8. Post Award Allocation Form IRA.pdf
PDF 220 KB Posted
- Solicitation number
- 47PH0825R0003
About this file
This is a Post Award Allocation Form IRA template for tracking costs and contract details for construction projects utilizing Inflation Reduction Act funding. The form is structured to capture key project information including building details, period of performance, delivery method (specified as Design Build - Performance), and contact information for both owner and contractor parties.
The form contains a detailed cost breakdown section using PBS MASTERFORMAT CSI divisions, with specific line items for tracking Low Embodied Carbon (LEC) materials including concrete, steel, glass, and asphalt. The form includes divisions 00-48 covering all aspects of construction from general requirements through electrical power generation. The template includes sections for general conditions, insurances, bonds, overhead, and profit calculations, with subtotal fields designed to track trade costs and estimated total cost of work. Empty text fields are provided for scope of work, materials/services not included, assumptions, and net zero contributions.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NAME
BUILDING NAME
BUILDING ADDRESS
BUILDING NUMBER
ESTIMATED START DATE
PERIOD OF
PERFORMANCE
DAYS
SOLICITATION # DELIVERY METHOD
Design Build - Performance
OWNER COMPANY NAME
CONTRACTOR
COMPANY NAME
OWNER CONTACT NAME
CONTRACTOR
CONTACT NAME
ADDRESS ADDRESS
OWNER PHONE
CONTRACTOR
PHONE
OWNER EMAIL
CONTRACTOR
TEXT
NET ZERO CONTRIBUTIONS
TEXT
POST AWARD ALLOCATION FORM IRA
OWNER INFORMATION CONTRACTOR INFORMATION
SCOPE OF WORK
TEXT
MATERIALS AND SERVICES NOT INCLUDED
TEXT
ASSUMPTIONS
Div. 00 Div. 00A Div. 00B Div. 01 Div. 02 Div. 03 0 Div. 03A Div 03.B Div. 04 Div. 05 0 Div. 05A Div 05.B Div. 06 Div. 07 Div. 08 0 Div. 08A Div 05.B Div. 09 Div. 10 Div. 11 Div. 12 Div. 13 Div. 14 Div. 21 Div. 22 Div. 23 Div. 26.1 Div. 26.2 Div. 27 Div. 28.1 Div. 28.2 Div. 31 Div. 32 0 Div. 32.A Div. 32.B Div. 33 Div. 34 Div. 35 Div. 40 Div. 41 Div. 42 Div. 43 Div. 44 Div. 45 Div. 46 Div. 48
Subtotal $0.00
Subtotal $0.00
$0.00
Estimated Cost of Work Overhead Profit
#NAME?
Water and Wastewater Equipment Electrical Power Generation
Trade Cost General Conditions Insurances (General Liability, Subcontractor Performance, Builders Risk Program) Payment and Performance Bond
PBS MASTERFORMAT CSI
MasterformatCSI System Elements (Trade Work) Self Performed/Subcontracted? Amount Design Services - for Design Build High Performing Green Buildings Emerging and Sustainable Technologies General Requirements (Please Include Jobsite Overhead) Existing Conditions Concrete Low Embodied Carbon Concrete Non LEC Concrete Masonry Metals Low Embodied Carbon Steel Non LEC Metals Wood, Plastics, Composites Thermal and Moisture Protection Openings Low Embodied Carbon Glass Non LEC Openings Finishes Specialties Equipment Furnishings Special Construction Conveying Equipment Fire Suppression Plumbing Heating, Ventilating, and Air Conditioning (HVAC) Electrical Lighting Communications Electronic Safety Electronic Security (TI - Non-BSAC) Earthwork Exterior Improvements LEC Asphalt Rest of Exterior Improvements
Process Heating, Cooling and Drying Equipment Process Gas and Liquid Handling, Purification and Storage Equipment Pollution and Waste Control Equipment Industry Specific Manufacturing Equipment
Utilities Transportation Waterway and Marine Construction Process Integration Material Processing and Handling Equipment
| Post Award Allocation Form IRA2 |
| Post Award Allocation Form IRA |
File details come from the government source that posted it. Updated .