2-B - ABI NWT3-Sec2 CAD (1).zip

ZIP file 22 MB Posted

Attached to
Northwest Corridor Segment 3B – Construction
Solicitation number
DC-2026-094:
Issued by
Fulton County, Georgia

About this file

This is a CAD (Computer-Aided Design) file package for the Northwest Corridor Segment 3B construction project, prepared by Atlanta Beltline, Inc. (ABI), a Georgia-based organization. The project involves construction services for the Northwest Trail Segment 3B, beginning at the south side of the entry drive at 1500 Northside Drive NW in Atlanta, Georgia, and continuing from the current endpoint of Segment 3A of the NW trail, including crossing the entry drive. This is an Invitation to Bid requiring attendance at a mandatory pre-bid meeting and site visit. The file contains technical CAD drawings and design documents necessary for bidders to prepare accurate construction cost estimates and project proposals.

The CAD file serves as a critical technical resource for qualified construction firms competing for this sealed bid contract. Prospective bidders must review all accompanying documentation, including the scope of work, project specifications, and any addenda, in conjunction with these design drawings to submit competitive proposals. The mandatory pre-bid meeting and site visit are required components of the bidding process, ensuring that all bidders have equal access to project information and site conditions. No pricing, contract term, award timeline, or funding source information is contained within the CAD file itself, as these details are typically specified in separate bid documents and contract terms.

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .