8 - Cost Estimate Worksheet.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C78624B0011
About this file
This document contains a cost estimate worksheet and related federal contract opportunity for restoration work at the Dayton National Cemetery Honor Guard Building. The cost estimate worksheet requires lump sums for each construction division to be utilized for the project, with totals provided for general construction, the base construction cost, insurance, bonding, overhead, and profit to calculate a grand total. The related federal contract opportunity is solicitation number 36C78624B0011 to provide complete construction services restoring the historically significant Honor Guard Building. The contractor will have 181 calendar days from notice to proceed to complete the work in accordance with National Cemetery Administration standards and the contract documents, statement of work, specifications and drawings. The Department of Veterans Affairs National Cemetery Administration is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TIL Specs_v2.pdf | ||
| DOL Wage Determination 01312024.pdf | ||
| 36C78624B0011.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number. |
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
| Offeror shall use and edit to fit Task Order Project | |
| Project Number: | 810-MM23-015 |
| Solicitation Number: | 36C78624B0011 |
| Project Title: | Honor Guard Building Restoration, Dayton National Cemetery |
| Division | Unit of Measure | # of Units | Unit Cost $ | Extended/Total Cost $ | Comments / Remarks |
| Division 0 - Special Sections | |||||
| General Conditions and Administration | JB | 1 | |||
| Division 01 - General Requirements | |||||
| Mobilization | JB | 1 |
| Division 02 - Existing Conditions | ||
| Site Investigation | JB | 1 |
| Division 03 - Concrete |
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
| Mechanical, Electrical, Plumbing Subtotal | ||
| General Construction Subtotal | ||
| Total Base Construction Cost | ||
| Insurance (if applicable) | ||
| Bonding (if applicable) | ||
| Overhead | ________ % | $0.00 |
| Profit | ________ % | $0.00 |
| GRAND TOTALS | $ |
File details come from the government source that posted it. Updated .