8-5. North 119th Street over Leggett Ditch Minor Structure Replacement Engineering Plans.pdf
PDF 47 MB Posted
- Solicitation number
- BID-207-25
- Issued by
- Boulder County, Colorado
About this file
These engineering design plans for the North 119th Street over Leggett Ditch Minor Structure Replacement project are prepared by Boulder County Public Works, Colorado. The project involves replacing an existing culvert with a new 8-foot wide by 4-foot high precast concrete box culvert at the Leggett Ditch crossing. The project limits extend from Station 10+09.00 to Station 15+96.00, with construction planned for October 2024. The scope includes removing the existing structure, installing a new precast concrete box culvert with cast-in-place wingwalls, reconstructing access roads and driveways, raising the roadway profile, and making associated hydraulic and roadway improvements.
The project will require utility relocations, including moving overhead electric lines, gas lines, and communication cables. The estimated structure excavation is 515 cubic yards, with structure backfill and other associated work. The design incorporates erosion control measures, roadside swales, and aims to maintain existing drainage patterns while improving the culvert's capacity. Funding appears to be through Boulder County Public Works, with the project designed to meet Colorado Department of Transportation (CDOT) and Boulder County engineering standards. The project includes temporary construction easements and will require coordination with utility owners and the Leggett Ditch Company to minimize disruption to existing infrastructure and water conveyance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
13 2
33 3634
16 15 1314
23 24
LOCATION MAP
1 Mile0 0.5 Miles 2 Miles
T.3N.
R.69W. R.68W.
PROJECT LOCATION
d s u n d e e n
:1
:0
A M
X
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I G
N
F I L
E S
D e s ig n
D r a w in g s
T it le .d g n
T.2N.
R.69W. R.68W.
T.3N.
T.2N.
BOULDER COUNTY PROJECT NUMBER BC-103-077
PROJECT SCOPE OF WORK:
S H
E. Ken Pratt Blvd.
N t h
S t
Ditch
LONGMONT
To I-25
T o
N iw o t
U S
Quicksilver Rd.
TITLE SHEET
NORTH 119TH STREET OVER LEGGETT DITCH
MINOR STRUCTURE REPLACEMENT OF
STR. NO. BC-000304-2.0A
Prospect Rd.
Le gg ett
BOULDER COUNTY PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
T o
L a f a y e t t e
RECONSTRUCTED.
ACCESS ROADS AND DRIVEWAY ARE SUBSEQUENTLY RAISED AND
THE DITCH HYDRAULICS AND FREEBOARD REQUIREMENT. ADJACENT
HEADWALLS AND APRONS. THE ROADWAY PROFILE IS RAISED DUE TO
CONCRETE BOX CULVERT WITH CAST-IN-PLACE CONCRETE WINGWALLS,
AT LEGGETT DITCH. THE REPLACEMENT STRUCTURE IS A PRECAST
THIS PROJECT CONSISTS OF REPLACING A CULVERT ON N. 119TH ST.
BEGIN PROJECT BC-103-077
N. 119TH ST. STA. 10+09.00
N. 119TH ST. STA. 15+96.00
END PROJECT BC-103-077
October, 2024
CONSTRUCTION PLAN SET
APPROVED FOR CONSTRUCTION:
COUNTY ENGINEER
DATE:DAVID C. WEBSTER, P.E.
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
UNDERGROUND MEMBER UTILITIES
OR EXCAVATE FOR THE MARKING OF
ADVANCE BEFORE YOU DIG, GRADE,
CALL 2-BUSINESS DAYS IN
BC-103-077DWS SEK
d s u n d e e n
:1
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
T it le .d g n
10/4/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
FOR CONSTRUCTION
10/04/2024
10/22/2024
STANDARDS PLANS LIST
M-100-1
M-208-1
M-203-1
M-203-2
M-203-11
STANDARD SYMBOLS (3 SHEETS)
APPROACH ROADS
DITCH TYPES
M-203-12
M-206-1
M-206-2
M-214-1
M-412-1
M-510-1
M-601-1
M-601-2
M-601-3
M-601-10
M-601-11
M-601-12
M-601-20
M-603-1
M-603-2
M-603-3
M-603-10
M-604-10
M-604-11
M-604-12
M-604-13
M-604-20
M-605-1
SUPERELEVATION STREETS (2 SHEETS)
EXCAVATION AND BACKFILL FOR BRIDGES (2 SHEETS)
CONCRETE PAVEMENT JOINTS (9 SHEETS)
STRUCTURAL PLATE PIPE H-20 LOADING
HEADWALL FOR PIPES
TYPE "S" SADDLE HEADWALLS FOR PIPE
HEADWALLS AND PIPE OUTLET PAVING
REINFORCED CONCRETE PIPE
PRECAST CONCRETE BOX CULVERT
INLET, TYPE C
INLET, TYPE D
CURB INLET TYPE R (2 SHEETS)
CONCRETE INLET TYPE 13
MANHOLES (3 SHEETS)
SUBSURFACE DRAINS
1-3
M-607-1
M-607-2
M-607-3
M-607-4
M-607-10
M-608-1
M-609-1
M-611-1
M-615-1
M-615-2
M-616-1
M-620-1
M-620-2
M-620-11
M-620-12
WIRE FENCES AND GATES (3 SHEETS)
CHAIN LINK FENCE (3 SHEETS)
BARRIER FENCE
PICKET SNOW FENCE
CURB RAMPS (10 SHEETS)
CATTLE GUARD (2 SHEETS)
EMBANKMENT PROTECTOR TYPE 3
EMBANKMENT PROTECTOR TYPE 5
INVERTED SIPHON
FIELD LABORATORY CLASS 1
FIELD OFFICE CLASS 1
FIELD OFFICE CLASS 2
M-210-1 MAILBOX SUPPORTS (2 SHEETS)
M-614-1 RUMBLE STRIPS (3 SHEETS)
M-629-1 SURVEY MONUMENTS (2 SHEETS)
19-29
17-18
30-31
35-39
41-42
43-44
45-46
52-55
67-68
70-72
GUARDRAIL TYPE 7 F-SHAPE BARRIER (4 SHEETS)M-606-13
138-147
148-151
152-153
156-158
169-170
73-77VANE GRATE INLET (5 SHEETS)M-604-25
M-606-14
ROAD CLOSURE GATE (9 SHEETS)M-607-15
15-16
159-160SAND BARREL ARRAYS (2 SHEETS)M-614-2
S-614-40 219-223
S-614-8 198-204
290-313
281-289
255-266S-614-50
224-227
211-214
196-197
194-195
191-193
187-188
171-178
FLASHING BEACON (PORTABLE) DETAILSS-630-3
TYPICAL MULTI-SIGN INSTALLATIONS
TYPICAL POLE MOUNT SIGN INSTALLATIONS
MARKER ASSEMBLY INSTALLATIONS
CLASS III SIGNS (3 SHEETS)
CLASS II SIGNS
CLASS I SIGNS
GROUND SIGN PLACEMENT (2 SHEETS)
S-627-1
S-630-2
S-630-1
S-614-40A
S-614-22
S-614-21
S-614-20
S-614-14
S-614-12
S-614-10
S-614-6
S-614-5
S-614-4
S-614-3
S-614-2
S-614-1
S-612-1
M-603-4
S-614-11
METAL PIPE (4 SHEETS)
M-603-5 POLYVINYL CHLORIDE (PVC) PIPE (AASHTO M304)
M-100-2
TEMPORARY EROSION CONTROL (11 SHEETS)
CURBS, GUTTERS, AND SIDEWALKS (4 SHEETS)
S-630-4
S-630-5
S-630-6 EMERGENCY PULL-OFF AREA (TEMPORARY)
S-630-7
PORTABLE RUMBLE STRIPS (TEMPORARY) (2 SHEETS)
13-14
119-121
123-127
129-137
318-319
ACRONYMS AND ABBREVIATIONS (4 SHEETS) 4-7
10-12
116-118
FIELD LABORATORY CLASS 2 (2 SHEETS) 165-166
S-614-9
S-614-41
241-244S-614-42 CABINET FOUNDATION DETAIL (4 SHEETS)
245-252S-614-43
267-280S-614-60 DYNAMIC SIGN MONOTUBE STRUCTURES (14 SHEETS)
316-317
DETAILS (2 SHEETS)
STEEL SIGN SUPPORT (TEMPORARY) INSTALLATION
321-323ROLLING ROADBLOCKS FOR TRAFFIC CONTROL (3 SHEETS)
STATIC SIGN MONOTUBE STRUCTURES (12 SHEETS)
M-216-1 33-34
50-51WINGWALLS FOR PIPE OR BOX CULVERTS (2 SHEETS)
CORRUGATED POLYPROPYLENE PIPE (AASHTO M330) (2 sheets)
CORRUGATED POLYETHYLENE PIPE (AASHTO M294) AND
M-603-6
RIBBED PIPE (AASHTO MP 20)
STEEL REINFORCED POLYETHYLENE 60
M-606-1 79-97
102-104
M-606-15 105-115
(11 SHEETS)
GUARDRAIL TYPE 9 SINGLE SLOPE BARRIER
M-611-2 154-155DEER GUARD (2 SHEETS)
SOIL RETENTION COVERING (2 SHEETS)
(2 SHEETS)
SINGLE CONCRETE BOX CULVERT (CAST-IN-PLACE)
(2 SHEETS)
DOUBLE CONCRETE BOX CULVERT (CAST-IN-PLACE)
(2 SHEETS)
TRIPLE CONCRETE BOX CULVERT (CAST-IN-PLACE)
62-64
98-101
205-206
209-210
216-217
228-240
COLORADO
DEPARTMENT OF TRANSPORTATION
July 31, 2019
M&S STANDARDS PLANS LIST
BY DESIGNATED PAY ITEM OR SUBSIDIARY ITEM.
AND REVISED, APPLY TO THIS PROJECT WHEN USED
ALL OF THE M&S STANDARD PLANS, AS SUPPLEMENTED
179-186
253-254
(REVISED ON SEPTEMBER 6, 2022)
IN CONSTRUCTION IF APPROVED BY AN APPROPRIATE CDOT ENGINEER.
PLANS. ALL OTHER M&S STANDARD PLANS ARE STILL ELIGIBLE FOR USE
INDICATED BY A MARKED BOX , AND WILL BE ATTACHED TO THE
THE M&S STANDARD PLANS USED TO DESIGN THIS PROJECT ARE
(REVISED ON SEPTEMBER 30, 2020)
(SUPERSEDED ON JANUARY 23, 2020 BY S-614-45)
(REVISED ON DECEMBER 3, 2020)
(REVISED ON MARCH 5, 2020)
(REVISED ON FEBRUARY 17, 2023)
(REVISED ON FEBRUARY 9, 2023)
(REVISED ON JULY 13, 2020)
(REVISED ON SEPTEMBER 10, 2020)
(REVISED ON SEPTEMBER 21, 2020)
(NEW, ISSUED ON SEPTEMBER 30, 2020)
(REVISED ON MARCH 1, 2024)
(REVISED ON JANUARY 31, 2022)
(REVISED ON MARCH 7, 2022)
(REVISED ON JULY 22, 2022)
(REVISED ON JULY 22, 2022)
(REVISED ON APRIL 30, 2024)
(REVISED ON FEBRUARY 3, 2023)
(NEW, ISSUED ON JUNE 15, 2023)
(REVISED ON APRIL 30, 2024)
MARCH 1, 2024)
(REVISED ON
(REVISED ON MARCH 1, 2024)
(REVISED ON MARCH 1, 2024)
MARCH 1, 2024)
(REVISED ON
MARCH 1, 2024)
(REVISED ON
J-POST SIGN SUPPORT (3 SHEETS)S-614-23 (NEW, ISSUED ON MAR. 1, 2024)
(NEW, ISSUED ON APRIL 4, 2024)
(REV. APRIL 30, 2024)
(REVISED ON APRIL 4, 2024)
CHAIN STATION SIGNAGE (1 SHEET)S-614-15 (NEW, ISSUED ON APRIL 30, 2024)
APRIL 4, 2024)
(REVISED ON
REVISED ON MAY 16, 2024
(REVISED ON MAY 16, 2022)
PAGE NUMBERPLAN NUMBER M STANDARD TITLE PAGE NUMBER PLAN NUMBER M STANDARD TITLE PAGE NUMBER PLAN NUMBER S STANDARD TITLE
PRECAST TYPE 7 CONCRETE BARRIER (4 SHEETS)
TUBULAR STEEL SIGN SUPPORT DETAILS (7 SHEETS)
DELINEATOR INSTALLATIONS (8 SHEETS)
PAVEMENT MARKINGS (11 SHEETS)
FLASHING BEACON AND SIGN INSTALLATIONS (4 SHEETS)
MILEPOST SIGN DETAIL FOR HIGH SNOW AREAS
31 INCHES (19 SHEETS)
MIDWEST GUARDRAIL SYSTEM TYPE 3 W-BEAM
DEER FENCE, GATES, AND GAME RAMPS (7 SHEETS)
DIVIDED HIGHWAYS (3 SHEETS)
SUPERELEVATION CROWNED AND
(2 SHEETS)
EXCAVATION AND BACKFILL FOR STRUCTURES
FOR CLASS III SIGNS (2 SHEETS)
CONCRETE FOOTINGS AND SIGN ISLANDS
M-603-12
CONCRETE AND METAL END SECTIONS
NURSERY STOCK DETAILS
PEDESTRIAN PUSH BUTTON POST ASSEMBLY (2 SHEETS)
STRUCTURE NUMBER INSTALLATION (2 SHEETS)
(2 SHEETS)
CONCRETE BARRIER SIGN POST INSTALLATIONS
65'-75' SINGLE MAST ARMS (5 SHEETS)
TYPICAL TRAFFIC SIGNAL 30'-75' DOUBLE MAST ARMS
(26 SHEETS)
TRAFFIC CONTROLS FOR HIGHWAY CONSTRUCTION
AND VERTICAL PANELS
BARRICADES, DRUMS, CONCRETE BARRIERS (TEMP)
25'-55' SINGLE MAST ARMS (4 SHEETS)
ALTERNATIVE TRAFFIC SIGNAL
TEMPORARY SPAN WIRE SIGNALS (13 SHEETS)
S-613-1 ROADWAY LIGHTING (6 SHEETS)
(7 SHEETS)
TRAFFIC LOOP AND MISCELLANEOUS SIGNAL DETAILS
S-614-44 PEDESTAL POLE SIGNALS (2 SHEETS)
FOR CLASS III SIGNS (2 SHEETS)
BREAK-AWAY SIGN SUPPORT DETAILS
(3 SHEETS)
TRAVERSABLE END SECTIONS AND SAFETY GRATES
M-412-2 CONCRETE PAVEMENT CRACK REPAIR (6 SHEETS)
S-614-45 PEDESTRIAN PUSH BUTTON POST ASSEMBLY DETAILS (6 SHEETS)
S-613-2 ALTERNATIVE ROADWAY LIGHTING (4 SHEETS)
S-613-4 TRAFFIC SIGNAL ONE-LINE DIAGRAMS (6 SHEETS)
S-613-3 PULL BOX DETAIL (2 SHEETS)
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
UNDERGROUND MEMBER UTILITIES
OR EXCAVATE FOR THE MARKING OF
ADVANCE BEFORE YOU DIG, GRADE,
CALL 2-BUSINESS DAYS IN
BC-103-077DWS SEK
d s u n d e e n
:0
:5
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
S P
L .d g n
8/7/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
FOR CONSTRUCTION
W
E
W
G
T
159.27'
N1°6'5"W
159.27'
N1°23'46"W
142.73'
N0°12'18"W
142.73'
N0°16'58"WN. 119TH ST.
N. 119TH ST.
HORIZONTAL CONTROL LINE
Ò ROADWAY AND
ELEV. 5040.62
E 3119093.72
N 1290710.10
MON. NO 5 REBAR OPC
CP 101
ELEV. 5044.55
E 3119027.16
N 1290625.16
MON. NO 5 REBAR OPC
CP 100
40'0' 20' 80'
POINT TABLE
POINT #
RAW DESCRIPTION
MON :NO5REB OPC
MON :NO5REB OPC
MON :HAPPY JACK LL1418
MON :HAPPY JACK AZ MK LL1419
ELEVATION
5044.55
5040.62
5099.40
5101.70
NORTHING
1290625.16
1290710.10
1284236.80
1285660.25
EASTING
3119027.16
3119093.72
3116389.03
3115166.74
VERTCAL DATUM IS NAVD 88 USING NGS MON LL1418 (EL=5099.40')
1.0002814392.
GROUND SCALE FACTOR, SCALED FROM LL1418 USED TO MODIFY THE COORDINATES TO GROUND IS
(0501) NAD 83 (2011) COORDINATES. THE PROJECT SEED POINT IS NGS LL1418 (HAPPY JACK). THE
SURVEY CONTROL STATEMENT: PROJECT COORDINATES ARE COLORADO STATE PLANE NORTH ZONE
ELEV. 5101.70
E 3115166.74
N 1285660.25
MON. HAPPY JACK AZ MK LL1419
CP 501
ELEV. 5099.40
E 3116389.03
N 1284236.80
MON. HAPPY JACK LL 1418
CP 500
SURVEY CONTROL PLAN
L e g g e t t
D it c h
EXISTING R.O.W. (TYP.)
SECTION LINE
E 3119056.36
N 1290351.42
STA. 10+09.00
BEGIN PROJECT
E 3119048.41
N 1290938.35
STA. 15+96.00
END PROJECT
SK
TEMPORARY CONSTRUCTION EASEMENT
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
CALL 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES BC-103-077DWS
d s u n d e e n
:0
:4
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
S u r v
C o n t r o l.
d g n
8/7/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
FOR CONSTRUCTION
P I
.0
P I
.2
P I
.5
P I
.2
P I
.0
10/03/24
SURVEY TABULATION
Inlets (Section 604) and all other structures assigned a structure number
Light pole locations and elevations
Signal pole locations and elevations
Lighting (Section 613) and Traffic Control Devices (Permanent) (Section 614)
Slope and Ditch Paving (Section 507)
Deck grades at Girder 10th or "n" th point locations and elevations
Structural concrete form locations
Wingwall skew angles/offsets
Abutment/Pier locations, alignment, and elevations
Footing locations, alignment, and elevations
Caisson locations and elevations (Section 503)
Piling locations and cut off elevations (Section 502)
Structure Excavation limits (Section 206)
Major Structures - Overhead Signs (Section 614), Concrete Box Culverts, Bridges -
Riprap (Temp)
Seeding (Temp)
Erosion Control (Section 208)
Striping (Temp)
Striping (Perm)
Other:
Symbols
Pavement Marking (Section 627)
Other:
Rock
Seeding (Section 212)
Planting (Section 214)
Other:
Mulching (Section 213)
Landscaping
Top Soil (Section 207)
Site Grading
Embankment
Erosion Control (Perm)
Other:
Other:
Borrow
Delineators (Section 612)
Temporary
Permanent
Temporary
Sound Barrier
Other:
Permanent
Other:
Fencing (Section 607)
Grid
Establish and Maintain Project Centerline or Engineer Approved Offset Line(s)
Excavation and Embankment (Section 203)
Excavation
Reset Items (Section 210)
Removal Limits (Section 202)
Muck
Stripping
Unclassified
Verify or Determine existing topography
Clearing and Grubbing Limits (Section 201)
Verify or Determine existing grades and alignments
Verification and Maintenance of Horizontal and Vertical Control
Interval
SpecialGrade
Other:
Seal Coat or Chip Seal (Section 409)
Heating & Scarifying Treatment
Miscellaneous
Aggregate Base Course (Section 304)
PMBB - Plant Mix Bituminous Base
Storm Sewer
Sanitary Sewer
Structure Excavation limits (Section 206)
Treated Subgrade
Signalization
New Bridge
SURVEY WORK TO BE PERFORMED BY OTHERS:
Other:
New Roadway Construction
Bridge Replacement
Bridge Widening
Major Reconstruction
Asphalt Overlay
Concrete Overlay
Minor Widening
Safety Improvement
Manholes (Section 604)
Irrigation
Water
Pipes (Section 603)
Slope and Ditch Paving (Section 507)
Minor Structures
Culverts (Section 603)
Riprap (Perm) (Section 506)
Other:
Sidewalk (Section 608)
TYPE OF PROJECT
Landscaping
Vertical Control
Original Terrain Data
Other:
Roadway Alignment
Horizontal Control
Format *
Roadway Elements
Retaining Walls
Curb and Gutter (Section 609)
Other:
Concrete (Section 412)
Reconditioning
Other:
Pavements
Untreated Subgrade
Roadway Bases
Signal pole locations and elevations (Temp)
Monumentation (Section 629)
Tangent
Interval Interval
Curve
Offset
Special
Replace the specified existing monuments:
Reference the specified existing monuments:
Right of Way
Land corners, Aliquot corners
Control
Light pole locations and elevations (Temp)
Other:
Temporary Lighting and Construction Traffic Control Devices (Section 630)
Grid Special (Y/N)
R o a d w y
B s e s
P a v e m e n t s
G u t t e r
C u r b
E x c a v a t io n m b a n k m e n t
(Y/N)(Y/N)
Property Pin Ties
Major Structures
Minor Structures
Slope Staking
Grading
Horizontal Alignment
Vertical Control (i.e. Benchmarks)
Horizontal Control (Primary & Secondary)
Other Fieldbook(s):
One fieldbook for each work category shown on this sheet
TO ESTABLISH GEOMETRIC CONTROL FOR THE CONSTRUCTION OF THIS
PROJECT, THE DEPARTMENT HAS PROVIDED THE FOLLOWING INFORMATION:
WORK PERFORMED BY THE CONTRACTOR'S SURVEYOR UNDER SECTION 625:
GENERAL NOTES:
Herbicide (Section 217)
* Specify the information format, ie., plan sheet, computer disk, computer printout, or other.
The information marked is either contained on the plans or is available from the Engineer.
Offset Special
Grade (Y/N) Interval
Grid Special (Y/N)
Special Interval Offset
Slope Staking
Guard Rail (Section 606)
Right of Way (Temp Staking by P.L.S. Only)
Interval Interval
Center
S t a t io n in g
Overlay Stationing
Left Right
Interval
Erosion Logs
HMA - Hot Mix Asphalt (Section 403)
Sign Locations (Temp)
Sign locations
Other:
Potholing
Erosion Bales
Concrete Box Culverts (Section 603) w/ Headwalls and Wingwalls (Section 601)
Bridge expansion joint(s) alignment and grade (longitudinal and transverse)
(See General Notes) As Staked Earthwork Quantities
(Section 407) Prime Coat, Tack Coat & Rejuvenating Agent alignment and grades (Section 604)
Drop inlets -required for Bridges (Subsection 601 .12) and Overhead signs (S-614-50) Substructure As-constructed survey
Field verify sign post locations, elevations, and lengths before fabrication.
Easements
Silt Fence be done in accordance with the latest edition of the CDOT Survey Manual.
1. Unless indicated otherwise on this Survey Tabulation Sheet, all survey work and staking intervals shall the Contractor's surveyor.
on the plans. Any additional information required to stake the item or element shall be generated by
2. Adequate information for establishing lines, grades, and locations for all work items have been specified
8. The Contractor shall coordinate construction staking on the project with any utility work.
10. The Contractor's surveyor shall submit the following fieldbooks to the Engineer:
Culverts w/ Headwalls and Wingwalls (Section 601)
Concrete Box Culverts w/ Headwalls and Wingwalls information, such as point numbers, to the sketch.
measured information. Non-linear surveys such as structures staking shall have sketches relating electronic linear surveys, such as slope stakes and blue tops, shall have the station and offset information related to the copy format that is intuitive, clear and related to the supplemental information recorded in the field books. All information is collected electronically, information recorded shall be provided to the Project Engineer in a hard shall contain: date, crew members' names, point no., description, staking information, and sketches. If the survey
9. Fieldbooks shall contain daily records of points set and or measurements observed. The information recorded replaced by the Contractor at no additional cost to the Department.
4. Stakes and Monuments which are damaged or destroyed by the progress of construction shall be
NOTE: All 629 items shall include adequate research, calculations, and evaluations of evidence for monuments to be set.
** A Tabulation of Survey Monuments may be provided on the plans.
(Y/N)
All Easements (Temp Staking by P.L.S. Only)
5.
Contractor shall certify in writing to the Engineer that the final grade is within specified tolerance.
6. Prior to beginning work on any subsequent operation, such as placing base course or paving, the into field grades.
7. The Contractor's surveyor shall perform all field surveying and calculations necessary to tie plan grades
Permanent Water Quality BMP (Section 208)
WORK PERFORMED BY THE CONTRACTOR'S SURVEYOR UNDER SECTION 629:
3D Design Modeling Electronic Files
Engineer. The Contractor shall field verify original ground cross sections at a maximum 500 feet intervals.
data report and a computer disk with that information on it, in the specified format shall be submitted to the
CDOT Survey Manual. A printed copy of the As Staked (or 3D Design Modeling Electronic Files) Earthwork to the Engineer prior to completion of twenty percent (20%) of the planned earthwork in any phase as per the
The Contractor shall furnish an As Staked (or 3D Design Modeling Electronic Files) Earthwork Quantity report
Plan Sheet
Plan Sheet
Plan Sheet
Y Y 100
Y Y
Locate monuments. It is estimated __ hours are required.
Engineer __ days prior to the Presurvey Conference - Construction Survey.
blank line to the left of the specified items, shall be submitted with the Survey Schedule to the items indicated on this sheet. A copy of this sheet, with the estimated man-hours written on the
3. The Contractor's surveyor shall provide an estimate of the man-hours necessary to complete the work
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
CALL 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES BC-103-077DWS SEK
d s u n d e e n
:1
:1
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
S u r v
T a b .d g n
8/7/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
11' Lane11' Lane
12' ~ Width of Pavement10' ~ Width of Pavement 10' ~ Width of Pavement
11' Lane11' Lane
1'
5'-0"
1' Shldr
1'
2'
24' ~ Width of Pavement
1' Shldr
1'
2'
1' Shldr
1'
2'
24' ~ Width of Pavement
1' Shldr
1'
2'
2'-0"
1'-0"
60' ~ Existing R.O.W. 60' ~ Existing R.O.W.
4:
1 4:1
2.00% 2.00%
P.G.L.
H.P. H.P.
P.O.S.S. P.O.S.S.
CL
P.G.L. ~ Profile Grade Line
H.M.A. ~ Hot Mix Asphalt
H.P. ~ Hinge Point
P.O.S.S. ~ Point of Slope Selection
~ Minimum 4" Topsoil or Specified Alternative
TYPICAL SECTION - N. 119TH ST.
2.00%
P.O.S.S.
P.O.S.S.
CL
4:1
6" ABC (Class 6)
4:
TYPICAL SECTION - EAST DITCH ACCESS
2.00%
P.O.S.S.
P.O.S.S.
CL
4:
6" ABC (Class 6)
4:1
TYPICAL SECTION - WEST DITCH ACCESS
P.O.S.S. P.O.S.S.
CL
4:1
6" ABC (Class 5)
4:
1.00%
TYPICAL SECTION - WEST DRIVEWAY
(PG 58-28)
(Grading SX) (50)
Top Lift = H.M.A.
H.M.A. PAVEMENT SECTION
ROADWAY TYPICAL SECTIONS
8 1/2" H.M.A. Pavement
8" A.B.C. (Class 6)
2.00% 2.00%
P.O.S.S. P.O.S.S.
CL
TYPICAL SECTION - N. 119TH ST.
10 1/2" H.M.A. Pavement
:1
:1
12+75.00, Lt. Only)
(Sta. 11+25.00 to
Ditch Swale
H.M.A. PAVEMENT JOINT DETAIL
shown in plans Limits of new pavement
Existing Pavement
3" (Min.) Mill and Overlay
Proposed Pavement
(Grading S) (75) (PG 58-28)
Bottom Lifts = H.M.A.
SAFETY EDGE DETAIL
2%
1•" Top Lift
@ 30° to 35° Slope
Wedge built with Top Lift
8" A.B.C.
4:1 4" Topsoil be paid for separately, but shall be included in the work.
Site preparation and additional earthwork required to construct the Safety Edge will not
Short sections of handwork will be allowed when necessary for transitions and turnouts.
the same compaction results.
The Contractor may use a Shoulder Wedge Maker or a similar device that produces
Wedge Device will be added to the Screed of the Paving Machine.
The Safety Edge will be constructed as part of the Roadway Pavement. A Shoulder
N.T.S.
N.T.S.
(Sta. 10+09.00 to 13+08.62, Sta. 13+18.34 to 15+96.00)
N.T.S.
(Sta. 13+08.62 to 13+18.34)
N.T.S.
(Requires 4 Lifts)
N.T.S.
(Sta. 13+37.16, Lt.)
N.T.S.
(Sta. 13+42.68, Rt.)
N.T.S.
(Sta. 13+81.32, Lt.)
N.T.S.
(4:
1 o r F lat ter
Va rie s (4:1 or Flatter)
Varies
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
CALL 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES BC-103-077DWS SEK
d s u n d e e n
:0
:3
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
T y p S e c t io n s .d g n
8/7/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
08/14/2024
GENERAL NOTES
GENERAL NOTES
SIGNING, STRIPING AND TRAFFIC CONTROL NOTES
DELIVERIES, ETC. AT ALL TIMES.
CONTRACTOR SHALL PROVIDE SAFE, LOCAL ACCESS FOR ALL ADJACENT PROPERTY OWNERS, EMERGENCY SERVICES, SCHOOL BUSES, AND PEDESTRIANS, HAS NOT BEEN SUBMITTED AND APPROVED BY THE BOULDER COUNTY ENGINEER OR TRAFFIC ENGINEER.
THE CONTRACTOR IS PROHIBITED FROM STARTING WORK AT ANY LOCATION IF A TRAFFIC CONTROL PLAN, INCLUDING BICYCLES
CONTROL DEVICES AND PERSONNEL PER SPECIAL PROVISIONS, SECTION 630 OF THE STANDARD SPECIFICATIONS AND THE MUTCD.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING, INSTALLING, AND MAINTAINING THE REQUIRED CONSTRUCTION ZONE TRAFFIC
2.)
1.)
EROSION AND STORMWATER NOTES
5.)
4.)
3.)
2.)
1.)
REMOVAL FROM THE PROJECT ONCE FINAL STABILIZATION HAS BEEN REACHED.
IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN EXISTING CONTROL MEASURES AND ENSURE THEIR COMPLETE
LANDSCAPING. EROSION CONTROL MEASURES SHALL BE PLACED CONTINUALLY AS DRAINAGE FEATURES ARE BEING CONSTRUCTED.
GOOD REPAIR BY THE CONTRACTOR, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR
OR OFF SITE, PRIOR TO ANY OTHER GROUND DISTURBING ACTIVITY. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN
ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION AND AT AREAS WITH DISTURBED SOIL, ON
THIS SHALL INCLUDE REMOVAL OF ANY DEBRIS CAUSED BY FLOODING.
TO FLOODING, REGARDLESS OF THE SOURCE OF WATER SHALL BE PROMPTLY DEWATERED AND RESTORED AT NO COST TO THE OWNER.
THE CONTRACTOR SHALL PROTECT ALL WORK AREAS AND FACILITIES FROM WATER AT ALL TIMES. AREA AND FACILITIES SUBJECTED
INCLUDED WITHIN THE DEWATERING PAY ITEM. A DETAILED DEWATERING PLAN SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW.
STATES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN THIS PERMIT. ALL COSTS ASSOCIATED WITH DEWATERING SHALL BE
BE REQUIRED IN ORDER TO COMPLETE THE WORK AND WATER WILL BE DISCHARGED INTO A CHANNEL OR WATERS OF THE UNITED
A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED ON THIS PROJECT SINCE DEWATERING WILL
ACQUIRED VIA https://www.bouldercounty.org/transportation/permits/stormwater-quality-permit/
MORE, OR IS WITHIN 100 HORIZONTAL FEET OF A WATERWAY. THE BOULDER COUNTY STORMWATER QUALITY PERMIT CAN BE
A BOULDER COUNTY STORMWATER QUALITY PERMIT (SWQP) IS REQUIRED FOR THIS PROJECT. BECAUSE IT DISTURBS ONE ACRE OR
BEST MANAGEMENT PRACTICES
THE OWNER'S REPRESENTATIVE OR ENGINEER IMMEDIATELY.
SPILLED INTO ANY SURFACE WATERS DURING THE COURSE OF CONSTRUCTION ACTIVITIES, THE CONTRACTOR/PERMITTEE MUST NOTIFY
THE CONTRACTOR/PERMITTEE MUST MAINTAIN A SPILL KIT ON SITE WHEN WORKING AROUND SURFACE WATERS. IF POLLUTANTS ARE
CONCRETE THAT ENDS UP ON THE GROUND.
PROPERLY. WASTED CONCRETE ALSO INCLUDES EXCESS CONCRETE REMOVED FROM FORMS, SPILLS, SLOP, AND ALL OTHER UNUSED
CONCRETE WASTED IN DESIGNATED DEWATERING AREAS SHALL BE COLLECTED, REMOVED FROM THE PROJECT SITE, AND DISPOSED OF
BE RECORDED ON THE SWMP SITE MAP.
ALL INLETS AND CULVERTS SHALL BE PROTECTED DURING ONSITE CONSTRUCTION ACTIVITIES. INLET PROTECTION LOCATIONS SHALL
BY THE ENGINEER. VEHICLE TRACKING CONTROL LOCATIONS SHALL BE RECORDED ON THE SWMP SITE MAP.
SEDIMENT EXITING THE PROJECT SITE ONTO PAVED PUBLIC ROADS. ACCESS SHALL BE PROVIDED ONLY AT LOCATIONS APPROVED
VEHICLE TRACKING CONTROLS SHALL BE USED AT ALL VEHICLE AND EQUIPMENT ACCESS POINTS TO THE SITE TO PREVENT
WITHIN 30 DAYS AFTER THE DATE OF WARRANTY PERFORMANCE OF THE WORK OR IN ACCORDANCE WITH BMPS.
LAND. UNLESS OTHERWISE SPECIFIED IN THE CONTRACT DOCUMENTS, OR OTHERWISE REQUESTED, REMOVE PERIMETER CONTROLS
SILT FENCE OR AN EQUIVALENT SHALL BE PLACED AS PERIMETER CONTROL ON ALL CONSTRUCTION ACTIVITIES THAT OCCUR ON
NECESSARY TO PREVENT THEIR FAILURE.
CONTRACTOR/PERMITTEE SHALL PERIODICALLY INSPECT ALL INSTALLED BMPS, PROVIDE MAINTENANCE, AND MAKE REPAIRS AS
6.)
5.)
4.)
3.)
2.)
1.)
https://www.bouldercounty.org/environment/trash/hauler-license/.
MATERIALS) IN UNINCORPORATED BOULDER COUNTY. SEE LINK OR ADDITIONAL INFORMATION:
DISCARDED MATERIALS (GARBAGE, RECYCLABLES OR COMPOSTABLES, CONSTRUCTION AND DEMOLITION WASTE, OR LANDSCAPING
DEPOSITED. THIS APPLIES TO THE PRIME CONTRACTOR AS WELL AS ANY SUBCONTRACTORS THAT COLLECT, TRANSPORT OR DISPOSE OF
A BOULDER COUNTY HAULER LICENSE IS REQUIRED FOR HAULING OF MATERIAL OFF SITE, REGARDLESS OF WHERE THE MATERIAL IS
DONE IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL ENVIRONMENTAL REGULATIONS AND POLICIES.
DISPOSAL OF EXCESS MATERIAL OFF-SITE OR THE IMPORTING OF MATERIALS ON-SITE, REGARDLESS OF PROPERTY OWNERSHIP, MUST BE
WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION REQUIRED IN THESE PLANS AS APPROVED BY BOULDER COUNTY.
UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO OR BETTER THAN, THAT
PROGRESSES. PREPARATION OF AS-BUILT PLANS WILL NOT BE PAID FOR SEPARATELY.
CONSTRUCTION SITE, AND AVAILABLE TO THE BOULDER COUNTY INSPECTOR AT ALL TIMES. THESE UPDATES SHALL BE DONE AS WORK
THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE
SHORING, TRAFFIC CONTROL AND SECURITY. REFER TO OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, OUTSIDE OF THE PROJECT'S LIMITS, UNLESS OTHERWISE APPROVED BY THE ENGINEER AT NO ADDITIONAL COST TO THE PROJECT.
UNLESS OTHERWISE SPECIFIED, REMOVAL ITEMS SHALL BECOME THE PROPERTY OF THE CONTRACTOR. REMOVALS SHALL BE DISPOSED OF
19.)
18.)
17.)
16.)
15.)
14.)
13.)
12.)
11.)
10.)
9.)
8.)
7.)
6.)
5.)
4.)
3.)
2.)
1.)
25.)
24.)
23.)
22.)
21.)
20.)
AND RESERVOIR COMPANY.
ALL WORK IN LEGGETT DITCH SHALL OCCUR WITHIN LEGGETT DITCH PRESCRIPTIVE EASEMENT, PER THE LEGGETT DITCH
OTHER ACTIVITY THAT WOULD ALTER EXISTING CONDITIONS.
CONSTRUCTION ACTIVITIES SHALL ALSO INCLUDE VEHICLE AND EQUIPMENT PARKING, DISPOSAL OF LITTER, AND ANY
DISTURBANCE BEYOND THOSE LIMITS SHALL BE RESTORED TO ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS OF DISTURBANCE. ANY
CONSTRUCTION INSPECTION AND MATERIAL TESTING WILL BE PROVIDED BY BOULDER COUNTY.
CONTRACTOR'S EXPENSE.
AREA. DAMAGED VEGETATION UNDESIGNATED FOR REMOVAL, SHALL BE REPLACED WITH SIMILAR ITEMS AT THE
CONTRACTOR SHALL PROTECT EXISTING VEGETATION NOT DESIGNATED FOR REMOVAL, INSIDE AND OUTSIDE THE PROJECT
EXPENSE, IN ACCORDANCE WITH CDOT SPECIFICATIONS, SECTION 629, SURVEY MONUMENTATION.
ANY MONUMENTS DISTURBED BY THE CONSTRUCTION OPERATIONS SHALL BE RESET BY THE CONTRACTOR AT THEIR
CONTRACTOR SHALL PROTECT ALL SURVEY AND RIGHT-OF-WAY MONUMENTATION DURING CONSTRUCTION OPERATIONS.
IN ACCORDANCE WITH THE PROJECT'S FLOODPLAIN DEVELOPMENT PERMIT.
EQUIPMENT AND MATERIAL STORAGE PRIOR TO CONSTRUCTION. ALL STAGING AND MATERIAL STORAGE AREAS SHALL BE
THE CONTRACTOR SHALL SUBMIT A PLAN TO BOULDER COUNTY FOR APPROVAL REGARDING LOCATION OF STAGING AREAS, RESTRICTIONS FOR COLORADO RAPTORS" GUIDELINES AVAILABLE AT COLORADO PARKS AND WILDLIFE DISTRICT OFFICES.
BIOLOGIST AND/OR REFER TO THE COLORADO PARKS AND WILDLIFE'S "RECOMMENDED BUFFER ZONES AND SEASONAL
FOR BIRDS OF PREY THAT COULD POTENTIALLY NEST NEAR THE PROJECT SITE, PLEASE CONTACT THE BOULDER COUNTY
MAINTAIN VEGETATION HEIGHT OF SIX (6) INCHES OR LESS MAY POSTPONE PROJECT CONSTRUCTION.
TRIMMING, SHALL BE IMPLEMENTED TO ASSURE VEGETATION DOES NOT GROW MORE THAN SIX (6) INCHES. FAILURE TO
APRIL 1. ONCE VEGETATION HAS BEEN REMOVED AND/OR TRIMMED, APPROPRIATE MEASURES, I.E. REPEATED MOWING/
AUGUST 31, VEGETATION SHALL BE REMOVED AND/OR TRIMMED TO A HEIGHT OF SIX (6) INCHES OR LESS PRIOR TO
BIRDS BEGIN TO NEST OR AFTER THE YOUNG HAVE FLEDGED. IF WORK ACTIVITIES ARE PLANNED BETWEEN APRIL 1 AND
CLEARING AND GRUBBING OF VEGETATION THAT MAY DISTURB GROUND NESTING BIRDS SHALL BE COMPLETED BEFORE
AUGUST 31 AND BEFORE APRIL 1.
SURVEY REQUIREMENT, IT IS RECOMMENDED THAT ALL VEGETATION THAT NEEDS TO BE REMOVED, BE REMOVED AFTER
IS FOUND, NO WORK MAY BE DONE WITHIN 50' OF THE NEST(S) UNTIL THE NESTS(S) BECOMES INACTIVE. TO AVOID THE
NESTS PRIOR TO ANY WORK ON OR UNDER THE BRIDGE OR ANY REMOVAL OF TREES OR SHRUBS. IF AN ACTIVE NEST(S)
SURVEY CONDUCTED BY BOULDER COUNTY OR OTHERS SHALL BE COMPLETED TO VERIFY THE ABSENCE OF ANY ACTIVE
CONTRACTOR SHALL COMPLY WITH THE MIGRATORY BIRD TREATY ACT OF 1918. BETWEEN APRIL 1 AND AUGUST 31 A
FOR CONCRETE TO BE PLACED ON THE PROJECT, THE SULFATE EXPOSURE LEVEL IS CLASS 0.
QUALITY PERMIT.
CONTRACTOR IS RESPONSIBLE FOR ACQUIRING A DEWATER PERMIT FROM CDPHE AND A BOULDER COUNTY STORMWATER
UNUSABLE MATERIALS.
COST TO THE PROJECT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN A DISPOSAL SITE FOR ALL
WASTE MATERIALS GENERATED BY THE CONTRACTOR SHALL BE DISPOSED OF BY THE CONTRACTOR AT NO ADDITIONAL
BUT WILL BE CONSIDERED A SUBSIDIARY OBLIGATION OF THE CONTRACTOR UNDER OTHER CONTRACT ITEMS.
THE CONTRACTOR SHALL MAINTAIN DRAINAGE DURING CONSTRUCTION. THIS WORK WILL NOT BE PAID FOR SEPARATELY, AND REMOVED BY THE CONTRACTOR.
TRAFFIC CONTROL SIGNING, BARRICADES AND CONSTRUCTION SIGNING SHALL BE FURNISHED, INSTALLED, MAINTAINED
BY THE CONTRACTOR.
EMBANKMENT, SITE GRADING AND CHANNEL SHAPING. SEED AND MULCH SHALL BE FURNISHED AND PLACED
SEEDING AND MULCHING WILL BE REQUIRED FOR ALL DISTURBED AREAS NOT SURFACED, INCLUDING ROADWAY
MATERIALS WITHIN THESE ESTABLISHED LIMITS.
CONFORMANCE AT NO ADDITIONAL COST TO THE PROJECT. THE CONTRACTOR SHALL KEEP EQUIPMENT AND
IN DISTURBANCE GREATER THAN 1 ACRE WILL REQUIRE THE CONTRACTOR TO OBTAIN PERMITTING AND NPDES
INDICATED IN THE PLANS AND AS DIRECTED BY THE ENGINEER. EXCEEDING THESE WORK LIMITS THAT RESULTS
THE CONTRACTOR SHALL WORK WITHIN THE LIMITS OF THE PERMANENT R.O.W. AND TEMPORARY EASEMENTS
SPECIAL PROVISION, REVISION OF SECTION 203, 206, 304 AND 603 - COMPACTION.
COMPACTION OF SOILS, AGGREGATE BASES, AND STRUCTURE BACKFILL SHALL BE DETERMINED BY CDOT STANDARD
WORKING HOURS.
PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT INCLUDING SAFETY OF ALL PERSONS AND
CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, PLANS M&S STANDARDS, AND BOULDER COUNTY MULTIMODAL TRANSPORTATION STANDARDS SHALL APPLY.
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION 2023 AND THE CURRENT STANDARD
EXCEPT WHERE OTHERWISE PROVIDED FOR IN THESE PLANS AND SPECIFICATIONS, THE COLORADO DEPARTMENT OF
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
CALL 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES BC-103-077DWS SEK
d s u n d e e n
:0
:1
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
G e n
N o t e s .d g n
8/7/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
FOR CONSTRUCTION08/14/2024
WASTE MANAGEMENT
CONSTRUCTION ACTIVITIES.
AREA SUFFICIENT TO ACCOMMODATE THE CONSTRUCTION CREW AND ALL OTHER AUTHORIZED PERSONS TO BE ONSITE DURING
THE CONTRACTOR/PERMITTEE SHALL PROVIDE A PORTABLE TOILET AND ASSOCIATED MAINTENANCE SCHEDULE FOR THE CONSTRUCTION
UNLESS SPECIFIED OTHERWISE.
THE CONTRACTOR/PERMITTEE SHALL NOT BURN, BURY, OR OTHERWISE DISCHARGE CONSTRUCTION OR DEMOLITION WASTE ON THE SITE
2.)
1.)
HAZARDOUS MATERIALS
OTHER SYSTEM TO CONTAIN SPILLED FUEL.
WATER, AND GROUND WATER. THE CONTRACTOR/PERMITTEE SHALL USE CONTAINMENT BERMS AND AN IMPERMEABLE BASE COURSE OR
C.) THE CONTRACTOR/PERMITTEE SHALL PREVENT HANDLING AND FUELING OPERATIONS FROM CONTAMINATING THE GROUND, SURFACE
EXTERNAL GREASE, OIL, AND MUD.
OTHER BODIES OF WATER. THE CONTRACTOR/PERMITTEE SHALL ENSURE EQUIPMENT THAT ENTERS THE WATER IS FREE FROM
B.) THE CONTRACTOR/PERMITTEE SHALL REFUEL AND SERVICE EQUIPMENT AWAY FROM FLOODPLAINS OF RIVERS, STREAMS AND
A.) THE CONTRACTOR/PERMITTEE SHALL EMPLOY PERSONS QUALIFIED TO HANDLE CONSTRUCTION EQUIPMENT FUELS AND LUBRICANTS.
HANDLING OF CONSTRUCTION FUELS AND LUBRICANTS:
NOTIFY THE ENGINEER.
THE CONTRACTOR/PERMITTEE SHALL IMMEDIATELY REPORT SPILLS TO THE PROPER REGULATORY AUTHORITY AND SHALL IMMEDIATELY
PROPERTY RESTORED TO ITS PRE--SPILL STATE IN ACCORDANCE WITH REGULATORY REQUIREMENTS.
REQUIREMENTS. SPILLED HAZARDOUS MATERIALS, INCLUDING HAZARDOUS LIQUID WASTES, SHALL BE REMOVED FROM THE SITE AND THE
THE CONTRACTOR/PERMITTEE SHALL TRANSPORT, USE, AND STORE HAZARDOUS MATERIALS IN ACCORDANCE WITH ALL REGULATORY
3.)
2.)
1.)
5.)
4.)
3.)
2.)
1.)
ENVIRONMENTAL NOTES
OR THEIR RUNOFF ENTERS WETLANDS OR WATERS OF THE U.S., WHETHER FLOWING OR DRY.
MATERIALS STOCKPILES: ALL STOCKPILED PROJECT MATERIALS SHALL BE LOCATED AWAY FROM SENSITIVE AREAS AND CONFINED SO THAT NO MATERIAL(S)
OR CONCRETE ADJACENT TO WETLANDS OR WATERS OF THE U.S.
WASTE MATERIALS: THERE SHALL BE NO STOCKPILING OR SIDE CASTING OF WASTE MATERIALS, INCLUDING BUT NOT LIMITED TO, PAINT CHIPS, ASPHALT
BE PAID FOR SEPARATELY, BUT WILL BE INCLUDED IN THE COST OF THE WORK.
LEAKAGE CONTROL AND CLEANUP SHALL REMAIN THE PROPERTY OF THE CONTRACTOR. THE COST OF CONTROL AND CLEANUP OF POL LEAKS WILL NOT
CONTAINERS OF SUFFICIENT CAPACITY TO CONTAIN ANY LEAK OF POL THAT CAN REASONABLY BE FORESEEN. ALL MATERIALS RESULTING FROM POL
LUBRICANTS (POL) ARE NOT LEAKING ONTO THE SOIL OR PAVEMENT. THE CONTRACTOR SHALL HAVE READY APPROVED ABSORBENT MATERIALS OR
WASTE MANAGEMENT: CONTRACTOR SHALL INSPECT EQUIPMENT AND VEHICLES AS OFTEN AS IS NECESSARY TO INSURE THAT PETROLEUM, OILS AND
HTTPS://WWW.COLORADO.GOV/PACIFIC/AGCONSERVATION/NOXIOUS-WEED-SPECIES. WEED CONTROL SHALL BE INCLUDED IN THE COST OF THE WORK.
MUST BE CONTROLLED IN ACCORDANCE WITH STATE REQUIREMENTS. THE STATE WEED LIST IS AVAILABLE HERE:
NOXIOUS WEEDS: NOXIOUS WEEDS MAY PERSIST ON OR ADJACENT TO THE PROJECT LOCATION. NOXIOUS WEEDS ON THE STATE A & B WEEDS LIST
GUIDELINES (https://cpw.state.co.us/Documents/WildlifeSpecies/LivingWithWildlife/Raptor-Buffer-Guidelines.pdf#search=bird%20buffer%20zone).
FOLLOW THE COLORADO PARKS AND WILDLIFE'S "RECOMMENDED BUFFER ZONES AND SEASONAL RESTRICTIONS FOR COLORADO RAPTORS"
MUST BE COMPLETED WITHIN A HALF-MILE BUFFER OF THE PROJECT LIMITS. IF ANY NESTING RAPTORS OCCUR WITHIN THIS BUFFER AREA, BIRDS OF PREY: IF CONSTRUCTION OCCURS BETWEEN FEBRUARY 15 AND AUGUST 31, A PRE-CONSTRUCTION SURVEY FOR NESTING RAPTORSD.
OF SIX (6) INCHES OR LESS MAY POSTPONE PROJECT CONSTRUCTION.
SHALL BE IMPLEMENTED TO ASSURE VEGETATION DOES NOT GROW MORE THAN SIX (6) INCHES. FAILURE TO MAINTAIN VEGETATION HEIGHT
PRIOR TO APRIL 1. ONCE VEGETATION HAS BEEN REMOVED AND/OR TRIMMED, APPROPRIATE MEASURES, I.E. REPEATED MOWING/TRIMMING, OCCUR BETWEEN APRIL 1 AND AUGUST 31. VEGETATION SHALL BE REMOVED AND/OR TRIMMED TO A HEIGHT OF SIX (6) INCHES OR LESS
COMPLETED BEFORE BIRDS BEGIN TO NEST OR AFTER THE YOUNG HAVE FLEDGED. IN COLORADO, MOST NESTING AND REARING ACTIVITIES
CLEARING/GRUBBING ACTIVITIES: CLEARING AND GRUBBING OF VEGETATION THAT MAY DISTURB GROUND NESTING BIRDS SHALL BEC.
ESTABLISHED MAY POSTPONE PROJECT CONSTRUCTION.
APPROPRIATE MEASURES TAKEN TO ASSURE NO NEW NESTS ARE CONSTRUCTED. FAILURE TO REMOVE AND KEEP NESTS FROM BECOMING
AUGUST 31. IF WORK ACTIVITIES ARE PLANNED BETWEEN THESE DATES, NESTS SHALL BE REMOVED BEFORE NESTING BEGINS AND
TO NEST OR AFTER THE YOUNG HAVE FLEDGED. IN COLORADO, MOST NESTING AND REARING ACTIVITIES OCCUR BETWEEN APRIL 1 AND
BRIDGE/CULVERT WORK: BRIDGE OR CULVERT WORK THAT MAY DISTURB NESTING BIRDS SHALL BE COMPLETED BEFORE BIRDS BEGINB.
ANY TREE REMOVAL OR TRIMMING ACTIVITIES BEGIN.
HOWEVER, SINCE SOME BIRDS NEST AS EARLY AS FEBRUARY, A NESTING BIRD SURVEY SHALL BE CONDUCTED BY A BIOLOGIST BEFORE
AFTER THE YOUNG HAVE FLEDGED. IN COLORADO, MOST NESTING AND REARING ACTIVITIES OCCUR BETWEEN APRIL 1 AND AUGUST 31.
TREE TRIMMING/REMOVAL: TREE TRIMMING AND/OR REMOVAL ACTIVITIES SHALL BE COMPLETED BEFORE BIRDS BEGIN TO NEST ORA.
HAVE AN IMPACT, THE FOLLOWING CONDITIONS APPLY.
THE MIGRATORY BIRD TREATY ACT (MBTA) PROTECTS MIGRATORY BIRDS AND THEIR NESTS AND EGGS. FOR PROJECTS THAT COULD POTENTIALLY
ENVIRONMENTAL NOTES (CON'T.)
RESPONSIBLE PARTY UNTIL CDPS PERMIT IS CLOSED.
OF THE WALKTHROUGH IS TO IDENTIFY ANY AREAS WHERE CONTROL MEASURES NEED TO BE REMOVED OR MAINTAINED AND IDENTIFICATION OF
ONCE VEGETATION HAS BEEN COMPLETED, THE ENGINEER AND THE CONTRACTOR WILL CONDUCT A WALKTHROUGH OF THE PROJECT SITE. THE PURPOSE
GREATER THAN 130 DEGREES FAHRENHEIT FOR AT LEAST 10 MINUTES.
REMOVE ALL MUD AND DEBRIS FROM EQUIPMENT (TRACKS, TURRETS, BUCKETS, DRAGS, TEETH, ETC.) AND SPRAY/SOAK EQUIPMENT WITH WATERC.
ALL EQUIPMENT MOIST FOR AT LEAST 10 MINUTES, OR
SOLUTION OF FORMULA 409 HOUSEHOLD CLEANER AND WATER, OR A 1:15 SOLUTION OF SPARQUAT INSTITUTIONAL CLEANER AND WATER. KEEP
REMOVE ALL MUD AND DEBRIS FROM EQUIPMENT (TRACKS, TURRETS, BUCKETS, DRAGS, TEETH, ETC.) AND SPRAY/SOAK EQUIPMENT WITH A 1:1B.
DAYS; OR
REMOVE ALL MUD AND DEBRIS FROM EQUIPMENT (TRACKS, TURRETS, BUCKETS, DRAGS, TEETH, ETC.) AND THEN KEEP EQUIPMENT DRY FOR 10A.
PROJECT COMPLETION, PRIOR TO EQUIPMENT BEING USED IN ANOTHER STREAM, RIVER, LAKE, POND OR WETLAND FOR THE SAME PURPOSE:
BOOTS, OR OTHER EQUIPMENT THAT WILL BE SUED IN THE WATER WITH ONE OF THE BELOW METHODS. THESE PRACTICES ALSO ARE NECESSARY AFTER
TO PREVENT THE SPREAD OF NEW ZEALAND MUD SNAILS AND OTHER AQUATIC HITCHHIKERS INTO THIS DRAINAGE. ALSO CLEAN ANY HAND TOOLS, WETLAND WITHIN 10 DAYS OF WORKING ON THIS PROJECT, ONE FO THE FOLLOWING DISINFECTION PRACTICES IS NECESSARY PRIOR TO CONSTRUCTION
CONDITIONS FOR WORK IN STREAMS. IF HEAVY EQUIPMENT IS USED THAT WAS PREVIOUSLY WORKING IN ANOTHER STREAM, RIVER, LAKE, POND OR
INVASIVE AQUATIC SPECIES: THE UNITED STATES ARMY CORPS OF ENGINEERS (USACE) AND THE COLORADO PARKS & WILDLIFE HAVE THE FOLLOWING
7.)
6.)
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
CALL 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES BC-103-077DWS SEK
d s u n d e e n
:0
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
G e n
N o t e s .d g n
8/7/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
6.)
5.)
4.)
3.)
2.)
1.)
UTILITY NOTES
SEE SUE PLANS
UTILITY CONTACTS:
WORK.
ALL COSTS INCIDENTAL TO THE FOREGOING REQUIREMENTS WILL NOT BE PAID FOR SEPARATELY BUT SHALL BE INCLUDED IN THE
SHALL HOLD THE COUNTY HARMLESS FOR ANY AND ALL DAMAGES TO LIVE UTILITIES ARISING FROM THEIR CONSTRUCTION OPERATIONS.
THE CONTRACTOR SHALL HAVE THE RESPONSIBILITY OF PROTECTING LIVE UTILITIES DURING THEIR CONSTRUCTION OPERATIONS AND
SHALL ALSO BE LOCATED PRIOR TO BEGINNING EXCAVATING OR GRADING.
ALL OTHER UNDERGROUND FACILITIES SHALL BE LOCATED BY CONTACTING THE RESPECTIVE COMPANY. UTILITY SERVICE LATERALS
1-800-922-1987 AT LEAST 3 DAYS (NOT INCLUDING THE DAY OF NOTIFICATION) PRIOR TO ANY EXCAVATION OR OTHER EARTHWORK.
COLORADO (UNCC) TO HAVE LOCATIONS OF UNCC REGISTERED LINES MARKED BY MEMBER COMPANIES. CONTACT THE UNCC AT
LEAST THREE (3) BUSINESS DAYS PRIOR TO COMMENCING SUCH OPERATIONS. CONTACT THE UTILITY NOTIFICATION CENTER OF
IS PLANNED IN THE AREA OF UNDERGROUND UTILITY FACILITIES. THE CONTRACTOR SHALL NOTIFY ALL AFFECTED UTILITIES AT
THE CONTRACTOR SHALL COMPLY WITH ARTICLE 1.5 OF TITLE 9, CRS ("EXCAVATION REQUIREMENTS") WHEN EXCAVATION OR GRADING
PARAGRAPH 105.11 OF THE STANDARD SPECIFICATIONS CONCERNING UTILITIES.
UNDERGROUND UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR'S ATTENTION IS DIRECTED TO
THE CONTRACTOR IS RESPONSIBLE FOR MAKING THEIR OWN DETERMINATION AS TO THE TYPE AND LOCATION OF ABOVE GROUND AND
AVAILABLE INFORMATION.
THE LOCATION OF UTILITY FACILITIES AS SHOWN ON THE PLAN SHEETS, AND HEREIN DESCRIBED, WERE OBTAINED FROM THE BEST
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
CALL 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES BC-103-077DWS SEK
d s u n d e e n
:0
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
G e n
N o t e s .d g n
8/7/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
SUMMARY OF APPROXIMATE QUANTITIES
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
CALL 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES BC-103-077DWS SEK
d s u n d e e n
:0
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
S O
A Q .d g n
8/7/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
SUMMARY OF APPROXIMATE QUANTITIES
NOTE: REINFORCING STEEL FOR CAST-IN-PLACE CONCRETE WILL NOT BE PAID FOR SEPARATELY, BUT SHALL BE INCLUDED IN ITEM 601, CONCRETE CLASS D (BOX CULVERT).
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
UNDERGROUND MEMBER UTILITIES
OR EXCAVATE FOR THE MARKING OF
ADVANCE BEFORE YOU DIG, GRADE,
CALL 2-BUSINESS DAYS IN
BC-103-077DWS SEK
d s u n d e e n
:2
P
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
S O
A Q .d g n
8/13/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
TABULATIONS
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
UNDERGROUND MEMBER UTILITIES
OR EXCAVATE FOR THE MARKING OF
ADVANCE BEFORE YOU DIG, GRADE,
CALL 2-BUSINESS DAYS IN
BC-103-077DWS SEK
d s u n d e e n
:5
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
T A
B S .d g n
8/7/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
W
T
E
W
G
T
40'0' 20' 80'
Ground Line along H.C.L.
Approximate Existing
Proposed 8' x 4' CBC
L e g g e t t
D it c h
PLAN
PROFILE
PLAN AND PROFILE GRADE
Proposed Grade
Existing Structure (To be Removed)
Ditch Access (W=10')
Sta. 13+37.16, Lt. Req'd.
Driveway Access (W=10')
Sta. 13+81.32, Lt. Req'd.
Ditch Access (W=12')
Sta. 13+42.68, Rt. Req'd.
Section Line
Existing R.O.W. (Typ.)
Toe of Fill (Typ.)
N. 119th St.
N. 119th St.
BEGIN PROJECT
(MATCH EXISTING)
STA. 10+09.00
END PROJECT
(MATCH EXISTING)
STA. 15+96.00
Existing Structure (To be Removed) concrete walls (To be Removed)
Existing abandoned headgate and but shall be included in Item 202, Removal of Structure.
Note: Removal of existing guardrail will not be paid for separately, A.B.C. (Class 6) (Typ.)
L n
L n
P v m n t
Extend HMA to existing R.O.W. (Typ.)
18' Clear Zone (Typ.)
End Section
(HDPE) with Plastic (HDPE)
Proposed 18"Ý x 43' Plastic
12" min. cover over pipe).
driveway profile shall provide
Future Driveway (Proposed
D e t a il s in
P la n s
B C .0
A
R e q 'd
C u lv e r t
S t r
N o
S t a
.6 t o
.3
Proposed Precast 8' x 4' CBC
Footing, Apron and Toe Wall (Typ.)
Cast-in-Place Headwall, Wingwall, Remove Existing 15" Metal Pipe
Remove Existing 15" Metal Pipe
Proposed Roadside Swale and be protected during construction)
Existing Water Meter (To remain in place
Access
West Ditch
East Ditch Access
West Driveway
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
CALL 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES BC-103-077DWS SEK
d s u n d e e n
:3
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
P
P .d g n
8/13/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
FOR CONSTRUCTION
P I
.0
P I
.2
P I
.5
P I
.2
P I
.0
50605060
50605060
10+00 11+00 12+00 13+00 14+00 15+00 16+00
V P
C
.6
E L
.0
V P I
.1
E L
.2
' V
P T
.6
E L
.7
V P
C
.4
E L
.8
' V P I
.4
E L
.7
V P
T
.4
E L
.0
' V
P C
.8
E L
.1
V P I
.3
E L
.0
V P
T
.8
E L
.9
VPI=15+96.00
EL.=5033.94'
-3.60%
-2.00%
-4.50%
-3.14%
V.C. = 155.00' e = 0.31'
SSD = 430'
K = 97.03
V.C. = 210.00' e = -0.66'
SSD = 537'
K = 84.00
V.C. = 135.00' e = 0.23'
SSD = 437'
K = 99.00
V P I
.0
E L
.0
MDS = 50 MPH
MDS = 50 MPH
MDS = 50 MPH
PSD = 800'
PSD = N/A
PSD = N/A
E
G
'0 "160°
41'0"
°7 '10
10'-0"R
R
WEST DITCH ACCESS PLAN AND PROFILE
P I
.0
P I
.1
P I
.0
P I
.7
10'0' 5' 20'
10'0' 5'
0'
2'
1'
Ground Line
Approximate Existing
Proposed Grade
Ditch Access Sta. 0+00.00
N. 119th St. Sta. 13+37.16 =
Existing R.O.W.
Edge of Asphalt (Typ.)
PLAN
PROFILE
H
S
Edge of A.B.C.
Ò Driveway & H.C.L.Lt. 12.00
13+49.61
Lt. 18.69
13+40.18
Lt. 18.65
13+29.59
Lt. 12.00
13+24.87
Lt. 25.10
13+32.63
KC
18' Clear Zone (Typ.)
concrete walls (To be Removed)
Existing abandoned headgate and
Lefthand Water District buried Water Line
Electric (Typ.)
Xcel Energy Overhead
Gas Line
Xcel Energy buried
Comcast buried CATV
Toe of Fill (Typ.)
Existing Electric Pedestal
Existing Overhead Electric PoleLEGEND
LIMITS OF A.B.C. PLACEMENT ONLY
LIMITS OF ASPHALT PLACEMENT
E 3118991.94
N 1290664.98
(Match Existing)
Sta. 0+60.00
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
CALL 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES BC-103-077DWS
d s u n d e e n
:3
:2
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
A c c e s s .d g n
8/13/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
FOR CONSTRUCTION
50455045
50455045
0+001+00
V P
C
.5
E L
.0
V P I
.0
E L
.9
V P
T
.5
E L
.8
V P
C
.5
E L
.7
V P I
.5
E L
.1
V P
T
.5
E L
.2
V P I
.0
E L
.2
-2.00%
-4.0 0%
0.73%
V.C. = 5.00' e = -0.01'
SSD = 542'
K = 2.50
V.C. = 30.00' e = 0.18'
SSD = 91'
K = 6.35
V P I
.0
E L
.2
E X I
O
T
E
'0
179°38'13"
R
R
EAST DITCH ACCESS PLAN AND PROFILE
10'0' 5' 20'
10'0' 5'
0'
2'
1'
Ground Line
Approximate Existing
Proposed Grade
Ditch Access Sta. 0+00.00
N. 119th St. Sta. 13+42.68 =
Existing R.O.W.
Edge of Asphalt (Typ.)
E 3119129.50
N 1290685.66
(Match Existing)
Sta. 0+80.00
PLAN
Edge of A.B.C.
Ò Driveway & H.C.L.
P I
.0
P I
.4
P I
.2
Rt. 34.77
13+42.73
Rt. 12.00
13+63.68
Rt. 27.10
13+48.68
Rt. 26.90
13+36.68
Rt. 12.00
13+21.68
KC
18' Clear Zone (Typ.)
concrete walls (To be Removed)
Existing abandoned headgate and
Electric (Typ.)
Xcel Energy Overhead
Gas Line
Xcel Energy buried Comcast buried CATV buried Water Line
Lefthand Water District
Toe of Fill (Typ.)
LEGEND
LIMITS OF A.B.C. PLACEMENT ONLY
LIMITS OF ASPHALT PLACEMENT
Existing Overhead Electric Pole
Existing CenturyLink Pedestal
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
CALL 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES BC-103-077DWS
d s u n d e e n
:0
:2
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
A c c e s s .d g n
8/7/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
FOR CONSTRUCTION
50455045
50455045
0+00 1+00
V P
C
.5
E L
.8
V P I
.0
E L
.7
V P
T
.5
E L
.6
V P
C
.6
E L
.4
V P I
.6
E L
.8
V P
T
.6
E L
.0
-2.00%
-4.00%
1.05%
V.C. = 5.00' e = -0.01'
SSD = 542'
K = 2.50
V.C. = 30.00' e = 0.19'
SSD = 84'
K = 5.94
V P I
.0
E L
.0
V P I
.0
E L
.0
E X I
W
T
'0
178°5'40"
179°9'45"
R
15'-0"R
M in
5'-0"
10'0' 5' 20'
10'0' 5'
0'
2'
1'
Ground Line
Approximate Existing
Proposed Grade
Ditch Access Sta. 0+00.00
N. 119th St. Sta. 13+81.32 =
Existing R.O.W.
Edge of Asphalt (Typ.)
PLAN
Edge of A.B.C.
Ò Driveway & H.C.L.
P I
.0
P I
.5
P I
.5
P I
.0
Temporary Construction Easement
E 3118979.39
N 1290722.14
(Match Existing)
Sta. 0+70.00
WEST DRIVEWAY ACCESS PLAN AND PROFILE
Lt. 25.72
13+81.28
Lt. 26.50
13+86.26
Lt. 27.50
13+76.22
Lt. 12.00
13+61.23
Lt. 12.00
14+01.25
KC
18' Clear Zone (Typ.)
Edge of Timber Curb
(Min.)
T y p
Gas Line
Xcel Energy buried
Comcast buried CATV
Electric (Typ.)
Xcel Energy Overhead buried Water Line (Typ.)
Lefthand Water District
LEGEND
LIMITS OF A.B.C. PLACEMENT ONLY
LIMITS OF ASPHALT PLACEMENT
Toe of Fill (Typ.)
Existing Overhead Electric Pole
ENGINEERING DIVISION
BOULDER COUNTY PUBLIC WORKS
DESIGNED:
PROJECT NO:
DATE:CAD/C3D: CHECKED:
REVISION DESCRIPTION:DATECALL UTILITY NOTIFICATION CENTER OF COLORADO
R E
V
IS
IO
N S
: NO.
SHEET NO:
R
CALL 2-BUSINESS DAYS IN
ADVANCE BEFORE YOU DIG, GRADE,
OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES BC-103-077DWS
d s u n d e e n
:1
A E
B
B O
U C
O f in a l-d s g n d r a w in g s
D
E S I
L
E S
D e s ig n
D r a w in g s
A c c e s s .d g n
8/7/2024
N. 119TH ST. AT LEGGETT DITCH STRUCTURE REPLACEMENT
PK
FOR CONSTRUCTION
0+001+00
V P
C
.5
E L
.3
V P I
.0
E L
.2
V P
T
.5
E L
.1
V P
C
.9
E L
.8
V P I
.9
E L
.9
V P
T
.9
E L
.9
-2.00%
-6.
-0.29% V.C. = 5.00' e = -0.02'
SSD = 272'
K = 1.25
V.C. = 30.00' e = 0.21'
SSD = 72'
K = 5.25
V P I
.0
E L
.9
E L
.5
V P I
.0
E X I
W
T E
M P
O R
A
Y
S E
M E
N
BC-000304-2.0A
STRUCTURE NO.
N
QUAIL RD.
PROSPECT RD.
PIPIT RD.
OXFORD RD.
U S
QUICKSILVER RD.
E
C O
U N
Y
L
D
N
SH-119
DETOUR PLAN
KF
F
K
G
G
M4-8
DETOUR
M4-9L M4-9R M4-8a
M5-1M6-3
R11-2
A B C D E
F G
K
LEGEND OF TRAFFIC CONTROL SIGNS
B B
B
B
B
B
B B
B B
C
D
B
B
B
B
C
D
K
K
B
B
E
E
A
A
Leggett
Ditch
H
R11-3b
H
119th St 119th St 119th St 119th St
WITH FLASHERS
(2) TYPE III BARRICADES
WITH FLASHERS
(2) TYPE III BARRICADES
R3-1
I J
JC
DI
R3-1
H
1,600'0' 800' 3,200'
SIGN PANEL
PORTABLE MESSAGE
AM
TRAFFIC CONTROL (SPECIAL)
SE…
This is the start of the file's text. The full file is on GovTribe.