This document is an appendix of construction and administration forms for the Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality, related to the Kos952935D Nutrient Reduction Wetland Project (Bid No. 25-09) in Kossuth County. The project involves construction of a nutrient reduction wetland with major work items including 55,688 cubic yards of excavation, 812 linear feet of tile installation, 636 square feet of sheet pile installation, 1,082 tons of riprap placement, and 34.8 acres of seeding. The bid submission deadline was September 30, 2025, at 3:00 PM CDT through the IMPACS platform, with a pre-bid conference held on September 16, 2025. Award notification occurred on September 2, 2025, with all construction work except seeding required to be completed by June 15, 2026, and seeding completion by June 30, 2026. The successful contractor was required to obtain a Performance Bond, submit a Construction Progress Schedule, and execute the contract within fourteen calendar days of the Notice of Award. A preconstruction conference must be held within seven days prior to the construction start date, and no work may commence before this conference.
The estimated construction cost ranges between $650,000 and $800,000, with the successful bidder required to submit a bid bond equal to 10 percent of the project cost and a Performance/Payment Bond for 100 percent of the contract price upon award. Contractors must be registered with the Iowa Division of Labor and provide proof of registration. The Division of Soil Conservation and Water Quality provided an Iowa Construction Sales Tax Exempt Certificate allowing the contractor to purchase materials tax-free for the project. Change orders, contract amendments, and payment applications are processed through designated forms, with authorization required from the Director of the Division of Soil Conservation and Water Quality. The project engineer is Andrew Schippers from Ducks Unlimited, with administrative inquiries directed to Tracy Bruun at (515) 344-6279.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX I
CONSTRUCTION & ADMINISTRATION FORMS
Kos952935D Nutrient Reduction Wetland Project DOCUMENT LL
Bid No. 25-090 NOTICE-OF-AWARD
LL-1
September 2, 2025
Contractor name and address
Delivery via email: Contractor Email
RE: NOTICE-OF-AWARD – Kos952935D Nutrient Reduction Wetland Project, Contract 25-09
Dear _______________________________, This is to notify you that the Division of Soil Conservation and Water Quality has determined __________________ is the successful bidder for the Kos952935D Nutrient Reduction Wetland Project.
Award is being made for the base bid of $____________.
In accordance with Item #9 of the Instructions to Bidders, Document BB, you have fourteen (14) calendar days from the date of receipt of this notice to obtain the Performance Bond (Document NN), submit your Construction Progress Schedule (Document JJ) for review, and execute the Contract (Document DD). In addition, the Division must be provided with a Certificate of Insurance pursuant to the General Conditions, Insurance and Related Provisions (Document FF, Part 6-01).
Please note that Iowa Code Section 91C.7, requires that all construction contractors awarded a contract to perform work for the state or an agency of the state must be registered with the Iowa Division of Labor. The Division of Soil Conservation and Water Quality cannot execute a contract with your firm unless you provide proof of this registration. Be sure to fill in the Division of Labor registration number blank on the Contract (Document DD).
Enclosed are the Contract (Document DD), Construction Progress Schedule form (Document JJ), and the Performance Bond (Document NN). Please complete, sign and return scanned electronic copies along with completed Performance Bond. In addition, we must have the Certificate of Insurance pursuant to the General Conditions and/or Special Conditions.
Congratulations on being the successful bidder. We look forward to working with your company on this project. If you have any questions, please contact Tracy Bruun, (515) 344-6279.
Sincerely, Jake Hansen, Chief Water Resources Bureau Division of Soil Conservation and Water Quality
JH/tab Enclosures
CC:
Kos952935D Nutrient Reduction Wetland Project DOCUMENT MM
Bid No. 25-090 NOTICE- TO-PROCEED
MM-1
September 2, 2025
Contractor name and address
Delivery via email: Contractor Email
RE: NOTICE-TO-PROCEED – Kos952935D Nutrient Reduction Wetland Project, Contract 25-09
Dear____________________________, The Division of Soil Conservation and Water Quality received the signed construction Contract (Document DD), the completed Performance Bond (Document NN), and the Certificate of Insurance from your company. These documents were found to be in order and the Division executed this contract with ___________________________ dated _____________________. A scanned copy of the executed Contract and Performance Bond are enclosed.
The Division has accepted the Construction Progress Schedule (Document JJ) included here, with a Construction Start Date of ________________________ . A Preconstruction Conference, as required in Item 13 of the Instructions to Bidders (Document BB), must be held within seven (7) days prior to the Construction Start Date established in the Construction Progress Schedule, or earlier if mutually agreed. No work may commence on site prior to the Preconstruction Conference. If the Construction Start Date requires adjustment, that needs to be communicated to the Engineer and Division in a timely manner so as to facilitate scheduling of the Preconstruction Conference.
In accordance with the Contract _____________________ must commence work under this contract for the Kos952935D Nutrient Reduction Wetland Project on or before the Construction Start Date scheduled in the Construction Progress Schedule, but not before the Preconstruction Conference. You have until June 15, 2026 to complete all of the work except for seeding, and until June 30, 2026 to complete the seeding.
Also attached is a scanned copy of the Iowa Construction Sales Tax Exempt Certificate and Authorization Letter for this project. Pursuant to Iowa Code Section 423.2(80), this allows you to purchase materials tax free for use on this project. Please read the information provided in the authorization letter. You are authorized with this Notice-to-Proceed to purchase necessary materials for this project and request reimbursement for those items that are stored prior to the Construction Start Date.
If you have any questions, please contact Tracy Bruun, (515) 344-6279.
Sincerely, Jake Hansen, Chief Water Resources Bureau
JH/tab Attachments
CC:
Kos952935D Nutrient Reduction Wetland Project DOCUMENT JJ
Bid No. 25-090 CONSTRUCTION PROGRESS SCHEDULE
JJ-1
STATE OF IOWA
DIVISION OF SOIL CONSERVATION AND WATER QUALITY
CONSTRUCTION PROGRESS SCHEDULE
Project ID: Kos952935D Date: _______________________________
Contractor: ___________________________________________________________________________________
Contract End Dates:
All Construction Work Except Seeding: June 15, 2026
Seeding: June 30, 2026
Scheduled Dates:
Anticipated Construction Start Date:
Preconstruction Conference Date Range*:
*Preconstruction Conference must be held prior to Construction Start Date, by no more than seven (7) days
Estimated Completion Date of All Work Except Seeding:
Final Walkthrough should be held prior to Contract End Date for all construction work except seeding
Major Construction Work Item(s) Order of Work Estimated Duration of
Work
(Items to be established/grouped by Division on an individual project basis)
Dates established in this schedule may be adjusted as described in Document FF, Paragraph 3-21.
Kos952935D Nutrient Reduction Wetland Project DOCUMENT JJ
Bid No. 25-090 CONSTRUCTION PROGRESS SCHEDULE
JJ-2
FOR THE CONTRACTOR
(Company Representative)
(Date)
(Name of Company)
(Address of Company)
(City, State, Zip code
FOR THE DIVISION
Mike Bourland, Water Resources Bureau
Accepted
Adjustment Requested
If adjustment is requested, describe below:
END OF DOCUMENT JJ
Kos952935D Nutrient Reduction Wetland Project DOCUMENT SS
Bid No.25-09 APPLICATION AND CERTIFICATE FOR PAYMENT
SS-1
Kos952935D Nutrient Reduction Wetland Project DOCUMENT SS
Bid No.25-09 APPLICATION AND CERTIFICATE FOR PAYMENT
SS-2
Kos952935D Nutrient Reduction Wetland Project DOCUMENT HH
Bid No. 25-09 CHANGE ORDER REQUEST
HH-1
STATE OF IOWA
CHANGE ORDER REQUEST
Change Order Request No.
Project ID: Kos952935D Date:
Name of Project: Kos952935D
Location of Project: Kossuth County
Name of Contractor:
Architect/Engineer: Ducks Unlimited
Contract Plan and
Detail Reference:
Change Order Request
Drawing No. and Date:
Contract Specification
Reference:
Description of Change:
BREAKDOWN OF CONTRACT COST:
Original Project Contract Amount: $
Approved Change Orders No. thru : $
Pending Recommended Change Order Requests Nos. : $
This Change Order Request: $
Resulting Total Recommended Amount: $
Kos952935D Nutrient Reduction Wetland Project DOCUMENT HH
Bid No. 25-09 CHANGE ORDER REQUEST
HH-2
Reason for Contract Change:
Change Requested by:
(Signature) (Date)
CONTRACTOR APPROVAL
By:
(Company) (Signature)
(Address) (Date)
IDALS PROJECT REPRESENTATIVE RECOMMENDATIONS
Concur Recommend Rejection (Attach Explanation)
IDALS Project Representative:
(Signature) (Date)
DIVISION OF SOIL CONSERVATION AND WATER QUALITY AUTHORIZATION
Change Order required due to:
Immediate authorization to proceed granted: Yes No
APPROVED: DENIED:
Susan Kozak, Director Susan Kozak, Director
Division of Soil Conservation and Water Quality Division of Soil Conservation and Water Quality
Iowa Department of Agriculture Iowa Department of Agriculture and Land Stewardship and Land Stewardship
(Date) (Date)
END OF DOCUMENT HH
Kos952935D Nutrient Reduction Wetland Project DOCUMENT II
Bid No. 25-09 CONSTRUCTION CONTRACT AMENDMENT
II-1
State of Iowa
Iowa Department of Agriculture and Land Stewardship
Kos952935D Nutrient Reduction Wetland Project Construction Contract Amendment
THIS AMENDMENT, made this ______ day of ___________________________, 20____, by and between the State of Iowa, acting through:
hereinafter called the DIVISION, and
(Name of Company)
(Address)
(City, State, Zip) hereinafter called the CONTRACTOR.
WITNESSETH: That the DIVISION and the CONTRACTOR mutually agree to amend the agreement made the
_____day of __________, 20_____, for the Kossuth County Nutrient Reduction Wetland Project (Kos952935D –
Bid No. 25-09) in this Amendment Number _________ as described below:
Description of Amendment:
Contract Plan Sheet(s) and Detail Reference(s):
Amendment No. _____
Drawing No. and Date:
Contract Specification
Reference(s):
Reason for Revision of
Contract Completion Date(s):
Original Contract Completion Date for All Work Except Seeding: June 15, 2026
Original Contract Completion Date for Seeding: June 30, 2026
Current Completion Date for All Work Except Seeding:
Current Completion Date for Seeding:
Revised Completion Date for All Work Except Seeding, This Amendment:
Revised Completion Date for Seeding, This Amendment:
Kos952935D Nutrient Reduction Wetland Project DOCUMENT II
Bid No. 25-09 CONSTRUCTION CONTRACT AMENDMENT
II-2
BREAKDOWN OF AMENDMENT CONTRACT COST BY BID ITEM:
Item # Description
Adjustment
Quantity Unit Cost
Total Cost
Adjustment
TOTAL $
Original Project Contract Amount: $ 0.00
Approved Contract Amendments No. ____ through ____: $ 0.00
Pending Recommended Change Order Requests No. ____ through ____: $ 0.00
Approved Change Order Requests No. ____ through ____: $ 0.00
This Amendment Request: $ 0.00
Resulting Total Recommended Amount: $ 0.00
IN WITNESS WHEREOF, the parties hereto have executed this Amendment, in the day and year first above mentioned.
FOR THE DIVISION FOR THE CONTRACTOR
Grant D. Menke, Deputy Secretary
(Company Representative)
(Date) (Date)
(Name of Company)
(Address of Company)
(City, State, Zip Code)
CONSENT FROM SURETY
Seal if by a corporation
(Surety Representative)
(Name of Surety)
END OF DOCUMENT II
Kos952935Dtrient Reduction Wetland Project DOCUMENT QQ
Bid No. 25-09 SALES TAX EXEMPTION CERTIFICATE
IOWA
Department of Revenue www.state.ia.us/tax
Designated Exempt Entity Iowa Construction Sales Tax Exemption Certificate
This document may be completed by a designated exempt entity and given to their contractor and/or subcontractor along with an authorization letter. Seller: Keep this certificate in your files. Contractor/Exempt Entity: Keep a copy of this certificate for your records. Do not send this to the Department of Revenue
Designated Exempt Entity Division of Soil Conservation and Water Quality Iowa Department of Agriculture and Land Stewardship
Address 1 1305 East Walnut Street
Address 2
City Des Moines
State
IA
Zip Code 50319
Construction Project Name Kos952935D Nutrient Reduction Wetland Project
Construction Project Number (if used) Job No. 25-09
General Contractor or Subcontractor Name Sample
Address 1 123 Construction Ave
Address 2
City Dig City
State
IA
Zip Code 55555
Description of contract/subcontract (please print/type clearly)
Construction of Nutrient Reduction Wetland.
The named contractor may purchase building materials used in the contract, exempt from sales tax. This exemption does NOT apply to materials, equipment and supplies consumed by the contractor or subcontractor.
Designated Exempt Entity Authorized Agent ._____________________________________ Date: _____________
Authorization Letter From Division of Soil Conservation and Water Quality - Agriculture and Land Stewardship
Pursuant to Iowa Code Sections: 422.42 (16) & (17), and 422.47 (5), you are authorized to purchase construction materials tax free for the contract specified above.
The exemption certificate (or a copy of the certificate) may be provided to the suppliers of your construction materials and will authorize them to sell you the materials exempt from Iowa sales tax and any applicable local option sales tax and school infrastructure local option sales tax. Complete information on qualifying materials can be found at www.state.ia.us/tax, the Department of Revenue (IDR) website.
It is your responsibility to have records identifying the materials purchased and verifying they were used on this contract. Any materials purchased tax-free and not used on the construction project are subject to sales and applicable local option taxes. Should this occur, the tax must be paid directly by you to IDR in the same calendar quarter the project is completed. E-mail the department at: idrf@idrf.state.ia.us if you have questions on this requirement.
Contractors should be aware that use of the certificate to claim exemption from tax for items not used on this project or that do not qualify for exemption could result in civil or criminal penalties.
31-013 (12/10/02)
END OF DOCUMENT QQ