8-Attachment G-Total Project Cost.pdf
PDF 110 KB Posted
- Attached to
- SEVCC CU3&CU6 Replacements
- Solicitation number
- PROJ-26-027
- Issued by
- Volusia County, Florida
About this file
This is a bid form attachment for Halifax Health Medical Center related to Construction Services Project PROJ-26-027 for Lab Ductwork Modifications in Florida. The document establishes the framework for contractor submissions and requires bidders to provide a comprehensive total project cost proposal. Key submission requirements include a detailed schedule and timeline demonstrating full understanding of the project scope, a Schedule of Values organized by division that separately lists any requested allowances, and a detailed work description showing comprehension of the Scope of Work. The contractor must hold the bid open for acceptance for 120 days from the bid due date and agree to complete all work in accordance with the bid solicitation details and an approved project schedule submitted by the successful bidder.
The bid form requires contractors to enter their proposed total project cost and acknowledge responsibility for any facility repairs needed due to damages caused by trucks deviating from designated routes. While specific pricing guidance is not provided in this attachment, the form establishes that bidders must submit complete cost proposals with supporting schedules and detailed work descriptions to demonstrate project understanding and capability. The successful contractor will be required to execute the work within a timeline approved by Halifax Health Medical Center, with all terms and conditions outlined in the broader bid solicitation documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G
HALIFAX HEALTH MEDICAL CENTER
BID FORM of TOTAL PROJECT COST
Invitation to Bid for Construction Services
PROJ-26-027 – LAB DUCTWORK MODIFICATIONS
I/We propose to furnish the work described below at the following delivered price:
Contractor shall be responsible for any repair needed to the facility as a result of damages caused by trucks going outside designated routes.
As part of the project bid submittal, a detailed schedule/timeline must be included with each bid response. Sufficient detail will be included in the project schedule/timeline to demonstrate the bidder fully understands the project scope and specifications.
In addition, a Schedule of Values detailed by division must be provided with bid submittal and will include any requested allowances. Requested allowances will be listed separately.
Bidder will include with their bid submittal a detailed work description to show they fully understand the Scope of Work.
The Contractor agrees to:
A. Hold this bid open to acceptance for 120 days from the bid due date.
B. Accomplish project work in accordance with details provided in the bid solicitation.
C. Complete the work within a detailed schedule submitted to HHMC by the successful bidder for review and approval.