This is a Stage II Invitation to Bid document and approved mechanical plans prepared by the State of Utah's Division of Facilities Construction and Management (DFCM) for the Otter Creek Maintenance HVAC project (#27134510) at 480 UT-22, Antimony, UT 84712, in partnership with the Department of Natural Resources-State Parks. The project scope involves removing an existing roof-mounted evaporative cooler (swamp cooler) and unit heater, then installing a new split-system propane furnace with a new split condensing unit and associated HVAC accommodations. The approved plans include mechanical demolition, floor plans for two levels, mechanical sections, and detailed specifications for ductwork, refrigerant piping, gas piping, electrical connections, and component schedules. Only contractors prequalified under Stage I Prequalification and currently listed on the DFCM Prequalified Contractors list are eligible to submit bids for this project. The construction cost estimate is $70,600.00.
The approved mechanical plans specify a Trane 5TXC+S9X1D furnace/cooling coil unit with 1,995 CFM total capacity, a Trane 5TTR3060A1 condensing unit with 60,000 Btu/h cooling load and R-454B refrigerant, a 7-day programmable thermostat with auto-changeover capability, and a complete ductwork system with supply and return air components. The contractor is responsible for coordinating with design-build electrical contractors to provide all new wiring, circuit breakers, panels, and electrical accommodations; all roofing modifications must be performed by approved roofing contractors from the DFCM short list. A licensed and approved Test & Balance contractor must provide a full test and balance report of all impacted systems. The work must comply with 2024 International Mechanical Code and International Plumbing Code with Utah annotations and include field verification of all existing conditions prior to fabrication or equipment ordering.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SE
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
North: ______ South: ______ East: ______ West: ______
d) Unlimited Area Building: Yes ______ No ______ Code Section: ______ a a
3) Three Story: A (3)______
2) Two Story: A (2)______
1) One Story: ______
c) Total Allowable Area for:
1_< Allowable Area
Actual Area
b) Sum of the Ratio Calculations for Mixed Occupancies:
a) 0.25I = 100f
F
P 30
WstA I
100100 fIA t taA = A + +
Official for Complex Buildings. Including, but not limited to:
g) Fire Stopping, Including Tested Design Number.
f) Exterior and Interior Accessibility Route.
e) Fire Assembly Locator Sheet.
a) High Rise Requirements.
b) Atriums.
c) Performance Based Criteria.
d) Means or Egress Analysis.
2) Additional Code Information shall be provided at the discretion of the Building
Code Accessibility Chapters, the more restrictive requirement shall govern.
through - ADA Guidelines and specific reference to the International Building
1) In case of conflict with the U.S. Department of Justice Federal Registers Parts
FOOTNOTES:
d) Drinking Fountains: ______ Service Sinks: ______
c) Bath Tubs or Showers: ______
b) Lavatories - Required (m) ______ (f) ______ Provided (m) ______ (f) ______
a) Water Closets - Required (m) ______ (f) ______ Provided (m) ______ (f) _____
M. Minimum Number of Required Plumbing Facilities:
Exit Width Required: ______ Exit Width Provided: ______
Element Hours Assembly
ListingListing Element
Assembly Hours
Smoke Partitions
Fire Partitions
Exterior Bearing Walls
Interior Bearing Walls
Exterior Non-Bearing Walls
Structural Frame
Partitions - Permanent
Fire Barriers
Floors - Ceiling Floors
Roofs - Ceiling Roofs
Exterior Doors and Windows
Shaft Enclosures
Fire Walls
BAHTBABABA
L. Design Occupant Load: ______
K. Fire Resistance Rating Requirements for Building Elements (hours).
Area Modifications:J:
____________________________________________Tabular Area:I:
per Floor (square feet): __________________________Actual AreaH:
Number of Stories: ______ Building Height: ______G:
Required: ______ Provided: ______ Type of Sprinkler System: ____________
Sprinklers:F:
Mixed Occupancies: ______ Nonseparated Uses: ______E.
separation distance (in hours):
Requirements for the Exterior Walls based on the fireFire Resistance RatingD.
Special Use and Occupancy (e.g. High Rise, Covered Mall): __________________
Design Wind Speed: ______ mphB. Seismic Design Category: ______
C. Type of Construction (circle one):
Change in Use: Yes ______ No ______ Mixed Occupancy: Yes ______ No ______
A. Occupancy and Group: ________ ________ ________ ________ ________
CODE ANALYSIS
Guidelines
ADA Accessibility
Building Conservation
Uniform Code for
National Electrical Code
Conservation Code
International Energy
International Fire Code
International Plumbing Code
International Mechanical Code
International Building Code
YearYear
APPLICABLE CODES
IND
USTRY
OTTER CREEK MAINTENANCE
BUILDING HVAC
DFCM #27134510
09/02/2026
480 UT-22,
Antimony, UT 84712
GENERAL:
G001 - TITLE SHEET
G002 - SPECIAL INSPECTIONS AND TESTING
MECHANICAL:
MG001 - MECHANICAL LEGEND AND GENERAL NOTES
MD101 - MECHANICAL DEMOLITION FLOOR PLAN
ME101 - MECHANICAL FLOOR PLANS
ME301 - MECHANICAL SECTION
ME501 - MECHANICAL DETAILS
ME502 - MECHANICAL DETAILS
ME601 - MECHANICAL SCHEDULES
DRAWING INDEX:
DEFERRED SUBMITTALS: SEISMIC
SPECIAL INSPECTIONS:
1. SEE SHEET DRAWING G002.
DESIGN CRITERIA:
THESE DOCUMENTS - DRAWINGS AND
SPECIFICATIONS COMPLY WITH ALL THE
REQUIREMENTS OF THE DFCM STANDARDS FOR
MECHANICAL UPGRADES OF EXISTING BUILDING.
CODE INSPECTION REQUIREMENTS:
1. BEFORE A FINAL ACCEPTANCE CAN BE ISSUED,
THE STATE APPOINTED CODE INSPECTOR SHALL
PROVIDE A FINAL REPORT RECOMMENDING THAT
THE NEW MECHANICAL WORK IS IN COMPLIANCE
WITH THE DRAWINGS, SPECIFICATIONS AND
APPLICABLE CODES ESPECIALLY FOR THE
FOLLOWING ITEMS.
2. SEE ALSO SHEET G002.
CODE REVIEW STAMP
SCOPE:
REMOVE EXISTING SWAMP COOLER.
PROVIDE A NEW SPLIT SYSTEM PROPANE
FURNACE AND NEW SPLIT CONDENSING
UNIT. PROVIDE A NEW MAIN ELECTRICAL
ACCOMMODATIONS FOR THE NEW HVAC
SYSTEM.
N/A
N/A
N/A
X X
N/A N/A
N/A N/A N/A N/A
N/A N/A
N/A N/A
2 22'
1,050 SF
S1
G001
20232024
T H E
G R E A T
S E
A L
OF THE
S
T A T E
O F
U T A H
State of Utah-Department of Administrative Services
DIVISION OF FACILITIES CONSTRUCTION AND MANAGEMENT
4315 South 2700 West, Floor 3/Taylorsville, Utah 84129-2128
PROJECT SITE
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
09/09/2026
REVIEWED FOR CODE
COMPLIANCE
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
H W
N G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A D
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
09/02/2026MO
WP
09/02/26
26094
CL
SPECIAL
INSPECTIONS AND
TESTING
G002
OTTER CREEK
MAINTENANCE HVAC
DFCM #27134510
480 UT-22, Antimony, UT 84712
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
09/09/2026
1"ø LP (E)
3/4"ø CW (E)
3/4"ø CD (E)
1"ø CW (E)
1"ø HW (E)
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL
AND ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT
LIMITED TO: EXISTING ROUTING AND LOCATION OF
DUCTWORK, PIPING, ELECTRICAL AND STRUCTURAL
ELEMENTS. CONTRACTOR SHALL FIELD VERIFY POTENTIAL
CONFLICTS BETWEEN NEW MECHANICAL ELEMENTS AND
EXISTING CONDITIONS PRIOR TO BEGINNING FABRICATION OR
ORDERING EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL COORDINATION
BETWEEN SUB-TIER CONTRACTORS. THIS SHALL INCLUDE THE
COORDINATION BETWEEN SUB-TIER CONTRACTORS, SUB-TIER
CONTRACTORS AND FACILITIES, SUB-TIER CONTRACTORS
AND ARCHITECT/ENGINEER, ETC.
3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL BE
BROKEN DOWN TO FIT THROUGH DESIGNATED PATHWAYS.
FIELD VERIFY EXACT SCOPE OF DEMOLITION AND REMOVAL
PATH. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY
DAMAGE TO BUILDING DURING REMOVAL OF EQUIPMENT AND
MATERIAL.
4. SOME EXISTING PIPING AND EXISTING DUCTWORK NOT
SHOWN ON THIS SHEET FOR CLARIFICATION. FIELD VERIFY
EXISTING CONDITIONS PRIOR TO BID.
5. CONTRACTOR SHALL MAKE PROVISIONS WITH A DESIGN
BUILD ELECTRICIAN TO VERIFY ELECTRICAL CONDITIONS.
DESIGN BUILD CONTRACTOR SHALL PROVIDE ANY NEW
WIRING, CIRCUIT BREAKERS, PANELS, SWITCH GEAR, AND ALL
NECESSARY ELECTRICAL ACCOMMODATIONS OR ANY NEW OR
RELOCATED MECHANICAL EQUIPMENT. CONTRACTOR SHALL
COORDINATE THE DEMOLITION AND REMOVAL OF ANY
ELECTRICAL ELEMENTS ASSOCIATED WITH EXISTING
MECHANICAL BEING REMOVED. ALL ABANDONED PIPING AND
WIRING SHALL BE REMOVED BACK TO PANEL UNLESS
OTHERWISE APPROVED. ELECTRICIAN SHALL FIELD VERIFY
AND CONFIRM ELECTRICAL SCOPE AND EXISTING CONDITIONS
PRIOR TO ANY DEMOLITION WORK AND ORDERING ANY NEW
MECHANICAL EQUIPMENT.
6. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED BY
APPROVED ROOFING CONTRACTOR FROM THE DFCM SHORT
LIST.
7. PROVIDE FULL TEST AND BALANCE REPORT OF ALL
IMPACTED SYSTEMS BY LICENSED AND APPROVED TEST &
BALANCE CONTRACTOR.
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
09/02/2026MO
WP
09/02/26
26094
CL
MECHANICAL
DEMOLITION FLOOR
PLAN
MD101
OTTER CREEK
MAINTENANCE HVAC
DFCM #27134510
480 UT-22, Antimony, UT 84712
3/8" = 1'-0"
LEVEL 1 MECHANICAL DEMOLITION
PLAN
SHEET NOTES
1 REMOVE EXISTING ROOF MOUNTED EVAPORATIVE
COOLER AND ALL ASSOCIATED ITEMS IN THIS
APPROXIMATE LOCATION. COORDINATE WITH DFCM
SHORT LISTED ROOFING CONTRACTOR TO PATCH
AND REPAIR ROOF WEATHER/WATER TIGHT. REMOVE
EXISTING ELECTRICAL BACK TO PANEL. REMOVE ALL
ASSOCIATED ELECTRICAL ACCOMODATIONS AND
EXISTING CONDUIT. REMOVE EXISITNG DOMESTIC
WATER BACK TO MAIN AND CAP. REMOVE EXISTING
DRAIN PIPING. FIELD VERIFY.
2 REMOVE EXISTING UNIT HEATER AND ALL
ASSOCIATED ITEMS IN THIS APPROXIMATE
LOCATION. SALVAGE UNIT BACK TO OWNER. REMOVE
EXISTING PROPANE PIPING BACK TO MAIN AND CAP.
FIELD VERIFY. REMOVE EXISTING FLUE AND PATCH
AND REPAIR EXISTING ROOF PENETRATION. REMOVE
ALL EXISTING ELECTRICAL ACCOMODATIONS BACK
TO PANEL.
3 REMOVE EXISTING PROPANE GAS PIPING BACK TO
THIS APPROXIMATE LOCATION AND CAP. FIELD
VERIFY EXACT POINT OF REMOVAL.
4 REMOVE EXISTING DOMESTIC WATER PIPING BACK
TO THIS APPROXIMATE LOCATION AND CAP. FIELD
VERIFY EXACT POINT OF REMOVAL.
5 REMOVE EXISTING EVAPORATIVE COOLER DRAIN
BACK TO THIS APPROXIMATE LOCATION. FIELD
VERIFY EXACT POINT OF REMOVAL.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
09/09/2026
16"ø SA
16"ø SA
12"x12" SA
D-1
D-1
D-1
3"ø F UP 3"ø CBA UP
F
CC
SWS-1
SWT-1
L-1
3/4"ø CD DN
ME301
20"ø SA
10"x8" SA
10"x10" SA
10"x8" SA DN
1"ø LP (E)
18"x18" OA
24"x20" RA
CU
T
F-1
3/4"ø CD UP
ME301
D-2
D-2
D-2
SWT-2
10"x8" SA UP
6"ø SA
6"ø SA
10"x8" SA
8"x6" TA
D-3
8"ø SA
6"ø SA8"ø SA
1"ø LP UP (E)
VD
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL
AND ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT
LIMITED TO: EXISTING ROUTING AND LOCATION OF
DUCTWORK, PIPING, ELECTRICAL AND STRUCTURAL
ELEMENTS. CONTRACTOR SHALL FIELD VERIFY POTENTIAL
CONFLICTS BETWEEN NEW MECHANICAL ELEMENTS AND
EXISTING CONDITIONS PRIOR TO BEGINNING FABRICATION OR
ORDERING EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL COORDINATION
BETWEEN SUB-TIER CONTRACTORS. THIS SHALL INCLUDE THE
COORDINATION BETWEEN SUB-TIER CONTRACTORS, SUB-TIER
CONTRACTORS AND FACILITIES, SUB-TIER CONTRACTORS
AND ARCHITECT/ENGINEER, ETC.
3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL BE
BROKEN DOWN TO FIT THROUGH DESIGNATED PATHWAYS.
FIELD VERIFY EXACT SCOPE OF DEMOLITION AND REMOVAL
PATH. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY
DAMAGE TO BUILDING DURING REMOVAL OF EQUIPMENT AND
MATERIAL.
4. SOME EXISTING PIPING AND EXISTING DUCTWORK NOT
SHOWN ON THIS SHEET FOR CLARIFICATION. FIELD VERIFY
EXISTING CONDITIONS PRIOR TO BID.
5. CONTRACTOR SHALL MAKE PROVISIONS WITH A DESIGN
BUILD ELECTRICIAN TO VERIFY ELECTRICAL CONDITIONS.
DESIGN BUILD CONTRACTOR SHALL PROVIDE ANY NEW
WIRING, CIRCUIT BREAKERS, PANELS, SWITCH GEAR, AND ALL
NECESSARY ELECTRICAL ACCOMMODATIONS OR ANY NEW OR
RELOCATED MECHANICAL EQUIPMENT. CONTRACTOR SHALL
COORDINATE THE DEMOLITION AND REMOVAL OF ANY
ELECTRICAL ELEMENTS ASSOCIATED WITH EXISTING
MECHANICAL BEING REMOVED. ALL ABANDONED PIPING AND
WIRING SHALL BE REMOVED BACK TO PANEL UNLESS
OTHERWISE APPROVED. ELECTRICIAN SHALL FIELD VERIFY
AND CONFIRM ELECTRICAL SCOPE AND EXISTING CONDITIONS
PRIOR TO ANY DEMOLITION WORK AND ORDERING ANY NEW
MECHANICAL EQUIPMENT.
6. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED BY
APPROVED ROOFING CONTRACTOR FROM THE DFCM SHORT
LIST.
7. PROVIDE FULL TEST AND BALANCE REPORT OF ALL
IMPACTED SYSTEMS BY LICENSED AND APPROVED TEST &
BALANCE CONTRACTOR.
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
09/02/2026MO
WP
09/02/26
26094
CL
MECHANICAL FLOOR
PLANS
ME101
OTTER CREEK
MAINTENANCE HVAC
DFCM #27134510
480 UT-22, Antimony, UT 84712
1/4" = 1'-0"
LEVEL 2 MECHANICAL PLAN
1/4" = 1'-0"
LEVEL 1 MECHANICAL PLAN
SHEET NOTES
1 PROVIDE NEW 7 DAY PROGRAMMABLE THERMOSTAT WITH
AUTO-CHANGEOVER AND OCCUPIED/UNOCCUPIED
FUNCTION 4' AFF IN THIS APPROXIMATE LOCATION. FIELD
VERIFY.
2 PROVIDE NEW OUTDOOR CONDENSING UNIT IN THIS
APPROXIMATE LOCATOIN. PROVIDE NEW REFRIGERANT
PIPING FROM OUTDOOR UNIT TO NEW INDOOR COOLING
COIL. FIELD VERIFY EXACT ROUTING. INSTALL PER
MANUFACTURER'S RECOMMENDATIONS. COORDINATE WITH
DESIGN BUILD ELECTRICIAN TO PROVIDE NEW FUSED
DISCONNECT AND ALL ASSOCIATED ELECTRICAL
ACCOMMODATIONS. PROVIDE WITH NEW CONCRETE HOUSE
KEEPING PAD. SEE DETAILS.
3 PROVIDE NEW HORIZONTAL CEILING HUNG PROPANE GAS
FURNACE SPLIT SYSTEM IN THIS APPROXIMATE LOCATION.
SEE DETAILS. COORDINATE WITH DESIGN BUILD
ELECTRICIAN TO PROVIDE ALL NEW ELECTRICAL
ACCOMODATIONS. PROVIDE NEW FLUE AND COMBUSTION
AIR. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
PROVIDE NEW SUPPORT STRUCTURE BY DEFERRED
SUBMITTAL.
4 PROVIDE NEW DX COOLING COIL IN THIS APPROXIMATE
LOCATION. PROVIDE ALL NEW REFRIGERANT PIPING FROM
COOLING COIL TO OUTDDOR CONDENSING UNIT. INSTALL
PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE NEW
COPPER CONDENSATE DRAIN AND DAYLIGHT 18" AFF. FIELD
VERIFY EXACT ROUTING.
5 PROVIDE NEW DUCT DIFFUSER IN THIS APPROXIMATE
LOCATION. FIELD VERIFY. PROVIDE WITH NEW BALANCING
DAMPER AND BALANCE TO CFM AS SHOWN.
6 PROVIDE NEW CEILING DIFFUSER IN THIS APPROXIMATE
LOCATION. BALANCE TO CFM SHOWN.
7 PROVIDE NEW TRANSFER GRILLE IN THIS APPROXIMATE
LOCATION.
8 PATCH, REPAIR, AND PAINT EXISTING SHEET ROCK TO
MATCH AS NEEDED.
9 PROVIDE NEW SIDEWALL DIFFUSER IN THIS APPROXIMATE
LOCATION. BALANCE TO CFM SHOWN.
10 CONNECT NEW PROPANE GAS PIPING TO EXISTING IN THIS
APPROXIMATE LOCATION. FIELD VERIFY EXACT ROUTING
AND POINT OF CONNECTION.
11 PROVIDE NEW 30"X16" OPENING IN TOP OF RETURN AIR
DUCTWORK IN THIS APPROXIMATE LOCATION. FIELD VERIFY.
12 PROVIDE NEW OUTSIDE AIR CONNECTION IN THIS
APPROXIMATE LOCATION. FIELD VERIFY. SEE DETAILS. TIE
NEW DAMPER ACTUATOR INTO NEW PROGRAMMABLE
THERMOSTAT. OPEN OUTSIDE ARE DAMPER WHEN
BUILDING IS OCCUPIED AND CLOSE DAMPER WHEN
BUILDING IS UNOCCUPIED.
13 PROVIDE NEW OUTSIDE AIR LOUVER IN THIS APPROXIMATE
LOCATION. FIELD VERIFY. SEAL INTERSTITIAL SPACES
WEATHER/WATER TIGHT.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
09/09/2026
Level 1 0"
LEVEL 2
8' - 7"
Level 1 0"
ROOF
13' - 9"
LEVEL 2
8' - 7"
CU
F
CC
D-1
D-1
D-1
3"ø CBA
3"ø F
3/4"ø CD
16"ø SA 12"x12" SA
SWS-1
20"ø SA
L-1
18"x18" OA
T
F-1
10"x10" SA
6"ø SA
8"ø SA 1"ø HW (E) 1"ø CW (E)
1"ø LP (E)
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL
AND ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT
LIMITED TO: EXISTING ROUTING AND LOCATION OF
DUCTWORK, PIPING, ELECTRICAL AND STRUCTURAL
ELEMENTS. CONTRACTOR SHALL FIELD VERIFY POTENTIAL
CONFLICTS BETWEEN NEW MECHANICAL ELEMENTS AND
EXISTING CONDITIONS PRIOR TO BEGINNING FABRICATION OR
ORDERING EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL COORDINATION
BETWEEN SUB-TIER CONTRACTORS. THIS SHALL INCLUDE THE
COORDINATION BETWEEN SUB-TIER CONTRACTORS, SUB-TIER
CONTRACTORS AND FACILITIES, SUB-TIER CONTRACTORS
AND ARCHITECT/ENGINEER, ETC.
3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL BE
BROKEN DOWN TO FIT THROUGH DESIGNATED PATHWAYS.
FIELD VERIFY EXACT SCOPE OF DEMOLITION AND REMOVAL
PATH. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY
DAMAGE TO BUILDING DURING REMOVAL OF EQUIPMENT AND
MATERIAL.
4. SOME EXISTING PIPING AND EXISTING DUCTWORK NOT
SHOWN ON THIS SHEET FOR CLARIFICATION. FIELD VERIFY
EXISTING CONDITIONS PRIOR TO BID.
5. CONTRACTOR SHALL MAKE PROVISIONS WITH A DESIGN
BUILD ELECTRICIAN TO VERIFY ELECTRICAL CONDITIONS.
DESIGN BUILD CONTRACTOR SHALL PROVIDE ANY NEW
WIRING, CIRCUIT BREAKERS, PANELS, SWITCH GEAR, AND ALL
NECESSARY ELECTRICAL ACCOMMODATIONS OR ANY NEW OR
RELOCATED MECHANICAL EQUIPMENT. CONTRACTOR SHALL
COORDINATE THE DEMOLITION AND REMOVAL OF ANY
ELECTRICAL ELEMENTS ASSOCIATED WITH EXISTING
MECHANICAL BEING REMOVED. ALL ABANDONED PIPING AND
WIRING SHALL BE REMOVED BACK TO PANEL UNLESS
OTHERWISE APPROVED. ELECTRICIAN SHALL FIELD VERIFY
AND CONFIRM ELECTRICAL SCOPE AND EXISTING CONDITIONS
PRIOR TO ANY DEMOLITION WORK AND ORDERING ANY NEW
MECHANICAL EQUIPMENT.
6. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED BY
APPROVED ROOFING CONTRACTOR FROM THE DFCM SHORT
LIST.
7. PROVIDE FULL TEST AND BALANCE REPORT OF ALL
IMPACTED SYSTEMS BY LICENSED AND APPROVED TEST &
BALANCE CONTRACTOR.
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
09/02/2026MO
WP
09/02/26
26094
Designer
MECHANICAL
SECTION
ME301
OTTER CREEK
MAINTENANCE HVAC
DFCM #27134510
480 UT-22, Antimony, UT 84712
3/8" = 1'-0"
MECHANICAL SECTION
SHEET NOTES
1 PROVIDE NEW OUTDOOR CONDENSING UNIT IN THIS
APPROXIMATE LOCATOIN. PROVIDE NEW
REFRIGERANT PIPING FROM OUTDOOR UNIT TO NEW
INDOOR COOLING COIL. FIELD VERIFY EXACT
ROUTING. INSTALL PER MANUFACTURER'S
RECOMMENDATIONS. COORDINATE WITH DESIGN
BUILD ELECTRICIAN TO PROVIDE NEW FUSED
DISCONNECT AND ALL ASSOCIATED ELECTRICAL
ACCOMMODATIONS. PROVIDE WITH NEW CONCRETE
HOUSE KEEPING PAD. SEE DETAILS.
2 PROVIDE NEW DUCT DIFFUSER IN THIS
APPROXIMATE LOCATION. FIELD VERIFY. PROVIDE
WITH NEW BALANCING DAMPER AND BALANCE TO
CFM AS SHOWN.
3 PROVIDE NEW HORIZONTAL CEILING HUNG PROPANE
GAS FURNACE SPLIT SYSTEM IN THIS APPROXIMATE
LOCATION. SEE DETAILS. COORDINATE WITH DESIGN
BUILD ELECTRICIAN TO PROVIDE ALL NEW
ELECTRICAL ACCOMODATIONS. PROVIDE NEW FLUE
AND COMBUSTION AIR. INSTALL PER
MANUFACTURER'S RECOMMENDATIONS. PROVIDE
NEW SUPPORT STRUCTURE BY DEFERRED
SUBMITTAL.
4 PROVIDE NEW DX COOLING COIL IN THIS
APPROXIMATE LOCATION. PROVIDE ALL NEW
REFRIGERANT PIPING FROM COOLING COIL TO
OUTDDOR CONDENSING UNIT. INSTALL PER
MANUFACTURER'S RECOMMENDATIONS. PROVIDE
NEW COPPER CONDENSATE DRAIN AND DAYLIGHT
18" AFF. FIELD VERIFY EXACT ROUTING.
5 PROVIDE NEW 7 DAY PROGRAMMABLE THERMOSTAT
WITH AUTO-CHANGEOVER AND
OCCUPIED/UNOCCUPIED FUNCTION 4' AFF IN THIS
APPROXIMATE LOCATION. FIELD VERIFY.
6 PROVIDE NEW OUTSIDE AIR LOUVER IN THIS
APPROXIMATE LOCATION. FIELD VERIFY. SEAL
INTERSTITIAL SPACES WEATHER/WATER TIGHT.
7 PROVIDE NEW OUTSIDE AIR CONNECTION IN THIS
APPROXIMATE LOCATION. FIELD VERIFY. SEE
DETAILS. TIE NEW DAMPER ACTUATOR INTO NEW
PROGRAMMABLE THERMOSTAT. OPEN OUTSIDE ARE
DAMPER WHEN BUILDING IS OCCUPIED AND CLOSE
DAMPER WHEN BUILDING IS UNOCCUPIED.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
09/09/2026
TYPICAL FOR ALL HEAT PUMPS
1'-0"
D
NOTE:
DRY-CHARGED LINE SETS ARE AVAILABLE
IN LENGTHS OF 16, 22, 32, & 49 FEET.
LENGTHS ARE TO BE KEPT AS SHORT AS
POSSIBLE. COILING OF LINES THAT ARE
TOO LONG WILL NOT BE ACCEPTABLE AND
WILL BE REPLACED AT THE
CONTRACTORS EXPENSE. OPTIONAL:
HARD REFRIGERANT PIPING. ALL
CONNECTIONS ARE TO BE FLARED.
AIR FLOW
CU
CC
APPROX. 4"
D2
HORIZONTAL FURNACE
AND COIL ALIGNMENT DETAIL
PLAN VIEW
HEAT PUMP UNIT DETAIL
B2
ROUND DUCT SUPPORT DETAIL
B4
DUCT STRAP HANGER DETAIL
C4
CONCENTRIC ROOF
TERMINATION DETAIL
B1
PIPE HANGER DETAIL
A2
REFRIGERANT PIPING DETAIL
A4
FURNACE/COOLING COIL SUPPORT DETAIL
D1
RET.
AIR
SCALE: NONE
SUPPLY
AIR
COOLING
COIL
FILTER SECTIONFLEX.CONN.
(TYP.)
FURNACE
CENTERLINE OF
FURNACE DISCHARGE
AND COOLING COIL
INLET.
TRANSIZE AS
NECESSARY
REFRIGERANT
PIPING
SCALE: NONE
20 GAUGE SHEET METAL PAN
AROUND REFRIGERANT LINES.
ANCHOR TO WALL. PAINT PAN TO
MATCH BUILDING COLOR WITH
PRIMER AND TWO COATS OF OIL
BASE PAINT. COLOR TO BE SELECTED
BY OWNERS REPRESENTATIVE.
THRU WALL. CAULK
AND MAKE WEATHER
TIGHT
3/4" COND. DRAIN
LINE. TERMINATE
3" ABOVE CONC.
PAD.
CEILING
THERMOSTAT
CONTROLLER.
WALL
4" MIN. RADIUS
ALL BENDS
FLOOR
BOLT CONDENSING
UNIT TO PAD
4" CONCRETE
PAD
SCALE: NONE
DUCTS < 20" DIA.
20" DIA TO 36" DIA.DUCTS > 36" DIA.
HANGERS MUST NOT DEFORM DUCT SHAPE
NOTES:
1. SEE SPECIFICATIONS FOR
SEISMIC RESTRAINT
REQUIREMENTS.
2. MAXIMUM SPACING OF
10'-0"
ATTACH HANGER STRAPS
TO STRUCTURE
3/8" BOLT
SHEET METAL SCREW
1" x 18 GA.
HANGER STRAP
DUCT
1" x 16 GA.
HANGER STRAP
SIZE PER
SMACNA
#10 x 3/4" SELF
TAPPING CADMIUM PLATED
SHEET METAL SCREWS TO
ANCHOR STRAPS TO DUCT.
ALL STRAPS TO BE TIGHT
AGAINST DUCT AND SUPPORT
MEMBERS. (TYPICAL)
SCALE: NONE
1"
1" x 18 GAUGE STRAP
HANGERS AT 8'-0"
SPACING.
1" x 18 GAUGE STRAP
HANGERS AT 8'-0"
SPACING.
NO POP RIVETS
ALLOWED
NOTES:
1. DUCT OUTSIDE OF BUILDING
ENVELOPE SHALL BE WRAPPED
EXTERNALLY AS PER THE
SPECIFICATIONS.
2. SEE SPECIFICATIONS FOR
SEISMIC RESTRAINT
REQUIREMENTS.
ATTACH SECURELY TO
STRUCTURE.
22" MIN.
(OR MANUFACTURERS
STANDARD)
SCALE: NONE
NOTE:
USE EXTENSION KIT
NECESSARY TO ACHEIVE
CLEARANCE ABOVE SNOW
LEVEL
EXHAUST
INTAKEEXHAUST
INTAKE
FLASHING
ROOF
SCREW SLEEVE
SECURELY TO 2X4
BRACING. SCREW
HEAD TO BE
INSTALLED INSIDE OF
SLEEVE (TYPICAL OF 4
PLACES) CLAMP
20 GA. GALV.
SLEEVE. ALLOW
PIPING TO MOVE
FREELY THRU
SLEEVE.
20 GA. GALV.
SHEET METAL
STRAP
HANGER ROD
PIPE
HANGER
SUPPORT NUT
LOCKING NUT
CALCIUM SILICATE BLOCK
16 GA. ZINC COATED SHEET STEEL
SHIELD AT LEAST 12" LONG (TYP)
MOUNT PIPING TO UNISTRUT
PROVIDE PIPE CLAMPS
WITH BOLTS AND NUTS
CALCIUM SILICATE BLOCK
CALCIUM SILICATE
BLOCK
BOLT UNISTRUT TO EXISTING
CONCRETE WALL USING
EXPANSION ANCHOR BOLTS
ATTACH TO ROOM
STRUCTURE
SPRING TYPE ISOLATOR FOR
INSTALLATION NEAR HOT
WATER PUMPS
CLEVIS HANGER
INSULATION WITH
OR WITHOUT VAPOR
BARRIER
16 GAGE ZINC COATED SHEET STEEL
SHIELD AT LEAST 12" LONG.
HEAVY DUTY
CLEVIS HANGER
ATTACH TO EXISTING
CEILING
SCALE: N/A
SCALE: NONE
RACK PIPES TIGHT TOGETHER
PROVIDE TIGHT ELBOWS
SCALE: NONE
DRAIN PAN 3" BEYOND
EQUIPMENT, HUNG FROM
SUPPORT FRAME.
PIPE TO FLOOR DRAIN
HANG UNIT
HORIZONTALLY
FROM
STRUCTURE
PROVIDE NEW
FURNACE/COOLING COIL
SUPPORTS BY DEFERRED
SUBMITTAL FROM
LICENSED STRUCTURAL
ENGINEER.
S
SS
S
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
09/02/2026MO
WP
09/02/26
26094
CL
MECHANICAL
DETAILS
ME501
OTTER CREEK
MAINTENANCE HVAC
DFCM #27134510
480 UT-22, Antimony, UT 84712
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
09/09/2026
A
45°
V E
R T
IC
A
L
MIN 10
PIPE
DIAMETERS
D4
DRUM LOUVER DETAIL
END VIEW
OUTDOOR EQUIPMENT PAD DETAIL
B4
D3
GAS LINE CONNECTION DETAILFRESH AIR DUCT DETAIL
D2
RETURN DUCT DETAIL
B2
REFRIGERANT PIPE SUPPORT AT WALL
A1
EXTERIOR REFRIGERANT PIPE SUPPORT DETAIL
A3 REFRIGERANT PIPE SUPPORT AT WALL DETAIL
A4
SINGLE REFRIGERANT COIL
CONNECTION DETAIL
D1 SCALE: NONE
DRUM LOUVERS
MANUAL BALANCING
DAMPER W/ LOCKING
QUADRANT, MAY BE A
PART OF DRUM LOUVER.
SEAL DUCT
CONNECTION
MAIN AIR
ROUND DUCT
DETAIL NOTES:
PROVIDE 12" OF COMPACTED STRUCTURAL FILL MINIMUM. COMPACTED LIFTS TO AT LEAST 95% OF THE DRY DENSITY IN
ACCORDANCE WITH ASTM D-1557.
4" COMPACTED LAYER OF COMPACTED GRAVEL. GRAVEL MAY CONSIST OF TYPE I OR TYPE II AGGREGATE BASE, OR PIT RUN
GRAVEL WITH A 2- INCH MAXIMUM PARTICLE SIZE AND NO MORE THAN 12% FINES PASSING THE NO. 200 SIEVE.
4" THICK REINFORCED CONCRETE PAD.
#4 @16 BOTHWAYS
12"4"
See Plan
SCALE: NONE
4"
2 3
SCALE: NONE
MANUAL
SHUT-OFF
VALVE.
GAS PRESSURE
REGULATOR
(2 PSI TO 4 OZ).
GAS
SUPPLY.
DRIP LEG.CAP.
EQUIPMENT
CONNECTION.
GROUND
JOINT
UNION.
FLEXIBLE GAS
CONNECTOR
18" MAX.
SCALE: NONE
FROM O.A.
TRUNK DUCT
AUTO DAMPER
ACCESS DOOR
VOLUME DAMPER BALANCE
FRESH AIR TO CFM SHOWN
ON SCHEDULE
TO FURNACE
R.A. DUCT
W
L = 2 x W
SOUND SHALL
NOT HAVE A
DIRECT PATH TO
PLENUM
PROVIDE HANGER
STRAP TO
STABILIZE AND
BALANCE BOOT
RETURN AIR BOOT
W/ 1" LINER
PROVIDE HANGER
STRAP TO STABILIZE
AND BALANCE BOOT
PROVIDE HANGER
STRAP TO STABILIZE
AND BALANCE BOOT
W
PROVIDE OPENING IN
TOP OF DUCTWORK
SCALE: NONE
SCALE: NONE
NOTE:
LIQUID LINE SIMILAR
V A
R
IE
S
SCALE: NONE
NOTE:
RUN STEEL COVER CONTINUOUS FROM CONDENSING
UNIT TO RISERS OR PENETRATIONS AT BUILDING WALL
OR ROOF.
SCALE: NONE
NOTE:
LIQUID LINE SIMILAR
RUN PIPE
IN STUD WALL
INTERIOR
STUD WALL
FACE BRICK
SUCTION LINEINSULATION
SECURE REFRIGERANT
PIPING TO SUPPORTS
WITH "HYDRA-ZORB"
"CUSH-A-CLAMP" OR
EQUAL (TYPICAL).
BUTT INSULATION OFF SUCTION LINE
AGAINST CLAMP ASSEMBLY.
1 5/8" P-3300
"UNISTRUT" OR
EQUAL
PIPE SLEEVE THRU WALL, SEAL ALL
AROUND.
WELD BOTH SIDES
(TYPICAL)
6"x4"x1/4" ANGLE ANCHORED TO STRUCTURE 1/2" x 3 1/2" EXPANSION
BOLTS.
UNISTRUT PIPE CLAMP (TYP.)
BUTT INSULATION OFF
SUCTION LINE AGAINST
CLAMP ASSEMBLY.
ANGLE IRON
UNISTRUT P1026
18 GAUGE GALVANIZED
SHEET METAL PROTECTIVE
COVER. RUN FROM COND.
UNIT TO BUILDING.
1 5/8" x 1 5/8" UNISTRUT
CHANNEL (GALVANIZED)
TYPICAL.
POST PLATE UNISTRUT
P2072A (TYP.) ANCHOR
TO SLAB.
CONCRETESECURE REFRIGERANT PIPING TO SUPPORTS
WITH "HYDRA-ZORB" "CUSH-A-CLAMP" OR EQUAL
(TYPICAL).
16 GAUGE GALVANIZED
SLEEVE
SEALANT SUCTION
LINE
INSULATION
FACE BRICK
SEAL AROUND
PENETRATION
THRU SOFFIT
DX COIL
S
L
THERMOSTATIC BULB
TO BE AS CLOSE TO
COIL AS POSSIBLE NOT
ALLOWED ON VERTICAL
LINES.
SCALE: NONE
45°
THERMOSTATIC
BULB
4" MINIMUM
TRAP
TRAP
EQUALIZING
LINE
THERMOSTATIC
EXPANSION VALVE
CLAMP
SUCTION
LINE
THERMAL BULB
LOCATION
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
09/02/2026MO
WP
09/02/26
26094
Designer
MECHANICAL
DETAILS
ME502
OTTER CREEK
MAINTENANCE HVAC
DFCM #27134510
480 UT-22, Antimony, UT 84712
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
09/09/2026
1. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS.
1. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS.
2. RATED AT SEA LEVEL.
3. CONDENSING UNIT SYMBOL CORRESPONDS WITH FURNACE UNIT AND COOLING COIL UNLESS OTHERWISE NOTED. COOLING COIL CAPACITIES SHALL MATCH CONDENSING UNIT.
4. PROVIDE 4" CONCRETE PAD.
5. PROVIDE VOLTAGE MONITORS.
6. SEE SPECIFICATIONS FOR APPROVED ALTERNATE REFRIGERANTS
7. PROVIDE HAIL GUARD TO PROTECT CONDENSER FINS.
8. PROVIDE WITH CRANK CASE HEATER AND LOW AMBIENT KIT.
9. PROVIDE WITH NEW FUSED DISCONNECT, WIRING, CONDUIT, BREAKERS, RACEWAYS/JUNCTION BOXES AND ALL ELECTRICAL ACCOMMODATIONS FOR A FULLY FUNCTIONAL SYSTEM.
1. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS.
2. RATED AT SEA LEVEL.
3. FURNACE SYMBOL CORRESPONDS WITH CONDENSING UNIT AND COOLING COIL UNLESS OTHERWISE NOTED.
COOLING COIL CAPACITIES SHALL MATCH CONDENSING UNIT.
4. ECONOMIZER: FOR UNITS OVER 4.5 TONS PROVIDE FULL 100% OA ECONOMIZER. THIS INCLUDES 3 POSITION DAMPERS ON THE OUTSIDE AIR, RELIEF AIR, AND RETURN AIR DUCTS. PROVIDE OUTSIDE AIR TEMPERATURE SENSOR AND CONTROL CAPABLE OF PROVIDING THIS SEQUENCE OF OPERATIONS. DURING UNOCCUPIED, CLOSE ALL DAMPERS. DURING OCCUPIED MODE OPEN MINIMUM OUTSIDE AIR POSITION (RETURN INVERSE OPEN FROM OUTSIDE AIR AND RELIEF AIR). WHEN TEMPERATURE OUTSIDE IS LESS THAN 55 (ADJUSTABLE) AND UNIT IS CALLING FOR COOLING, FULLY OPEN OUTSIDE AIR AND RELIEF AIR DAMPERS AND CLOSE RETURN DAMPER.
5. PROVIDE FLUE AND COMBUSTION AIR PIPING PER DETAIL.
6. PROVIDE NEW GAS PIPING PER DETAIL.
7. PROVIDE WITH 120 VOLT CONTROLS CIRCUIT.
1. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS.
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
09/02/2026MO
WP
09/02/26
26094
CL
MECHANICAL
SCHEDULES
ME601
OTTER CREEK
MAINTENANCE HVAC
DFCM #27134510
480 UT-22, Antimony, UT 84712
DIFFUSER AND GRILLE SCHEDULE
TYPE
GRD
SERVICE
MAX CFM
FACE DIMENSIONS NECK DIMENSIONS CEILING
TYPE
DISCHARGE
PATTERN
THROW 50
FPM
MAX NC MANUF. AND MODEL
SCHEDULE
NOTESL W DIAMETER L W
D-1 SUPPLY 500 CFM 8" 2' - 2" 0" 6" 2' - 0"
DUCT
MOUNTED
1-WAY 33' 25 PRICE HCD 1
D-2 SUPPLY 200 CFM 1' - 0" 1' - 0" 6" 0" 0" HARD 4 WAY 12' 25 PRICE SPD 1
D-3 SUPPLY 314 CFM 1' - 0" 1' - 0" 8" 0" 0" HARD 4 WAY 14' 25 PRICE SPD 1
SWS-1 SUPPLY 430 CFM 10" 10" 0" 10" 10" NONE N/A 32' 25 PRICE 510 1
SWT-1 TRANSFER 430 CFM 10" 1' - 0" 0" 10" 1' - 0" NONE N/A 0' 25 PRICE 535 1
SWT-2 TRANSFER 156 CFM 6" 8" 0" 6" 8" NONE N/A 0' 25 PRICE 535 1
FURNACE / COOLING COIL SCHEDULE
TAG
AREA
SERVED
CU SA CFM OA CFM ESP
COOLING
REFRIGER
ANT HEATING
ELECTRICAL DIMENSIONS
MANUF. AND MODEL
SCHEDULE
NOTES
TYPE NUMBER
CLG LOAD
TOTAL
EADB EAWB LADB TYPE HTG INPUT HTG OUTPUT EADB LADB TYPE EFF V PH HZ HP L W H WT
F 1 SHOP CU-1 1,995 CFM 400 CFM 0.50 in-wg 60000.0 Btu/h 80 °F 62 °F 54 °F R-454B 120,000 Btu/h 115,000 Btu/h 70 °F 124 °F R-454B 95% 115 V 1 60 Hz 1 hp 2' - 11" 3' - 2" 3' - 2" 156 lb TRANE 5TXC+S9X1D 1,2,3,4,5,6,7
CONDENSING UNIT SCHEDULE
TAG AREA
SERVED
SYSTEM
SERVED
COOLING
LOAD TOTAL
REFRIG
EFFICIENCY ELECTRICAL DIMENSIONS
MANUF. AND MODEL
SCHEDULE
NOTESTYPE # SEER 2 HSPF2 V PH HZ MCA MOCP L W H WT
CU 1 SHOP F-1 60000.0 Btu/h R-454B 13.4 0 230 V 1 60 Hz 30 A 50 A 2' - 11" 3' - 2" 3' - 2" 211 lb TRANE 5TTR3060A1 1,2,3,4,5,6,7,8,9
LOUVER SCHEDULE
TAG
AREA
SERVED
SYSTEM
SERVED
AIR FLOW CFM
DIMENSIONS MAX
VELOCITY
MIN FREE
AREA
DAMPER MANUF. AND MODEL
SCHEDULE
NOTESDEPTH L H
L-1 SHOP
OUTSIDE
AIR
400 CFM 4" 1' - 6" 1' - 6" 500 FPM 0.8 SF NO
GREENHECK
EDD-401
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
09/09/2026
M
M
P
T
S
PS
F
MECHANICAL LEGEND
SYMBOL ABR, DESCRIPTION
GENERAL TERMINOLOGY
A
ME101
SECTION LETTER DESIGNATION
SECTION DRAWN ON THIS SHEET
A2
AH
DETAIL NUMBER DESIGNATION
CORRESPONDING WITH GRID
LOCATION
MECHANICAL EQUIPMENT DESIGNATION
EQUIPMENT ITEM DESIGNATION
REGISTER, GRILLE OR DIFFUSER
DESIGNATION WITH BALANCING CFM
LISTED BELOW
D-1
CFM
GRILLE OR LOUVER DESIGNATION
WHERE BALANCING NOT REQUIREDR-1
REVISION DESIGNATOR AND NUMBER
KEY NOTE DESIGNATOR AND NUMBER
POINT OF CONNECTION
POINT OF REMOVAL
ABOVE FINISHED FLOOR
ACCESS PANEL
CENTERLINE ELEVATION
GENERAL CONTRACTOR
AFF
AP
POC
POR
C EL.
GC
MECHANICAL CONTRACTORMC
CONTROLS CONTRACTORATC
ELECTRICAL CONTRACTOREC
FIRE PROTECTION CONTRACTORFPC
NOT IN CONTRACTNIC
NOT TO SCALENTS
VITRIFIED CLAY PIPEVCP
NORMALLY CLOSEDNC
COMMONC
NORMALLY OPENNO
SYMBOL ABR, DESCRIPTION
AIR SIDE
EXISTING AIR DUCT TO BE REMOVED
EXISTING AIR DUCT TO REMAIN
NEW AIR DUCT
RECT TO RECT AIR DUCT TAKE-OFF
RECT TO RND AIR DUCT TAKE-OFF
RND TO RND AIR DUCT TAKE-OFF
MEDIUM PRESSURE TAKE-OFF
FLEXIBLE AIR DUCT
LINED DUCT
RADIUS ELBOW
ECCENTRIC DUCT TRANSITION
CONCENTRIC DUCT TRANSITION
VOLUME DAMPER
SUPPLY AIR DIFFUSER
RETURN & TRANSFER AIR GRILLE
EXHAUST GRILLE OR CEILING EXH. FAN
RETURN & OUTSIDE AIR DUCT UP/DN
RETURN & OA ROUND DUCT UP/DN
SUPPLY AIR DUCT UP/DN
SUPPLY AIR ROUND DUCT UP/DN
EXHAUST AIR DUCT UP/DN
EXHAUST AIR ROUND DUCT UP/DN
ACCESS PANELAP
EXISTING EQUIPMENT TO BE REMOVED
EXISTING EQUIPMENT TO REMAIN
NEW EQUIPMENT
SUPPLY AIR
RETURN AIRRA
SA
EXHAUST AIREA
OUTSIDE AIROA
MIXED AIRMA
RELIEF AIRRF
FLAT OVALFO
MOTORIZED VOLUME DAMPER
BACKDRAFT DAMPER
FIRE DAMPER
SMOKE DAMPER
FIRE & SMOKE DAMPER
WALL MOUNTED THERMOSTAT
WALL MOUNTED TEMP. SENSOR
WALL MOUNTED HUMIDISTAT
WALL MOUNTED FIRESTAT
M
BD
F
S
FS
T
S
H
F
SYMBOL ABR, DESCRIPTION
WET SIDE
PUMP
MVD
BD
FD
SD
FS
T-STAT
H-STAT
F-STAT
REGULATOR
UNION
MANUAL ACTUATOR
PNUEMATIC DIAPHRAM ACTUATOR
ELECTRIC MOTOR ACTUATOR
SOLENOID ACTUATOR
BUTTERFLY VALVE
GATE VALVE
GLOBE VALVE - STRAIGHT PATTERN
GLOBE VALVE - ANGLE PATTERN
MOTORIZED 2-WAY CONTROL VALVE
MOTORIZED 3-WAY CONTROL VALVE
CHECK VALVE
CIRCUIT BALANCING VALVE
BALL VALVE
PRESSURE RELIEF VALVE
THERMAL RELIEF VALVE
SAFETY RELIEF VALVE
PLUG VALVE
NEEDLE VALVE
TRIPLE DUTY VALVE
AUTOMATIC AIR VENT
MANUAL AIR VENT
STRAINER
STRAINER W/ PLUG BLOW OFF
VENTURI
PRESSURE GAUGE W/ COCK - WATER
PRESSURE GAUGE W/ COCK - STEAM
THERMOMETER & THERMOWELL
WATER TEMP SENSOR & THERMOWELL
FLOW SWITCH
PRESSURE SWITCH
THERMOWELL
PRESSURE & TEMP TAP
DIRECTION OF FLOW
BACKFLOW PREVENTING VALVE
SYMBOL ABR, DESCRIPTION
WET SIDE
PITCH DOWN
ELBOW UP/DN
TEE UP/DN
EXISTING PIPING TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
PIPE CAP OR PLUG
REDUCER - CONCENTRIC / ECCENTRIC
EXPANSION JOINT
FLEXIBLE CONNECTION
ANCHOR POINT
CONDENSATE DRAIN
NATURAL GAS PIPING
MAKE-UP WATER LINE
CULINARY COLD WATER
CULINARY HOT WATER
CULINARY HOT WATER RECIRC
CD
G
MU
CW
HW
HWREC
GLYCOL FILL LINEGF
R
M
S
PRESSURE REDUCING VALVEPRV
S
HEATING WATER SUPPLY
REFRIGERANT LIQUID
REFRIGERANT SUCTION
HWS
L
S
VENT LINEV
SANITARY SEWERSS
GENERAL NOTES
G-1 - MECHANICAL INFORMATION IS NOT LIMITED TO THE MECHANICAL
DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMATION OF
THE EXISTING BUILDING AND SITE CONDITIONS, EXISTING PIPING, EXISTING
ELECTRICAL, AND EXISTING SUPPORTS.
A - EACH DRAWING SHEET AND THE SPECIFICATIONS HAVE BEEN PREPARED
TO SUPPLEMENT EACH OTHER AND THEY SHALL BE INTERPRETED AS AN
INTEGRAL UNIT WITH ITEMS SHOWN AND NOTED ON ONE AND NOT THE
OTHER BEING FURNISHED AND INSTALLED AS THOUGH SHOWN AND CALLED
OUT IN ALL PLACES. ITEMS IN SPECIFICATIONS OR DRAWINGS LISTED WHICH
ARE DIFFERING IN EFFICIENCY OR QUALITY SHALL BE HELD TO THE
GREATEST OF: EFFICIENCY, QUALITY OR GOVERNING CODE.
B - THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE INSTALLATION
OF THE SYSTEMS ACCORDING TO THE TRUE INTENT AND MEANING OF THE
CONTRACT DOCUMENTS.
C - THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT WITH PROPER SERVICE
ACCESS AND CLEARANCES ACCORDING TO MANUFACTURERS
RECOMMENDATIONS. THE CONTRACTOR SHALL REVIEW SUPPLIERS BID
PACKAGES FOR COMPLETENESS AND COMPLIANCE TO THE SPECIFICATIONS,
SCHEDULES, AND DESIGN INTENT (ALL EQUIPMENT AND METHODS). THE
CONTRACTOR SHALL REMOVE AND REINSTALL CORRECTLY AT HIS OWN
EXPENSE ANY EQUIPMENT NOT IN COMPLIANCE.
D - THE CONTRACTOR SHALL CONSULT MANUFACTURERS INSTALLATION
INSTRUCTIONS FOR SIZES, METHODS, ACCESSORIES, AND CLEARANCES IN
SPACE AVAILABLE PRIOR TO BIDDING PROJECT.
E - ANYTHING NOT CLEAR OR IN CONFLICT WILL BE EXPLAINED BY MAKING
APPLICATION TO THE ENGINEER IN WRITING.
G-2 - ANY AND ALL ALTERATIONS TO THE SYSTEM SHOWN SHALL BE
SUBMITTED TO THE ENGINEER PRIOR TO CHANGES FOR APPROVAL.
CONTRACTOR SHALL NOT START ANY CHANGES UNTIL NOTIFIED IN WRITING.
IF CHANGES ARE MADE PRIOR TO APPROVAL CONTRACTOR SHALL TAKE ALL
RESPONSIBILITY FOR THE CHANGES MADE AND ALL COSTS RELATING TO
FAILURE OR REPLACEMENT OF ALTERATIONS.
G-3 - CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LOCATIONS.
G-4 - THE WORKING DRAWINGS ARE DIAGRAMMATIC. THEY DO NOT SHOW
EVERY OFFSET, BEND, OR ELBOW NECESSARY FOR THE COMPLETE
INSTALLATION IN THE SPACE PROVIDED. ALL LOCATIONS FOR MECHANICAL
EQUIPMENT SHALL BE FIELD VERIFIED AND COORDINATED WITH ALL
DRAWINGS. THE CONTRACTOR SHALL PROVIDE OR COORDINATE WITH THE
GENERAL CONTRACTOR PROVISIONS FOR BLOCKOUTS OR CORE DRILLS
THROUGH STRUCTURE.
G-5 - THE INSTRUCTION TO "PROVIDE" ALSO INCLUDES INSTALLATION.
G-6 - MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL SMOKE AND
FIRE DAMPERS AS REQUIRED BY LOCAL CODES AND AUTHORITIES.
G-7 - SHEET METAL DUCT SIZES SHOWN ON DRAWINGS ARE FREE AREA
DIMENSIONS.
G-8 - PROVIDE AND INSTALL BALANCING DAMPERS IN ALL SUPPLY AND
EXHAUST AIR BRANCH DUCTS. BALANCE TO CFM SHOWN ON PLAN.
G-9 - SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION
OF DIFFUSERS AND GRILLES.
G-10 - PROVIDE TURNING VANES IN ALL ELBOWS OF RECTANGULAR DUCT.
G-11 - THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY IN HANDLING
AND DISPOSING OF REFRIGERANTS, OILS, ETC. ALL SUCH MATERIALS SHALL
BE HANDLED, DISPOSED, AND USED IN ACCORDANCE WITH ALL LOCAL, STATE,
AND FEDERAL LAWS.
G-12 - THE MECHANICAL CONTRACTOR SHALL VERIFY MOTOR VOLTAGES WITH
THE ELECTRICAL DRAWING BEFORE ORDERING MOTORIZED EQUIPMENT AND
CONTROLS.
G-13 - C.F.M. LISTED IS ACTUAL AIR.
G-14 - SUPPLIERS SHALL REVIEW ALL DRAWINGS AND THE SPECIFICATIONS
PRIOR TO SUBMITTING PRICES TO THE CONTRACTOR. ALL QUESTIONS AND
DISCREPANCIES SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR
TO BIDDING.
G-15 - CONTRACTOR SHALL THOROUGHLY REVIEW AND SIGN SUBMITTALS
FOR COMPLETENESS AND COMPLIANCE TO THE SPECIFICATIONS PRIOR TO
ENGINEERS REVIEW. SUPPLIERS SHALL HIGHLIGHT OR MARK ALL
INFORMATION REQUIRED TO SHOW COMPLIANCE TO THE SPECIFICATIONS.
ALL REQUESTED EXCEPTIONS TO THE SPECIFICATIONS, OR SCHEDULES
SHALL BE CLEARLY NOTED AND EXPLAINED. SUBMITTAL REVIEW AND
ACCEPTANCE IS FOR DESIGN CONCEPT ONLY, AND DOES NOT AT ANY TIME
RELIEVE THE CONTRACTOR OF RESPONSIBILITY TO MEET SPECIFICATIONS,
CAPACITIES, OR DESIGN INTENT.
G-16 - ALL MECHANICAL SHALL BE INSTALLED AND CONFORM TO THE 2024
EDITION OF THE IMC AND IPC WITH UTAH ANNOTATIONS AND LOCAL
AUTHORITY REQUIREMENTS.
G-17 - THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE DRAINING DOWN
AND RE-FILLING OF ALL SYSTEMS NECESSARY TO COMPLETE THE WORK
OUTLINED BY THIS PROJECT. THIS INCLUDES PROVIDING THE REQUIRED
CHEMICAL TREATMENT WHEN RE-FILLING THE SYSTEM.
G-18 - ALL PIPING, MATERIALS, ETC. SHALL BE NEW AND DOMESTIC MADE
UNLESS SPECIFICALLY AUTHORIZED IN WRITING PRIOR TO BID.
G-19 - THIS CONTRACTOR SHALL CONTRACT WITH A DESIGN BUILD
ELECTRICAL CONTRACTOR FOR THE DESIGN AND CONSTRUCTION OF THE
ELECTRICAL PORTION OF THIS PROJECT. ELECTRICAL INSTALLATION AND
DESIGN SHALL BE PER 2023 NEC.
S E
F O
R P
H
ATUFOETA
T S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A L L I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S A
N D
P L A
N S
I N
D
IC
A T
E D
O R
R E
P R
E S
E N
T E
D B
Y T
H
IS
D R
A W
IN
G
A R
E O
W N
E D
B Y
A N
D T
H E
P R
O P
E R
T Y
O F
W H
W E
N G
IN
E
E R
IN
G
I N
C
A N
D W
E R
E C
R E
A T
E D
E
V O
L V
E D
A
N D
D E
V E
L O
P E
D F
O R
U S
E O
N A
N D
I N
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O J E
C T
N
O N
E O
F T
H E
I D
E A
S
D E
S
IG
N S
A
R R
A N
G E
M E
N T
S O
R P
L A
N S
S H
A L L B
E U
S E
D B
Y O
R D
IS
C
L O
S E
D T
O A
N Y
P E
R S
O N
F
IR
M
O
R C
O R
P O
R A
T
IO
N F
O R
A N
Y P
U R
P O
S E
W H
A T
S O
E V
E R
W
IT
H O
U T
W R
IT
T
E N
C O
N S
E N
T O
F W
G
IN
E
E R
IN
G
I N
C
W R
IT
T
E N
D
IM
E N
S
IO
N S
O N
T H
E S
E D
R A
W
IN
G S
S H
A L L H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
L E
D
IM
E N
S
IO
N S
C
O N
T R
A C
T O
R S
S H
A L L V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
L E
F O
R A
L L D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
F
IC
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G
R E
P R
O D
U C
T
IO
N H
E R
E O
F I S
A C
R
IM
IN
A
L O
F F
E N
S E
U N
D E
R
U
.S .C
S
E C
U N
A U
T H
O R
IZ
E
D D
IS
C
L O
S U
R E
M A
Y C
O N
S T
IT
U
T E
T R
A
C R
E T
M
IS
A P
P R
O P
R
IA
T
IO
N I N
V
IO
L A
T
IO
N O
F I .C
.2 -2
-3 -1
E T
S
E Q
A
N D
O T
H E
R L
A W
S
1 2 3 4 5
D
C
B
A
1 2 3 4 5
D
C
B
A
CONSULTANTS
CODE REVIEW STAMP
PROJECT NAME & ADDRESS
MARK DATE REVISION
PROJECT MANAGER:
DRAWN BY:
CHECKED BY:
DATE:
WHW PROJECT NUMBER:
09/02/2026MO
WP
09/02/26
26094
CL
MECHANICAL
LEGEND AND
GENERAL NOTES
MG001
OTTER CREEK
MAINTENANCE HVAC
DFCM #27134510
480 UT-22, Antimony, UT 84712
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
Jason Van Ausdal
09/09/2026
File details come from the government source that posted it. Updated .