS
SWITCHGEAR SE
MATERIAL BUNKERS
MW-3
WATER BLAST
STORM DRAIN
PUMP STATION
FUEL ISLAND
SEE NOTE 6 CONTRACTORS
ENTRANCE
COVERED
STORAGE
ASPHALT PAVEMENT, TYP
DB
WASH EQUIPMENT ROOM
WASH RACK
SEE NOTE 5
FMC STORAGE AREA
CS STORAGE AREA
STORAGE
SECURE
STORAGE
DOWNSPOUT, TYP
SEE ARCH DWGS
FW
FW
FW
FW
LEAVE ACCESS
FOR TRUCKS
POWER VAULT
DB
Buil de r's Exc ha ng e lsaleeby Layout1 lsaleeby Image lsaleeby
X
X
X X
X X
X X
X X
X X
X X
X X
X X XX X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
W W
W
G
AS
GAS GAS GAS GAS
G
AS
G
AS
W W W W
FOC
FOC
FOC
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
STOP
YIELDYIELD
STOP
ST
OP
UGCUGC
UG
C
UGC UGC
UGC
UGCUGC UGC
U G
C
UGC
UGC
UGC
UGC
U G
C U
G C
U G
C
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSD
SD
SD
SD
UGC
UGC
UGC
UGC
U G
C U
G C
UGC UGC
UGC
UGC
U G
C
U G
C U
G C
U G
C
U G
C U
G C
U G
C U
G C
U G
C
UGC
U G
C U
G C
U G
C U
G C
UGC
UGC
GAS
G
AS
G
AS
GAS
GAS
GAS
GAS
GAS
GASGAS
GAS
GAS
GAS
8.40
8.75
8.40EG 8.80
FL 8.55
7.65
N 2042236.7687 E 6101093.7853
8.46
8.46
9.05
9.05
8.75
9.05
8.50
8.50
STOP
STOP
9.50
8.75
8.50
8.50
9.08
TC 8.50
BC 8.00
TC 8.50
BC 8.00
7.80
8.25
8.00
7.80
7.83 7.85
9.00
10.00
10.00
9.50
9.50
7.71
8.46
TC 8.50
BC 8.00
CB #2
GRATE 8.38
INV OUT (SW) 4.63 (6")
" S
D
15" SD
INV OUT : -4.00
O
HE
O
HE
LOD
LO
D LO
D
LO
D
LO
D
LODLODLODLODLODLODLODLODLOD
LO
D
LO
D
SCALE: 1" = 20'
PLAN
PL
O
T D
AT
E:
0/
3/
1:
H
JO
N
ES
Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\2
-0
_U
SD
C
AM
PU
S
SO
LA
R
F
AC
IL
IT
IE
S\
PR
O
JE
C
T
FI
LE
S\
_D
ES
IG
N \C
IV
IL
\C
IV
IL
SI
TE
P
LA
N (2
S
ER
IE
S)
\2
-0
C
P
AR
TI
AL
P
LA
N
AR
EA
S av ed b y H
JO
N
ES
S av e da te
: 1 0/
3/
0:
A M
CAMPUS SOLAR
FACILITIES
ENHANCED TREATMENT
AND SITE UPGRADE
PROGRAM
20118-014
800-606
C. PORTNER
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
USD NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
101 MONTGOMERY STREET, SUITE 1500
SAN FRANCISCO, CA 94104
SHEET
NUMBER:
FINAL DRAWINGS - ISSUED FOR CONSTRUCTION
OCTOBER 2025
1 CONSTRUCTION 10/25 CGP
L. SALEEBY
W. CARRAWAY
C26
CIVIL - SITE PLAN
PARTIAL PLAN - AREA 6G. CUMMINGS
AREA 6
CAMPUS
SECONDARY
CLARIFIER 2
STORM DRAIN
PUMP STATION
FUEL
ISLAND
CONTRACTORS
ENTRANCE
ASPHALT PAVEMENT, TYP
DB
SEE C27 FOR
CONTINUATION
NOTES:
1. FIELD LOCATE WASH WATER LINE FROM
FUEL ISLAND AND KEEP IN SERVICE
DURING CONSTRUCTION. MAINTAIN
ACCESS AND PROVIDE TEMPORARY
UTILITY CONNECTIONS AS REQUIRED.
SEE SECTION 01010 FOR WORK
RESTRICTIONS.
SEE NOTE 1
POWER VAULT
DB
ELEC DUCT BANK
SEE DWG E-102
Buil de r's Exc ha ng e lsaleeby Layout1 lsaleeby Image lsaleeby
X
X
X
X
X
X
X
X
X
XX
XXXX
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X
X X
X X
X X
X
X
X
W W
W W
W W
WWW
W
W W
W W
W W
W W
W
W W
W W
W
G
AS
G
AS
G
AS
G
AS
G
AS
GAS
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD LOD LOD LOD LOD
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLODLODLO
D
LO
D
LO
DLO
D UGC
SD JB #12
RIM 10.79
INV IN 6.41 (4")
INV THRU 5.73 (12")
48 LF 12" SD
S = 0.004
SDCB #11
GRATE 9.30
INV 5.92
158 LF 12" SD
S=0.005
56 LF 12" SD @ S = 0.005
SD CB #13
GRATE 7.94
INV IN 4.67
INV OUT 4.47
SD JB #14
RIM 10.36
INV IN 5.09
INV OUT 4.89
118 LF 12" SD
S = 0.002
MH #1
RIM 9.47
INV IN (N) 4.06 (12")
INV IN (SW) 4.06 (12")
INV OUT (E) 4.06 (15")
CB #3
GRATE 8.41
INV OUT (S) 5.40 (12")
CB #1
GRATE 9.70
INV IN 4.60 (4")
INV OUT 4.50 (12")
10 LF 4" SD @ S = 0.020
CB #2
GRATE 8.38
INV OUT (SW) 4.63 (6")
4" D
12" SD
15" SD
12" SD
6" SD
O H
E O
H E
O H
E O
H E
O H
E O
H E
FW
FH PIV FDC
DOWNSPOUT, TYP
SEE ARCH DRAWINGS
SCALE: 1" = 20'
PLAN
PL
O
T D
AT
E:
0/
3/
1:
H
JO
N
ES
Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\2
-0
_U
SD
C
AM
PU
S
SO
LA
R
F
AC
IL
IT
IE
S\
PR
O
JE
C
T
FI
LE
S\
_D
ES
IG
N \C
IV
IL
\C
IV
IL
SI
TE
P
LA
N (2
S
ER
IE
S)
\2
-0
C
P
AR
TI
AL
P
LA
N
AR
EA
S av ed b y H
JO
N
ES
S av e da te
: 1 0/
2/
:1
PM
CAMPUS SOLAR
FACILITIES
ENHANCED TREATMENT
AND SITE UPGRADE
PROGRAM
20118-014
800-606
C. PORTNER
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
USD NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
101 MONTGOMERY STREET, SUITE 1500
SAN FRANCISCO, CA 94104
SHEET
NUMBER:
FINAL DRAWINGS - ISSUED FOR CONSTRUCTION
OCTOBER 2025
1 CONSTRUCTION 10/25 CGP
L. SALEEBY
W. CARRAWAY
C27
CIVIL - SITE PLAN
PARTIAL PLAN - AREA 7G. CUMMINGS
AREA 7
MW2
MW-3
MW-1
WATER BLAST
WASH EQUIPMENT ROOM
WASH RACK
UNDERGROUND
FUEL TANKS
SWITCHGEAR SE
FMC STORAGE AREA
CS STORAGE
AREA
STORAGE
MATERIAL BUNKERS
SECURE
STORAGE
COVERED
STORAGE
SEE DWG C26 FOR
CONTINUATION
SEE NOTE 1
SEE NOTE 1
SEE NOTE 1
SEE NOTE 1
NOTES:
1. ELEVATIONS WERE CORRECTED FROM
NGVD29 VERTICAL DATUM TO NAVD88 VERTICAL
DATUM. SEE GENERAL NOTE 1 ON DWG G02 FOR
CONVERSION FACTOR.
2. ELECTRICAL DUCT BANKS SHALL HAVE A
MINIMUM COVER OF 24 INCHES.
3. MAINTAIN ACCESS TO MATERIAL BUNKERS
AND UNDERGROUND FUEL TANKS AT ALL TIMES.
REMOVABLE BOLLARD TO
PROTECT ELEC EQUIP
BENEATH COVERED
STORAGE, TYP
SEE DETAIL 1, DWG CD01
Buil de r's Exc ha ng e lsaleeby Layout1 lsaleeby Image lsaleeby
PL
O
T D
AT
E:
0/
3/
1:
H
JO
N
ES
Fi le : C
D
C \A
C C
D O
C S\
H
AZ
EN
A
N D
S
AW
YE
R
\2
-0
_U
SD
C
AM
PU
S
SO
LA
R
F
AC
IL
IT
IE
S\
PR
O
JE
C
T
FI
LE
S\
_D
ES
IG
N \C
IV
IL
\S
TA
N D
AR
D
D
ET
AI
LS
\2
-0
C
D
C
IV
IL
D
ET
AI
LS
S av ed b y
LS
AL
EE
BY
S av e da te : 8
/2 6/
:1
PM
CAMPUS SOLAR
FACILITIES
ENHANCED TREATMENT
AND SITE UPGRADE
PROGRAM
20118-014
800-606
C. PORTNER
IF THIS BAR DOES NOT
MEASURE 1" THEN DRAWING
IS NOT TO FULL SCALE
CHECKED BY:
DRAWN BY:
DESIGNED BY:
PROJECT
ENGINEER:
REV ISSUED FOR DATE BY
0 1"1/2"
USD NO.:
HAZEN NO.:
DATE:
DRAWING
NUMBER:HAZEN AND SAWYER
101 MONTGOMERY STREET, SUITE 1500
SAN FRANCISCO, CA 94104
SHEET
NUMBER:
FINAL DRAWINGS - ISSUED FOR CONSTRUCTION
OCTOBER 2025
1 CONSTRUCTION 10/25 CGP
L. SALEEBY
W. CARRAWAY
CD01
STANDARD DETAILS
CIVIL DETAILSG. CUMMINGS
TYPE B
W
C-01-0102
SELECT FILL MATERIAL
(NO MATERIAL LARGER
THAN 2")
CRUSHED STONE - 1/8
PIPE OD BELOW PIPE
(MIN 6") AND UP TO
PIPE MIDPOINT
COMPACTED
SELECT FILL
TYPICAL TRENCH
C-01-0106
W
1/2 S
4' -0
" M
IN
(T
YP
" M
IN
ASPHALT SURFACE
COURSE, MATCH
EXISTING, 1.5" MIN
EXISTING PAVEMENT
COMPACTED
BACKFILL
ASPHALT BASE
COURSE, 3" MIN
AGGREGATE BASE
COURSE, MATCH
EXISTING, 6" MIN
FOR ASPHALT PAVEMENT
SEE NOTE 1
NOTES:
1. SEE C-01-0107 FOR TRENCH
WIDTH, "W" VALUES.
CONCRETE ENCASED DUCT
BANKS MAY BE PLACED
AGAINST TRENCH WALLS.
2. SEE C-01-0102 FOR PIPE
BEDDING DETAILS.
TYPE I SEPARATOR
GEOTEXTILE
TRENCH EXCAVATION LIMITS
DIAMETER
INTERNAL
OF PIPE
W
WIDTH OF TRENCH
MAX W=MIN
4"-6" 8"-10"
12" 14"-16"
18" 20",21"
24" 27" 30" 36" 42" 48" 54" 60" 72" 78" 84" 90" 96" 108"
3'-9" 3'-9" 3'-9" 4'-2" 4'-4" 4'-8"
4'-11" 5'-9" 6'-7" 7'-4" 8'-2" 8'-9" 9'-4"
9'-10" 11'-0" 11'-8" 12'-0" 12'-6" 13'-0" 14'-0"
2'-0" 2'-2"
O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2' O.D.+2'
O.D.+2' O.D.+2'
O.D.+2' O.D.+2'
DEPTH
OF
CUT
S
MAXIMUM PAVEMENT
REPLACEMENT WIDTH
0-6' >6-8'
>8-10' >10-12'
S=W+4' S=W+8'
S=W+12' S=W+16'
W = TRENCH WIDTH AT BOTTOM OF
PIPE. TRENCH SIDE SLOPES SHALL
BE IN ACCORDANCE WITH OSHA
REQUIREMENTS.
C-01-0107
>12-14' S=W+20' >14-16' S=W+24' >16-18' S=W+28'
>18' S=W+32'
4'-0"EQUALEQUAL4'-0"VARIES
12:1 3:1
3:1 SLOPE
12:1
3:1 SLOPE, MAX
VARIES - SEE SITE PLAN
C-32-0550
SLOPE AT 1/4:12 SLOPE AT 1/4:1212"
MIN
TYP
TACK COAT
1.5" ASPHALT
SURFACE COURSE
3.0" ASPHALT
BASE COURSE
NOTE:
THE 1.5" ASPHALT CONCRETE SURFACE COURSE AND THE
TACK COAT SHALL NOT BE PLACED UNTIL COMPLETION OF
ALL OTHER WORK IN CONTRACT.
TYPICAL ROADWAY SECTION
CUT SECTION FILL SECTION
CL
6" AGGREGATE BASE COURSE
COMPACTED SUB-GRADE
TYPE I SEPARATOR GEOTEXTILE
NEW ASPHALT PAVEMENT
AGGREGATE BASE COURSE
CUT BACK EXIST BASE
COURSE 12" MIN
CUT BACK EXIST
EXIST BASE COURSE
C-32-0550SEE
C-32-0555
RESURFACED ASPHALT PAVEMENT
TACK COAT
1" M
IN
TACK COAT
ASPHALT BASE
COURSE, 3.5" MIN
ASPHALT SURFACE
COURSE, 2" MIN
TYPICAL PAVEMENT JUNCTION WITH
RESURFACING OF EXISTING PAVEMENT
SURFACE COURSE
6" MIN FROM BASE
SLOPE
EXISTING SURFACE COURSE;
REPAIR HOLES, CRACKS, ETC.
BEFORE APPLYING TACK COAT
AND NEW ASPHALT
CD01
REMOVABLE BOLLARD DETAIL
Buil de r's Exc ha ng e lsaleeby Layout1 lsaleeby Image lsaleeby
GENERAL STRUCTURAL NOTES CONCRETE (CAST-IN-PLACE)
THESE NOTES ARE GENERAL AND SUPPLEMENT THE SPECIFICATIONS. THESE NOTES APPLY TO THE ENTIRE PROJECT UNLESS
MODIFIED OR NOTED OTHERWISE IN THE CONTRACT DOCUMENTS.
STANDARD DETAILS SHALL BE USED WHEN REFERRED TO OR WHEN NO MORE RESTRICTIVE OR DIFFERENT DETAILS ARE SHOWN
ON THE DRAWINGS.
DESIGN IS IN ACCORDANCE WITH AND CONSTRUCTION SHALL COMPLY WITH THE PROVISIONS OF THE CALIFORNIA BUILDING CODE.
THE DESIGN LOADS AND OTHER DESIGN VALUES GIVEN IN NOTES G-4 THROUGH G-8 WERE USED FOR DESIGN OF STRUCTURES
UNLESS NOTED OTHERWISE ON THE DRAWINGS.
DESIGN TREATS SOLAR PANELS AS DEAD LOAD= 5 PSF.
LIVE LOADS:
C-1
C-2
G-1
G-2
G-3
G-4
G-5
G-6
G-7
G-8
G-9
G-10
G-11
G-12
G-13
G-14
G-15
-ALL STAIRWAYS, LANDINGS AND PLATFORMS ARE DESIGNED FOR A LIVE LOAD = 100 PSF UNLESS NOTED OTHERWISE.
SEISMIC LOAD:
RISK CATEGORY = II
SEISMIC IMPORTANCE FACTOR (Ie) = 1.0
SITE CLASS = AS PER SITE SPECIFC STUDY
MAPPED SPECTRAL RESPONSE ACCELERATIONS (Ss/S1) = 1.622/1.613
SPECTRAL RESPONSE ACCELERATIONS (SMS/SM1) = 1.425/1.563
SPECTRAL RESPONSE COEFFICIENTS (SDS/SD1) = 0.95/1.042
SEISMIC DESIGN CATEGORY = D
RAIN LOAD:
RAIN INTENSITY (i) = 2.5 IN/HR
ALL DIMENSIONS INDICATED FOR EXISTING STRUCTURES SHALL BE VERIFIED BY FIELD MEASUREMENT. ALL DIMENSIONS THAT ARE CONTROLLED BY OR RELATED TO EQUIPMENT SHALL BE VERIFIED BY THE CONTRACTOR WITH THE MANUFACTURER SHOP DRAWINGS
PRIOR TO CONSTRUCTION.
THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING INFORMATION IN THE FIELD AS REQUIRED FOR NEW WORK.
IF A CONFLICT IS FOUND BETWEEN DIFFERENT PORTIONS OF THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. CONTINUED CONSTRUCTION OF THE AREA IN CONFLICT SHALL BE AT THE CONTRACTOR'S OWN RISK UNTIL
THE CONFLICT IS RESOLVED.
EQUIPMENT ANCHOR SIZES, TYPES, EMBEDMENT AND PATTERNS SHALL BE VERIFIED WITH THE MANUFACTURER. ALL ANCHOR
PATTERNS SHALL BE TEMPLATED TO ENSURE ACCURACY OF PLACEMENT.
STRUCTURAL DRAWINGS SHALL BE USED IN COORDINATION WITH THE DRAWINGS OF ALL OTHER DISCIPLINES AND MANUFACTURER'S
SHOP DRAWINGS.
STRUCTURES HAVE BEEN DESIGNED FOR OPERATIONAL LOADS ON THE COMPLETED STRUCTURE. DURING CONSTRUCTION, THE STRUCTURES SHALL BE PROTECTED BY BRACING AND TEMPORARY SUPPORTS WHEREVER EXCESSIVE CONSTRUCTION LOADS MAY
OCCUR. OVERSTRESSING OF ANY STRUCTURAL ELEMENT IS PROHIBITED.
IF CONTRACTOR DESIRES TO TEMPORARILY PLACE OR MOVE LOADS ON OR ADJACENT TO EXISTING STRUCTURES OR UTILITIES DURING CONSTRUCTION PROCESS, CONTRACTOR IS EXCLUSIVELY RESPONSIBLE FOR MAINTAINING STRUCTURAL INTEGRITY AND AVOIDING OVERSTRESSING AND DAMAGING EXISTING STRUCTURES AND UTILITIES. CONTRACTOR SHALL SUBMIT STRUCTURAL CALCULATIONS AND DRAWINGS VERIFYING THAT PROPOSED CONSTRUCTION INCLUDING APPLICATION OF TEMPORARY CONSTRUCTION LOADS WILL NOT OVERSTRESS OR DAMAGE EXISTING STRUCTURES AND UTILITIES. DRAWINGS AND CALCULATIONS SHALL BE SEALED BY A PROFESSIONAL ENGINEER CURRENTLY REGISTERED IN THE STATE OF CALIFORNIA. SEE NOTE G-5 FOR ALLOWABLE LIVE LOADS FOR EACH STUCTURE ONCE ALL STRUCTURAL ELEMENTS HAVE ACHIEVED DESIGN STRENGTH.
STRUCTURAL METALS
M-1
M-2
M-3
M-4
M-5
M-6
M-7
M-8
M-9
M-10
M-11
M-12
M-13
M-14
M-15
DETAIL, FABRICATE, AND ERECT STRUCTURAL STEEL IN…