8 - Cost Estimate Worksheet.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Z2AZ--810-MM23-015, Honor Guard Bldg Restoration Dayton National Cemetery
Solicitation number
36C78624B0011
Issued by

About this file

This document contains a cost estimate worksheet and related federal contract opportunity for restoration work at the Dayton National Cemetery Honor Guard Building. The cost estimate worksheet requires lump sums for each construction division to be utilized for the project, with totals provided for general construction, the base construction cost, insurance, bonding, overhead, and profit to calculate a grand total. The related federal contract opportunity is solicitation number 36C78624B0011 to provide complete construction services restoring the historically significant Honor Guard Building. The contractor will have 181 calendar days from notice to proceed to complete the work in accordance with National Cemetery Administration standards and the contract documents, statement of work, specifications and drawings. The Department of Veterans Affairs National Cemetery Administration is the contracting agency.

View the file

Other files

File Type Posted
TIL Specs_v2.pdf PDF
DOL Wage Determination 01312024.pdf PDF
36C78624B0011.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IFB Contractor Cost Estimate Worksheet
Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number.

If a Division is not being used put N/A in that field.

Additional lines/items can be added if needed or appropriate.

Offeror shall use and edit to fit Task Order Project
Project Number:810-MM23-015
Solicitation Number:36C78624B0011
Project Title:Honor Guard Building Restoration, Dayton National Cemetery
DivisionUnit of Measure# of UnitsUnit Cost $Extended/Total Cost $Comments / Remarks
Division 0 - Special Sections
General Conditions and AdministrationJB1
Division 01 - General Requirements
MobilizationJB1
Division 02 - Existing Conditions
Site InvestigationJB1
Division 03 - Concrete

Division 04 - Masonry

Division 05 - Metals

Division 06 - Wood, Plastic, and Composites

Division 07 - Thermal and Moisture Protection

Division 08 - Openings (Doors, Windows, etc...)

Division 09 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12- Furnishings

Division 13 - Special Construction

Division 14 - Fire Suppression

Division 22 - Plumbing

Division 23 - Heat, Ventilating, and Air Conditioning

Division 25 - Integrated Automation

Division 26 - Electrical

Division 27 - Communications

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Mechanical, Electrical, Plumbing Subtotal
General Construction Subtotal
Total Base Construction Cost
Insurance (if applicable)
Bonding (if applicable)
Overhead________ %$0.00
Profit________ %$0.00
GRAND TOTALS$