8-Exhibit A - PRIOR BID TABULATION.pdf
PDF 120 KB Posted
- Attached to
- AS NEEDED PAVEMENT MARKING INSTALLATION
- Solicitation number
- IFB-BW-25-142
- Issued by
- Pasco County, Florida
About this file
This is a bid tabulation document for IFB-RH-23-016, an as-needed pavement marking installation contract opened on November 29, 2022, at 1:15 PM. The solicitation covers various pavement marking services including retro-reflective pavement markers, painted pavement markings in white, yellow, black, and blue colors, thermoplastic markings, durable paint markings, and traffic control devices such as delineators and message boards. The scope encompasses standard and refurbishment applications with different line widths (6", 8", 12", 18", 24"), skip patterns, dotted guidelines, symbols, arrows, crosswalks, and specialized markings for interchanges, roundabouts, and accessible parking areas. Quantities range from small amounts (5 units) to larger volumes (up to 5,000 linear feet or square feet for certain items), indicating this is likely an indefinite delivery/indefinite quantity contract for ongoing maintenance needs.
Three contractors submitted bids: McShea Contracting, LLC from Leigh Acres, FL with a total bid of $283,405.00; AKCA, LLC from Plant City, FL with a total bid of $392,500.00; and Traffic Control Products of Florida, Inc. from Tampa, FL with the highest bid of $1,076,130.00. The wide variation in total pricing suggests significant differences in the contractors' unit price strategies, with McShea Contracting offering the most competitive overall pricing at approximately 26% of the highest bidder's total. The contract appears to be for routine road maintenance services, likely funded through municipal or state transportation budgets, with pricing structured on a unit-cost basis for each specific type of pavement marking or traffic control device installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6-F. SAMPLE AGREEMENT.pdf | ||
| 1-C. SPECIAL PROVISIONS.pdf | ||
| 7-ADDENDUM 1.pdf | ||
| 2-B. GENERAL CONDITIONS.pdf | ||
| 3-D. SPECIFICATIONS.pdf | ||
| 4-E. OFFEROR FORM.pdf | ||
| 5-A. ADVERTISEMENT PAGE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Estimated Annual
Quantity
Unit of Measure
Description Unit Price Total Unit Price Total Unit Price Total
0706 3 2000 EA RETRO-REFLECTIVE PAVEMENT MARKERS $4.50 $9,000.00 $3.50 $7,000.00 $3.89 $7,780.00
0710 11101 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID,
6"
$800.00 $4,000.00 $1,300.00 $6,500.00 $1,800.00 $9,000.00
0710 11102 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID
FOR INTERCHANGE AND URBAN ISLAND, 8"
$500.00 $2,500.00 $400.00 $2,000.00 $2,500.00 $12,500.00
0710 11103 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID
FOR INTERCHANGE MARKINGS, 12"
$100.00 $500.00 $100.00 $500.00 $3,000.00 $15,000.00
0710 11123 1000 LF PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID
FOR CROSSWALK AND ROUNDABOUT, 12"
$1.00 $1,000.00 $1.25 $1,250.00 $1.50 $1,500.00
0710 11124 1000 LF PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID
FOR DIAGONAL OR CHEVRON, 18"
$0.20 $200.00 $0.50 $500.00 $1.72 $1,720.00
0710 11125 1000 LF PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID
FOR STOP LINE OR CROSSWALK, 24"
$1.25 $1,250.00 $1.50 $1,500.00 $2.11 $2,110.00
0710 11131 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SKIP,
10-30 OR 3-9 SKIP, 6" WIDE
$350.00 $1,750.00 $500.00 $2,500.00 $950.00 $4,750.00
0710 11133 5 GM PAINTED PAVEMENT MARKING, STANDARD, WHITE, 3'-9'
SKIP DROP LINE AND APPROACH TO TOLL PLAZA, 12" WIDE,
$25.00 $125.00 $25.00 $125.00 $1,800.00 $9,000.00
0710 11141 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, 2-4
DOTTED GUIDELINE/ 6-10 DOTTED EXTENSION, 6"
$150.00 $750.00 $350.00 $1,750.00 $950.00 $4,750.00
0710 11144 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, 2-2
DOTTED EXTENSION LINE FOR ROUNDABOUT, 12"
$25.00 $125.00 $200.00 $1,000.00 $2,100.00 $10,500.00
0710 11160 100 EA PAINTED PAVEMENT MARKINGS, STANDARD, WHITE,
MESSAGE OR SYMBOL
$20.00 $2,000.00 $30.00 $3,000.00 $58.00 $5,800.00
0710 11170 100 EA PAINTED PAVEMENT MARKINGS, STANDARD, WHITE,
ARROWS
$40.00 $4,000.00 $40.00 $4,000.00 $38.00 $3,800.00
0710 11180 50 LF PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, YIELD
LINE
$10.00 $500.00 $10.00 $500.00 $7.00 $350.00
0710 11190 1000 SF PAINTED PAVEMENT MARKINGS, STANDARD, WHITE,
ISLAND NOSE
$0.50 $500.00 $2.00 $2,000.00 $3.00 $3,000.00
0710 11201 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW,
SOLID, 6"
$800.00 $4,000.00 $1,300.00 $6,500.00 $1,500.00 $7,500.00
0710 11202 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW,
SOLID FOR INTERCHANGE AND URBAN ISLAND, 8"
$50.00 $250.00 $50.00 $250.00 $2,500.00 $12,500.00
0710 11203 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW,
SOLID, 12"
$5.00 $25.00 $5.00 $25.00 $3,000.00 $15,000.00
0710 11223 1000 LF PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW,
SOLID FOR CROSSWALK OR ROUNDABOUT, 12"
$0.01 $10.00 $0.05 $50.00 $1.50 $1,500.00
0710 11224 1000 LF PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW,
SOLID FOR DIAGONAL OR CHEVRON, 18"
$0.75 $750.00 $0.75 $750.00 $1.72 $1,720.00
0710 11225 1000 LF PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW,
SOLID FOR STOP LINE OR CROSSWALK, 24"
$0.01 $10.00 $0.05 $50.00 $2.11 $2,110.00
0710 11231 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SKIP,
6"
$300.00 $1,500.00 $500.00 $2,500.00 $1,350.00 $6,750.00
0710 11241 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, 2-4
DOTTED GUIDELINE/6-10 DOTTED EXTENSION, 6"
$200.00 $1,000.00 $350.00 $1,750.00 $1,950.00 $9,750.00
0710 11290 1000 SF PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW,
ISLAND NOSE
$1.00 $1,000.00 $1.00 $1,000.00 $3.00 $3,000.00
0710 11331 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, BLACK, SKIP,
6"
$150.00 $750.00 $200.00 $1,000.00 $750.00 $3,750.00
0710 11333 5 GM PAINTED PAVEMENT MARKING, STANDARD, BLACK, 3'-9'
DOTTED LANE DROP AND APPROACH TO TOLL PLAZA, 12"
$10.00 $50.00 $25.00 $125.00 $1,900.00 $9,500.00
0710 11341 5 GM PAINTED PAVEMENT MARKINGS, STANDARD, BLACK, 2-4
DOTTED GUIDELINE/ 6-10 DOTTED EXTENSION, 6"
$10.00 $50.00 $25.00 $125.00 $1,500.00 $7,500.00
AKCA, LLC
PLANT CITY, FL
TRAFFIC CONTROL PRODUCTS
OF FLORIDA, INC.
TAMPA, FL
BID TABULATION
IFB-RH-23-016
NOVEMBER 29, 2022 AT 1:15PM
AS NEEDED PAVEMENT MARKING INSTALLATION
MCSHEA CONTRACTING, LLC
LEIGH ACRES, FL
Quantity
Unit of Measure
Description Unit Price Total Unit Price Total Unit Price Total
0710 11421 1000 LF PAINTED PAVEMENT MARKINGS, STANDARD, BLUE, SOLID
FOR PARKING LOT- ACCESSIBLE MARKINGS, 6"
$0.50 $500.00 $1.00 $1,000.00 $0.65 $650.00
0710 12101 5 GM PAINTED PAVEMENT MARKINGS, DURABLE PAINT, WHITE,
SOLID, 6" MAINTENANCE USE
$1,700.00 $8,500.00 $2,400.00 $12,000.00 $1,800.00 $9,000.00
0710 12102 5 GM PAINTED PAVEMENT MARKINGS, DURABLE PAINT, WHITE,
SOLID, 8" WIDE FOR INTERCHANGE AND URBAN ISLAND-
$1,000.00 $5,000.00 $1,500.00 $7,500.00 $3,200.00 $16,000.00
0710 12131 5 GM PAINTED PAVEMENT MARKINGS, DURABLE PAINT, WHITE,
10-30 OR 3-9 SKIP, 6" WIDE- MAINTENANCE USE
$600.00 $3,000.00 $900.00 $4,500.00 $750.00 $3,750.00
0710 12201 5 GM PAINTED PAVEMENT MARKINGS, DURABLE PAINT, YELLOW,
SOLID, 6" WIDE, MAINTENANCE USE
$1,600.00 $8,000.00 $2,400.00 $12,000.00 $1,500.00 $7,500.00
0710 12231 5 GM PAINTED PAVEMENT MARKINGS, DURABLE, YELLOW, SKIP,
6"
$600.00 $3,000.00 $900.00 $4,500.00 $750.00 $3,750.00
0710 12421 1000 LF PAINTED PAVEMENT MARKINGS, DURABLE, BLUE, SOLID
FOR PARKING LOT- ACCESSIBLE MARKINGS, 6"
$0.50 $500.00 $0.50 $500.00 $0.95 $950.00
0711 11102 5 GM THERMOPLASTIC, STANDARD, WHITE, SOLID, 8" FOR
INTERCHANGE AND URBAN ISLAND
$3,000.00 $15,000.00 $3,000.00 $15,000.00 $7,500.00 $37,500.00
0711 11103 5 GM THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR
INTERCHANGE MARKINGS
$500.00 $2,500.00 $500.00 $2,500.00 $10,000.00 $50,000.00
0711 11123 1000 LF THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR
CROSSWALK AND ROUNDABOUT
$3.50 $3,500.00 $8.00 $8,000.00 $3.00 $3,000.00
0711 11124 1000 LF THERMOPLASTIC, STANDARD, WHITE, SOLID, 18" FOR
DIAGONALS AND CHEVRONS
$2.50 $2,500.00 $7.00 $7,000.00 $4.00 $4,000.00
0711 11125 1000 LF THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP
LINE AND CROSSWALK
$4.00 $4,000.00 $9.00 $9,000.00 $5.00 $5,000.00
0711 11141 5 GM THERMOPLASTIC, STANDARD, WHITE, 2-4 DOTTED
GUIDELINE/ 6-10 GAP EXTENSION, 6"
$800.00 $4,000.00 $1,300.00 $6,500.00 $4,200.00 $21,000.00
0711 11144 5 GM THERMOPLASTIC, STANDARD, WHITE, 2-2 DOTTED
EXTENSION LINE, 12" FOR ROUNDABOUT
$100.00 $500.00 $1,000.00 $5,000.00 $7,200.00 $36,000.00
0711 11160 100 EA THERMOPLASTIC, STANDARD, WHITE, MESSAGE OR
SYMBOL
$60.00 $6,000.00 $70.00 $7,000.00 $164.00 $16,400.00
0711 11170 100 EA HERMOPLASTIC, STANDARD, WHITE, ARROW $90.00 $9,000.00 $110.00 $11,000.00 $84.00 $8,400.00
0711 11180 1000 LF THERMOPLASTIC, STANDARD, WHITE, YIELD LINE $0.50 $500.00 $0.50 $500.00 $20.00 $20,000.00
0711 11224 1000 LF THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR
DIAGONAL OR CHEVRON
$3.00 $3,000.00 $7.00 $7,000.00 $4.00 $4,000.00
0711 11241 5 GM THERMOPLASTIC, STANDARD, YELLOW, 2-4 DOTTED
GUIDELINE /6-10 DOTTED EXTENSION LINE, 6"
$1,000.00 $5,000.00 $1,300.00 $6,500.00 $4,200.00 $21,000.00
0711 11421 1000 LF THERMOPLASTIC, STANDARD, BLUE, SOLID,6" $0.50 $500.00 $0.50 $500.00 $5.00 $5,000.00
0711 12101 5 GM THERMOPLASTIC, REFURBISHMENT, WHITE, SOLID, 6" $3,600.00 $18,000.00 $4,600.00 $23,000.00 $5,637.00 $28,185.00
0711 12121 1000 LF THERMOPLASTIC, REFURBISHMENT, WHITE, SOLID, 6" FOR
MAINTENANCE USE
$1.00 $1,000.00 $1.00 $1,000.00 $1.25 $1,250.00
0711 12122 1000 LF THERMOPLASTIC, REFURBISHMENT, WHITE, SOLID, 8" FOR
MAINTENANCE USE
$1.75 $1,750.00 $2.00 $2,000.00 $1.50 $1,500.00
0711 12123 1000 LF THERMOPLASTIC, REFURBISHMENT, WHITE, SOLID, 12" FOR
CROSS WALK OR ROUNDABOUT- MAINTENANCE USE ONLY
$4.50 $4,500.00 $8.00 $8,000.00 $1.58 $1,580.00
0711 12124 1000 LF THERMOPLASTIC, REFURBISHMENT, WHITE, SOLID, 18" FOR
DIAGONAL OR CHEVRON, MAINTENANCE USE ONLY
$3.50 $3,500.00 $7.00 $7,000.00 $4.00 $4,000.00
0711 12125 1000 LF THERMOPLASTIC, REFURBISHMENT, WHITE, SOLID, 24" FOR
STOP LINE OR CROSSWALK, MAINTENANCE USE ONLY
$5.00 $5,000.00 $9.00 $9,000.00 $5.00 $5,000.00
0711 12131 5 GM THERMOPLASTIC, REFURBISHMENT, WHITE, SKIP, 6" $1,200.00 $6,000.00 $1,700.00 $8,500.00 $1,350.00 $6,750.00
0711 12141 5 GM THERMOPLASTIC, REFURBISHMENT, WHITE, 2-4 DOTTED
GUIDELINE / 6-10 GAP EXTENSION, 6", MAINTENANCE USE
$700.00 $3,500.00 $1,400.00 $7,000.00 $2,500.00 $12,500.00
0711 12160 100 EA THERMOPLASTIC, REFURBISH, WHITE, MESSAGE $60.00 $6,000.00 $70.00 $7,000.00 $165.00 $16,500.00
0711 12170 100 EA THERMOPLASTIC, REFURBISH, WHITE, ARROWS $90.00 $9,000.00 $110.00 $11,000.00 $70.00 $7,000.00
0711 12201 5 GM THERMOPLASTIC, REFURBISHMENT, YELLOW, SOLID, 6" $3,500.00 $17,500.00 $4,600.00 $23,000.00 $5,637.00 $28,185.00
Quantity
Unit of Measure
Description Unit Price Total Unit Price Total Unit Price Total
0711 12221 1000 LF THERMOPLASTIC, REFURBISHMENT, YELLOW, SOLID, 6"
MAINTENANCE USE ONLY
$0.70 $700.00 $1.00 $1,000.00 $1.20 $1,200.00
0711 12222 1000 LF THERMOPLASTIC, REFURBISHMENT, YELLOW, SOLID, 8"
MAINTENANCE USE ONLY
$0.50 $500.00 $1.00 $1,000.00 $1.50 $1,500.00
0711 12224 1000 LF THERMOPLASTIC, REFURBISHMENT, YELLOW, SOLID, 18"
FOR DIAGONAL OR CHEVRON, MAINTENANCE USE ONLY
$3.75 $3,750.00 $7.00 $7,000.00 $4.00 $4,000.00
0711 12231 5 GM THERMOPLASTIC, REFURBISHMENT, YELLOW, SKIP, 6" $1,300.00 $6,500.00 $1,700.00 $8,500.00 $3,900.00 $19,500.00
0711 12241 5 GM THERMOPLASTIC, REFURBISHMENT, YELLOW 2-4 DOTTED
GUIDELINE/ 6-10 GAP EXTENSION, 6" MAINT USE ONLY
$300.00 $1,500.00 $1,400.00 $7,000.00 $3,900.00 $19,500.00
0711 14160 100 EA THERMOPLASTIC, PREFORMED, WHITE, MESSAGE $150.00 $15,000.00 $150.00 $15,000.00 $550.00 $55,000.00
0711 14170 100 EA THERMOPLASTIC, PREFORMED, WHITE, ARROW $100.00 $10,000.00 $100.00 $10,000.00 $350.00 $35,000.00
0711 14660 100 EA THERMOPLASTIC, PREFORMED, MULTI COLOR ROUTE
SHIELD
$75.00 $7,500.00 $75.00 $7,500.00 $2,350.00 $235,000.00
0711 17 1000 SF THERMOPLASTIC, REMOVE EXISTING THERMOPLASTIC
PAVEMENT MARKINGS: NON-CONFLICTING ONLY
$2.00 $2,000.00 $3.00 $3,000.00 $4.00 $4,000.00
E706 1 32 1000 EA REFLECTIVE PAVEMENT MARKER (REMOVE) (CLASS B) $0.01 $10.00 $1.00 $1,000.00 $1.00 $1,000.00
E706 1 42 1000 EA REFLECTIVE PAVEMENT MARKER (REMOVE AND REPLACE)
(CLASS B)
$4.50 $4,500.00 $5.50 $5,500.00 $3.84 $3,840.00
E710 11121 1000 LF PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID,
6"
$0.15 $150.00 $0.25 $250.00 $1.35 $1,350.00
E710 11141 1000 LF PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SKIP,
6"
$0.15 $150.00 $0.25 $250.00 $1.25 $1,250.00
E710 11221 1000 LF PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW,
SOLID, 6"
$0.15 $150.00 $0.25 $250.00 $1.35 $1,350.00
E710 11241 1000 LF PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SKIP,
6"
$0.15 $150.00 $0.25 $250.00 $1.25 $1,250.00
E710 17 1000 SF REMOVAL OF NON-CONFLICTING PAINT/LONGLINE STRIPE
PRIOR TO REFURBISH
$1.00 $1,000.00 $1.50 $1,500.00 $4.00 $4,000.00
E711 3 1 1000 SF PAVEMENT MESSAGES (THERMOPLASTIC) $6.00 $6,000.00 $6.00 $6,000.00 $47.00 $47,000.00
E711 11121 1000 LF THERMOPLASTIC, STANDARD, WHITE, SOLID, 6" $1.00 $1,000.00 $1.25 $1,250.00 $1.25 $1,250.00
E711 11141 1000 LF THERMOPLASTIC, STANDARD, WHITE, SKIP, 6" $1.00 $1,000.00 $1.25 $1,250.00 $0.58 $580.00
E711 11221 1000 LF THERMOPLASTIC, STANDARD, YELLOW, SOLID, 6" $1.00 $1,000.00 $1.25 $1,250.00 $1.25 $1,250.00
E711 11241 1000 LF THERMOPLASTIC, STANDARD, YELLOW, SKIP, 6" $1.00 $1,000.00 $1.25 $1,250.00 $0.58 $580.00
E711 12141 1000 LF THERMOPLASTIC, REFURBISHMENT, WHITE, SKIP, 6" $1.00 $1,000.00 $1.25 $1,250.00 $0.49 $490.00
0705 10 1 100 EA OBJECT MARKER, TYPE 1 $30.00 $3,000.00 $30.00 $3,000.00 $180.00 $18,000.00
0705 11 1 100 EA DELINEATOR, FLEXIBLE TUBULAR $40.00 $4,000.00 $40.00 $4,000.00 $100.00 $10,000.00
0705 11 2 100 EA DELINEATOR, NON-FLEXIBLE $20.00 $2,000.00 $20.00 $2,000.00 $110.00 $11,000.00
0705 11 3 100 EA DELINEATOR, FLEXIBLE HIGH VISABILITY MEDIAN $70.00 $7,000.00 $70.00 $7,000.00 $215.00 $21,500.00
0705 11 4 100 EA DELINEATOR, FLEXIBLE HIGH-PERFORMANCE 48" $40.00 $4,000.00 $70.00 $7,000.00 $155.00 $15,500.00
0705 11 5 10 WEEKLY MESSAGE BOARD RENTAL $100.00 $1,000.00 $600.00 $6,000.00 $275.00 $2,750.00
$392,500.00 $1,076,130.00$283,405.00GRAND TOTAL:
Sheet1
File details come from the government source that posted it. Updated .