8 - Cost Estimate Worksheet.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Y1PC--930CM3005: Construction, Cemetery Expansion, Fort Jackson National Cemetery (VA-25-00053285)
- Solicitation number
- 36C78625B0020
About this file
The file is a Cost Estimate Worksheet for a construction project at Fort Jackson National Cemetery, associated with VA Solicitation Number 36C78625B0020. The worksheet provides a comprehensive template for contractors to detail construction costs across multiple division categories, including general conditions, site investigation, and potential mechanical, electrical, and plumbing work. The template allows offerors to specify unit costs, number of units, and extended total costs for each division, with sections for subtotals, insurance, bonding, overhead, and profit calculations. While many division categories are listed (such as concrete, masonry, metals, electrical, and utilities), only a few initial sections like site investigation and general conditions are currently populated, suggesting contractors will need to complete the detailed cost breakdown for their specific project approach.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number. |
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
| Offeror shall use and edit to fit Task Order Project |
| Project Number: |
| Solicitation Number: |
| Project Title: |
| Division | Unit of Measure | # of Units | Unit Cost $ | Extended/Total Cost $ | Comments / Remarks |
| Division 0 - Special Sections | |||||
| General Conditions and Administration | JB | 1 | |||
| Division 01 - General Requirements | |||||
| Mobilization | JB | 1 |
| Division 02 - Existing Conditions | ||
| Site Investigation | JB | 1 |
| Division 03 - Concrete |
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
| Mechanical, Electrical, Plumbing Subtotal | ||
| General Construction Subtotal | ||
| Total Base Construction Cost | ||
| Insurance (if applicable) | ||
| Bonding (if applicable) | ||
| Overhead | ________ % | $0.00 |
| Profit | ________ % | $0.00 |
| GRAND TOTALS | $ |