8. MECS2 CDRL Roll-Up For Industry Comment.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- FA2541-24-002
- Issued by
- Not on record
About this file
This document outlines the deliverables required (CDRLs) under the United States Marine Corps (USMC) Enterprise Commercial Satellite Services 2 (MECS2) contract. Key requirements include the provision of transponded bandwidth and managed satellite services leveraging multi-orbit/multi-band satellites to provide global coverage across five regions, high-capacity and mobile spread spectrum services, and worldwide IP backhaul from commercial gateways to the Marine Corps Enterprise Network and Department of Defense Information Network. Deliverables such as the Contractor's Data Management Plan, Quality Assurance Program Plan, Trouble Tickets, and Network Security documentation are due on a regular basis or within a specified timeframe, generally ranging from 5 to 30 days. Annual inventories and plans are also required. The related pre-solicitation notice provides additional context, seeking these capabilities and program management support via a full and open competition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4. MECS2 STO-1 TechSpec.xlsx | XLSX spreadsheet | |
| 2. MECS2 PWS.pdf | ||
| 7. MECS2 DD1423-1 Exhibit A-J.pdf | ||
| 3. MECS2 STO 1-3.pdf | ||
| 6. MECS2 CLIN List.xlsx | XLSX spreadsheet | |
| 5. MECS2 STO-2 TechSpec.xlsx | XLSX spreadsheet | |
| 9. RFI Comment Resolution Matrix.xlsx | XLSX spreadsheet | |
| 1. MECS2 RFI.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CDRL # | CLIN | DID # | DID Title | PWS Reference | Deliverable Title | Format | Due Date | Contractor Feedback |
| Exhibit A | x0095 - x0098 | DI-MGMT-82228 | CONTRACTOR’S DATA MANAGEMENT PLAN (CDMP) | 2.4.3.1 | Data Export | Contractor Format | Report shall be provided on the first full week following contract award. Subsequent reports will be provided weekly, with the required delivery date being the first business day of each week. Monday on regular weeks, and Tuesday on weeks where a federal holiday is observed on a Monday. | |
| Exhibit A | x0095 - x0098 | DI-MGMT-82228 | CONTRACTOR’S DATA MANAGEMENT PLAN (CDMP) | 2.4.3.8 | Data Export - SIPRNet | Contractor Format | Report shall be provided on the first full week following contract award. Subsequent reports will be provided weekly, with the required delivery date being the first business day of each week. Monday on regular weeks, and Tuesday on weeks where a federal holiday is observed on a Monday. | |
| Exhibit B | x103 | DI-EMCS-81827 | SPECTRUM CERTIFICATION SPECTRAL CHARACTERISTICS DATA | 2.5.2 | Host Nation Support Effort | Contractor Format | Dependent on country, no later than service start. Temporary licenses may be provided to allow service to start on time while permanent licenses are procured. | |
| Exhibit B | x001 - x 0028 | DI-EMCS-81827 | SPECTRUM CERTIFICATION SPECTRAL CHARACTERISTICS DATA | 2.6.2 | Transmission Plan | MS Excel and XML format required (XML tool provided by RSSC after contract award). | 5 days or less after award; at least 24 hours before start date; 3 days or less from receipt of updated Technical Specification for Government requested changes. | |
| Exhibit C | x001 - x104 | DI-QCIC-81794A | QUALITY ASSURANCE PROGAM PLAN (QAPP) | 2.6.1 | Monthly Status Report | Contractor Format | Monthly; 5th business day of each month. | |
| Exhibit D | x001 - x050 | DI-MISC-80279A | UTILITIES OUTAGE AND STATUS REPORT (UOSR) | 2.5.3 | EMI/RFI Reporting Checklist | In accordance with USSTRATCOM EMI/RFI Guidelines | As required. Frequency is event-driven. |
Within 30 minutes of detection by vendor or at the request of the Government when the EMI/RFI is detected by the Government. Updates shall be provided to the Government upon change, upon re-quest, or every two hours from initial report, until incident.
Exhibit D x001 - x050 DI-MISC-80279A UTILITIES OUTAGE AND STATUS REPORT (UOSR) 2.5.3 EMI/RFI Summary of Action Report In accordance with USSTRATCOM EMI/RFI Guidelines As required. Frequency is event-driven.
EMI/RFI Summary of Action Report In accordance with guidelines within 24 hours of incident resolution.
| Exhibit D | x001 - x050 | DI-MISC-80279A | UTILITIES OUTAGE AND STATUS REPORT (UOSR) | 2.6.3 | Semi-Annual Sun Transit Report | Contractor Format | Semi-Annually. At least 14 days prior to each seasonal eclipse event. | |
| Exhibit E | x001 - x050; | |||||||
| x077 - x094 | DI-MISC-80279A | UTILITIES OUTAGE AND STATUS REPORT (UOSR) | 2.5.4.1; 2.5.4.2 | Trouble Ticket | Contractor Format | As required. Frequency is event-driven. |
Within 30 minutes of incident; updated upon change or at Government request. Trouble tickets shall be updated daily for serious issues or every 2 calendar days for non-serious issues regardless of change status. A final report is due within 5 calendar days of resolution.
| Exhibit F | x077 - x094 | DI-SESS-82238 | TECHNICAL DATA PACKAGE LIST (TDPL) | 2.3.7 | Detailed Layout Record | Contractor Format | At service start and subsequently updated and provided upon effective date of any required or requested changes to circuit path. |
| Exhibit G | x001 - x104 | DI-MGMT-82228 | CONTRACTOR’S DATA MANAGEMENT PLAN (CDMP) | 2.4.4 | Transition Plan | Contractor Format | No later than 30 days prior to contract service start date |
| Exhibit H | TBD | TBD | 2.7.2.1 | RMF Package and artifacts | In accordance with USMC RMF templates and Process Guide | Within 270 calendar days after award, as needed for changes in configuration. | |
| Exhibit I | x029 - x098 | DI-MGMT-82191 | CYBERSECURITY VULNERABILITY REPORT (CVR) | 2.7.2.2 | Network and Systems Testing | Contractor Format | Within 15 calendar days of completion of testing when requested by the Government. |
| Exhibit J | x029 - x098 | DI-MGMT-82191 | CYBERSECURITY VULNERABILITY REPORT (CVR) | 2.7.2.3 | Network Auditing | Contractor Format | Required annual completion. Additionally required as requested and funded by the Government. |
| Exhibit K | TBD | TBD | TBD | 2.8.2 | Standard And Extended Warranty | Contractor Format | Due upon service start. Updated versions will be event-driven. |
| Exhibit L | TBD | TBD | TBD | 5.0 | GFP Inventory | MS Excel | Annually; 30 calendar days prior to the end of the POP. |
| Exhibit M | TBD | TBD | TBD | 5.0 | Property Management Plan | Provided Template | Required within 10 days following award. |
| Exhibit N | TBD | TBD | TBD | 6.5 | System Security Plan (SSP) and Associated Plans of Action for a Vendor’s Internal Un-classified Information System | MS Excel | Required 30 calendar days after contract award and every three years following award. |
| Exhibit O | TBD | TBD | TBD | 6.7 | Cyber Incident Reporting for a Vendor’s Internal Unclassified Information System | Provided Template | Required within 10 days following award. |
| Exhibit P | TBD | TBD | TBD | 6.10.1 | Vendor's Record of Tier 1 Level Suppliers Receiving/Developing Covered Defense Information | Contractor Format | Required within 10 days following award. |
| * Standard Distribution: 1 copy of the transmittal letter without the deliverable to the Contracting Officer; 1 copy of the transmittal letter with the deliverable to the Primary COR and HQ USMC IC4 Program Management Team. (Contact information for required personnel will be distributed following award.) |
** RSSC-W distribution: rsscwest.commercial@us.af.mil
***All operational deliverables shall be encrypted in accordance with subparagraph 7.4 (b)
File details come from the government source that posted it. Updated .