8-Drawings.pdf
PDF 11 MB Posted
- Attached to
- CSP - Grease Waste Infrastructure Replacement at Ben Taub for Harris Health (Estimated Budget $948, 500)
- Solicitation number
- 26/0039
- Issued by
- Harris County, Texas
About this file
This file contains construction drawings for the Ben Taub Underground Pipe Replacement project, a grease waste infrastructure replacement initiative for Harris Health System in Houston, Texas, with an estimated budget of $948,500. The project, identified as CSP (Construction Services Project) 27198-00, involves the replacement of underground sanitary sewer lines, storm drainage systems, and grease trap infrastructure at the Ben Taub Hospital facility located at 1504 Ben Taub Loop, Houston, TX 77030. The drawings are 100% construction documents issued on December 3, 2025, prepared by Affiliated Engineers, Inc. in conjunction with Walter P. Moore and Associates, Inc. The project encompasses multiple sheets detailing site demolition, erosion control measures, utility plans, and construction details for MEP (mechanical, electrical, plumbing) work including sanitary sewer lines, storm water management systems, and grease trap modifications.
The construction documents contain comprehensive general notes, grading specifications, sanitary sewer construction requirements, and erosion control plans in compliance with EPA NPDES regulations and City of Houston standards. Key requirements include field verification of all existing utilities prior to construction commencement, contractor responsibility for locating and protecting all underground and overhead facilities, compliance with OSHA excavation and trenching standards, and notification of utility locating services including Texas One Call and Lone Star One Call at least 48 hours before work begins. The contractor is responsible for obtaining all necessary permits, providing traffic control and barricading in accordance with Texas MUTCD standards, maintaining trench safety systems for excavations exceeding specified depths, and preparing as-built drawings documenting any field changes. The project also requires coordination with CenterPoint Energy regarding underground gas facilities and AT&T Texas/SWBT for telecommunications facilities, with non-mechanized excavation procedures mandated within 18 inches of marked utility locations.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Affiliated Engineers, Inc.
20 Greenway Plaza, Suite 410 Houston, Texas 77046 Tel 713.548.8900 Fax 713.548.8901
Affiliated Engineers
Texas Registered Engineering Firm F-8301
Sheet No.
AEI Project No.
Date Drawn By
Sheet Title
Project
Revisions
Scale
MEP
27198-00
AS NOTED
BEN TAUB
UNDERGROUND PIPE
REPLACEMENT
12/03/2025
Issue
100% CONSTRUCTION
DOCUMENTS
12/03/2025
TRUE
NORTH
PLAN
NORTHKEY PLAN
1504 Ben Taub Loop Houston, TX 77030
109860
DANIEL E. FALKENSTINE
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
GENERAL NOTES
C0.0
GENERAL NOTES
1. BOUNDARY AND TOPOGRAPHIC INFORMATION OBTAINED FROM A SURVEY BY
C.L. DAVIS, DATED 05-16-2022.
2. THE PLANS AND SURVEYS UPON WHICH THEY ARE BASED ARE TIED INTO THE
OFFICIAL CITY OF HOUSTON SURVEY SYSTEM IN COMPLIANCE WITH ORDINANCE
NO. 69-1978.
3. NO GEOTECHNICAL INVESTIGATION WAS PERFORMED WITH THIS PROJECT
4. CONTRACTOR IS RESPONSIBLE FOR HIS OWN HORIZONTAL AND VERTICAL
CONTROL, REFERENCE POINTS, AND CONSTRUCTION STAKING AS INCIDENTAL
TO THE PROJECT.
5. CONTRACTOR TO FIELD VERIFY ALL BOUNDARY AND TOPOGRAPHIC
INFORMATION PRIOR TO BEGINNING WORK.
6. EXISTING UTILITIES ARE SHOWN IN AN APPROXIMATE LOCATION BASED ON
AVAILABLE INFORMATION. CONTRACTOR TO FIELD VERIFY LOCATION OF ANY
EXISTING UTILITIES AND OTHER FACILITIES BEFORE COMMENCING WORK.
CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES
WHICH MIGHT OCCUR BY HIS FAILURE TO LOCATE AND PRESERVE ANY AND ALL
EXISTING FACILITIES. CONTRACTOR SHALL INFORM THE ENGINEER OF ANY
DISCREPANCY IN FLOWLINES, LID AND GRATE ELEVATIONS PRIOR TO
CONSTRUCTION.
7. THE LENGTHS OF PROPOSED UNDERGROUND UTILITY LINES SHOWN ARE
APPROXIMATE ONLY. LENGTHS OF LINES MAY VARY DUE TO FIELD CONDITIONS
ENCOUNTERED AT THE TIME OF CONSTRUCTION. CONTRACTOR SHALL PROVIDE
ALL LABOR AND MATERIALS NECESSARY FOR UTILITY LINES TO SERVE THEIR
INTENDED PURPOSE AND SHALL BE RESPONSIBLE FOR THE REROUTING OF LINES
WHICH MAY CONFLICT WITH OTHER UTILITIES AND SITE FEATURES.
8. WATER METERS, UTILITY LINES AND APPURTENANCES, DRIVEWAYS, AND ALL
OTHER ITEMS TO BE LOCATED WITHIN THE STREET RIGHT-OF-WAY OR A PUBLIC
EASEMENT, ARE TO BE CONSTRUCTED IN STRICT ACCORDANCE WITH CURRENT
GOVERNING CITY, COUNTY, AND STATE STANDARDS.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY
BUILDING PERMITS AND FOR NOTIFICATION OF ALL AUTHORIZED INSPECTORS,
SUPERINTENDENTS, OR PERSONS IN CHARGE OF PRIVATE OR PUBLIC UTILITIES
AFFECTED BY HIS OPERATIONS, PRIOR TO COMMENCEMENT OF WORK.
10. CONTRACTOR SHALL NOTIFY TEXAS ONE CALL BY TELEPHONE AT 713-223-4567
OR 1-800-245-4545, LONE STAR ONE CALL AT 1-800-669-8344, AND CITY OF
HOUSTON PUBLIC WORKS CIVIL CONSTRUCTION SECTION BY TELEPHONE AT
832-395-2511, AT LEAST TWO FULL WORKING DAYS BEFORE STARTING WORK IN
ANY STREET RIGHT-OF-WAY OR PUBLIC EASEMENTS.
11. CONTRACTOR TO BE RESPONSIBLE FOR PROVIDING AND MAINTAINING ALL
BARRICADES, WARNING SIGNS, FLASHING LIGHTS, AND TRAFFIC CONTROL
DEVICES IN CONFORMANCE WITH PART VI OF THE “TEXAS MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES”, (TEXAS M.U.T.C.D. MOST RECENT
EDITION AS REVISED) DURING CONSTRUCTION.
12. CONTRACTOR SHALL COMPLY WITH O.S.H.A. REGULATIONS AND STATE OF
TEXAS LAW CONCERNING EXCAVATION, TRENCHING ,AND SHORING.
CONTRACTOR TO MAINTAIN TRENCH SAFETY SYSTEM IN ACCORDANCE WITH
O.S.H.A. STANDARDS, 29 CFR, PART 1926 SUBPART P, INCLUDING FINAL RULE
PUBLISHED IN THE FEDERAL REGISTER VOL. 54, NO 209., AND TEXAS
LEGISLATURE UNDER TEXAS HEALTH AND SAFETY CODE ANN., 756.021.
EXCAVATIONS OVER 4 FEET DEEP TO FOLLOW STATE OF TEXAS REQUIREMENTS
WITH REGARDS TO (BUT NOT LIMITED TO) ACCESS STAIRS, LADDERS, RAMPS
WITH NECESSARY BENCHING, AND SLOPING. EXCAVATIONS OVER 5 FEET DEEP
TO BE SHEETED AND PROTECTED (IN ACCORDANCE WITH THE “TRENCH SAFETY
DETAILS” CONTAINED IN THE PLANS) AS REQUIRED BY STATE LAW AND O.S.H.A.
ANY DEVIATION FROM THE METHOD SHOWN IN THE PLANS MUST BE DESIGNED
AND SEALED BY A REGISTERED PROFESSIONAL ENGINEER LICENSED IN THE
STATE OF TEXAS AND IN GOOD STANDING. SAID DESIGN MUST BE FORWARDED
TO THE ENGINEER AND IN HIS HANDS AT LEAST 48 HOURS BEFORE BEGINNING
EXCAVATION OPERATIONS. FAILURE TO COMPLY WITH THE REQUIREMENTS
HEREIN WILL CONSTITUTE AGREEMENT BY THE CONTRACTOR TO BE FULLY
RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY
HIS FAILURE TO COMPLY. ASSUME TYPE “C” SOIL.
13. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT ROOT
SYSTEMS OF SHRUBS, PLANTS, AND TREES ALONG THE AREA OF EXCAVATION.
REFER TO SPECIFICATIONS AND LANDSCAPE ARCHITECT DRAWINGS FOR
FURTHER INSTRUCTIONS ON TREE PROTECTION.
14. IF THE CONSTRUCTION DOES NOT BEGIN WITHIN A YEAR AFTER THE PLANS
HAVE BEEN SIGNED, NEW SIGNATURES MUST BE OBTAINED AND LETTERS OF
AVAILABILITY MUST BE UPDATED.
15. CONTRACTOR SHALL PREPARE A SET OF “AS-BUILT” DRAWINGS SHOWING ANY
FIELD CHANGES MADE TO THE APPROVED ENGINEERING PLANS AND SUBMIT TO
THE DESIGN CONSULTANT FOR SUBMISSION TO CITY ENGINEER.
16. CONSTRUCT WASTEWATER COLLECTION SYSTEMS, WATER LINES, STORM
DRAINAGE, AND STREET PAVING IN ACCORDANCE WITH THE LATEST EDITION OF
THE PUBLICATIONS STANDARD CONSTRUCTION SPECIFICATIONS FOR
WASTEWATER COLLECTION SYSTEMS, WATER LINES, STORM DRAINAGE, AND
STREET PAVING PUBLISHED BY THE CITY OF HOUSTON, HOUSTON PUBLIC
WORKS.
17. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGES TO EXISTING WATER,
WASTEWATER, STORM WATER LINES, AND TRAFFIC CONTROL DEVICES.
DAMAGE SHALL BE REPAIRED IN ACCORDANCE WITH THE CITY OF HOUSTON,
HOUSTON PUBLIC WORKS'S STANDARD CONSTRUCTION SPECIFICATIONS FOR
WASTEWATER COLLECTION SYSTEMS, WATER LINES, STORM DRAINAGE, AND
STREET PAVING AND STANDARD CONSTRUCTION DETAILS FOR WASTEWATER
COLLECTION SYSTEMS, WATER LINES, STORM DRAINAGE, AND STREET PAVING,
REFERENCED ABOVE, AT NO ADDITIONAL COST.
18. CONTRACTOR SHALL NOTIFY THE OFFICE OF THE CITY ENGINEER, HOUSTON
PUBLIC WORKS AT 832-394-9098, OR VIA FAX AT 832-395-4424, FOR INSPECTION
AT LEAST 48 HOURS PRIOR TO COMMENCING CONSTRUCTION.
GENERAL GRADING NOTES
1. PRIOR TO ANY GRADING OPERATIONS, THE CONTRACTOR SHALL OBTAIN ANY
APPLICABLE GRADING AND OTHER ASSOCIATED PERMITS.
2. ALL GRADING SHALL CONFORM TO THESE CONSTRUCTION DOCUMENTS, ANY
CONSTRUCTION RECOMMENDATIONS BY THE PROJECT GEOTECHNICAL
ENGINEER, THE CONDITIONS OF THE APPROVAL, AND THE PERMIT CONDITIONS.
3. THE PROJECT GEOTECHNICAL ENGINEER SHALL PROVIDE OBSERVATION AND
TESTING DURING GRADING OPERATIONS IN THE FIELD. SOIL TESTS SHALL BE
CONDUCTED IN ACCORDANCE WITH THE SPECIFICATIONS.
4. AREAS TO BE GRADED SHALL BE CLEARED OF ALL VEGETATION, INCLUDING
ROOTS AND ROOT STRUCTURES, AND OTHER UNSUITABLE MATERIAL FOR FILL,
THEN SCARIFIED TO A DEPTH OF 6 INCHES PRIOR TO PLACING ANY FILL. ALL
UNSUITABLE MATERIAL SHALL BE REMOVED FROM THE PROJECT SITE AND
TRANSPORTED TO A SUITABLE DISPOSAL AREA PRIOR TO PLACING ANY FILL
MATERIAL. THE AREA SHALL BE INSPECTED BY THE PUBLIC WORKS INSPECTOR
(ALLOW 48-HOUR MINIMUM ADVANCED NOTICE). DISPOSAL MUST BE IN
ACCORDANCE WITH LOCAL, STATE, AND FEDERAL GUIDELINES AT NO
ADDITIONAL COST TO THE OWNER.
5. AREAS WITH EXISTING SLOPES WHICH ARE TO RECEIVE FILL MATERIAL SHALL BE
KEYED AND BENCHED. THE DESIGN AND INSTALLATION OF THE KEYWAY SHALL
BE PER THE DETAILS PROVIDED IN THESE PLANS, AS MODIFIED BY THE
GEOTECHNICAL ENGINEER.
6. FILL MATERIAL SHALL BE PLACED IN LIFTS PER THE SPECIFICATIONS AND
GEOTECHNICAL REPORT. ANY DISCREPANCY BETWEEN THE SPECIFICATIONS AND
GEOTECHNICAL REPORT MUST BE BROUGHT TO THE ENGINEER'S ATTENTION
PRIOR TO START OF CONSTRUCTION.
7. ALL AREAS RECEIVING FILL SHALL BE STABILIZED IN ACCORDANCE WITH THE
PROJECT SPECIFICATIONS.
8. ALL TREES TO REMAIN ON SITE SHALL BE PROTECTED FROM DAMAGE BY
TEMPORARY FENCING AROUND THE DRIP LINE DURING GRADING OPERATION.
REFER TO LANDSCAPE ARCHITECT DRAWINGS AND SPECIFICATIONS FOR TREE
PROTECTION REQUIREMENTS.
9. PRIOR TO PLACEMENT OF COMPACTED FILL, LOOSE SOILS SHALL BE
COMPLETELY REMOVED DOWN TO COMPETENT MATERIAL AS APPROVED BY
THE GEOTECHNICAL ENGINEER. OVER-EXCAVATION AND RECOMPACTION
ACTIVITIES SHALL BE COORDINATED WITH THE GEOTECHNICAL ENGINEER.
10. ALL GEOTECHNICAL EXPLORATORY TRENCHES, BORINGS, OR OTHER
SUBSURFACE EXCAVATIONS LOCATED WITHIN THE BUILDING ENVELOPE, SHALL
BE LOCATED AND PROPERLY BACKFILLED WITH FILL MATERIAL HOMOGENEOUS
TO THE SURROUNDING SOIL.
11. STONES LARGER THAN 6 INCHES IN DIAMETER SHALL NOT BE PLACED IN THE
FILL. STONES LESS THAN 6 INCHES IN DIAMETER SHALL BE THOROUGHLY MIXED
WITH THE SOIL IN SUCH A MANNER THAT NO VOIDS ARE CREATED IN THE FILL.
STONES LARGER THAN 3 INCHES IN DIAMETER SHALL NOT BE PLACED IN THE
UPPER THREE FEET OF FILL.
12. EARTH MOVING AND WORKING OPERATION SHALL BE CONTROLLED TO
PREVENT WATER FROM RUNNING INTO THE EXCAVATED AREAS. EXCESS WATER
SHALL BE PROMPTLY REMOVED AND THE SITE KEPT DRY. FILL MATERIAL SHALL
NOT BE PLACED, SPREAD, OR ROLLED DURING UNFAVORABLE WEATHER
CONDITIONS. WHEN THE WORK IS INTERRUPTED BY HEAVY RAIN, FILL
OPERATIONS SHALL NOT RESUME UNTIL FIELD TEST BY THE SOIL ENGINEER
INDICATES THAT THE MOISTURE CONTENT AND DENSITY OF THE FILL ARE ABLE
TO BE PLACED AND MEET THE REQUIRED COMPACTION.
13. FILL MATERIAL SHALL NOT BE PLACED IF NOT WITHIN PROPER MOISTURE
REQUIREMENTS PER THE SPECIFICATIONS.
14. IMPORT OR ON-SITE SOILS USED IN FILL OPERATION SHALL BE FREE FROM
ORGANIC MATERIAL OR OTHER DELETERIOUS MATERIALS.
15. FINAL GRADES AS SHOWN ON THE PLANS ARE FINAL ELEVATIONS REGARDLESS
OF SURFACE MATERIALS (SOD, MULCH, PAVEMENT, SIDEWALK, LANDSCAPING,
SOFTSCAPE, HARDSCAPE, ETC.). ENSURE ROUGH AND FINE GRADING
OPERATIONS TO ACCOUNT FOR SURFACE MATERIAL THICKNESS.
SANITARY SEWER CONSTRUCTION NOTES (GRAVITY)
1. CONTRACTOR SHALL PROVIDE SHEETING, SHORING, AND BRACING AS
NECESSARY IN COMPLIANCE WITH O.S.H.A. REGULATIONS AND STATE OF TEXAS
LAW CONCERNING EXCAVATION, TRENCHING, AND SHORING TO PROTECT
WORKMEN AND EXISTING UTILITIES DURING ALL PHASES OF CONSTRUCTION.
2. WHERE MANHOLES ARE LOCATED WITHIN HARDSCAPE OR PAVEMENT AREAS,
CONTRACTOR SHALL SET RIM ELEVATIONS TO MATCH TOP OF PAVEMENT
ELEVATIONS. WITHIN LANDSCAPED OR SOFTSCAPE AREAS, SET MANHOLE RIMS
THREE (3) INCHES (MIN.) TO SIX (6) INCHES (MAX.) ABOVE FINISHED GRADE.
ADD SLOPED FILL AROUND MANHOLE RIMS, SLOPED AWAY AND DOWN FROM
MANHOLE RIMS.
3. WHEREVER NEW SANITARY SEWER LINES PARALLEL WATER LINES WITH LESS
THAN NINE (9) FEET OF HORIZONTAL SEPARATION, THE SANITARY LINE SHALL BE
CONSTRUCTED OF DUCTILE IRON PIPE (DIP) OR PVC PIPE PRESSURE RATED TO
150 PSI (PIPE AND JOINTS), CONSTRUCTED WITH NO LESS THAN FOUR (4) FEET
HORIZONTAL SEPARATION, WITH TWO (2) FEET OF VERTICAL SEPARATION
BETWEEN OUTSIDE DIAMETER OF THE WASTEWATER AND WATER LINES. IN NO
WAY SHALL THE WASTEWATER LINE RUN ABOVE THE WATERLINE.
4. WHEREVER NEW SANITARY LINES CROSS WATERLINES WITH LESS THAN TWO (2)
FEET OF VERTICAL SEPARATION, SANITARY LINES SHALL BE CONSTRUCTED OF
DUCTILE IRON OR PVC PRESSURE RATED TO 150 PSI (PIPE AND JOINTS).
SANITARY LINE MUST CROSS UNDER WATERLINE WITH NO LESS THAN SIX (6)
INCHES OF VERTICAL CLEARANCE BETWEEN OUTSIDE DIAMETERS OF PIPES.
5. CONTRACTOR TO ALLOW A MINIMUM OF ONE (1) FOOT VERTICAL CLEARANCE
BETWEEN PROPOSED SANITARY SEWER LINE AND OTHER EXISTING OR
PROPOSED UTILITIES WITH THE EXCEPTION OF WATERLINES AS STATED IN NOTE
ABOVE.
6. IN EVERY CASE WHERE TRENCHES HAVE BEEN EXCAVATED BELOW THE
SPECIFIED DEPTH FOR REQUIRED BEDDING, THE PIPE'S BEDDING SHALL START
AT THE BOTTOM OF SAID EXCAVATION.
7. SANITARY SEWER PIPE TO BE POLYVINYL CHLORIDE PIPE (PVC) CONFORMING TO
ASTM D3034, ASTM F 679 SDR35/PS 115 OR PS 46, C900 DR 18 OR DUCTILE IRON
PIPE (DIP) CONFORMING TO ANSI A21.51 THICKNESS CLASS 52 EXCEPT AS
OTHERWISE NOTED ON THE PLANS. DUCTILE IRON PIPE (DIP) SHALL BE
MINIMUM THICKNESS CLASS 52. THE PRESSURE RATING FOR BOTH THE PIPE
AND THE JOINTS SHALL BE 150 PSI OR GREATER.
8. SANITARY LINE'S PROPOSED ROAD BORE CONNECTION WORK IS NOT TO BE
ACCEPTED UNTIL THE ON-SITE PRIVATE SANITARY SEWER MANHOLE IS BUILT.
SAID PRIVATE ON-SITE MANHOLE ALSO REQUIRES AN ON-SITE PLUMBING
PERMIT FOR ITS CONSTRUCTION.
12 ALL NON-PUBLIC ON-SITE WASTEWATER PLUMBING WORK IS SUBJECT TO CODE
ENFORCEMENT'S REVIEW, REQUIREMENTS, PERMITTING, INSPECTION, AND
APPROVAL, IN THE APPROPRIATE ORDER.
13. CONTRACTOR TO VERITY ELEVATIONS OF EXISTING GRAVITY SEWER LINES
SHOWN ON DRAWINGS PRIOR TO START OF CONSTRUCTION OR PURCHASE OF
MATERIALS. DISCREPANCIES BETWEEN SURVEY INFORMATION OF EXISTING
SEWER LINES AND WHAT IS FOUND IN THE FIELD MUST BE BROUGHT TO
ENGINEER'S ATTENTION FOR POSSIBLE REDESIGN.
14. CONTRACTOR SHALL UNCOVER EXISTING UTILITIES AT ALL “POINTS OF
CROSSING” TO DETERMINE IF CONFLICT EXISTS BEFORE COMMENCING ANY
CONSTRUCTION. NOTIFY THE ENGINEER AT ONCE OF ANY CONFLICT FOR
POSSIBLE REDESIGN.
15. CONTRACTOR SHALL CONSTRUCT ALL GRAVITY SEWER LINES STARTING AT THE
OUTFALL POINT OR AT THE ULTIMATE POINT OF CONNECTION TO THE
SERVICING LINE AND THEN CONTINUE CONSTRUCTING UPSTREAM.
16. LENGTHS OF SANITARY SEWER PIPE IN PROFILES ARE BASED ON STRAIGHT
CENTER LINE SEWER LINE LENGTHS BETWEEN MANHOLE'S VERTICAL CENTER
LINES. FLOWLINE ELEVATIONS ARE BASED ON CENTER LINE LENGTHS BETWEEN
MANHOLES' VERTICAL CENTER LINES.
17. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, MAINTAINING, AND
RESTORING ALL AFFECTED DRAINAGE SYSTEMS.
EROSION CONTROL PLAN CONSTRUCTION NOTES
1. CONTRACTOR TO FURNISH SWPPP PER TCEQ REQUIREMENTS. THE EROSION
CONTROL PLAN AS CONTAINED IN THE DRAWING SET CAN BE USED IN THE
STORM WATER POLLUTION PREVENTION PLAN.
2. CONTRACTOR SHALL IMPLEMENT INLET PROTECTION DEVISES, REINFORCED
FILTER FABRIC BARRIER, STABILIZED CONSTRUCTION ENTRANCES AND OTHER
STORM WATER POLLUTION PREVENTION MEASURES AT LOCATIONS SHOWN ON
THE PLAN(S) TO KEEP SILT AND/OR EXCAVATED MATERIALS FROM ENTERING
THE STORM WATER INLETS AND DITCHES, EVENTUALLY POLLUTING THE
RECEIVING STORM SYSTEM. NO HAY BALES WILL BE ALLOWED.
3. DURING THE EXCAVATION/FILL PHASE OF THE PROJECT, CONTRACTOR SHALL
SCHEDULE THE WORK IN APPROPRIATE SEGMENTS SO THAT EXCESS MATERIAL
CAN BE QUICKLY HAULED AWAY PREVENTING IT FROM STAYING UNCOLLECTED
ON THE EXISTING PAVEMENT. ANY LOOSE EXCAVATED MATERIAL WHICH FALLS
ON PAVEMENT OR DRIVEWAYS SHALL BE REMOVED APPROPRIATELY.
4. CONTRACTOR SHALL CLEAN UP THE EXISTING STREET INTERSECTIONS AND
DRIVEWAYS DAILY AND ADDITIONALLY AS NECESSARY TO REMOVE EXCESS
MUD, SOIL, SILT OR ROCK TRACKED FROM THE EXCAVATED AREA.
5. CONTRACTOR SHALL FOLLOW GOOD HOUSEKEEPING PRACTICES DURING THE
CONSTRUCTION OF THE PROJECT, ALWAYS CLEANING UP DIRT AND LOOSE
MATERIAL AS CONSTRUCTION PROGRESSES.
6. CONTRACTOR TO INSPECT AND MAINTAIN THE AREAS LISTED BELOW AT LEAST
ONCE EVERY 14 CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A
STORM EVENT OF 0.5 INCHES OR GREATER.
A. DISTURBED AREAS OF THE CONSTRUCTION SITE THAT HAVE NOT BEEN
FINALLY STABILIZED
B. AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO
PRECIPITATION
C. STRUCTURAL CONTROL MEASURES
D. LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE
7. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING EXISTING DITCHES
AND/OR CULVERTS FOR UNOBSTRUCTED DRAINAGE AT ALL TIMES. WHERE
SODDING IS DISTURBED BY EXCAVATION ON BACKFILLING OPERATIONS, SUCH
AREAS SHALL BE REPLACED BY SEEDING OR SODDING. SLOPES STEEPER THAN
4:1 SHALL BE REPLACED BY BLOCK SODDING. SLOPES STEEPER THAN 3:1 SHALL
BE STABILIZED WITH PLANT MATERIALS NOT REQUIRING MOWING FOR
MAINTENANCE AND/OR GEOTEXTILE FABRICS AS REQUIRED IN THE PLANS AND
SPECIFICATIONS.
CAUTION: UNDERGROUND GAS FACILITIES
THE CONTRACTOR SHALL CONTACT THE UTILITY COORDINATING COMMITTEE AT
1-800-545-6005 OR 811 A MINIMUM OF 48 HOURS PRIOR TO CONSTRUCTION TO
HAVE MAIN AND SERVICE LINES FIELD LOCATED.
· WHEN CENTERPOINT ENERGY PIPELINE MARKINGS ARE NOT VISIBLE, CALL
(713) 207-5463 OR (713) 945-8037 (7:00 A.M. to 4:30 P.M.) FOR STATUS OF LINE
LOCATION REQUEST BEFORE EXCAVATION BEGINS.
· WHEN EXCAVATING WITHIN EIGHTEEN INCHES (18”) OF THE INDICATED
LOCATION OF CENTERPOINT ENERGY FACILITIES, ALL EXCAVATION MUST BE
ACCOMPLISHED USING NON-MECHANIZED EXCAVATION PROCEDURES.
· WHEN CENTERPOINT ENERGY FACILITIES ARE EXPOSED, SUFFICIENT SUPPORT
MUST BE PROVIDED TO THE FACILITIES TO PREVENT EXCESSIVE STRESS ON THE
PIPING.
· FOR EMERGENCIES REGARDING GAS LINES CALL (713) 659-2111 OR (713)
207-4200.
THE CONTRACTOR IS FULLY RESPONSIBLE FOR ANY DAMAGES CAUSED BY HIS
FAILURE TO EXACTLY LOCATE AND PRESERVE THESE UNDERGROUND FACILITIES.
WARNING: OVERHEAD ELECTRICAL LINES
OVERHEAD LINES MAY EXIST ON THE PROPERTY. THE LOCATION OF OVERHEAD
LINES HAS NOT BEEN SHOWN ON THESE DRAWINGS AS THE LINES ARE CLEARLY
VISIBLE, BUT YOU SHOULD LOCATE THEM PRIOR TO BEGINNING ANY
CONSTRUCTION. TEXAS LAW, SECTION 752, HEALTH & SAFETY CODE FORBIDS
ACTIVITIES THAT OCCUR IN CLOSE PROXIMITY TO HIGH VOLTAGE LINES,
SPECIFICALLY:
· ANY ACTIVITY WHERE PERSONS OR THINGS MAY COME WITHIN SIX (6) FEET OF
LIVE OVERHEAD HIGH VOLTAGE LINES; AND
· OPERATING A CRANE, DERRICK, POWER SHOVEL, DRILLING RIG, PILE DRIVER,
HOISTING EQUIPMENT, OR SIMILAR APPARATUS WITHIN 10 FEET OF LIVE
OVERHEAD HIGH VOLTAGE LINES.
PARTIES RESPONSIBLE FOR THE WORK, INCLUDING CONTRACTORS, ARE LEGALLY
RESPONSIBLE FOR THE SAFETY OF CONSTRUCTION WORKERS UNDER THIS LAW.
THIS LAW CARRIES BOTH CRIMINAL AND CIVIL LIABILITY. TO ARRANGE FOR LINES
TO BE TURNED OFF OR REMOVED CALL CENTERPOINT ENERGY AT 713-207-2222.
ACTIVITIES ON OR ACROSS CENTERPOINT ENERGY FEE OR EASEMENT PROPERTY
NO APPROVAL TO USE, CROSS, OR OCCUPY CENTERPOINT FEE OR EASEMENT
PROPERTY IS GIVEN. IF YOU NEED TO USE CENTERPOINT PROPERTY, PLEASE
CONTACT OUR SURVEYING & RIGHT OF WAY DIVISION AT 713-207-6348 OR
713-207-5769.
WARNING: UNDERGROUND ELECTRICAL UTILITIES
THE CONTRACTOR SHALL CONTACT THE UTILITY COORDINATING COMMITTEE AT
1-800-545-6005 OR 811 A MINIMUM OF 48 HOURS PRIOR TO CONSTRUCTION TO
HAVE MAIN AND SERVICE LINES FIELD LOCATED.
· ALL INFORMATION CONCERNING TYPE AND LOCATION OF UNDERGROUND
UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE
CONTRACTORS ARE RESPONSIBLE FOR MAKING THEIR OWN DETERMINATION
AS TO TYPE AND LOCATION OF UNDERGROUND UTILITIES AS MAY BE
NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL VERIFY
LOCATION OF UNDERGROUND PIPELINES, CONDUITS, AND STRUCTURES BY
CONTACTING OWNERS OF UNDERGROUND UTILITIES OR BY EXCAVATING IN
ADVANCE OF CONSTRUCTION.
· THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXACT LOCATION
OF ALL UTILITIES WHEN AND WHERE THE FALL IN THE PATH OF
CONSTRUCTION.
· THE CONTRACTOR IS ALSO RESPONSIBLE FOR CONTACTING THE UTILITY
COORDINATING COMMITTEE AT (713) 223-4567, AND TEXAS ONE CALL AT
1-800-245-4545, FORTY-EIGHT (48) HOURS PRIOR TO ANY CONSTRUCTION.
· THE LOCATION OF ANY CENTERPOINT ENERGY UTILITIES ARE SHOWN IN AN
APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION BEFORE COMMENCING WORK. THEY AGREE TO BE FULLY
RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY
THIS FAILURE TO EXACTLY LOCATE AND PRESERVE THESE UNDERGROUND
UTILITIES.
· ALL PROPOSED FACILITIES SHALL MAINTAIN TWELVE INCHES (12") CLEAR FROM
ALL EXISTING UTILITIES.
WARNING: AT&T TEXAS/SWBT FACILITIES
1. THE LOCATIONS OF AT&T TEXAS/SWBT FACILITIES ARE SHOWN IN AN
APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION BEFORE COMMENCING WORK. HE AGREES TO BE FULLY RESPONSIBLE
FOR ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THIS FAILURE TO
EXACTLY LOCATE AND PRESERVE THESE UNDERGROUND UTILITIES.
2. THE CONTRACTOR SHALL CALL 1-800-344-8377 (TEXAS 811) A MINIMUM OF 48
HOURS PRIOR TO CONSTRUCTION TO HAVE UNDERGROUND LINES FIELD
LOCATED.
3. WHEN EXCAVATING WITHIN EIGHTEEN INCHES (18") OF THE INDICATED
LOCATION OF AT&T TEXAS/ SWBT FACILITIES, ALL EXCAVATIONS MUST BE
ACCOMPLISHED USING NON-MECHANIZED EXCAVATION PROCEDURES. WHEN
BORING, THE CONTRACTOR SHALL EXPOSE THE AT&T TEXAS/SWBT FACILITIES.
4. WHEN AT&T TEXAS/SWBT FACILITIES ARE EXPOSED, THE CONTRACTOR WILL
PROVIDE SUPPORT TO PREVENT DAMAGE TO THE CONDUIT DUCTS OR CABLES.
WHEN EXCAVATING NEAR TELEPHONE POLES THE CONTRACTOR SHALL BRACE
THE POLE FOR SUPPORT.
5. THE PRESENCE OR ABSENCE OF AT&T TEXAS/SWBT UNDERGROUND CONDUIT
FACILITIES OR BURIED CABLE FACILITIES SHOWN ON THESE PLANS DOES NOT
MEAN THAT THERE ARE NO DIRECT BURIED CABLES OR OTHER CABLES IN
CONDUIT IN THE AREA.
6. PLEASE CONTACT THE AT&T TEXAS DAMAGE PREVENTION MANAGER, KEVIN
RAY, AT (713) 614-1983 OR EMAIL HIM AT kr7896@att.com IF CABLE LOCATE
REQUESTS ARE NOT COMPLETED FOR OUR AT&T TEXAS/SWBT FACILITIES.
12/03/2025
EASEMENT No. 1
10' WATER MAIN EASEMENT
(VOL. 1952, PG. 79 H.C.D.R.)
4A
TC43.30
TC41.66
G42.80
G41.18
43.73
43.87
41.7441.54
SS
C/O
METAL
SIGN
12"STM
"S
TM
18"STM.(P.P.)
18"SAN 18"SAN
18"SAN
CM
CM
CM
CM
CM
CM
CM
TC40.94
G40.44 41.09
(2)IRV
COV'D CONC
20"O
19"O
ENTRY ELEVATION
43.95
6.
8'
.3
25.4'
MULTI STORY
BRICK BLDG
BEN TAUB
CONC
.5
GRATE INLET
TOP 40.16
4"(NE)39.51
SS
W W W W W W
(SEE NOTE A)
4"STM
6"STM
CALLED 11.4361 ACRES
UNDIVIDED ONE-HALF INTEREST
CITY OF HOUSTON
TO
HARRIS COUNTY HOSPITAL DISTRICT
(C-348902 057-31-1488)
12-31-1965
CALLED 11.4361 ACRES
UNDIVIDED ONE-HALF INTEREST
HARRIS COUNTY, TEXAS
TO
HARRIS COUNTY HOSPITAL DISTRICT
(C-348906 057-32-0052)
05-30-1966
RESIDUE
G.H. HERMANN
TO
CITY OF HOUSTON
(VOL. 327, PG. 146 H.C.D.R.)
05-30-1914
15"SAN
"S
TM
24.96
24.98
BASEMENT
FLOOR ELEV.
24.96
BASEMENT
FLOOR ELEV.
BASEMENT
FLOOR ELEV.
44.00
ENTRY ELEV.
BASEMENT WALL
(3)BOL
BA
SE
M
EN
T W
AL
L
STAIR
WELL
2020-16
2020-17
2020-18
2020-19
CONC
2020-20
2020-21
15"
2020-25
EB
STORAGE/OFFICE
HA
LL
W
AY
KITCHEN
LO
CK
ER
R
O O
M
BA
TH
RO
O
M /S
TO
RA
GE
HA
LL
W
AY
HALLWAY
WALK IN FREEZER
OFFICE/STORAGE
HALLWAY
HA
LL
W
AY
CM
COV'D CONC
BE
N
T
AU
B
LO
O P
CO
N
CR
ET
E
PA
VE
M
EN
T
W /C
U
RB
G
U
TT
ER
AREA WITHIN
CLOUD UPDATED
JANUARY 2021
40.9440.94 40.88
40.91 40.99
41.16
41.44
42.52
41.70
42.88
42.23
41.94
43.62
43.52
43.45 42.77
40.99
40.93
40.72 40.64 40.48
40.91 40.95
40.78 40.55
41.07
.8
43.32
G40.68
G40.38
G41.64
G41.48 G42.31
G42.64
G41.98 G42.26
G41.79
G42.09
G42.37
G42.23 G42.00
G41.61
G41.76
G41.62
G41.32
G39.54
40.87
40.71
40.77 41.19
41.54
43.21
40.73 40.90
40.94
40.94
42.65
43.43
43.45
40.80
40.72
40.88
40.89
40.94
40.84
40.87
40.92
40.86 40.98
41.00
41.00
40.90 41.07 40.99 41.01
40.99
40.9540.90
40.93
41.00
41.10
41.06 40.71
40.96
41.1941.13
40.73
40.79 40.85
41.41
TC41.15
TC40.86
TC40.80
TC42.41
TC42.04
TC41.85
TC41.94
TC42.74
TC43.14
TC42.48
TC42.60
TC42.88
TC42.30
TC42.88
TC42.78
TC42.51
TC42.13
TC41.86
TC41.91
TC42.29
TC42.15
X X
X
X
X X
X
XXX
X X
X X
X
X
X
X
X X X X X X
X X X X
X X
X
X X
X
(3)C/O
CHAIN LINK
CH
AI
N L
IN
K
FE
N
CE
CH
AI
N L
IN
K
FE
N
CE
LAY DOWN
YARD
CM
(3)TRUNK TR
CM
10",10",10"
PLANTER
EB
WV
FH
(2)BOL
SHRUB
SHRUB
BU
S
ST
O
P
BU
S
ST
O
P
AL
SN
C/O
CM
PLANTER
CM
PLANTER
PLANTER
GRASS
GRASS
GRASS
CONCRETE SIDEWALK
CONCRETE
CO
N
C
HE
DG
E
GRASS
GRASS
CONC
CO
N
CR
ET
E
CONCRETE
CONC
IRV
AIR
VENT
ELEC.
TRAN.
(2)EB
BREAKER
BOX
ELEC.
TRAN.
IRV
IRV
IRV
IRV
CM
(4)CM
CM
28"P
24"P
2"RSR
CO
N
CR
ET
E
SHRUB SHRUB
EB
AL
17"O
20"O
24"P
TSB
CHAIN LINK FENCE CHAIN LINK FENCE
X X
X
X X
X
GRASS
COL
COL
COLCOL
IRV
SHRUB
TENT ON
133-3 133-4
133-5
133-6
133-7
133-8
133-9
133-10
133-11
133-12
133-13
133-14
DETAIL NO. 133-1
FIELD NO. 4130
SANITARY MH
TOP MH 40.41
18"(SW)27.63
18"(NW)27.57
DETAIL No. 133-2 FIELD No. 4027
BB-INLET
TC 40.39
G 39.76
6"(SE)38.76
12"(NW)36.71
DETAIL No. 133-3 FIELD No. 4059
SANITARY MH
TOP MH 41.39
18"(E&W)27.84
15"(SE)28.88
15"(S)36.11
DETAIL No. 133-4 FIELD No. 4053
GRATE INLET
TOP 41.47
Note:UNABLE TO
DETAIL/COVERED WITH
DEBRIS
DETAIL No. 133-5 FIELD No. 4056
STORM MH
TOP MH 42.26
18"(SE)33.40
15"(SW)37.56
12"(NW)34.98
DETAIL No. 133-6 FIELD No. 4077
SANITARY MH
TOP MH 42.16
10"(SE)37.46
10"(NW)37.44
DETAIL No. 133-7 FIELD No. 4096
GREASE TRAP
TOP MH 43.46
BOT 12.71
DETAIL No. 133-8 FIELD No. 40.95
GREASE TRAP
TOP MH 43.47
BOT 12.72
DETAIL No. 133-9 FIELD No. 4094
GREASE TRAP
TOP MH 43.45
BOT 12.70
DETAIL No. 133-10 FIELD No. 4166
GREASE TRAP
TOP MH 43.53
BOT 12.78
DETAIL No. 133-11 FIELD No. 4175
STORM MH
TOP MH 41.99
48"(SE)34.27
12"(NW)36.36
DETAIL No. 133-12 FIELD No. 4183
SANITARY MH
TOP MH 42.17
18"(SE)27.33
18"(NW)27.39
DETAIL No. 133-13 FIELD No. 4182
STORM MH
TOP MH 41.93
4"(SE)39.31
18"(SE)33.79
6"(SW)39.11
18"(NW)33.79
4"(NW)37.47
DETAIL No. 133-14 FIELD No. 4242
GRATE INLET
TOP 41.22
Note:UNABLE TO
DETAIL/COVERED WITH
DEBRIS
DETAIL No. 133-15 FIELD No. 4291
BB-INLET
TC 40.05
G 39.12
18"(NE)36.22
DETAIL No. 133-16 FIELD No. 4321
STORM MH
TOP MH 42.82
24"(SE)33.74
15"(SW)38.65
24"(NW)33.72
DETAIL No. 133-17 FIELD No. 4345
GRATE INLET
TOP 40.59
6"(S)38.77
4"(NW)39.39
DETAIL No. 133-18 FIELD No. 4353
MANHOLE
TOP MH 43.66
BOT 39.66
Note:FULL OF WATER
DETAIL No. 133-20 FIELD No. 4489
STORM MH
TOP MH 42.46
8"(N)40.54
10"(NE)36.42
24"(E)34.18 36"(S)33.40
12"(SW)39.06
size?(NW)33.53 Note:UNABLE TO SEE (NW)
PIPE
DETAIL No. 133-21 FIELD No. 4575
BB-INLET
TC 41.08
G 40.20
24"(NW)35.46
DETAIL No. 133-22 FIELD No. 4499
BB-INLET
TC 41.26
G 40.41
24"(SE)35.28
24"(SW)35.12
DETAIL No. 133-23 FIELD No. 4472
SANITARY MH
TOP MH 42.39
18"(NE)28.04
18"(SW)28.04
10"(W)36.09 10"(W)29.47
DETAIL No. 133-24 FIELD No. 4465
SANITARY MH
TOP MH 41.32
18"(SE)26.94
18"(SW)27.96
18"(NW)26.96
24"STM(P.P.)
48"STM.12"STM.
WOOD DECK
18"SAN
6"
ST
M
4"STM.
10"SAN
10"SAN
W W W W W W W 12"W.L.(P.P.)
W W W W W W W W W W W
12"W.L.(APPROX. LOCATION PER PLAN)
DETAIL No. 133-19 FIELD No. 4519
SANITARY MH
TOP MH 40.63
8"(NE)33.43
8"(SW)33.33
Note:NOT IN USE/NO FLOW
COV'D
CONC
TEMPORARY
WOOD WALL
42.50
43.49
X X X X X
X
TEMPORARY
WOOD WALL
OPEN TO BASEMENT
ENTRY
*ELEV.
43.96
ENTRY
ELEV.
43.96
COVERED
CONCRETE
CONC WALL w/
WROUGHT IRON FENCE
BLDG. OVERHANG
COLCOL
CONC WALL w/
WROUGHT IRON FENCE
STAIRWELL
"A"
STAIRWELL
"B"
DETAIL No. 133-25 FIELD No. 4589
SANITARY MH
TOP MH 41.53
18"(SE)26.64
8"(SW)32.97
18"(NW)26.73
DETAIL No. 133-26 FIELD No. 4590
STORM MH
TOP MH 42.66
10"(N)37.83
30"(SE)33.44
size?(SW)37.75
24"(NW)33.41
6"(NW)39.18
182.7'
9.
9'
67.5'
.2
.5
15.2'WOOD DECK
TENT ON
WOOD DECK
BUILDING FACE/
BUILDING FACE/
FENCE
(2)BOL
PLANTER
4A
DETAIL No. 2020-20 FIELD No. 2196
GRATE INLET
TOP 43.56
4"VERT 40.26
DETAIL No. 2020-21 FIELD No. 2101
STORM MH
TOP MH 42.06
12"(NE)35.80
12"(SE)35.34
12"(W)36.04
12"(NW)37.83
DETAIL No. 2020-15 FIELD No. 2268
GRATE INLET
TOP 43.50
4"VERT 39.05
DETAIL No. 2020-16 FIELD No. 2270
GRATE INLET
TOP 43.58
4"VERT 39.15
DETAIL No. 2020-17 FIELD No. 2258
GRATE INLET
TOP 43.47
4"VERT 39.28
DETAIL No. 2020-18 FIELD No. 2257
GRATE INLET
TOP 43.49
4"VERT 39.38
DETAIL No. 2020-19 FIELD No. 2253
GRATE INLET
TOP 43.45
4"VERT 39.57
DETAIL No. 2020-7 FIELD No. 2252
GRATE INLET
TOP 43.44
6"(NE)39.55
4"(SE)39.57
DETAIL No. 2020-8 FIELD No. 2256
GRATE INLET
TOP 43.17
10"(NE)39.31
4"(SE)39.42
6"(SW)39.32
MULTI STORY
BRICK BLDG
BEN TAUB
STM MH(P.P.) STM MH(P.P.)
SAN MH(P.P.)
XXX
XXXXX
X X
X X X X
RFB
RFB
(TYP)
1 (TYP)
5 2
(TYP)
Affiliated Engineers, Inc.
20 Greenway Plaza, Suite 410 Houston, Texas 77046 Tel 713.548.8900 Fax 713.548.8901
Affiliated Engineers
Texas Registered Engineering Firm F-8301
Sheet No.
AEI Project No.
Date Drawn By
Sheet Title
Project
Revisions
Scale
MEP
27198-00
AS NOTED
BEN TAUB
UNDERGROUND PIPE
REPLACEMENT
12/03/2025
Issue
100% CONSTRUCTION
DOCUMENTS
12/03/2025
TRUE
NORTH
PLAN
NORTHKEY PLAN
1504 Ben Taub Loop Houston, TX 77030
109860
DANIEL E. FALKENSTINE
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
LEGEND
REINFORCED FILTER FABRIC BARRIER
INLET PROTECTION BARRIER
DROP INLET BASKET
STABILIZED CONSTRUCTION EXIT
PORTABLE SEDIMENT TANKST
SC
DIB
RFB
IPB
NOTES:
1. ALL AFFECTED INLETS SHALL BE PROTECTED BEFORE
CONSTRUCTION ACTIVITIES BEGIN.
2. SEDIMENT AND EROSION CONTROLS INCLUDING
NON-STORMWATER DISCHARGES SHALL BE AS PER
THE SPECIFICATIONS.
EROSION CONTROL NOTES
1. THIS PROJECT IS SUBJECT TO ENVIRONMENTAL PROTECTION
AGENCY (EPA) NATIONAL POLLUTION DISCHARGE ELIMINATIONAL
SYSTEM (NPDES) CONSTRUCTION STORM WATER DISCHARGE
REGULATIONS AND REQUIREMENTS. THE CONTRACTOR WILL BE
REQUIRED TO EXECUTE A NOTICE OF INTENT AND IMPLEMENT
THE POLLUTION PREVENTION PLAN INCLUDED IN THE CONTRACT
DOCUMENTS AND COMPLY WITH ALL REPORTING AND
INSPECTION REQUIREMENTS SET FORTH IN THE NPDES
REGULATIONS.
2. REINFORCED SILT FENCES AND INLET PROTECTION TO BE
PROVIDED DURING CONSTRUCTION OF THIS PROJECT, AND
REMOVED UPON CONSTRUCTION COMPLETION (SEE SPECS. AND
DETAILS).
3. CONTRACTOR TO PROVIDE STABILIZED CONSTRUCTION EXIT PER
DETAIL AT ALL POINTS OF EGRESS DURING CONSTRUCTION.
4. PRIOR TO REMOVAL OF EROSION CONTROL DEVICES, ALL AREAS
DISTURBED ARE TO BE HYDRO-MULCH SEEDED.
Key Notes:
PROTECT IN PLACE EXISTING UTILITY
CONTRACTOR TO PROTECT EXISTING PAVEMENT AND TO REPLACE
DAMAGED PAVEMENT TO ORIGINAL CONDITIONS
PROTECT IN PLACE EXISTING CURB
REMOVE AND REPLACE EXISTING UTILITY4
EXISTING GREASE TRAP TO BE PROTECTED IN PLACE. REFER TO
PLUMBING PLANS FOR RECONNECTION TO GREASE TRAP5
REMOVE AND REPLACE LANDSCAPING6
RE: PLUMBING DRAWINGS FOR RECONNECTION TO VENT7
CIVIL SITE DEMOLITION
AND SWPPP
C1.0
EASEMENT No. 1
10' WATER MAIN EASEMENT
(VOL. 1952, PG. 79 H.C.D.R.)
4A
TC43.30
TC41.66
G42.80
G41.18
43.73
43.87
41.7441.54
SS
C/O
METAL
SIGN
12"STM
"S
TM
18"STM.(P.P.)
18"SAN 18"SAN
18"SAN
CM
CM
CM
CM
CM
CM
CM
TC40.94
G40.44 41.09
(2)IRV
COV'D CONC
20"O
19"O
ENTRY ELEVATION
43.95
6.
8'
.3
25.4'
MULTI STORY
BRICK BLDG
BEN TAUB
CONC
.5
GRATE INLET
TOP 40.16
4"(NE)39.51
SS
W W W W W W
(SEE NOTE A)
4"STM
6"STM
CALLED 11.4361 ACRES
UNDIVIDED ONE-HALF INTEREST
CITY OF HOUSTON
TO
HARRIS COUNTY HOSPITAL DISTRICT
(C-348902 057-31-1488)
12-31-1965
CALLED 11.4361 ACRES
UNDIVIDED ONE-HALF INTEREST
HARRIS COUNTY, TEXAS
TO
HARRIS COUNTY HOSPITAL DISTRICT
(C-348906 057-32-0052)
05-30-1966
RESIDUE
G.H. HERMANN
TO
CITY OF HOUSTON
(VOL. 327, PG. 146 H.C.D.R.)
05-30-1914
15"SAN
"S
TM
24.96
24.98
BASEMENT
FLOOR ELEV.
24.96
BASEMENT
FLOOR ELEV.
BASEMENT
FLOOR ELEV.
44.00
ENTRY ELEV.
BASEMENT WALL
(3)BOL
BA
SE
M
EN
T W
AL
L
STAIR
WELL
2020-16
2020-17
2020-18
2020-19
CONC
2020-20
2020-21
15"
2020-25
EB
STORAGE/OFFICE
HA
LL
W
AY
KITCHEN
LO
CK
ER
R
O O
M
BA
TH
RO
O
M /S
TO
RA
GE
HA
LL
W
AY
HALLWAY
WALK IN FREEZER
OFFICE/STORAGE
HALLWAY
HA
LL
W
AY
CM
COV'D CONC
BE
N
T
AU
B
LO
O P
CO
N
CR
ET
E
PA
VE
M
EN
T
W /C
U
RB
G
U
TT
ER
AREA WITHIN
CLOUD UPDATED
JANUARY 2021
40.9440.94 40.88
40.91 40.99
41.16
41.44
42.52
41.70
42.88
42.23
41.94
43.62
43.52
43.45 42.77
40.99
40.93
40.72 40.64 40.48
40.91 40.95
40.78 40.55
41.07
.8
43.32
G40.68
G40.38
G41.64
G41.48 G42.31
G42.64
G41.98 G42.26
G41.79
G42.09
G42.37
G42.23 G42.00
G41.61
G41.76
G41.62
G41.32
G39.54
40.87
40.71
40.77 41.19
41.54
43.21
40.73 40.90
40.94
40.94
42.65
43.43
43.45
40.80
40.72
40.88
40.89
40.94
40.84
40.87
40.92
40.86 40.98
41.00
41.00
40.90 41.07 40.99 41.01
40.99
40.9540.90
40.93
41.00
41.10
41.06 40.71
40.96
41.1941.13
40.73
40.79 40.85
41.41
TC41.15
TC40.86
TC40.80
TC42.41
TC42.04
TC41.85
TC41.94
TC42.74
TC43.14
TC42.48
TC42.60
TC42.88
TC42.30
TC42.88
TC42.78
TC42.51
TC42.13
TC41.86
TC41.91
TC42.29
TC42.15
X X
X
X
X X
X
XXX
X X
X X
X
X
X
X
X X X X X X
X X X X
X X
X
X X
X
(3)C/O
CHAIN LINK
CH
AI
N L
IN
K
FE
N
CE
CH
AI
N L
IN
K
FE
N
CE
LAY DOWN
YARD
CM
(3)TRUNK TR
CM
10",10",10"
PLANTER
EB
WV
FH
(2)BOL
SHRUB
SHRUB
BU
S
ST
O
P
BU
S
ST
O
P
AL
SN
C/O
CM
PLANTER
CM
PLANTER
PLANTER
GRASS
GRASS
GRASS
CONCRETE SIDEWALK
CONCRETE
CO
N
C
HE
DG
E
GRASS
GRASS
CONC
CO
N
CR
ET
E
CONCRETE
CONC
IRV
AIR
VENT
ELEC.
TRAN.
(2)EB
BREAKER
BOX
ELEC.
TRAN.
IRV
IRV
IRV
IRV
CM
(4)CM
CM
28"P
24"P
2"RSR
CO
N
CR
ET
E
SHRUB SHRUB
EB
AL
17"O
20"O
24"P
TSB
CHAIN LINK FENCE CHAIN LINK FENCE
X X
X
X X
X
GRASS
COL
COL
COLCOL
IRV
SHRUB
TENT ON
133-3 133-4
133-5
133-6
133-7
133-8
133-9
133-10
133-11
133-12
133-13
133-14
DETAIL NO. 133-1
FIELD NO. 4130
SANITARY MH
TOP MH 40.41
18"(SW)27.63
18"(NW)27.57
DETAIL No. 133-2 FIELD No. 4027
BB-INLET
TC 40.39
G 39.76
6"(SE)38.76
12"(NW)36.71
DETAIL No. 133-3 FIELD No. 4059
SANITARY MH
TOP MH 41.39
18"(E&W)27.84
15"(SE)28.88
15"(S)36.11
DETAIL No. 133-4 FIELD No. 4053
GRATE INLET
TOP 41.47
Note:UNABLE TO
DETAIL/COVERED WITH
DEBRIS
DETAIL No. 133-5 FIELD No. 4056
STORM MH
TOP MH 42.26
18"(SE)33.40
15"(SW)37.56
12"(NW)34.98
DETAIL No. 133-6 FIELD No. 4077
SANITARY MH
TOP MH 42.16
10"(SE)37.46
10"(NW)37.44
DETAIL No. 133-7 FIELD No. 4096
GREASE TRAP
TOP MH 43.46
BOT 12.71
DETAIL No. 133-8 FIELD No. 40.95
GREASE TRAP
TOP MH 43.47
BOT 12.72
DETAIL No. 133-9 FIELD No. 4094
GREASE TRAP
TOP MH 43.45
BOT 12.70
DETAIL No. 133-10 FIELD No. 4166
GREASE TRAP
TOP MH 43.53
BOT 12.78
DETAIL No. 133-11 FIELD No. 4175
STORM MH
TOP MH 41.99
48"(SE)34.27
12"(NW)36.36
DETAIL No. 133-12 FIELD No. 4183
SANITARY MH
TOP MH 42.17
18"(SE)27.33
18"(NW)27.39
DETAIL No. 133-13 FIELD No. 4182
STORM MH
TOP MH 41.93
4"(SE)39.31
18"(SE)33.79
6"(SW)39.11
18"(NW)33.79
4"(NW)37.47
DETAIL No. 133-14 FIELD No. 4242
GRATE INLET
TOP 41.22
Note:UNABLE TO
DETAIL/COVERED WITH
DEBRIS
DETAIL No. 133-15 FIELD No. 4291
BB-INLET
TC 40.05
G 39.12
18"(NE)36.22
DETAIL No. 133-16 FIELD No. 4321
STORM MH
TOP MH 42.82
24"(SE)33.74
15"(SW)38.65
24"(NW)33.72
DETAIL No. 133-17 FIELD No. 4345
GRATE INLET
TOP 40.59
6"(S)38.77
4"(NW)39.39
DETAIL No. 133-18 FIELD No. 4353
MANHOLE
TOP MH 43.66
BOT 39.66
Note:FULL OF WATER
DETAIL No. 133-20 FIELD No. 4489
STORM MH
TOP MH 42.46
8"(N)40.54
10"(NE)36.42
24"(E)34.18 36"(S)33.40
12"(SW)39.06
size?(NW)33.53 Note:UNABLE TO SEE (NW)
PIPE
DETAIL No. 133-21 FIELD No. 4575
BB-INLET
TC 41.08
G 40.20
24"(NW)35.46
DETAIL No. 133-22 FIELD No. 4499
BB-INLET
TC 41.26
G 40.41
24"(SE)35.28
24"(SW)35.12
DETAIL No. 133-23 FIELD No. 4472
SANITARY MH
TOP MH 42.39
18"(NE)28.04
18"(SW)28.04
10"(W)36.09 10"(W)29.47
DETAIL No. 133-24 FIELD No. 4465
SANITARY MH
TOP MH 41.32
18"(SE)26.94
18"(SW)27.96
18"(NW)26.96
24"STM(P.P.)
48"STM.12"STM.
WOOD DECK
18"SAN
6"
ST
M
4"STM.
10"SAN
10"SAN
W W W W W W W 12"W.L.(P.P.)
W W W W W W W W W W W
12"W.L.(APPROX. LOCATION PER PLAN)
DETAIL No. 133-19 FIELD No. 4519
SANITARY MH
TOP MH 40.63
8"(NE)33.43
8"(SW)33.33
Note:NOT IN USE/NO FLOW
COV'D
CONC
TEMPORARY
WOOD WALL
42.50
43.49
X X X X X
X
TEMPORARY
WOOD WALL
OPEN TO BASEMENT
ENTRY
*ELEV.
43.96
ENTRY
ELEV.
43.96
COVERED
CONCRETE
CONC WALL w/
WROUGHT IRON FENCE
BLDG. OVERHANG
COLCOL
CONC WALL w/
WROUGHT IRON FENCE
STAIRWELL
"A"
STAIRWELL
"B"
DETAIL No. 133-25 FIELD No. 4589
SANITARY MH
TOP MH 41.53
18"(SE)26.64
8"(SW)32.97
18"(NW)26.73
DETAIL No. 133-26 FIELD No. 4590
STORM MH
TOP MH 42.66
10"(N)37.83
30"(SE)33.44
size?(SW)37.75
24"(NW)33.41
6"(NW)39.18
182.7'
9.
9'
67.5'
.2
.5
15.2'WOOD DECK
TENT ON
WOOD DECK
BUILDING FACE/
BUILDING FACE/
FENCE
(2)BOL
PLANTER
4A
DETAIL No. 2020-20 FIELD No. 2196
GRATE INLET
TOP 43.56
4"VERT 40.26
DETAIL No. 2020-21 FIELD No. 2101
STORM MH
TOP MH 42.06
12"(NE)35.80
12"(SE)35.34
12"(W)36.04
12"(NW)37.83
DETAIL No. 2020-15 FIELD No. 2268
GRATE INLET
TOP 43.50
4"VERT 39.05
DETAIL No. 2020-16 FIELD No. 2270
GRATE INLET
TOP 43.58
4"VERT 39.15
DETAIL No. 2020-17 FIELD No. 2258
GRATE INLET
TOP 43.47
4"VERT 39.28
DETAIL No. 2020-18 FIELD No. 2257
GRATE INLET
TOP 43.49
4"VERT 39.38
DETAIL No. 2020-19 FIELD No. 2253
GRATE INLET
TOP 43.45
4"VERT 39.57
DETAIL No. 2020-7 FIELD No. 2252
GRATE INLET
TOP 43.44
6"(NE)39.55
4"(SE)39.57
DETAIL No. 2020-8 FIELD No. 2256
GRATE INLET
TOP 43.17
10"(NE)39.31
4"(SE)39.42
6"(SW)39.32
MULTI STORY
BRICK BLDG
BEN TAUB
STM MH(P.P.) STM MH(P.P.)
SAN MH(P.P.)
SA
N
PROP 5LF~4" PVC
SAN SWR @ 2.00%
PROP 20LF~4" PVC
SAN SWR @ 2.00%
PROP 5LF~4" PVC
SAN SWR @ 2.00% 1
Affiliated Engineers, Inc.
20 Greenway Plaza, Suite 410 Houston, Texas 77046 Tel 713.548.8900 Fax 713.548.8901
Affiliated Engineers
Texas Registered Engineering Firm F-8301
Sheet No.
AEI Project No.
Date Drawn By
Sheet Title
Project
Revisions
Scale
MEP
27198-00
AS NOTED
BEN TAUB
UNDERGROUND PIPE
REPLACEMENT
12/03/2025
Issue
100% CONSTRUCTION
DOCUMENTS
12/03/2025
TRUE
NORTH
PLAN
NORTHKEY PLAN
1504 Ben Taub Loop Houston, TX 77030
109860
DANIEL E. FALKENSTINE
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
A. CONTRACTOR TO INSTALL CLAY PLUG FOR ALL UTILITIES
PENETRATING PROPOSED BUILDING WALL OR FOUNDATION
B. CONTRACTOR TO FIELD VERIFY UTILITIES AND NOTIFY
ENGINEER IF CONFLICT EXISTS
Sheet Notes:
Key Notes:
RE: PLUMBING PLANS FOR CONTINUATION1
2 RE: MEP FOR PROPOSED GREASE TRAP
CIVIL SITE UTILITY
PLAN
C2.0
Affiliated Engineers, Inc.
20 Greenway Plaza, Suite 410 Houston, Texas 77046 Tel 713.548.8900 Fax 713.548.8901
Affiliated Engineers
Texas Registered Engineering Firm F-8301
Sheet No.
AEI Project No.
Date Drawn By
Sheet Title
Project
Revisions
Scale
MEP
27198-00
AS NOTED
BEN TAUB
UNDERGROUND PIPE
REPLACEMENT
12/03/2025
Issue
100% CONSTRUCTION
DOCUMENTS
12/03/2025
TRUE
NORTH
PLAN
NORTHKEY PLAN
1504 Ben Taub Loop Houston, TX 77030
109860
DANIEL E. FALKENSTINE
Walter P. Moore and Associates, Inc.
TBPE Firm Registration No. 1856
DETAILS
C3.0
| C0.0 - GENERAL NOTES |
| C1.0 - CIVIL SITE DEMOLITION AND SWPPP |
| C2.0 - CIVIL SITE UTILITY PLAN |
| C3.0 - DETAILS |
| P0.00 - PLUMBING SYMBOLS, LEGEND AND ABBREVIATIONS |
| P1.00 - PLUMBING SITE PLAN |
| P2.00 - PLUMBING OVERALL FLOOR PLAN - LEVEL B1 |
| P3.00 - PLUMBING ENLARGED FLOOR PLAN - LEVEL B1 |
| P4.00 - PLUMBING DETAILS & SCHEDULES |