This is a Wall Foundation Investigation Report (LRFD) prepared by Corporate Environmental Risk Management (CERM) for the Atlanta BeltLine Northwest Trails Segment 3 - Section 2 (I-75 Underpass) project located in Atlanta, Fulton County, Georgia. The report documents geotechnical investigation findings including subsurface soil conditions, soil parameters, and foundation design recommendations for the construction of multiple cast-in-place concrete retaining walls. The project scope includes retaining walls ranging from 6.1 to 13 feet in height extending approximately 1,455 feet from Station 38+00 to Station 54+00. A total of sixteen Standard Penetration Test (SPT) borings and three Dynamic Cone Penetrometer (DCP) borings were conducted from Station 38+00 to 54+00 to assess subsurface conditions and establish design parameters for shallow foundations supporting the trail path.
The investigation revealed subsurface soil consisting of fill materials, residuum soils, and partially weathered rock (PWR) at varying depths. Retained soil parameters include a unit weight of 110 pcf, internal friction angle of 30 degrees, and zero cohesion for walls 8.0, 8.1, 8.2, 9.0, and soil nail sections. Foundation soil parameters specify 120 pcf unit weight, 30-degree friction angle, and zero cohesion. The site is classified as Site Class D per AASHTO LRFD specifications. Bearing resistance and settlement analyses indicate nominal bearing resistances ranging from 4.5 to 6.0 ksf with total settlements of approximately 1.0 inch for all wall configurations. The report recommends protection of footing excavations from standing water, temporary shoring specifications for safe excavation (1.5H:1V maximum slope for depths up to 15 feet), and vibration monitoring during construction due to proximity of residential buildings. Special Provision 154 mandates preconstruction crack surveys, seismograph monitoring, and post-construction crack surveys for adjacent properties. No staged construction or waiting periods are required, and groundwater is not anticipated to be problematic for wall construction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1990 Lakeside Parkway | Suite 300 | Tucker, Georgia 30084 T: 678-999-0173 | F: 678-999-0186 www.cerm.com
WALL FOUNDATION INVESTIGATION (LRFD)
ATLANTA BELTLINE NORTHWEST TRAILS
SEGMENT 3 – SECTION 2 (I-75 UNDERPASS)
PI No. N/A
CERM PROJECT NO. 2022-1497A-000A
Atlanta, Fulton County, Georgia
Prepared For:
KAIZENCollaborative
2390 Main Street
Tucker, Georgia 30084
Prepared by:
Corporate Environmental Risk Management
Date: October 24, 2024
Wall Foundation Investigation (LRFD)
Atlanta BeltLine Northwest Trails Segment 3 – Section 2 (I-75 Underpass)
Atlanta, Fulton County, Georgia
PI No. N/A
October 24, 2024
LOCATION
The project involves designing and constructing a section of the
Atlanta BeltLine Northwest Trails Segment 3 – Section 2, located in Atlanta, Fulton County, Georgia. This segment includes the construction of retaining walls on both the north and south sides of
I-75, specifically at the underpass where I-75 intersects with the
Seaboard Coastline Railroad. For more details, please refer to
Figure 1 in the Appendix.
1.0 -- GENERAL INFORMATION
GEOLOGIC FORMATION This project is located within the Piedmont Formation of the
Georgia Region.
SUBSURFACE FEATURES Reference Boring Logs and Boring Location Plan in the Appendix to better understand the subsurface conditions encountered.
A total of sixteen (16) SPT borings and three (3) DCP borings were drilled from Station 38+00 to 54+00.
Fill soils were encountered in some of the borings from ground surface to an approximate depth of 6 feet. The fill soils generally consisted of very loose to medium dense relative compactness.
Below the fills, the borings encountered residuum soils. The residuum soil extended from the ground surface to an approximate depth of 25 feet. The residuum soil generally consisted of loose to dense relative compactness.
Below the residuum, the soil borings encountered partially weathered rock (PWR). The PWR extended from approximately 8.5 to 25 feet. PWR generally consisted of very dense relative compactness.
Auger refusal was encountered in Borings S3-WB-23 and S3-WB-
24 at depths of 13 feet and 12 feet, respectively. For additional information see the boring layout and boring logs
Groundwater was encountered in Boring S3-WB-11 at a depth of
17 feet begs. Groundwater was not reported in any other boring location at the time of drilling. We do not anticipate that groundwater will be problematic for the construction of the walls.
Atlanta, Fulton County, Georgia
1.1 – RETAINED SOIL PARAMETERS
Wall # (Station
Range) Unit Weight (pcf)
Internal Friction Angle
(degrees) Cohesion (psf) 8.0, 8.1, 8.2, and 9.0
(Station 39+20 to
53+43) and 110 30 0 Soil Nail (40+80 to
43+00)
1.2 – FOUNDATION SOIL PARAMETERS
Wall # (Station
Range) Unit Weight (pcf)
Internal Friction Angle
(degrees) Cohesion (psf) 8.0, 8.1, 8.2, and 9.0
(Station 39+20 to
53+43) and 120 30 0 Soil Nail (40+80 to 43+00)
SITE CLASSIFICATION
We recommend a site class of D per AASHTO LRFD, 9th Edition, 2020, section 3.10.3.1.
WALL DESCRIPTION This project consists of several cast in place (CIP) concrete walls with a height range of 6.1 to 13 feet. The walls begin near station
38+00 and end near station 54+00 for a total length of 1,455 feet.
The purpose of these walls is to retain a path for a concrete slab.
The proposed retaining walls are presented on the following table.
Wall No.
Station to
Station
Type of
Wall
Approximate
Height (ft)
Base
Width
(ft)
8.0 39+20 to
40+80
CIP
Concrete
10.7 8.25
8.1 40+80 to
43+08
CIP
Concrete
6.9 6.0
8.2 43+08 to
53+75
CIP
Concrete
13.0 10.5
9.0 44+90 to
53+43
CIP
Concrete
6.1 5.0
40+80 to
43+00 Soil Nail 6.33 1
CIP: Cast in place.
Atlanta, Fulton County, Georgia
1.3 -- DESIGN DATA
Wall
Wall
Height
(ft)
Wall Location
Description
Base
Width /
Strap
Length, B (ft)
Strength Limit State Service Limit State
Bearing
Pressure
(ksf)
Effective
Base
Width/Strap
Length, B’
(ft)
Bearing
Pressure
(ksf)
Effective
Base
Width/Strap
Length, B’
(ft)
8 10.7 39+20 to 40+80 8.25 3.0 8.25 2.0 8.25
8.1 6.9 40+80 to 43+08 6.0 2.0 6.0 2.0 6.0
8.2 13.0 43+08 to 53+75 10.5 3.2 10.5 1.5 10.5
9.0 6.1 44+90 to 53+43 5.0 2.0 5.0 1.5 5.0
2.0 -- FOUNDATION RECOMMENDATIONS
2.1 – BEARING RESISTANCE AND SETTLEMENT
Wall Height
(ft)
Base Width/Strap
Length, B (ft)
Nominal Bearing
Resistance (ksf)
Factored Bearing
Resistance (ksf)
Total Settlement
(inches)
10.7 8.25 6.0 2.0 1.0
6.9 6.0 6.0 2.0 1.0
13.0 10.5 4.5 1.5 1.0
6.1 5.0 4.5 1.5 1.0
Atlanta, Fulton County, Georgia
3.0 -- GENERAL NOTES
Elevations All elevations information is based on the grading and drainage (GD-101 to
GD-206) plans and structural plans (S-0.0 to S-4.17) prepared by
KaizenCollaborative and dated 09-19-2024.
Staged Construction
/Waiting Period
Not required.
Obstructions No obstructions were noted during drilling.
Alternate Wall Types
As an alternative, project designers may consider Mechanically Stabilized
Earth (MSE) walls.
Vibration Monitoring Several residential buildings are located close to the construction limits of this project. Vibrations from construction may cause concern with property owners. We recommend that the Project Engineer contact the Atlanta
Department of Transportation prior to construction to evaluate the need for crack surveys and vibration monitoring.
All work shall be performed in accordance with Special Provision 154:
Vibration Monitoring.
As Built Foundation
Information
The as built foundation information should be forwarded to the Geotechnical
Engineering Bureau upon completion of the foundation system.
Special Problems No special problems were observed in the field during our site visit.
Atlanta, Fulton County, Georgia
3.1 – SHALLOW FOUNDATION NOTES
Bearing Resistance and Settlement
Bearing Resistance and Settlement have been computed in accordance with
AASHTO LRFD 2014 and GDOT Research Project 14-26 – Implementation of AASHTO LRFD Specifications: Bearing Capacity and Settlement
Calculations for Shallow Foundations of Bridges and Walls.
A LRFD Shallow Foundations Spreadsheet developed by Georgia Institute of
Technology and GDOT’s Geotechnical Bureau was used to evaluate these parameters. The factored bearing resistance vs. footing width vs. settlement curves generated using this spreadsheet are attached to this report.
Bearing Resistance
Factor of Footings at the Strength Limit
State
Bearing resistance factors recommended by Paikowsky et al. (2010) were used in lieu of those recommended by the AASHTO LRFD Manual. This was done to overcome the wide applicability of the AASHTO values since they do not properly represent all grades of soil types, the loading conditions or the strength characteristics. The following table shows the recommended resistance factors for shallow foundations on natural deposits of granular soil
(after Paikowsky et al., 2010):
Soil Friction
Angle, φ'
Loading Conditions
Vertical –
Centric or
Eccentric
Inclined -
Centric
Inclined - Eccentric
Positive Negative
30° - 34° 0.40
0.40 0.35
0.65
35° - 36° 0.45 0.70
37° - 39° 0.50 0.40
40° - 44° 0.55 0.45 0.75
> 45° 0.65 0.50 0.45
Footing Excavation
The resistance factor used is automatically selected from this table in the
LRFD Shallow Foundations Spreadsheet based on the soil’s effective friction angle and the Vertical – Centric or Eccentric loading condition. It is then used to compute the Factored Bearing Resistance.
The footing excavations should be protected from standing water and surface run-off. Dewatering of the excavation would not be at the footing elevation.
Footings should be poured as soon as practical after excavation.
If the soil is saturated at the bottom of the walls at the time of construction, we recommend that the top two (2) feet below the bottom of the wall be
Atlanta, Fulton County, Georgia excavated and backfilled with Type II Foundation Fill. The foundation depth can be adjusted by the Engineer at the time of construction.
Temporary Shoring We understand that temporary shoring with either helical or soil nails is considered for a soil nail wall behind retaining wall #8.1 at the I-75 underpass between stations 40+80 to 43+00.
The construction of any below-grade structures will require temporary excavations that are either sloped or braced for safety. If temporary slopes are used, they should be constructed no steeper than 1.5H:1V for depths up to 15 feet.
Excavated soil should be stockpiled such that the toe of the stockpile is no closer than 1.5 times the excavation's depth from the excavation's surface edge. Stricter Occupational Safety Hazard Administration (OSHA) regulations may apply and should be followed. However, if the regulations are lenient regarding the recommendations stated previously, CERM should be notified to evaluate the situation. Shoring or bracing may be necessary if sufficient space is not available to safely slope the sides of the excavations.
The shoring or bracing system should be designed by a GA registered professional engineer.
These recommendations are based on our experience with similar conditions, and no detailed slope stability analyses were performed. All finished slopes should be suitably protected from erosion. The wall contractor’s design professional is responsible for performing the global stability analysis of the final design.
Groundwater
No groundwater level is expected at the foundation level.
However, if the soil is saturated at the bottom of the walls at the time of construction, we recommend that the top two (2) feet below the bottom of the wall be excavated and backfilled with Type II Foundation Fill. The foundation depth can be adjusted by the Engineer at the time of construction.
To limit hydrostatic pressures, weep holes in the wall and porous drainage material immediately behind the wall should be included as part of the design and construction.
Ground Improvement Not required.
Atlanta, Fulton County, Georgia
Differential
Settlement Analyses
Global Stability
Analyses
Differential settlement analyses have been performed in accordance with
AASHTO LRFD 2014 requirements – C11.6.2.2 for Rigid Retaining Walls.
The wall system meets the AASHTO LRFD requirements. The results of these analyses are attached to this report. The results of these analyses are attached to this report.
A global stability analysis was performed using the soil parameters selected along with the design construction drawings provided, as well as engineering judgment. The slope computer software, STABLE PRO 2015 (STABLE), developed by Ensoft Inc., was used to evaluate the global stability of the proposed retaining walls between stations 48+00 and 49+00. STABLE evaluates the factor of safety using the Modified Bishop method. The analysis was performed assuming Steady State (long term) conditions.
The table below shows a summary of the factors of safety obtained during the analysis. The table also shows several conditions assumed such as: slope angle in front of retaining wall (H:V), soil friction angle, and uniform distributed pressures (psf).
Stations
Slope angle in front of RW (H:V) (deg.)
Friction Angle
(deg.)
Safety Factor
Using q=250 psf (slab)
48+00 2:1.5 (37o) 30 1.58
48+50 3:2 (34o) 30 1.53
49+00
2:1.5 (37o) 30 1.39
Using q=250 psf (slab) and 2,000 psf (I-75 RW)
Hor. Distance = 10 ft
2:1.5 (37o) 30 1.39
H:V = (Horizontal to Vertical).
Based on the analysis, we obtained factors of safety for all station locations above 1.30.
The table below shows the result of the factor of safety obtained from the slope stability analysis corresponding to the soil wall.
Stations
Slope angle on back of RW (H:V) (deg.)
*Nail Length
(ft) Safety Factor
Surcharge loads on back slope: 580 psf (slab and overburden) and 100 psf (pedestrian) 40+80 to
43+00 2:1 (27o) 10 1.59
*The soil nail angle of inclination is 15 degrees.
The pullout resistance of soil nails is based on the length of the nail, the diameter of the grout surrounding the tendon, and the bond strength of the soil-to-grout interface. The bond strength is a function of the hole-drilling
8.2.17
Revised 07/23/2014
DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
SPECIAL PROVISION
PROJECT: Atlanta BeltLine Northwest Trails
Segment 3 – Section 2 (I-75 Underpass)
Atlanta, Fulton County, Georgia
Section 154 — Construction Vibration Monitoring
Add the following:
154.1 General Description
This Work consists of performing preconstruction crack surveys, seismograph and other monitoring of construction vibrations, and post construction crack surveys of the buildings located on Parcels # adjacent to the proposed project construction on (Atlanta, Fulton County, GA) by procuring the services of a prequalified subcontractor specializing in this work.
154.1.01 Definitions
General Provisions 101 through 150.
154.1.02 Related References
A. Standard Specifications
B. Referenced Documents
154.1.03 Submittals
A. Prequalification of Subcontractor
Submit the following documentation for the Engineer’s review and approval a minimum of thirty days prior to beginning construction activities on the project:
Evidence of the subcontractor’s successful completion of at least five projects similar in concept and scope to the proposed crack survey and vibration monitoring. Include names, addresses and telephone numbers of the owners’ representatives for verification.
Résumés of employees performing this work. Provide evidence showing each employee possesses experience and knowledge similar in concept and scope of this work for performing crack surveys and installing and reading seismographs. Provide evidence that the reports will be reviewed and signed by a
Georgia Licensed Professional Engineer or Georgia Licensed Professional Geologist. The Department will be sole judge of determining if employees are qualified to perform the work on this project.
A detailed survey plan, monitoring plan, and sequence of work that describes all materials, methods and equipment to be used to complete the crack survey and vibration monitoring.
B. Construction Monitoring
Submit the following documentation during construction monitoring:
Preconstruction Crack Survey Report documenting existing conditions of buildings prior to construction activities in accordance with subsection 154.3.03.B.
Monthly Seismograph Data and Data Summary Report and Activity Log of all construction activities within 500 feet (152 meters) of the seismograph in accordance with subsection 154.3.03.A.1.
Reports of building conditions regarding cracks or any other damage potentially caused by construction activities as complaints are received in accordance with subsection 154.3.03.C.
C. Post Construction
Submit a Post Construction Crack Survey Report in accordance with subsection 154.3.03.D documenting post construction condition of cracks or damage identified in the pre-construction survey and cracks or any other damage potentially caused by construction activities.
154.2 Materials
General Provision 101 through 150.
154.3 Construction Requirements
154.3.01 Personnel
Ensure all employees performing this work have been approved by the Engineer in accordance with subsection
154.1.03.A.
154.3.02 Equipment
A. Seismograph
Use a seismograph(s) that is weather proof and capable of continuously recording particle velocity in three perpendicular components with a flat response of 2-250 HZ over a range of at least 0.01 to 5.0 inches per second (0.254 to 127 mm per second). Provide a seismograph(s) that employs an internal dynamic calibration during each recording sequence and that has been shake table tested within the previous 24 months verifying an accuracy of +/- 5% over the frequency range of 4 to 125 Hertz. Provide a recorder/ software system that is capable of digitally storing and reproducing vibration levels in tabular or histogram (bar graph) form at no greater than six minute intervals.
B. Crack Gauges
Use crack gauges specifically designed for use on this type of work. Utilize a minimum of 15 crack gauges and a maximum of 25 to monitor significant cracks on the interior or exterior of buildings located closest to the construction activities. Submit the proposed locations of crack gauges to the Engineer for review and approval prior to installation. Use crack gauges that do not damage or stain existing surfaces. Replace missing or damaged gauges at no additional cost to the Department. Repair and restore surfaces back to the pre- installation state.
***Please note that if a Historical property is noted on the plans and is within the distance specified in this
Special Provision to require monitoring, crack gauges are required.
154.3.03 Construction
Obtain Engineer’s written approval of the Prequalification documents submitted in accordance with Subsection
154.1.03.A prior to beginning this work.
Perform the preconstruction crack survey prior to starting construction activities on the project.
Install and begin seismograph monitoring prior to starting excavation, shoring and backfilling construction activities on the project.
Maintain seismograph and crack monitoring until excavation, shoring and backfilling, compaction of subgrade, base and pavement construction activities on the project are complete.
A. Seismograph Installation and Monitoring
Monitor vibrations at building(s) using seismograph(s) when construction activities including, but not limited to, excavation, shoring installation, backfilling, and compaction of subgrade, base and pavement are within 75 feet (23 meters) of the building(s), or otherwise have the potential to result in vibrations that may cause damage or complaints. Relocate seismograph(s) as needed. Protect the seismograph from weather and vandalism.
Replace missing or damaged equipment at no cost to the Department. Document the following information at the time that the seismograph is installed:
Date and time of installation
Coordinates of installed instrument or Station and offset
Method of transducer attachment
Name and affiliation of the person installing the instrument
1. Monthly Seismograph Data and Data Summary Report and Activity Log:
Compile a Monthly Seismograph Data and Data Summary Report containing the data from the seismograph and a summarization of the data showing time and magnitude of the maximum vibration that has occurred each day.
Maintain an activity log of all construction activities within 500 feet (152 meters) of the seismograph
Include the following data in each log:
Location of construction activity
Type of construction activity
Types and number of construction equipment being used, including model, manufacture and weight.
Date and times construction equipment was used.
Submit Monthly Seismograph Data Summary Report and Activity Log to the Engineer on a monthly basis.
B. Preconstruction Crack Survey
Complete a preconstruction crack survey on the outside and inside of all buildings located on Parcels #.
Document building conditions by taking photographs and detailed notes citing location, length and width of cracks. Compile documentation into a Preconstruction Crack Survey Report and submit to the Engineer.
C. Building Monitoring
Monitor buildings during construction for any new cracks and or elongation or widening of existing cracks.
Provide a report of building conditions to the Engineer regarding cracks or any other damage potentially caused by construction activities as complaints are received.
D. Post Construction Crack Survey
Complete a post construction crack survey on the outside and inside of all buildings located on Parcels: #.
Document building conditions by taking photographs and detailed notes citing condition of cracks or damage identified in the pre-construction survey; also, location, length and width of cracks or any other damage potentially caused by construction activities.
154.4 Measurement
The Work under this Contract Item is not measured separately for payment.
154.5 Payment
This Contract Item completed and accepted will be paid for at the Lump Sum Price bid. Payment will be full compensation for furnishing and installing the seismograph(s) and crack gauges, for monitoring and reporting vibration data recorded on the seismograph(s) and crack gauges, and completing crack survey and documenting building conditions and providing copies of all data to the Engineer in accordance with this specification.
Seismographs, crack gauges and all other measuring equipment and devices will remain property of the Contractor.
Payment will be made under:
Item No. 154 Construction Vibration Monitoring Per Lump Sum
Office of Materials and Testing
FIGURES
1990 Suite 300
PROJECT
LOCATION
X
X
X X
X X X
X
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LOS#D LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
GENERATOR
BEGIN TRANSITION FROM 12'
WIDE TRAIL TO 14' WIDE TRAIL
BEGIN RETAINING WALL, STA. 41+18,
SEE S SHEETS FOR DETAILS
MAINTAIN 12' MIN. CLEAR FROM TOP OF
TRAIL TO BOTTOM OF BRIDGE
END RETAINING WALL
TRAIL TO TRANSITION FROM 12' WIDE
W/ 2' SHOULDERS TO 14' WIDE W/ 2' SHOULDERS
NEW CONC. CURB & GUTTER,
TIE TO & MATCH EXISTING
TS-05
16'-0"
16'-0"
18'-0"
22'-0" MIN
16'-0"
18'-0"
20'-0" MIN.
RAISED TRAIL CROSSING
REMOVE (1) EXIST.
PARKING STALL
REMOVE (17) EXIST.
PARKING STALLS
REMOVE (4) EXIST.
PARKING STALLS
CUT/FILL RETAINING
WALLS TO I-75 UNDERPASS
36+00
37+00
38+00
39+00
+0
+0
+0
37+00 36+75
NEW CONC. CURB & GUTTER,
TIE TO & MATCH EXISTING
KAIZENCOLLABORATIVE
2390 MAIN STREET | TUCKER, GEORGIA 30084 | 404.239.2521
Atlanta BeltLine, Inc.
100 Peachtree treet, NW, Suite 2300 Atlanta, GA 30303 t: (404) 477-3003
PATH Foundation, PO Box 14327, Atlanta, GA Pete Pellegrini
GA GSWCC LEVEL 1 CERTIFICATION #
0000029813 12/21/2023 office (404) 875-7284x2 cell (404) 277-5392
DATE DESCRIPTION
PROJECT #
PROJECT MANAGER AC
2022-253-3
ATLANTA BELTLINE
NORTHWEST TRAILS
SEGMENT 3
CITY OF ATLANTA, GA
SCALE
DATE JANUARY 30, 2024
SHEET #
1 inch = feet
( IN FEET )
KEY MAP
SHEET 02
SHEET 03
SHEET 04
SHEET 07
SHEET 06
SHEET 05
SHEET 01
SHEET 08
SHEET 09
SHEET 10
SHEET 11
I-75
26TH ST. NW
NORTHSIDE CIR
DEERING RD
NORTHSIDE DR / U.S. HWY 41
TRABERT AVE
ATC DRIVEWAY
CSX RAILROAD
CREEK
SHEET 12
01/06/2023 30% DESIGN REVIEW
10/31/2023 30% DESIGN RESUBMITTAL
1/30/2024 30% PRICING SET
LAYOUT & MATERIALS PLAN
L-108
1" = 20'-0"
MATCHLINE STA 36+25 SEE SHEET L-107
M
AT
C H
LI
N
E
ST
A
+7
SE
E
SH
EE
T L-
LAYOUT AND MATERIAL LEGEND
LOD
R/W LINE - P/L LINE
LIMIT OF DISTURBANCE
RETAINING WALL
TRAIL LIGHT
MULTI-USE TRAIL
MULTI-USE TRAIL - HEAVY DUTY
ASPHALT PAVING
GRANITE PAVING
DETECTABLE PAVER
HEAVY DUTY CONCRETE PAVING
BOLLARD
GUARDRAIL
72" CHAINLINK FENCE
MILL AND PAVE ASPHALT SURFACE,
2” DEPTH
SHEET NOTES:
1. ALL HANDICAP RAMPS TO HAVE PAVESTONETM
CITYSCAPE ADA 4"X8" PAVERS, COLOR DARK
GRAY, OR APPROVED EQUAL
2. ALL REMOVABLE & FIXED BOLLARDS TO BE
FIELD LOCATED BY C.M.
3. SHARED USE PATH DESIGN SPEED: 12-15mph
Figure 2: Boring Location Plan Atlanta BeltLine NW Trails Segment #3 (I-75 Underpass) Atlanta, Fulton County, Georgia
S3-WB=SEGMT. 3 - WALL BORINGS
S3-WB- 9
S3-WB-10
S3-WB-11
S3-WB-12
S3-WB-13
S3-WB-14
S3-WB-15
S3-WB-16
S3-WB-17
HAND AUGERS / DCP BORING
LOCATIONS
DCP-1
DCP-3
DCP-2
44+00
45+00
42+00
41+00
38+00
40+00
39+00
43+00
Figure 2a: Boring Location Plan
X
X X X X
X X
XX
X X X X X
X X X
X
X X X
X
X X X X X
X X
X LOD
LOD
LOD
LOD
LODLOD
LO
D
LOD
LODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
A B
14'-0" WIDE CONCRETE
MULTI-USE TRAIL, TYP
REMOVE EXIST. TREE 'X', TYP.
SEE S SHEETS FOR RETAINING
WALL DETAILS
NEW CONC. CURB & GUTTER,
TIE TO & MATCH EXISTING
TS-05
L-201
18'-0"
18'-0"
+0
+0
+0
+0
+0
+0
55+00
KAIZENCOLLABORATIVE
2390 MAIN STREET | TUCKER, GEORGIA 30084 | 404.239.2521
Atlanta BeltLine, Inc.
100 Peachtree treet, NW, Suite 2300 Atlanta, GA 30303 t: (404) 477-3003
PATH Foundation, PO Box 14327, Atlanta, GA Pete Pellegrini
GA GSWCC LEVEL 1 CERTIFICATION #
0000029813 12/21/2023 office (404) 875-7284x2 cell (404) 277-5392
DATE DESCRIPTION
PROJECT #
PROJECT MANAGER AC
2022-253-3
ATLANTA BELTLINE
NORTHWEST TRAILS
SEGMENT 3
CITY OF ATLANTA, GA
SCALE
DATE JANUARY 30, 2024
SHEET #
1 inch = feet
( IN FEET )
KEY MAP
SHEET 02
SHEET 03
SHEET 04
SHEET 07
SHEET 06
SHEET 05
SHEET 01
SHEET 08
SHEET 09
SHEET 10
SHEET 11
I-75
26TH ST. NW
NORTHSIDE CIR
DEERING RD
NORTHSIDE DR / U.S. HWY 41
TRABERT AVE
ATC DRIVEWAY
CSX RAILROAD
CREEK
SHEET 12
01/06/2023 30% DESIGN REVIEW
10/31/2023 30% DESIGN RESUBMITTAL
1/30/2024 30% PRICING SET
LAYOUT & MATERIALS PLAN
L-109
1" = 20'-0"
M
AT
C H
LI
N
E
ST
A
+7
SE
E
SH
EE
T L-
M
AT
C H
LI
N
E
ST
A
+2
SE
E
SH
EE
T L-
LAYOUT AND MATERIAL LEGEND
LOD
R/W LINE - P/L LINE
LIMIT OF DISTURBANCE
RETAINING WALL
TRAIL LIGHT
MULTI-USE TRAIL
MULTI-USE TRAIL - HEAVY DUTY
ASPHALT PAVING
GRANITE PAVING
DETECTABLE PAVER
HEAVY DUTY CONCRETE PAVING
BOLLARD
GUARDRAIL
72" CHAINLINK FENCE
MILL AND PAVE ASPHALT SURFACE,
2” DEPTH
SHEET NOTES:
1. ALL HANDICAP RAMPS TO HAVE PAVESTONETM
CITYSCAPE ADA 4"X8" PAVERS, COLOR DARK
GRAY, OR APPROVED EQUAL
2. ALL REMOVABLE & FIXED BOLLARDS TO BE
FIELD LOCATED BY C.M.
3. SHARED USE PATH DESIGN SPEED: 12-15mph
Figure 2: Boring Location Plan Atlanta BeltLine NW Trails Segment #3 (I-75 Underpass) Atlanta, Fulton County, Georgia
S3-WB=SEGMT. 3 - WALL BORINGS
S3-WB-18
S3-WB-20
S3-WB-19
S3-WB-21
46+00
47+00
48+00
49+00
50+00
51+00
Figure 2b: Boring Location Plan
FLOOD ELEV: 810
APPROX LOCATION
X X X
X
X X X
X
X X X X X
X X X
X
X
XX
X
X
XX
X X X
XXX
X
XX X
XX
X
X XXX
X
X X
X
XX
X
XX
XX
XX
X
X X
X X X
X
XX
XXX XX
X
XX XXX
XX
X
X R20'-0"
LOD
LOD
LOD
LOD
LODLOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LODLOD
LO
D
LOD
LO
D
LO
D
LOD
LODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD
LODLO
D
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LODLODLODLOD
LOD
LOD
LOD
LOD
A B
STRUCTURAL BENT, TYP.
REFER TO S SHEETS
RELOCATE EXISTING LIGHT POLE
OUTSIDE OF PLAZA
END RETAINING WALL, STA. 49+77
END RETAINING WALL, STA. 48+52
14'-0" WIDE CONCRETE
MULTI-USE TRAIL, TYP
BEGIN ELEVATED TRAIL STRUCTURE
SEE S SHEETS FOR DETAILS
REMOVE EXIST. TREE 'X', TYP.
SEAT WALL, REFER TO S SHEETS FOR DETAILS
REFER TO GD SHEET FOR BIO-SWALE
AND WALL DETAILS
SIDEWALK / MULTI-USE TRAIL TRANSITION
TS-06
L-201
L-202
14'-0"
16'-0"
14'-0"
18'-0"
+0
+0
+0
+0
+0
+0
+0
54+00
55+00
KAIZENCOLLABORATIVE
2390 MAIN STREET | TUCKER, GEORGIA 30084 | 404.239.2521
Atlanta BeltLine, Inc.
100 Peachtree treet, NW, Suite 2300 Atlanta, GA 30303 t: (404) 477-3003
PATH Foundation, PO Box 14327, Atlanta, GA Pete Pellegrini
GA GSWCC LEVEL 1 CERTIFICATION #
0000029813 12/21/2023 office (404) 875-7284x2 cell (404) 277-5392
DATE DESCRIPTION
PROJECT #
PROJECT MANAGER AC
2022-253-3
ATLANTA BELTLINE
NORTHWEST TRAILS
SEGMENT 3
CITY OF ATLANTA, GA
SCALE
DATE JANUARY 30, 2024
SHEET #
1 inch = feet
( IN FEET )
KEY MAP
SHEET 02
SHEET 03
SHEET 04
SHEET 07
SHEET 06
SHEET 05
SHEET 01
SHEET 08
SHEET 09
SHEET 10
SHEET 11
I-75
26TH ST. NW
NORTHSIDE CIR
DEERING RD
NORTHSIDE DR / U.S. HWY 41
TRABERT AVE
ATC DRIVEWAY
CSX RAILROAD
CREEK
SHEET 12
01/06/2023 30% DESIGN REVIEW
10/31/2023 30% DESIGN RESUBMITTAL
1/30/2024 30% PRICING SET
LAYOUT & MATERIALS PLAN
L-110
1" = 20'-0"
M
AT
C H
LI
N
E
ST
A
+2
SE
E
SH
EE
T L-
MATCHLINE STA 55+75 SEE SHEET L-111
LAYOUT AND MATERIAL LEGEND
LOD
R/W LINE - P/L LINE
LIMIT OF DISTURBANCE
RETAINING WALL
TRAIL LIGHT
MULTI-USE TRAIL
MULTI-USE TRAIL - HEAVY DUTY
ASPHALT PAVING
GRANITE PAVING
DETECTABLE PAVER
HEAVY DUTY CONCRETE PAVING
BOLLARD
GUARDRAIL
72" CHAINLINK FENCE
MILL AND PAVE ASPHALT SURFACE,
2” DEPTH
SHEET NOTES:
1. ALL HANDICAP RAMPS TO HAVE PAVESTONETM
CITYSCAPE ADA 4"X8" PAVERS, COLOR DARK
GRAY, OR APPROVED EQUAL
2. ALL REMOVABLE & FIXED BOLLARDS TO BE
FIELD LOCATED BY C.M.
3. SHARED USE PATH DESIGN SPEED: 12-15mph
Figure 2: Boring Location Plan Atlanta BeltLine NW Trails Segment #3 (I-75 Underpass) Atlanta, Fulton County, Georgia
S3-WB=SEGMT. 3 - WALL BORINGS
S3-WB-22
S3-WB-23
9 S3-WB-24
52+00
54+00
Figure 2c: Boring Location Plan
Prepared: HAA Title: Soil Profile Cross Section
Figure 3a Checked: TT Project: Proposed Retaining Walls
Date: 03/28/2024 Project No. BeltLine Segment #3 - 2023-1497A-000A
Scale: NTS Client: Kaizen Collaborative
866 866
865 865
864 864
863 863
862 862
861 861
860 860
859 859
858 858
857 857
856 856
855 855
854 854
853 853
852 852
851 851
850 850
849 849
848 848
847 847
846 846
845 845
844 844
843 843
842 842
841 841
840 840
839 839
Legend Key Fill
PEAT
SILTY SAND
SILT
Partially Weathered Rock
N=17
N=26
N=10
N=17
N=100
N=100
N=100
S3 -W
B1
N=18
N=7
N=12
N=10
N=29
N=100
S3 -W
B1
N=4
N=5
N=8
N=5
N=18
S3 -W
B1
N=9
N=7
N=8
N=9
N=19
S3 -W
B1
PWR
Residuum Residuum
Residuum
FILL
FILL
FILL
Existing Ground Surface
BT@25 ft
BT@20 ft
BT@15 ft BT@15 ft
3a
Prepared: HAA Title: Soil Profile Cross Section
Figure 3b Checked: TT Project: Proposed Retaining Walls
Date: 03/28/2024 Project No. BeltLine Segment #3 - 2023-1497A-000A
Scale: NTS Client: Kaizen Collaborative
872 872
870 870
868 868
866 866
864 864
862 862
860 860
858 858
856 856
854 854
852 852
850 850
848 848
846 846
844 844
842 842
840 840
838 838
836 836
834 834
832 832
830 830
828 828
826 826
824 824
822 822
820 820
818 818
816 816
814 814
812 812
810 810
808 808
806 806
804 804
802 802
800 800799.00
Legend Key
SILTY SAND
PEAT
Fill
SILT
Partially Weathered Rock
S3 -W
B1
N=6
N=6
N=8
N=7
N=8
N=11
N=16
S3 -W
B1
N=9
N=6
N=7
N=8
N=13
S3 -W
B1
N=2
N=10
N=10
N=7
N=10
N=12
S3 -W
B1
N=7
N=10
N=9
N=11
S3 -W
B1
N=11
N=13
N=10
N=8
N=10
N=15
S3 -W
B2
N=8
N=22
N=11
N=16
S3 -W
B2
N=5
N=7
N=12
N=8
N=12
N=13
S3 -W
B2
N=3
N=13
N=10
N=12
S3 -W
B2
N=5
N=13
N=18
N=100
S3 -W
B2
N=6
N=38
N=48
N=17
Existing Ground Surface
Existing Ground Surface
FILL
FILL
Residuum
Residuum
Residuum
Residuum
Residuum
FILL
PWR
Existing Ground Surface
BT@25 ft
BT@15 ft
BT@20 ft
BT@10 ft
BT@20 ft
BT@10 ft
BT@20 ft
BT@10 ft
BT@13 ft
BT@12 ft
3b
APPENDIX
SOIL TEST BORING PROCEDURES (ASTM D-1586)
The soil test borings were advanced by twisting continuous auger flights into the ground. At selected intervals, soil samples were obtained by driving a standard 1.4-inch I.D., 2.0-inch O.D., split tube sampler into the ground. The sampler was initially seated six inches by driving the sampler with a 140-pound automatic hammer falling 30 inches to penetrate any loose cuttings created in the boring process. The sampler is then driven an additional 12 inches with the hammer in two six-inch increments. The number of blows required to drive the sampler to the final foot is designated the
Standard Penetration Resistance.
The samples recovered were sealed against moisture loss and were transported to the office where they were classified by an engineer in general accordance with the Unified Soil Classification
System (USCS).
CORRELATION OF STANDARD PENETRATION RESISTANCE
WITH RELATIVE COMPACTNESS AND CONSISTENCY
Sand and Gravel
Standard Penetration Resistance
Blows / Foot Relative Compactness
0 - 4 Very Loose
5 - 10 Loose
11 - 30 Medium Dense
31- 50 Dense
Over 50 Very Dense
Silt and Clay
Standard Penetration Resistance
Blows / Foot Relative Consistency
0 - 1 Very Soft
2 - 4 Soft
5 - 8 Firm
9 - 15 Stiff
16 - 30 Very Stiff
31 - 50 Hard
Over 50 Very Hard
SOIL CLASSIFICATION CHART
MCK
MAJOR DIVISIONS
SYMBOLS TYPICAL
DESCRIPTIONS GRAPH LETTER
COARSE
GRAINED
SOILS
MORE THAN 50%
OF MATERIAL IS
LARGER THAN
NO. 200 SIEVE
SIZE
GRAVEL
AND
GRAVELLY
MORE THAN
50% OF COARSE
FRACTION
RETAINED ON
NO. 4 SIEVE
CLEAN
GRAVELS
(LITTLE OR NO
FINES)
GW
WELL-GRADED GRAVELS,
GRAVEL-SAND MIXTURES, LITTLE
OR NO FINES
GP
POORLY-GRADED GRAVELS,
GRAVEL-SAND MIXTURES, LITTLE
OR NO FINES
GRAVELS WITH
FINES
(APPRECIABLE
AMOUNT OF FINES)
GM
SILTY GRAVELS, GRAVEL-SAND-
SILT MIXTURES
GC
CLAYEY GRAVELS, GRAVEL-SAND-
CLAY MIXTURES
SAND
AND
SANDY
MORE THAN
50% OF COARSE
FRACTION
PASSING ON
NO. 4 SIEVE
CLEAN SANDS
(LITTLE OR NO
FINES)
SW
WELL-GRADED SANDS, GRAVELLY
SAND, LITTLE OR NO FINES
SP
POORLY-GRADED SANDS,
GRAVELLY SAND, LITTLE OR NO
SANDS WITH
(APPRECIABLE
AMOUNT OF FINES)
SM
SILTY SANDS, SAND-SILT
MIXTURES
SC
CLAYEY SANDS, SAND-CLAY
MIXTURES
FINE
GRAINED
MORE THAN 50%
OF MATERIAL IS
SMALLER THAN
NO. 200 SIEVE
SIZE
SILTS
AND
CLAYS
LIQUID LIMIT LESS
THAN 50
ML
INORGANIC SILTS AND VERY FINE
SANDS, ROCK FLOUR, SILTY OR
CLAYEY FINE SANDS OR CLAYEY
SILTS WITH SLIGHT PLASTICITY
CL
INORGANIC CLAYS OF LOW TO
MEDIUM PLASTICITY, GRAVELLY
CLAYS, SANDY CLAYS, SILTY
CLAYS, LEAN CLAYS
OL
ORGANIC SILTS AND ORGANIC
SILTY CLAYS OF LOW PLASTICITY
SILTS
AND
CLAYS
LIQUID LIMIT
GREATER THAN 50
MH
INORGANIC SILTS, MICACEOUS OR
DIATOMACEOUS FINE SAND OR
SILTY SOILS
CH
INORGANIC CLAYS OF HIGH
PLASTICITY
OH
ORGANIC CLAYS OF MEDIUM TO
HIGH PLASTICITY, ORGANIC SILTS
ALLUVIUM
PT
ALLUVIUM, PEAT, HUMUS, SWAMP
SOILS WITH HIGH ORGANIC
CONTENTS
FILL
FILL MATERIAL PLACED BY MAN
De pt h (Ō
G ra ph ic
Material DescripƟon
Asphalt 3-inches Crushed stone 6-inches RESIDUUM: Medium dense, reddish brown, silty SAND (SM), Įne sand, trace mica
Boring terminated at 5.0 feet.
El ev aƟ on
(Ō
856.0
851.0
846.0
841.0
836.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D
Bl ow
Co un ts
(N V al ue
3-6-11 (17)
7-6-7 (13)
Borehole ID: S3-WB 9 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta BeltLine NW Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, Georgia Date Started: Jan 18 2023 Completed: Jan 18 2023 Logged By: JD Checked By:
Drilling Contractor: Killman Brothers LaƟtude: 33.801395 Longitude: -84.403778 ElevaƟon: 861.00 Drilling Method: 8" Hollow Stem Auger Ground Water Levels Equipment: CME 550X TR At Ɵme of drilling Jan 18 2023 - not encountered Hammer Type: AutomaƟc hammer Notes:
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
Station 38+75, The N-values reported are raw values from the field.
The average Energy Transfer Ratio (ETR, percent) is reported as 87.
, S/N:248133
-FE 861
h (Ō
G ra ph ic
Material DescripƟon
Topsoil 3-inches FILL: Very sƟī, reddish brown, sandy lean CLAY (CL), Įne sand, trace mica, moist RESIDUUM: Medium dense, light pinkish brown to dark brown, silty SAND (SM), Įne sand, some mica, moist Medium dense, light gray to brown, silty SAND (SM), Įne sand, moist
Boring terminated at 10.0 feet.
El ev aƟ on
(Ō
859.0
854.0
849.0
844.0
839.0
834.0
829.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D ts
(N V al ue
3-3-18 (21)
5-8-11 (19)
7-6-7 (13)
11-9-11 (20)
Borehole ID: S3-WB10 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta NW BeltLine Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, GA Date Started: Jan 18 2023 Completed: Jan 18 2023 Logged By: JD Checked By:
Drilling Contractor: Killman Brothers Northing: 1382929.4 EasƟng: 2224437.1 ElevaƟon: 864.00 Drilling Method: 8" Hollow Stem Auger Ground Water Levels Equipment: CME 550X TR, S/N:248133 At Ɵme of drilling Jan 18 2023 - not encountered Hammer Type: AutomaƟc hammer Notes:
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
The N-values reported are raw values from the field.
The average Energy Transfer Ratio (ETR, percent) is reported as 87.
Station 40+00, 10' R.
-FE 867
h (Ō
G ra ph ic
Material DescripƟon
Topsoil 3-inches FILL: Medium dense, brown, silty SAND with gravel (SM), Įne to medium sand, trace mica, some rock fragments RESIDUUM: Medium dense, light pinkish gray to dark reddish brown, silty SAND (SM), Įne sand, trace mica SƟī, tan to dark brown, sandy SILT (ML), Įne sand, some mica
Medium dense, light to dark gray, silty SAND (SM), Įne sand, some mica
PARTIALLY WEATHERED ROCK: Very dense, grayish tan to brown, silty SAND (SM), Įne to medium sand, some mica
Very dense, tan to gray, silty SAND (SM), Įne to medium sand, some mica, wet
Boring terminated at 25.0 feet.
El ev aƟ on
(Ō
859.0
854.0
849.0
844.0
839.0
834.0
829.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D ts
(N V al ue
5-10-7 (17)
8-13-13 (26)
5-5-5 (10)
4-7-10 (17)
31-50/3" (50/3")
50/4" (50/4")
50/1" (50/1")
Borehole ID: S3-WB11 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta NW BeltLine Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, GA Date Started: Jan 18 2023 Completed: Jan 18 2023 Logged By: JD Checked By:
Drilling Contractor: Killman Brothers Northing: 1382944.1 EasƟng: 2224361.8 ElevaƟon: 864.00 Drilling Method: 8" Hollow Stem Auger Ground Water Levels Equipment: CME 550X TR, S/N:248133 At Ɵme of drilling Jan 18 2023 - not encountered Hammer Type: AutomaƟc hammer AŌer drilling 17.00 on Jan 20 2023 - 48 hrs aŌer drilling Notes:
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
The N-values reported are raw values from the field.
The average Energy Transfer Ratio (ETR, percent) is reported as 87.
Station 40+80, 10' L
-FE 864
h (Ō
G ra ph ic
Material DescripƟon
FILL: Medium dense, light brown, silty SAND (SM), Įne sand, trace mica, some rock fragments
RESIDUUM: Loose to medium dense, light to dark brown, silty SAND (SM), Įne sand, some mica, chemical odor
PARTIALLY WEATHERED ROCK: Very dense, light to dark brown, silty SAND (SM), Įne sand, some mica Boring terminated at 20.0 feet.
El ev aƟ on
(Ō
860.0
855.0
850.0
845.0
840.0
835.0
830.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D ts (N
V al ue
5-5-13 (18)
2-3-4 (7)
5-5-7 (12)
4-5-5 (10)
11-14-15 (29)
50/1" (50/1")
Po ck et P en
(t sf
Borehole ID: S3-WB12 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta NW BeltLine Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, GA Date Started: Jan 05 2023 Completed: Jan 05 2023 Logged By: JD Checked By:
Drilling Contractor: Envirorisk Northing: 1383015.8 EasƟng: 2224378.6 ElevaƟon: 865.00 Drilling Method: 4-1/4" Hollow stem auger Ground Water Levels Equipment: GeoProbe 7822, S/N 7822V31810044 At Ɵme of drilling Jan 05 2023 - not encountered Hammer Type: AutomaƟc hammer Notes:
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
The N-values reported are raw values from the field. The average Energy Transfer Ratio (ETR, percent) is reported as 87.
Station 41+40, 20 L
-FE 866
h (Ō
G ra ph ic
Material DescripƟon
FILL: Very loose, tan to light brown, silty SAND (SM), Įne sand, some mica Firm, reddish brown, sandy SILT (ML), Įne sand, trace mica
RESIDUUM: SƟī, tan to orangish brown, sandy SILT (ML), Įne sand, some mica SƟī, light to dark brown, sandy SILT (ML), Įne sand, some mica, moist
Medium dense, light gray, silty SAND (SM), Įne sand, some mica, moist
Boring terminated at 15.0 feet.
El ev aƟ on
(Ō
860.0
855.0
850.0
845.0
840.0
835.0
830.0
825.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D ts
(N V al ue
1-2-2 (4)
1-2-3 (5)
2-4-4 (8)
2-2-3 (5)
6-8-10 (18)
Borehole ID: S3-WB13 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta NW BeltLine Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, GA Date Started: Jan 05 2023 Completed: Jan 05 2023 Logged By: JD Checked By:
Drilling Contractor: Envirorisk Northing: 1383121.4 EasƟng: 2224470.3 ElevaƟon: 864.50 Drilling Method: 4-1/4" Hollow stem auger Ground Water Levels Equipment: GeoProbe 7822, S/N 7822V31810044 At Ɵme of drilling Jan 05 2023 - not encountered Hammer Type: AutomaƟc hammer Notes:
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
The N-values reported are raw values from the field.
The average Energy Transfer Ratio (ETR, percent) is reported as 87.
Station 42+80, 20' L h (Ō
G ra ph ic
Material DescripƟon
FILL: Very loose, light to dark reddish brown, silty SAND (SM), Įne sand, trace mica
RESIDUUM: Loose, light gray, silty SAND (SM), Įne sand, some mica
Medium dense, light gray, silty SAND (SM), Įne sand, some mica
Boring terminated at 15.0 feet.
El ev aƟ on
(Ō
860.0
855.0
850.0
845.0
840.0
835.0
830.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D ts
(N V al ue
3-4-5 (9)
4-4-3 (7)
2-3-5 (8)
3-4-5 (9)
7-9-10 (19)
Borehole ID: S3-WB14 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta NW BeltLine Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, GA Date Started: Jan 05 2023 Completed: Jan 05 2023 Logged By: JD Checked By:
Drilling Contractor: Envirorisk Northing: 1383206.3 EasƟng: 2224514.8 ElevaƟon: 865.00 Drilling Method: 4-1/4" Hollow stem auger Ground Water Levels Equipment: GeoProbe 7822, S/N 7822V31810044 At Ɵme of drilling Jan 05 2023 - not encountered Hammer Type: AutomaƟc hammer Notes:
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
The N-values reported are raw values from the field.
The average Energy Transfer Ratio (ETR, percent) is reported as 87.
Station 43+30, 30' L h (Ō
G ra ph ic
Material DescripƟon
RESIDUUM: Loose, tan to brown, silty SAND (SM), Įne sand, trace mica
Loose, light pinkish gray to dark brown, silty SAND (SM), Įne sand, some mica
Loose, light to dark brown, silty SAND (SM), Įne sand, some mica
Medium dense, gray to dark brown, silty SAND (SM), Įne sand, some mica
Boring terminated at 25.0 feet.
El ev aƟ on
(Ō
866.0
861.0
856.0
851.0
846.0
841.0
836.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D ts
(N V al ue
2-3-3 (6)
2-3-3 (6)
4-4-4 (8)
3-3-4 (7)
3-3-5 (8)
5-5-6 (11)
8-8-8 (16)
Borehole ID: S3-WB15 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta NW BeltLine Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, GA Date Started: Jan 18 2023 Completed: Jan 18 2023 Logged By: JD Checked By:
Drilling Contractor: Killman Brothers Northing: 1383149.6 EasƟng: 2224550.0 ElevaƟon: 871.00 Drilling Method: 8" Hollow Stem Auger Ground Water Levels Equipment: CME 550X TR, S/N:248133 At Ɵme of drilling Jan 18 2023 - not encountered Hammer Type: AutomaƟc hammer Notes:
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
The N-values reported are raw values from the field.
The average Energy Transfer Ratio (ETR, percent) is reported as 87.
Station 43+30.
-FE 865
-FE 849
h (Ō
G ra ph ic
Material DescripƟon
FILL: Loose, reddish brown to brown, silty SAND (SM), Įne sand, trace mica, some rock fragments
RESIDUUM: Loose to medium dense, light to dark pinkish brown, silty SAND (SM), Įne sand, some mica
Boring terminated at 15.0 feet.
El ev aƟ on
(Ō
863.0
858.0
853.0
848.0
843.0
838.0
833.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D ts
(N V al ue
2-6-3 (9)
3-3-3 (6)
3-3-4 (7)
4-4-4 (8)
6-6-7 (13)
Borehole ID: S3-WB16 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta NW BeltLine Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, GA Date Started: Jan 18 2023 Completed: Jan 18 2023 Logged By: JD Checked By:
Drilling Contractor: Killman Brothers Northing: 1383096.8 EasƟng: 2224724.2 ElevaƟon: 868.00 Drilling Method: 8" Hollow Stem Auger Ground Water Levels Equipment: CME 550X TR, S/N:248133 At Ɵme of drilling Jan 18 2023 - not encountered Hammer Type: AutomaƟc hammer Notes:
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
The N-values reported are raw values from the field.
The average Energy Transfer Ratio (ETR, percent) is reported as 87.
Station 45+25.
h (Ō
G ra ph ic
Material DescripƟon
Topsoil 3-inches FILL: Very loose, reddish brown, clayey SAND (SC), Įne sand, some mica Loose, reddish brown, silty SAND (SM), Įne sand, some mica, some rock fragments RESIDUUM: Loose, light to dark pinkish brown, silty SAND (SM), Įne sand, some mica
Loose, tan to light grayish brown, silty SAND (SM), Įne sand, some mica, moist
Medium dense, light to dark brown, silty SAND (SM), Įne sand, some mica
Boring terminated at 20.0 feet.
El ev aƟ on
(Ō
863.0
858.0
853.0
848.0
843.0
838.0
833.0
828.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D ts
(N V al ue
1-1-1 (2)
4-5-5 (10)
2-4-6 (10)
3-3-4 (7)
3-5-5 (10)
5-6-6 (12)
Borehole ID: S3-WB17 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta NW BeltLine Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, GA Date Started: Jan 18 2023 Completed: Jan 18 2023 Logged By: JD Checked By:
Drilling Contractor: Killman Brothers Northing: 1383096.1 EasƟng: 2224747.0 ElevaƟon: 867.50 Drilling Method: 8" Hollow Stem Auger Ground Water Levels Equipment: CME 550X TR, S/N:248133 At Ɵme of drilling Jan 18 2023 - not encountered Hammer Type: AutomaƟc hammer AŌer drilling Jan 19 2023 - not encountered Notes: 24 hours AŌer drilling Jan 23 2023 - not encountered
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
The N-values reported are raw values from the field.
The average Energy Transfer Ratio (ETR, percent) is reported as 87.
Station 45+50.
h (Ō
G ra ph ic
Material DescripƟon
Topsoil 3-inches RESIDUUM: Loose, reddish brown, silty SAND (SM), Įne sand, some mica Loose, light to dark pinkish brown, silty SAND (SM), Įne to medium sand, some mica SƟī, light pinkish brown, (ML), Įne sand, some mica, moist
Boring terminated at 10.0 feet.
El ev aƟ on
(Ō
863.0
858.0
853.0
848.0
843.0
838.0
833.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D ts
(N V al ue
3-3-4 (7)
4-5-5 (10)
4-4-5 (9)
3-5-6 (11)
Borehole ID: S3-WB18 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta NW BeltLine Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, GA Date Started: Jan 20 2023 Completed: Jan 20 2023 Logged By: JD Checked By:
Drilling Contractor: Killman Brothers Northing: 1383053.7 EasƟng: 2224896.1 ElevaƟon: 868.00 Drilling Method: 8" Hollow Stem Auger Ground Water Levels Equipment: CME 550X TR, S/N:248133 At Ɵme of drilling Jan 20 2023 - not encountered Hammer Type: AutomaƟc hammer Notes: 24 hours AŌer drilling Jan 23 2023 - not encountered
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
The N-values reported are raw values from the field.
The average Energy Transfer Ratio (ETR, percent) is reported as 87.
Station 47+00, 45' R h (Ō
G ra ph ic
Material DescripƟon
Topsoil 3-inches RESIDUUM: Medium dense to loose, reddish brown to tan, silty SAND (SM), Įne sand, trace mica
Loose, light to dark brown, silty SAND (SM), Įne sand, some mica
Medium dense, light to dark pinkish brown, silty SAND (SM), Įne sand, some mica
Boring terminated at 20.0 feet.
El ev aƟ on
(Ō
864.0
859.0
854.0
849.0
844.0
839.0
834.0
829.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D ts
(N V al ue
3-5-6 (11)
6-6-7 (13)
4-5-5 (10)
3-4-4 (8)
4-5-5 (10)
6-7-8 (15)
Borehole ID: S3-WB19 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta NW BeltLine Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, GA Date Started: Jan 20 2023 Completed: Jan 20 2023 Logged By: JD Checked By:
Drilling Contractor: Killman Brothers Northing: 1383034.9 EasƟng: 2224959.2 ElevaƟon: 868.50 Drilling Method: 8" Hollow Stem Auger Ground Water Levels Equipment: CME 550X TR, S/N:248133 At Ɵme of drilling Jan 20 2023 - not encountered Hammer Type: AutomaƟc hammer AŌer drilling Jan 20 2023 - not encountered Notes: 24 hours AŌer drilling Jan 23 2023 - not encountered
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
The N-values reported are raw values from the field.
The average Energy Transfer Ratio (ETR, percent) is reported as 87.
Station 47+75, 60' R h (Ō
G ra ph ic
Material DescripƟon
Topsoil 3-inches RESIDUUM: Loose to medium dense, reddish brown, silty SAND (SM), Įne sand, trace mica
Medium dense, light reddish brown, silty SAND (SM), Įne sand, some mica, moist
Boring terminated at 10.0 feet.
El ev aƟ on
(Ō
839.0
834.0
829.0
824.0
819.0
814.0
809.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D ts
(N V al ue
3-3-5 (8)
10-10-12 (22)
4-5-6 (11)
4-7-9 (16)
Borehole ID: S3-WB20 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta NW BeltLine Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, GA Date Started: Jan 20 2023 Completed: Jan 20 2023 Logged By: JD Checked By:
Drilling Contractor: Killman Brothers Northing: 1383047.6 EasƟng: 2225132.7 ElevaƟon: 844.00 Drilling Method: 8" Hollow Stem Auger Ground Water Levels Equipment: CME 550X TR, S/N:248133 At Ɵme of drilling Jan 20 2023 - not encountered Hammer Type: AutomaƟc hammer Notes: 24 hours AŌer drilling Jan 23 2023 - not encountered
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
The N-values reported are raw values from the field.
The average Energy Transfer Ratio (ETR, percent) is reported as 87.
Station 49+40, 20' L
-FE 831
h (Ō
G ra ph ic
Material DescripƟon
Topsoil 3-inches FILL: Loose, brown, silty SAND (SM), Įne sand, some mica
SƟī, reddish brown, sandy lean CLAY (CL), Įne sand, trace mica, moist
RESIDUUM: Medium dense to loose, reddish brown, silty SAND (SM), Įne sand, some mica, moist
Medium dense, tan to light reddish brown, silty SAND (SM), Įne sand, moist
Medium dense, tan to light brown, silty SAND (SM), Įne sand, moist
Boring terminated at 20.0 feet.
El ev aƟ on
(Ō
837.0
832.0
827.0
822.0
817.0
812.0
807.0
Sa m pl e
Ty pe
N um be r
Re co ve ry
RQ
D ts
(N V al ue
2-2-3 (5)
2-3-4 (7)
3-5-7 (12)
4-4-4 (8)
4-6-6 (12)
5-6-7 (13)
Borehole ID: S3-WB21 Sheet 1 of 1
Client: KAIZEN CollaboraƟve/PATH- Project Name: Atlanta NW BeltLine Trails - Segment 3 - Section 2 Project Number: 2022-1497A-000A - 3 Project LocaƟon: Atlanta, GA Date Started: Jan 20 2023 Completed: Jan 20 2023 Logged By: JD Checked By:
Drilling Contractor: Killman Brothers Northing: 1383010.7 EasƟng: 2225170.3 ElevaƟon: 842.00 Drilling Method: 8" Hollow Stem Auger Ground Water Levels Equipment: CME 550X TR, S/N:248133 At Ɵme of drilling Jan 20 2023 - not encountered Hammer Type: AutomaƟc hammer Notes: 24 hours AŌer drilling Jan 23 2023 - not encountered
Sample Legend Auger
Split Spoon
ModiĮed California
Rock Core
Shelby Tube
Undisturbed
SPT N Value 20 40 60 80
MC (%)
PL & LL (%)
20 40 60 80 Fines Content (%)
20 40 60 80
The N-values reported are raw values from the field.
The average Energy Transfer Ratio (ETR, percent) is reported as 87.
Station 50+00
-FE 831
h (Ō
G ra ph ic
Material DescripƟon
Topsoil 3-inches FILL: Very loose, reddish brown, silty SAND (SM), Įne sand, some mica RESIDUUM: Medium dense, light to dark brown, silty…
This is the start of the file's text. The full file is on GovTribe.