Summary

This is a Stage II Invitation to Bid document and approved mechanical plans prepared by the State of Utah's Division of Facilities Construction and Management (DFCM) for the Otter Creek Maintenance HVAC project (#27134510) at 480 UT-22, Antimony, UT 84712, in partnership with the Department of Natural Resources-State Parks. The project scope involves removing an existing roof-mounted evaporative cooler (swamp cooler) and unit heater, then installing a new split-system propane furnace with a new split condensing unit and associated HVAC accommodations. The approved plans include mechanical demolition, floor plans for two levels, mechanical sections, and detailed specifications for ductwork, refrigerant piping, gas piping, electrical connections, and component schedules. Only contractors prequalified under Stage I Prequalification and currently listed on the DFCM Prequalified Contractors list are eligible to submit bids for this project. The construction cost estimate is $70,600.00.

The approved mechanical plans specify a Trane 5TXC+S9X1D furnace/cooling coil unit with 1,995 CFM total capacity, a Trane 5TTR3060A1 condensing unit with 60,000 Btu/h cooling load and R-454B refrigerant, a 7-day programmable thermostat with auto-changeover capability, and a complete ductwork system with supply and return air components. The contractor is responsible for coordinating with design-build electrical contractors to provide all new wiring, circuit breakers, panels, and electrical accommodations; all roofing modifications must be performed by approved roofing contractors from the DFCM short list. A licensed and approved Test & Balance contractor must provide a full test and balance report of all impacted systems. The work must comply with 2024 International Mechanical Code and International Plumbing Code with Utah annotations and include field verification of all existing conditions prior to fabrication or equipment ordering.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SE

F O

R P

H

ATUFOETA

T S

R E

E

NI

GNELANOIS

WINWARD M.

PACKER

No. 375080

North: ______ South: ______ East: ______ West: ______

d) Unlimited Area Building: Yes ______ No ______ Code Section: ______ a a

3) Three Story: A (3)______

2) Two Story: A (2)______

1) One Story: ______

c) Total Allowable Area for:

1_< Allowable Area

Actual Area

b) Sum of the Ratio Calculations for Mixed Occupancies:

a) 0.25I = 100f

F

P 30

WstA I

100100 fIA t taA = A + +

Official for Complex Buildings. Including, but not limited to:

g) Fire Stopping, Including Tested Design Number.

f) Exterior and Interior Accessibility Route.

e) Fire Assembly Locator Sheet.

a) High Rise Requirements.

b) Atriums.

c) Performance Based Criteria.

d) Means or Egress Analysis.

2) Additional Code Information shall be provided at the discretion of the Building

Code Accessibility Chapters, the more restrictive requirement shall govern.

through - ADA Guidelines and specific reference to the International Building

1) In case of conflict with the U.S. Department of Justice Federal Registers Parts

FOOTNOTES:

d) Drinking Fountains: ______ Service Sinks: ______

c) Bath Tubs or Showers: ______

b) Lavatories - Required (m) ______ (f) ______ Provided (m) ______ (f) ______

a) Water Closets - Required (m) ______ (f) ______ Provided (m) ______ (f) _____

M. Minimum Number of Required Plumbing Facilities:

Exit Width Required: ______ Exit Width Provided: ______

Element Hours Assembly

ListingListing Element

Assembly Hours

Smoke Partitions

Fire Partitions

Exterior Bearing Walls

Interior Bearing Walls

Exterior Non-Bearing Walls

Structural Frame

Partitions - Permanent

Fire Barriers

Floors - Ceiling Floors

Roofs - Ceiling Roofs

Exterior Doors and Windows

Shaft Enclosures

Fire Walls

BAHTBABABA

L. Design Occupant Load: ______

K. Fire Resistance Rating Requirements for Building Elements (hours).

Area Modifications:J:

____________________________________________Tabular Area:I:

per Floor (square feet): __________________________Actual AreaH:

Number of Stories: ______ Building Height: ______G:

Required: ______ Provided: ______ Type of Sprinkler System: ____________

Sprinklers:F:

Mixed Occupancies: ______ Nonseparated Uses: ______E.

separation distance (in hours):

Requirements for the Exterior Walls based on the fireFire Resistance RatingD.

Special Use and Occupancy (e.g. High Rise, Covered Mall): __________________

Design Wind Speed: ______ mphB. Seismic Design Category: ______

C. Type of Construction (circle one):

Change in Use: Yes ______ No ______ Mixed Occupancy: Yes ______ No ______

A. Occupancy and Group: ________ ________ ________ ________ ________

CODE ANALYSIS

Guidelines

ADA Accessibility

Building Conservation

Uniform Code for

National Electrical Code

Conservation Code

International Energy

International Fire Code

International Plumbing Code

International Mechanical Code

International Building Code

YearYear

APPLICABLE CODES

IND

USTRY

OTTER CREEK MAINTENANCE

BUILDING HVAC

DFCM #27134510

09/02/2026

480 UT-22,

Antimony, UT 84712

GENERAL:

G001 - TITLE SHEET

G002 - SPECIAL INSPECTIONS AND TESTING

MECHANICAL:

MG001 - MECHANICAL LEGEND AND GENERAL NOTES

MD101 - MECHANICAL DEMOLITION FLOOR PLAN

ME101 - MECHANICAL FLOOR PLANS

ME301 - MECHANICAL SECTION

ME501 - MECHANICAL DETAILS

ME502 - MECHANICAL DETAILS

ME601 - MECHANICAL SCHEDULES

DRAWING INDEX:

DEFERRED SUBMITTALS: SEISMIC

SPECIAL INSPECTIONS:

1. SEE SHEET DRAWING G002.

DESIGN CRITERIA:

THESE DOCUMENTS - DRAWINGS AND

SPECIFICATIONS COMPLY WITH ALL THE

REQUIREMENTS OF THE DFCM STANDARDS FOR

MECHANICAL UPGRADES OF EXISTING BUILDING.

CODE INSPECTION REQUIREMENTS:

1. BEFORE A FINAL ACCEPTANCE CAN BE ISSUED,

THE STATE APPOINTED CODE INSPECTOR SHALL

PROVIDE A FINAL REPORT RECOMMENDING THAT

THE NEW MECHANICAL WORK IS IN COMPLIANCE

WITH THE DRAWINGS, SPECIFICATIONS AND

APPLICABLE CODES ESPECIALLY FOR THE

FOLLOWING ITEMS.

2. SEE ALSO SHEET G002.

CODE REVIEW STAMP

SCOPE:

REMOVE EXISTING SWAMP COOLER.

PROVIDE A NEW SPLIT SYSTEM PROPANE

FURNACE AND NEW SPLIT CONDENSING

UNIT. PROVIDE A NEW MAIN ELECTRICAL

ACCOMMODATIONS FOR THE NEW HVAC

SYSTEM.

N/A

N/A

N/A

X X

N/A N/A

N/A N/A N/A N/A

N/A N/A

N/A N/A

2 22'

1,050 SF

S1

G001

20232024

T H E

G R E A T

S E

A L

OF THE

S

T A T E

O F

U T A H

State of Utah-Department of Administrative Services

DIVISION OF FACILITIES CONSTRUCTION AND MANAGEMENT

4315 South 2700 West, Floor 3/Taylorsville, Utah 84129-2128

PROJECT SITE

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

09/09/2026

REVIEWED FOR CODE

COMPLIANCE

S E

F O

R P

H

ATUFOETA

T S

R E

E

NI

GNELANOIS

WINWARD M.

PACKER

No. 375080

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

H W

N G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A D

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

09/02/2026MO

WP

09/02/26

26094

CL

SPECIAL

INSPECTIONS AND

TESTING

G002

OTTER CREEK

MAINTENANCE HVAC

DFCM #27134510

480 UT-22, Antimony, UT 84712

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

09/09/2026

1"ø LP (E)

3/4"ø CW (E)

3/4"ø CD (E)

1"ø CW (E)

1"ø HW (E)

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL

AND ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT

LIMITED TO: EXISTING ROUTING AND LOCATION OF

DUCTWORK, PIPING, ELECTRICAL AND STRUCTURAL

ELEMENTS. CONTRACTOR SHALL FIELD VERIFY POTENTIAL

CONFLICTS BETWEEN NEW MECHANICAL ELEMENTS AND

EXISTING CONDITIONS PRIOR TO BEGINNING FABRICATION OR

ORDERING EQUIPMENT.

2. PRIME CONTRACTOR SHALL PROVIDE ALL COORDINATION

BETWEEN SUB-TIER CONTRACTORS. THIS SHALL INCLUDE THE

COORDINATION BETWEEN SUB-TIER CONTRACTORS, SUB-TIER

CONTRACTORS AND FACILITIES, SUB-TIER CONTRACTORS

AND ARCHITECT/ENGINEER, ETC.

3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL BE

BROKEN DOWN TO FIT THROUGH DESIGNATED PATHWAYS.

FIELD VERIFY EXACT SCOPE OF DEMOLITION AND REMOVAL

PATH. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY

DAMAGE TO BUILDING DURING REMOVAL OF EQUIPMENT AND

MATERIAL.

4. SOME EXISTING PIPING AND EXISTING DUCTWORK NOT

SHOWN ON THIS SHEET FOR CLARIFICATION. FIELD VERIFY

EXISTING CONDITIONS PRIOR TO BID.

5. CONTRACTOR SHALL MAKE PROVISIONS WITH A DESIGN

BUILD ELECTRICIAN TO VERIFY ELECTRICAL CONDITIONS.

DESIGN BUILD CONTRACTOR SHALL PROVIDE ANY NEW

WIRING, CIRCUIT BREAKERS, PANELS, SWITCH GEAR, AND ALL

NECESSARY ELECTRICAL ACCOMMODATIONS OR ANY NEW OR

RELOCATED MECHANICAL EQUIPMENT. CONTRACTOR SHALL

COORDINATE THE DEMOLITION AND REMOVAL OF ANY

ELECTRICAL ELEMENTS ASSOCIATED WITH EXISTING

MECHANICAL BEING REMOVED. ALL ABANDONED PIPING AND

WIRING SHALL BE REMOVED BACK TO PANEL UNLESS

OTHERWISE APPROVED. ELECTRICIAN SHALL FIELD VERIFY

AND CONFIRM ELECTRICAL SCOPE AND EXISTING CONDITIONS

PRIOR TO ANY DEMOLITION WORK AND ORDERING ANY NEW

MECHANICAL EQUIPMENT.

6. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED BY

APPROVED ROOFING CONTRACTOR FROM THE DFCM SHORT

LIST.

7. PROVIDE FULL TEST AND BALANCE REPORT OF ALL

IMPACTED SYSTEMS BY LICENSED AND APPROVED TEST &

BALANCE CONTRACTOR.

S E

F O

R P

H

ATUFOETA

T S

R E

E

NI

GNELANOIS

WINWARD M.

PACKER

No. 375080

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

09/02/2026MO

WP

09/02/26

26094

CL

MECHANICAL

DEMOLITION FLOOR

PLAN

MD101

OTTER CREEK

MAINTENANCE HVAC

DFCM #27134510

480 UT-22, Antimony, UT 84712

3/8" = 1'-0"

LEVEL 1 MECHANICAL DEMOLITION

PLAN

SHEET NOTES

1 REMOVE EXISTING ROOF MOUNTED EVAPORATIVE

COOLER AND ALL ASSOCIATED ITEMS IN THIS

APPROXIMATE LOCATION. COORDINATE WITH DFCM

SHORT LISTED ROOFING CONTRACTOR TO PATCH

AND REPAIR ROOF WEATHER/WATER TIGHT. REMOVE

EXISTING ELECTRICAL BACK TO PANEL. REMOVE ALL

ASSOCIATED ELECTRICAL ACCOMODATIONS AND

EXISTING CONDUIT. REMOVE EXISITNG DOMESTIC

WATER BACK TO MAIN AND CAP. REMOVE EXISTING

DRAIN PIPING. FIELD VERIFY.

2 REMOVE EXISTING UNIT HEATER AND ALL

ASSOCIATED ITEMS IN THIS APPROXIMATE

LOCATION. SALVAGE UNIT BACK TO OWNER. REMOVE

EXISTING PROPANE PIPING BACK TO MAIN AND CAP.

FIELD VERIFY. REMOVE EXISTING FLUE AND PATCH

AND REPAIR EXISTING ROOF PENETRATION. REMOVE

ALL EXISTING ELECTRICAL ACCOMODATIONS BACK

TO PANEL.

3 REMOVE EXISTING PROPANE GAS PIPING BACK TO

THIS APPROXIMATE LOCATION AND CAP. FIELD

VERIFY EXACT POINT OF REMOVAL.

4 REMOVE EXISTING DOMESTIC WATER PIPING BACK

TO THIS APPROXIMATE LOCATION AND CAP. FIELD

VERIFY EXACT POINT OF REMOVAL.

5 REMOVE EXISTING EVAPORATIVE COOLER DRAIN

BACK TO THIS APPROXIMATE LOCATION. FIELD

VERIFY EXACT POINT OF REMOVAL.

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

09/09/2026

16"ø SA

16"ø SA

12"x12" SA

D-1

D-1

D-1

3"ø F UP 3"ø CBA UP

F

CC

SWS-1

SWT-1

L-1

3/4"ø CD DN

ME301

20"ø SA

10"x8" SA

10"x10" SA

10"x8" SA DN

1"ø LP (E)

18"x18" OA

24"x20" RA

CU

T

F-1

3/4"ø CD UP

ME301

D-2

D-2

D-2

SWT-2

10"x8" SA UP

6"ø SA

6"ø SA

10"x8" SA

8"x6" TA

D-3

8"ø SA

6"ø SA8"ø SA

1"ø LP UP (E)

VD

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL

AND ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT

LIMITED TO: EXISTING ROUTING AND LOCATION OF

DUCTWORK, PIPING, ELECTRICAL AND STRUCTURAL

ELEMENTS. CONTRACTOR SHALL FIELD VERIFY POTENTIAL

CONFLICTS BETWEEN NEW MECHANICAL ELEMENTS AND

EXISTING CONDITIONS PRIOR TO BEGINNING FABRICATION OR

ORDERING EQUIPMENT.

2. PRIME CONTRACTOR SHALL PROVIDE ALL COORDINATION

BETWEEN SUB-TIER CONTRACTORS. THIS SHALL INCLUDE THE

COORDINATION BETWEEN SUB-TIER CONTRACTORS, SUB-TIER

CONTRACTORS AND FACILITIES, SUB-TIER CONTRACTORS

AND ARCHITECT/ENGINEER, ETC.

3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL BE

BROKEN DOWN TO FIT THROUGH DESIGNATED PATHWAYS.

FIELD VERIFY EXACT SCOPE OF DEMOLITION AND REMOVAL

PATH. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY

DAMAGE TO BUILDING DURING REMOVAL OF EQUIPMENT AND

MATERIAL.

4. SOME EXISTING PIPING AND EXISTING DUCTWORK NOT

SHOWN ON THIS SHEET FOR CLARIFICATION. FIELD VERIFY

EXISTING CONDITIONS PRIOR TO BID.

5. CONTRACTOR SHALL MAKE PROVISIONS WITH A DESIGN

BUILD ELECTRICIAN TO VERIFY ELECTRICAL CONDITIONS.

DESIGN BUILD CONTRACTOR SHALL PROVIDE ANY NEW

WIRING, CIRCUIT BREAKERS, PANELS, SWITCH GEAR, AND ALL

NECESSARY ELECTRICAL ACCOMMODATIONS OR ANY NEW OR

RELOCATED MECHANICAL EQUIPMENT. CONTRACTOR SHALL

COORDINATE THE DEMOLITION AND REMOVAL OF ANY

ELECTRICAL ELEMENTS ASSOCIATED WITH EXISTING

MECHANICAL BEING REMOVED. ALL ABANDONED PIPING AND

WIRING SHALL BE REMOVED BACK TO PANEL UNLESS

OTHERWISE APPROVED. ELECTRICIAN SHALL FIELD VERIFY

AND CONFIRM ELECTRICAL SCOPE AND EXISTING CONDITIONS

PRIOR TO ANY DEMOLITION WORK AND ORDERING ANY NEW

MECHANICAL EQUIPMENT.

6. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED BY

APPROVED ROOFING CONTRACTOR FROM THE DFCM SHORT

LIST.

7. PROVIDE FULL TEST AND BALANCE REPORT OF ALL

IMPACTED SYSTEMS BY LICENSED AND APPROVED TEST &

BALANCE CONTRACTOR.

S E

F O

R P

H

ATUFOETA

T S

R E

E

NI

GNELANOIS

WINWARD M.

PACKER

No. 375080

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

09/02/2026MO

WP

09/02/26

26094

CL

MECHANICAL FLOOR

PLANS

ME101

OTTER CREEK

MAINTENANCE HVAC

DFCM #27134510

480 UT-22, Antimony, UT 84712

1/4" = 1'-0"

LEVEL 2 MECHANICAL PLAN

1/4" = 1'-0"

LEVEL 1 MECHANICAL PLAN

SHEET NOTES

1 PROVIDE NEW 7 DAY PROGRAMMABLE THERMOSTAT WITH

AUTO-CHANGEOVER AND OCCUPIED/UNOCCUPIED

FUNCTION 4' AFF IN THIS APPROXIMATE LOCATION. FIELD

VERIFY.

2 PROVIDE NEW OUTDOOR CONDENSING UNIT IN THIS

APPROXIMATE LOCATOIN. PROVIDE NEW REFRIGERANT

PIPING FROM OUTDOOR UNIT TO NEW INDOOR COOLING

COIL. FIELD VERIFY EXACT ROUTING. INSTALL PER

MANUFACTURER'S RECOMMENDATIONS. COORDINATE WITH

DESIGN BUILD ELECTRICIAN TO PROVIDE NEW FUSED

DISCONNECT AND ALL ASSOCIATED ELECTRICAL

ACCOMMODATIONS. PROVIDE WITH NEW CONCRETE HOUSE

KEEPING PAD. SEE DETAILS.

3 PROVIDE NEW HORIZONTAL CEILING HUNG PROPANE GAS

FURNACE SPLIT SYSTEM IN THIS APPROXIMATE LOCATION.

SEE DETAILS. COORDINATE WITH DESIGN BUILD

ELECTRICIAN TO PROVIDE ALL NEW ELECTRICAL

ACCOMODATIONS. PROVIDE NEW FLUE AND COMBUSTION

AIR. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

PROVIDE NEW SUPPORT STRUCTURE BY DEFERRED

SUBMITTAL.

4 PROVIDE NEW DX COOLING COIL IN THIS APPROXIMATE

LOCATION. PROVIDE ALL NEW REFRIGERANT PIPING FROM

COOLING COIL TO OUTDDOR CONDENSING UNIT. INSTALL

PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE NEW

COPPER CONDENSATE DRAIN AND DAYLIGHT 18" AFF. FIELD

VERIFY EXACT ROUTING.

5 PROVIDE NEW DUCT DIFFUSER IN THIS APPROXIMATE

LOCATION. FIELD VERIFY. PROVIDE WITH NEW BALANCING

DAMPER AND BALANCE TO CFM AS SHOWN.

6 PROVIDE NEW CEILING DIFFUSER IN THIS APPROXIMATE

LOCATION. BALANCE TO CFM SHOWN.

7 PROVIDE NEW TRANSFER GRILLE IN THIS APPROXIMATE

LOCATION.

8 PATCH, REPAIR, AND PAINT EXISTING SHEET ROCK TO

MATCH AS NEEDED.

9 PROVIDE NEW SIDEWALL DIFFUSER IN THIS APPROXIMATE

LOCATION. BALANCE TO CFM SHOWN.

10 CONNECT NEW PROPANE GAS PIPING TO EXISTING IN THIS

APPROXIMATE LOCATION. FIELD VERIFY EXACT ROUTING

AND POINT OF CONNECTION.

11 PROVIDE NEW 30"X16" OPENING IN TOP OF RETURN AIR

DUCTWORK IN THIS APPROXIMATE LOCATION. FIELD VERIFY.

12 PROVIDE NEW OUTSIDE AIR CONNECTION IN THIS

APPROXIMATE LOCATION. FIELD VERIFY. SEE DETAILS. TIE

NEW DAMPER ACTUATOR INTO NEW PROGRAMMABLE

THERMOSTAT. OPEN OUTSIDE ARE DAMPER WHEN

BUILDING IS OCCUPIED AND CLOSE DAMPER WHEN

BUILDING IS UNOCCUPIED.

13 PROVIDE NEW OUTSIDE AIR LOUVER IN THIS APPROXIMATE

LOCATION. FIELD VERIFY. SEAL INTERSTITIAL SPACES

WEATHER/WATER TIGHT.

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

09/09/2026

Level 1 0"

LEVEL 2

8' - 7"

Level 1 0"

ROOF

13' - 9"

LEVEL 2

8' - 7"

CU

F

CC

D-1

D-1

D-1

3"ø CBA

3"ø F

3/4"ø CD

16"ø SA 12"x12" SA

SWS-1

20"ø SA

L-1

18"x18" OA

T

F-1

10"x10" SA

6"ø SA

8"ø SA 1"ø HW (E) 1"ø CW (E)

1"ø LP (E)

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY EXISTING MECHANICAL

AND ARCHITECTURAL CONDITIONS, INCLUDING, BUT NOT

LIMITED TO: EXISTING ROUTING AND LOCATION OF

DUCTWORK, PIPING, ELECTRICAL AND STRUCTURAL

ELEMENTS. CONTRACTOR SHALL FIELD VERIFY POTENTIAL

CONFLICTS BETWEEN NEW MECHANICAL ELEMENTS AND

EXISTING CONDITIONS PRIOR TO BEGINNING FABRICATION OR

ORDERING EQUIPMENT.

2. PRIME CONTRACTOR SHALL PROVIDE ALL COORDINATION

BETWEEN SUB-TIER CONTRACTORS. THIS SHALL INCLUDE THE

COORDINATION BETWEEN SUB-TIER CONTRACTORS, SUB-TIER

CONTRACTORS AND FACILITIES, SUB-TIER CONTRACTORS

AND ARCHITECT/ENGINEER, ETC.

3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL BE

BROKEN DOWN TO FIT THROUGH DESIGNATED PATHWAYS.

FIELD VERIFY EXACT SCOPE OF DEMOLITION AND REMOVAL

PATH. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY

DAMAGE TO BUILDING DURING REMOVAL OF EQUIPMENT AND

MATERIAL.

4. SOME EXISTING PIPING AND EXISTING DUCTWORK NOT

SHOWN ON THIS SHEET FOR CLARIFICATION. FIELD VERIFY

EXISTING CONDITIONS PRIOR TO BID.

5. CONTRACTOR SHALL MAKE PROVISIONS WITH A DESIGN

BUILD ELECTRICIAN TO VERIFY ELECTRICAL CONDITIONS.

DESIGN BUILD CONTRACTOR SHALL PROVIDE ANY NEW

WIRING, CIRCUIT BREAKERS, PANELS, SWITCH GEAR, AND ALL

NECESSARY ELECTRICAL ACCOMMODATIONS OR ANY NEW OR

RELOCATED MECHANICAL EQUIPMENT. CONTRACTOR SHALL

COORDINATE THE DEMOLITION AND REMOVAL OF ANY

ELECTRICAL ELEMENTS ASSOCIATED WITH EXISTING

MECHANICAL BEING REMOVED. ALL ABANDONED PIPING AND

WIRING SHALL BE REMOVED BACK TO PANEL UNLESS

OTHERWISE APPROVED. ELECTRICIAN SHALL FIELD VERIFY

AND CONFIRM ELECTRICAL SCOPE AND EXISTING CONDITIONS

PRIOR TO ANY DEMOLITION WORK AND ORDERING ANY NEW

MECHANICAL EQUIPMENT.

6. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED BY

APPROVED ROOFING CONTRACTOR FROM THE DFCM SHORT

LIST.

7. PROVIDE FULL TEST AND BALANCE REPORT OF ALL

IMPACTED SYSTEMS BY LICENSED AND APPROVED TEST &

BALANCE CONTRACTOR.

S E

F O

R P

H

ATUFOETA

T S

R E

E

NI

GNELANOIS

WINWARD M.

PACKER

No. 375080

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

09/02/2026MO

WP

09/02/26

26094

Designer

MECHANICAL

SECTION

ME301

OTTER CREEK

MAINTENANCE HVAC

DFCM #27134510

480 UT-22, Antimony, UT 84712

3/8" = 1'-0"

MECHANICAL SECTION

SHEET NOTES

1 PROVIDE NEW OUTDOOR CONDENSING UNIT IN THIS

APPROXIMATE LOCATOIN. PROVIDE NEW

REFRIGERANT PIPING FROM OUTDOOR UNIT TO NEW

INDOOR COOLING COIL. FIELD VERIFY EXACT

ROUTING. INSTALL PER MANUFACTURER'S

RECOMMENDATIONS. COORDINATE WITH DESIGN

BUILD ELECTRICIAN TO PROVIDE NEW FUSED

DISCONNECT AND ALL ASSOCIATED ELECTRICAL

ACCOMMODATIONS. PROVIDE WITH NEW CONCRETE

HOUSE KEEPING PAD. SEE DETAILS.

2 PROVIDE NEW DUCT DIFFUSER IN THIS

APPROXIMATE LOCATION. FIELD VERIFY. PROVIDE

WITH NEW BALANCING DAMPER AND BALANCE TO

CFM AS SHOWN.

3 PROVIDE NEW HORIZONTAL CEILING HUNG PROPANE

GAS FURNACE SPLIT SYSTEM IN THIS APPROXIMATE

LOCATION. SEE DETAILS. COORDINATE WITH DESIGN

BUILD ELECTRICIAN TO PROVIDE ALL NEW

ELECTRICAL ACCOMODATIONS. PROVIDE NEW FLUE

AND COMBUSTION AIR. INSTALL PER

MANUFACTURER'S RECOMMENDATIONS. PROVIDE

NEW SUPPORT STRUCTURE BY DEFERRED

SUBMITTAL.

4 PROVIDE NEW DX COOLING COIL IN THIS

APPROXIMATE LOCATION. PROVIDE ALL NEW

REFRIGERANT PIPING FROM COOLING COIL TO

OUTDDOR CONDENSING UNIT. INSTALL PER

MANUFACTURER'S RECOMMENDATIONS. PROVIDE

NEW COPPER CONDENSATE DRAIN AND DAYLIGHT

18" AFF. FIELD VERIFY EXACT ROUTING.

5 PROVIDE NEW 7 DAY PROGRAMMABLE THERMOSTAT

WITH AUTO-CHANGEOVER AND

OCCUPIED/UNOCCUPIED FUNCTION 4' AFF IN THIS

APPROXIMATE LOCATION. FIELD VERIFY.

6 PROVIDE NEW OUTSIDE AIR LOUVER IN THIS

APPROXIMATE LOCATION. FIELD VERIFY. SEAL

INTERSTITIAL SPACES WEATHER/WATER TIGHT.

7 PROVIDE NEW OUTSIDE AIR CONNECTION IN THIS

APPROXIMATE LOCATION. FIELD VERIFY. SEE

DETAILS. TIE NEW DAMPER ACTUATOR INTO NEW

PROGRAMMABLE THERMOSTAT. OPEN OUTSIDE ARE

DAMPER WHEN BUILDING IS OCCUPIED AND CLOSE

DAMPER WHEN BUILDING IS UNOCCUPIED.

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

09/09/2026

TYPICAL FOR ALL HEAT PUMPS

1'-0"

D

NOTE:

DRY-CHARGED LINE SETS ARE AVAILABLE

IN LENGTHS OF 16, 22, 32, & 49 FEET.

LENGTHS ARE TO BE KEPT AS SHORT AS

POSSIBLE. COILING OF LINES THAT ARE

TOO LONG WILL NOT BE ACCEPTABLE AND

WILL BE REPLACED AT THE

CONTRACTORS EXPENSE. OPTIONAL:

HARD REFRIGERANT PIPING. ALL

CONNECTIONS ARE TO BE FLARED.

AIR FLOW

CU

CC

APPROX. 4"

D2

HORIZONTAL FURNACE

AND COIL ALIGNMENT DETAIL

PLAN VIEW

HEAT PUMP UNIT DETAIL

B2

ROUND DUCT SUPPORT DETAIL

B4

DUCT STRAP HANGER DETAIL

C4

CONCENTRIC ROOF

TERMINATION DETAIL

B1

PIPE HANGER DETAIL

A2

REFRIGERANT PIPING DETAIL

A4

FURNACE/COOLING COIL SUPPORT DETAIL

D1

RET.

AIR

SCALE: NONE

SUPPLY

AIR

COOLING

COIL

FILTER SECTIONFLEX.CONN.

(TYP.)

FURNACE

CENTERLINE OF

FURNACE DISCHARGE

AND COOLING COIL

INLET.

TRANSIZE AS

NECESSARY

REFRIGERANT

PIPING

SCALE: NONE

20 GAUGE SHEET METAL PAN

AROUND REFRIGERANT LINES.

ANCHOR TO WALL. PAINT PAN TO

MATCH BUILDING COLOR WITH

PRIMER AND TWO COATS OF OIL

BASE PAINT. COLOR TO BE SELECTED

BY OWNERS REPRESENTATIVE.

THRU WALL. CAULK

AND MAKE WEATHER

TIGHT

3/4" COND. DRAIN

LINE. TERMINATE

3" ABOVE CONC.

PAD.

CEILING

THERMOSTAT

CONTROLLER.

WALL

4" MIN. RADIUS

ALL BENDS

FLOOR

BOLT CONDENSING

UNIT TO PAD

4" CONCRETE

PAD

SCALE: NONE

DUCTS < 20" DIA.

20" DIA TO 36" DIA.DUCTS > 36" DIA.

HANGERS MUST NOT DEFORM DUCT SHAPE

NOTES:

1. SEE SPECIFICATIONS FOR

SEISMIC RESTRAINT

REQUIREMENTS.

2. MAXIMUM SPACING OF

10'-0"

ATTACH HANGER STRAPS

TO STRUCTURE

3/8" BOLT

SHEET METAL SCREW

1" x 18 GA.

HANGER STRAP

DUCT

1" x 16 GA.

HANGER STRAP

SIZE PER

SMACNA

#10 x 3/4" SELF

TAPPING CADMIUM PLATED

SHEET METAL SCREWS TO

ANCHOR STRAPS TO DUCT.

ALL STRAPS TO BE TIGHT

AGAINST DUCT AND SUPPORT

MEMBERS. (TYPICAL)

SCALE: NONE

1"

1" x 18 GAUGE STRAP

HANGERS AT 8'-0"

SPACING.

1" x 18 GAUGE STRAP

HANGERS AT 8'-0"

SPACING.

NO POP RIVETS

ALLOWED

NOTES:

1. DUCT OUTSIDE OF BUILDING

ENVELOPE SHALL BE WRAPPED

EXTERNALLY AS PER THE

SPECIFICATIONS.

2. SEE SPECIFICATIONS FOR

SEISMIC RESTRAINT

REQUIREMENTS.

ATTACH SECURELY TO

STRUCTURE.

22" MIN.

(OR MANUFACTURERS

STANDARD)

SCALE: NONE

NOTE:

USE EXTENSION KIT

NECESSARY TO ACHEIVE

CLEARANCE ABOVE SNOW

LEVEL

EXHAUST

INTAKEEXHAUST

INTAKE

FLASHING

ROOF

SCREW SLEEVE

SECURELY TO 2X4

BRACING. SCREW

HEAD TO BE

INSTALLED INSIDE OF

SLEEVE (TYPICAL OF 4

PLACES) CLAMP

20 GA. GALV.

SLEEVE. ALLOW

PIPING TO MOVE

FREELY THRU

SLEEVE.

20 GA. GALV.

SHEET METAL

STRAP

HANGER ROD

PIPE

HANGER

SUPPORT NUT

LOCKING NUT

CALCIUM SILICATE BLOCK

16 GA. ZINC COATED SHEET STEEL

SHIELD AT LEAST 12" LONG (TYP)

MOUNT PIPING TO UNISTRUT

PROVIDE PIPE CLAMPS

WITH BOLTS AND NUTS

CALCIUM SILICATE BLOCK

CALCIUM SILICATE

BLOCK

BOLT UNISTRUT TO EXISTING

CONCRETE WALL USING

EXPANSION ANCHOR BOLTS

ATTACH TO ROOM

STRUCTURE

SPRING TYPE ISOLATOR FOR

INSTALLATION NEAR HOT

WATER PUMPS

CLEVIS HANGER

INSULATION WITH

OR WITHOUT VAPOR

BARRIER

16 GAGE ZINC COATED SHEET STEEL

SHIELD AT LEAST 12" LONG.

HEAVY DUTY

CLEVIS HANGER

ATTACH TO EXISTING

CEILING

SCALE: N/A

SCALE: NONE

RACK PIPES TIGHT TOGETHER

PROVIDE TIGHT ELBOWS

SCALE: NONE

DRAIN PAN 3" BEYOND

EQUIPMENT, HUNG FROM

SUPPORT FRAME.

PIPE TO FLOOR DRAIN

HANG UNIT

HORIZONTALLY

FROM

STRUCTURE

PROVIDE NEW

FURNACE/COOLING COIL

SUPPORTS BY DEFERRED

SUBMITTAL FROM

LICENSED STRUCTURAL

ENGINEER.

S

SS

S

S E

F O

R P

H

ATUFOETA

T S

R E

E

NI

GNELANOIS

WINWARD M.

PACKER

No. 375080

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

09/02/2026MO

WP

09/02/26

26094

CL

MECHANICAL

DETAILS

ME501

OTTER CREEK

MAINTENANCE HVAC

DFCM #27134510

480 UT-22, Antimony, UT 84712

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

09/09/2026

A

45°

V E

R T

IC

A

L

MIN 10

PIPE

DIAMETERS

D4

DRUM LOUVER DETAIL

END VIEW

OUTDOOR EQUIPMENT PAD DETAIL

B4

D3

GAS LINE CONNECTION DETAILFRESH AIR DUCT DETAIL

D2

RETURN DUCT DETAIL

B2

REFRIGERANT PIPE SUPPORT AT WALL

A1

EXTERIOR REFRIGERANT PIPE SUPPORT DETAIL

A3 REFRIGERANT PIPE SUPPORT AT WALL DETAIL

A4

SINGLE REFRIGERANT COIL

CONNECTION DETAIL

D1 SCALE: NONE

DRUM LOUVERS

MANUAL BALANCING

DAMPER W/ LOCKING

QUADRANT, MAY BE A

PART OF DRUM LOUVER.

SEAL DUCT

CONNECTION

MAIN AIR

ROUND DUCT

DETAIL NOTES:

PROVIDE 12" OF COMPACTED STRUCTURAL FILL MINIMUM. COMPACTED LIFTS TO AT LEAST 95% OF THE DRY DENSITY IN

ACCORDANCE WITH ASTM D-1557.

4" COMPACTED LAYER OF COMPACTED GRAVEL. GRAVEL MAY CONSIST OF TYPE I OR TYPE II AGGREGATE BASE, OR PIT RUN

GRAVEL WITH A 2- INCH MAXIMUM PARTICLE SIZE AND NO MORE THAN 12% FINES PASSING THE NO. 200 SIEVE.

4" THICK REINFORCED CONCRETE PAD.

#4 @16 BOTHWAYS

12"4"

See Plan

SCALE: NONE

4"

2 3

SCALE: NONE

MANUAL

SHUT-OFF

VALVE.

GAS PRESSURE

REGULATOR

(2 PSI TO 4 OZ).

GAS

SUPPLY.

DRIP LEG.CAP.

EQUIPMENT

CONNECTION.

GROUND

JOINT

UNION.

FLEXIBLE GAS

CONNECTOR

18" MAX.

SCALE: NONE

FROM O.A.

TRUNK DUCT

AUTO DAMPER

ACCESS DOOR

VOLUME DAMPER BALANCE

FRESH AIR TO CFM SHOWN

ON SCHEDULE

TO FURNACE

R.A. DUCT

W

L = 2 x W

SOUND SHALL

NOT HAVE A

DIRECT PATH TO

PLENUM

PROVIDE HANGER

STRAP TO

STABILIZE AND

BALANCE BOOT

RETURN AIR BOOT

W/ 1" LINER

PROVIDE HANGER

STRAP TO STABILIZE

AND BALANCE BOOT

PROVIDE HANGER

STRAP TO STABILIZE

AND BALANCE BOOT

W

PROVIDE OPENING IN

TOP OF DUCTWORK

SCALE: NONE

SCALE: NONE

NOTE:

LIQUID LINE SIMILAR

V A

R

IE

S

SCALE: NONE

NOTE:

RUN STEEL COVER CONTINUOUS FROM CONDENSING

UNIT TO RISERS OR PENETRATIONS AT BUILDING WALL

OR ROOF.

SCALE: NONE

NOTE:

LIQUID LINE SIMILAR

RUN PIPE

IN STUD WALL

INTERIOR

STUD WALL

FACE BRICK

SUCTION LINEINSULATION

SECURE REFRIGERANT

PIPING TO SUPPORTS

WITH "HYDRA-ZORB"

"CUSH-A-CLAMP" OR

EQUAL (TYPICAL).

BUTT INSULATION OFF SUCTION LINE

AGAINST CLAMP ASSEMBLY.

1 5/8" P-3300

"UNISTRUT" OR

EQUAL

PIPE SLEEVE THRU WALL, SEAL ALL

AROUND.

WELD BOTH SIDES

(TYPICAL)

6"x4"x1/4" ANGLE ANCHORED TO STRUCTURE 1/2" x 3 1/2" EXPANSION

BOLTS.

UNISTRUT PIPE CLAMP (TYP.)

BUTT INSULATION OFF

SUCTION LINE AGAINST

CLAMP ASSEMBLY.

ANGLE IRON

UNISTRUT P1026

18 GAUGE GALVANIZED

SHEET METAL PROTECTIVE

COVER. RUN FROM COND.

UNIT TO BUILDING.

1 5/8" x 1 5/8" UNISTRUT

CHANNEL (GALVANIZED)

TYPICAL.

POST PLATE UNISTRUT

P2072A (TYP.) ANCHOR

TO SLAB.

CONCRETESECURE REFRIGERANT PIPING TO SUPPORTS

WITH "HYDRA-ZORB" "CUSH-A-CLAMP" OR EQUAL

(TYPICAL).

16 GAUGE GALVANIZED

SLEEVE

SEALANT SUCTION

LINE

INSULATION

FACE BRICK

SEAL AROUND

PENETRATION

THRU SOFFIT

DX COIL

S

L

THERMOSTATIC BULB

TO BE AS CLOSE TO

COIL AS POSSIBLE NOT

ALLOWED ON VERTICAL

LINES.

SCALE: NONE

45°

THERMOSTATIC

BULB

4" MINIMUM

TRAP

TRAP

EQUALIZING

LINE

THERMOSTATIC

EXPANSION VALVE

CLAMP

SUCTION

LINE

THERMAL BULB

LOCATION

S E

F O

R P

H

ATUFOETA

T S

R E

E

NI

GNELANOIS

WINWARD M.

PACKER

No. 375080

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

09/02/2026MO

WP

09/02/26

26094

Designer

MECHANICAL

DETAILS

ME502

OTTER CREEK

MAINTENANCE HVAC

DFCM #27134510

480 UT-22, Antimony, UT 84712

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

09/09/2026

1. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS.

1. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS.

2. RATED AT SEA LEVEL.

3. CONDENSING UNIT SYMBOL CORRESPONDS WITH FURNACE UNIT AND COOLING COIL UNLESS OTHERWISE NOTED. COOLING COIL CAPACITIES SHALL MATCH CONDENSING UNIT.

4. PROVIDE 4" CONCRETE PAD.

5. PROVIDE VOLTAGE MONITORS.

6. SEE SPECIFICATIONS FOR APPROVED ALTERNATE REFRIGERANTS

7. PROVIDE HAIL GUARD TO PROTECT CONDENSER FINS.

8. PROVIDE WITH CRANK CASE HEATER AND LOW AMBIENT KIT.

9. PROVIDE WITH NEW FUSED DISCONNECT, WIRING, CONDUIT, BREAKERS, RACEWAYS/JUNCTION BOXES AND ALL ELECTRICAL ACCOMMODATIONS FOR A FULLY FUNCTIONAL SYSTEM.

1. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS.

2. RATED AT SEA LEVEL.

3. FURNACE SYMBOL CORRESPONDS WITH CONDENSING UNIT AND COOLING COIL UNLESS OTHERWISE NOTED.

COOLING COIL CAPACITIES SHALL MATCH CONDENSING UNIT.

4. ECONOMIZER: FOR UNITS OVER 4.5 TONS PROVIDE FULL 100% OA ECONOMIZER. THIS INCLUDES 3 POSITION DAMPERS ON THE OUTSIDE AIR, RELIEF AIR, AND RETURN AIR DUCTS. PROVIDE OUTSIDE AIR TEMPERATURE SENSOR AND CONTROL CAPABLE OF PROVIDING THIS SEQUENCE OF OPERATIONS. DURING UNOCCUPIED, CLOSE ALL DAMPERS. DURING OCCUPIED MODE OPEN MINIMUM OUTSIDE AIR POSITION (RETURN INVERSE OPEN FROM OUTSIDE AIR AND RELIEF AIR). WHEN TEMPERATURE OUTSIDE IS LESS THAN 55 (ADJUSTABLE) AND UNIT IS CALLING FOR COOLING, FULLY OPEN OUTSIDE AIR AND RELIEF AIR DAMPERS AND CLOSE RETURN DAMPER.

5. PROVIDE FLUE AND COMBUSTION AIR PIPING PER DETAIL.

6. PROVIDE NEW GAS PIPING PER DETAIL.

7. PROVIDE WITH 120 VOLT CONTROLS CIRCUIT.

1. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS.

S E

F O

R P

H

ATUFOETA

T S

R E

E

NI

GNELANOIS

WINWARD M.

PACKER

No. 375080

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

09/02/2026MO

WP

09/02/26

26094

CL

MECHANICAL

SCHEDULES

ME601

OTTER CREEK

MAINTENANCE HVAC

DFCM #27134510

480 UT-22, Antimony, UT 84712

DIFFUSER AND GRILLE SCHEDULE

TYPE

GRD

SERVICE

MAX CFM

FACE DIMENSIONS NECK DIMENSIONS CEILING

TYPE

DISCHARGE

PATTERN

THROW 50

FPM

MAX NC MANUF. AND MODEL

SCHEDULE

NOTESL W DIAMETER L W

D-1 SUPPLY 500 CFM 8" 2' - 2" 0" 6" 2' - 0"

DUCT

MOUNTED

1-WAY 33' 25 PRICE HCD 1

D-2 SUPPLY 200 CFM 1' - 0" 1' - 0" 6" 0" 0" HARD 4 WAY 12' 25 PRICE SPD 1

D-3 SUPPLY 314 CFM 1' - 0" 1' - 0" 8" 0" 0" HARD 4 WAY 14' 25 PRICE SPD 1

SWS-1 SUPPLY 430 CFM 10" 10" 0" 10" 10" NONE N/A 32' 25 PRICE 510 1

SWT-1 TRANSFER 430 CFM 10" 1' - 0" 0" 10" 1' - 0" NONE N/A 0' 25 PRICE 535 1

SWT-2 TRANSFER 156 CFM 6" 8" 0" 6" 8" NONE N/A 0' 25 PRICE 535 1

FURNACE / COOLING COIL SCHEDULE

TAG

AREA

SERVED

CU SA CFM OA CFM ESP

COOLING

REFRIGER

ANT HEATING

ELECTRICAL DIMENSIONS

MANUF. AND MODEL

SCHEDULE

NOTES

TYPE NUMBER

CLG LOAD

TOTAL

EADB EAWB LADB TYPE HTG INPUT HTG OUTPUT EADB LADB TYPE EFF V PH HZ HP L W H WT

F 1 SHOP CU-1 1,995 CFM 400 CFM 0.50 in-wg 60000.0 Btu/h 80 °F 62 °F 54 °F R-454B 120,000 Btu/h 115,000 Btu/h 70 °F 124 °F R-454B 95% 115 V 1 60 Hz 1 hp 2' - 11" 3' - 2" 3' - 2" 156 lb TRANE 5TXC+S9X1D 1,2,3,4,5,6,7

CONDENSING UNIT SCHEDULE

TAG AREA

SERVED

SYSTEM

SERVED

COOLING

LOAD TOTAL

REFRIG

EFFICIENCY ELECTRICAL DIMENSIONS

MANUF. AND MODEL

SCHEDULE

NOTESTYPE # SEER 2 HSPF2 V PH HZ MCA MOCP L W H WT

CU 1 SHOP F-1 60000.0 Btu/h R-454B 13.4 0 230 V 1 60 Hz 30 A 50 A 2' - 11" 3' - 2" 3' - 2" 211 lb TRANE 5TTR3060A1 1,2,3,4,5,6,7,8,9

LOUVER SCHEDULE

TAG

AREA

SERVED

SYSTEM

SERVED

AIR FLOW CFM

DIMENSIONS MAX

VELOCITY

MIN FREE

AREA

DAMPER MANUF. AND MODEL

SCHEDULE

NOTESDEPTH L H

L-1 SHOP

OUTSIDE

AIR

400 CFM 4" 1' - 6" 1' - 6" 500 FPM 0.8 SF NO

GREENHECK

EDD-401

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

09/09/2026

M

M

P

T

S

PS

F

MECHANICAL LEGEND

SYMBOL ABR, DESCRIPTION

GENERAL TERMINOLOGY

A

ME101

SECTION LETTER DESIGNATION

SECTION DRAWN ON THIS SHEET

A2

AH

DETAIL NUMBER DESIGNATION

CORRESPONDING WITH GRID

LOCATION

MECHANICAL EQUIPMENT DESIGNATION

EQUIPMENT ITEM DESIGNATION

REGISTER, GRILLE OR DIFFUSER

DESIGNATION WITH BALANCING CFM

LISTED BELOW

D-1

CFM

GRILLE OR LOUVER DESIGNATION

WHERE BALANCING NOT REQUIREDR-1

REVISION DESIGNATOR AND NUMBER

KEY NOTE DESIGNATOR AND NUMBER

POINT OF CONNECTION

POINT OF REMOVAL

ABOVE FINISHED FLOOR

ACCESS PANEL

CENTERLINE ELEVATION

GENERAL CONTRACTOR

AFF

AP

POC

POR

C EL.

GC

MECHANICAL CONTRACTORMC

CONTROLS CONTRACTORATC

ELECTRICAL CONTRACTOREC

FIRE PROTECTION CONTRACTORFPC

NOT IN CONTRACTNIC

NOT TO SCALENTS

VITRIFIED CLAY PIPEVCP

NORMALLY CLOSEDNC

COMMONC

NORMALLY OPENNO

SYMBOL ABR, DESCRIPTION

AIR SIDE

EXISTING AIR DUCT TO BE REMOVED

EXISTING AIR DUCT TO REMAIN

NEW AIR DUCT

RECT TO RECT AIR DUCT TAKE-OFF

RECT TO RND AIR DUCT TAKE-OFF

RND TO RND AIR DUCT TAKE-OFF

MEDIUM PRESSURE TAKE-OFF

FLEXIBLE AIR DUCT

LINED DUCT

RADIUS ELBOW

ECCENTRIC DUCT TRANSITION

CONCENTRIC DUCT TRANSITION

VOLUME DAMPER

SUPPLY AIR DIFFUSER

RETURN & TRANSFER AIR GRILLE

EXHAUST GRILLE OR CEILING EXH. FAN

RETURN & OUTSIDE AIR DUCT UP/DN

RETURN & OA ROUND DUCT UP/DN

SUPPLY AIR DUCT UP/DN

SUPPLY AIR ROUND DUCT UP/DN

EXHAUST AIR DUCT UP/DN

EXHAUST AIR ROUND DUCT UP/DN

ACCESS PANELAP

EXISTING EQUIPMENT TO BE REMOVED

EXISTING EQUIPMENT TO REMAIN

NEW EQUIPMENT

SUPPLY AIR

RETURN AIRRA

SA

EXHAUST AIREA

OUTSIDE AIROA

MIXED AIRMA

RELIEF AIRRF

FLAT OVALFO

MOTORIZED VOLUME DAMPER

BACKDRAFT DAMPER

FIRE DAMPER

SMOKE DAMPER

FIRE & SMOKE DAMPER

WALL MOUNTED THERMOSTAT

WALL MOUNTED TEMP. SENSOR

WALL MOUNTED HUMIDISTAT

WALL MOUNTED FIRESTAT

M

BD

F

S

FS

T

S

H

F

SYMBOL ABR, DESCRIPTION

WET SIDE

PUMP

MVD

BD

FD

SD

FS

T-STAT

H-STAT

F-STAT

REGULATOR

UNION

MANUAL ACTUATOR

PNUEMATIC DIAPHRAM ACTUATOR

ELECTRIC MOTOR ACTUATOR

SOLENOID ACTUATOR

BUTTERFLY VALVE

GATE VALVE

GLOBE VALVE - STRAIGHT PATTERN

GLOBE VALVE - ANGLE PATTERN

MOTORIZED 2-WAY CONTROL VALVE

MOTORIZED 3-WAY CONTROL VALVE

CHECK VALVE

CIRCUIT BALANCING VALVE

BALL VALVE

PRESSURE RELIEF VALVE

THERMAL RELIEF VALVE

SAFETY RELIEF VALVE

PLUG VALVE

NEEDLE VALVE

TRIPLE DUTY VALVE

AUTOMATIC AIR VENT

MANUAL AIR VENT

STRAINER

STRAINER W/ PLUG BLOW OFF

VENTURI

PRESSURE GAUGE W/ COCK - WATER

PRESSURE GAUGE W/ COCK - STEAM

THERMOMETER & THERMOWELL

WATER TEMP SENSOR & THERMOWELL

FLOW SWITCH

PRESSURE SWITCH

THERMOWELL

PRESSURE & TEMP TAP

DIRECTION OF FLOW

BACKFLOW PREVENTING VALVE

SYMBOL ABR, DESCRIPTION

WET SIDE

PITCH DOWN

ELBOW UP/DN

TEE UP/DN

EXISTING PIPING TO BE REMOVED

EXISTING PIPING TO REMAIN

NEW PIPING

PIPE CAP OR PLUG

REDUCER - CONCENTRIC / ECCENTRIC

EXPANSION JOINT

FLEXIBLE CONNECTION

ANCHOR POINT

CONDENSATE DRAIN

NATURAL GAS PIPING

MAKE-UP WATER LINE

CULINARY COLD WATER

CULINARY HOT WATER

CULINARY HOT WATER RECIRC

CD

G

MU

CW

HW

HWREC

GLYCOL FILL LINEGF

R

M

S

PRESSURE REDUCING VALVEPRV

S

HEATING WATER SUPPLY

REFRIGERANT LIQUID

REFRIGERANT SUCTION

HWS

L

S

VENT LINEV

SANITARY SEWERSS

GENERAL NOTES

G-1 - MECHANICAL INFORMATION IS NOT LIMITED TO THE MECHANICAL

DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMATION OF

THE EXISTING BUILDING AND SITE CONDITIONS, EXISTING PIPING, EXISTING

ELECTRICAL, AND EXISTING SUPPORTS.

A - EACH DRAWING SHEET AND THE SPECIFICATIONS HAVE BEEN PREPARED

TO SUPPLEMENT EACH OTHER AND THEY SHALL BE INTERPRETED AS AN

INTEGRAL UNIT WITH ITEMS SHOWN AND NOTED ON ONE AND NOT THE

OTHER BEING FURNISHED AND INSTALLED AS THOUGH SHOWN AND CALLED

OUT IN ALL PLACES. ITEMS IN SPECIFICATIONS OR DRAWINGS LISTED WHICH

ARE DIFFERING IN EFFICIENCY OR QUALITY SHALL BE HELD TO THE

GREATEST OF: EFFICIENCY, QUALITY OR GOVERNING CODE.

B - THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE INSTALLATION

OF THE SYSTEMS ACCORDING TO THE TRUE INTENT AND MEANING OF THE

CONTRACT DOCUMENTS.

C - THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT WITH PROPER SERVICE

ACCESS AND CLEARANCES ACCORDING TO MANUFACTURERS

RECOMMENDATIONS. THE CONTRACTOR SHALL REVIEW SUPPLIERS BID

PACKAGES FOR COMPLETENESS AND COMPLIANCE TO THE SPECIFICATIONS,

SCHEDULES, AND DESIGN INTENT (ALL EQUIPMENT AND METHODS). THE

CONTRACTOR SHALL REMOVE AND REINSTALL CORRECTLY AT HIS OWN

EXPENSE ANY EQUIPMENT NOT IN COMPLIANCE.

D - THE CONTRACTOR SHALL CONSULT MANUFACTURERS INSTALLATION

INSTRUCTIONS FOR SIZES, METHODS, ACCESSORIES, AND CLEARANCES IN

SPACE AVAILABLE PRIOR TO BIDDING PROJECT.

E - ANYTHING NOT CLEAR OR IN CONFLICT WILL BE EXPLAINED BY MAKING

APPLICATION TO THE ENGINEER IN WRITING.

G-2 - ANY AND ALL ALTERATIONS TO THE SYSTEM SHOWN SHALL BE

SUBMITTED TO THE ENGINEER PRIOR TO CHANGES FOR APPROVAL.

CONTRACTOR SHALL NOT START ANY CHANGES UNTIL NOTIFIED IN WRITING.

IF CHANGES ARE MADE PRIOR TO APPROVAL CONTRACTOR SHALL TAKE ALL

RESPONSIBILITY FOR THE CHANGES MADE AND ALL COSTS RELATING TO

FAILURE OR REPLACEMENT OF ALTERATIONS.

G-3 - CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LOCATIONS.

G-4 - THE WORKING DRAWINGS ARE DIAGRAMMATIC. THEY DO NOT SHOW

EVERY OFFSET, BEND, OR ELBOW NECESSARY FOR THE COMPLETE

INSTALLATION IN THE SPACE PROVIDED. ALL LOCATIONS FOR MECHANICAL

EQUIPMENT SHALL BE FIELD VERIFIED AND COORDINATED WITH ALL

DRAWINGS. THE CONTRACTOR SHALL PROVIDE OR COORDINATE WITH THE

GENERAL CONTRACTOR PROVISIONS FOR BLOCKOUTS OR CORE DRILLS

THROUGH STRUCTURE.

G-5 - THE INSTRUCTION TO "PROVIDE" ALSO INCLUDES INSTALLATION.

G-6 - MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL SMOKE AND

FIRE DAMPERS AS REQUIRED BY LOCAL CODES AND AUTHORITIES.

G-7 - SHEET METAL DUCT SIZES SHOWN ON DRAWINGS ARE FREE AREA

DIMENSIONS.

G-8 - PROVIDE AND INSTALL BALANCING DAMPERS IN ALL SUPPLY AND

EXHAUST AIR BRANCH DUCTS. BALANCE TO CFM SHOWN ON PLAN.

G-9 - SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION

OF DIFFUSERS AND GRILLES.

G-10 - PROVIDE TURNING VANES IN ALL ELBOWS OF RECTANGULAR DUCT.

G-11 - THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY IN HANDLING

AND DISPOSING OF REFRIGERANTS, OILS, ETC. ALL SUCH MATERIALS SHALL

BE HANDLED, DISPOSED, AND USED IN ACCORDANCE WITH ALL LOCAL, STATE,

AND FEDERAL LAWS.

G-12 - THE MECHANICAL CONTRACTOR SHALL VERIFY MOTOR VOLTAGES WITH

THE ELECTRICAL DRAWING BEFORE ORDERING MOTORIZED EQUIPMENT AND

CONTROLS.

G-13 - C.F.M. LISTED IS ACTUAL AIR.

G-14 - SUPPLIERS SHALL REVIEW ALL DRAWINGS AND THE SPECIFICATIONS

PRIOR TO SUBMITTING PRICES TO THE CONTRACTOR. ALL QUESTIONS AND

DISCREPANCIES SHALL BE BROUGHT TO THE ENGINEERS ATTENTION PRIOR

TO BIDDING.

G-15 - CONTRACTOR SHALL THOROUGHLY REVIEW AND SIGN SUBMITTALS

FOR COMPLETENESS AND COMPLIANCE TO THE SPECIFICATIONS PRIOR TO

ENGINEERS REVIEW. SUPPLIERS SHALL HIGHLIGHT OR MARK ALL

INFORMATION REQUIRED TO SHOW COMPLIANCE TO THE SPECIFICATIONS.

ALL REQUESTED EXCEPTIONS TO THE SPECIFICATIONS, OR SCHEDULES

SHALL BE CLEARLY NOTED AND EXPLAINED. SUBMITTAL REVIEW AND

ACCEPTANCE IS FOR DESIGN CONCEPT ONLY, AND DOES NOT AT ANY TIME

RELIEVE THE CONTRACTOR OF RESPONSIBILITY TO MEET SPECIFICATIONS,

CAPACITIES, OR DESIGN INTENT.

G-16 - ALL MECHANICAL SHALL BE INSTALLED AND CONFORM TO THE 2024

EDITION OF THE IMC AND IPC WITH UTAH ANNOTATIONS AND LOCAL

AUTHORITY REQUIREMENTS.

G-17 - THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE DRAINING DOWN

AND RE-FILLING OF ALL SYSTEMS NECESSARY TO COMPLETE THE WORK

OUTLINED BY THIS PROJECT. THIS INCLUDES PROVIDING THE REQUIRED

CHEMICAL TREATMENT WHEN RE-FILLING THE SYSTEM.

G-18 - ALL PIPING, MATERIALS, ETC. SHALL BE NEW AND DOMESTIC MADE

UNLESS SPECIFICALLY AUTHORIZED IN WRITING PRIOR TO BID.

G-19 - THIS CONTRACTOR SHALL CONTRACT WITH A DESIGN BUILD

ELECTRICAL CONTRACTOR FOR THE DESIGN AND CONSTRUCTION OF THE

ELECTRICAL PORTION OF THIS PROJECT. ELECTRICAL INSTALLATION AND

DESIGN SHALL BE PER 2023 NEC.

S E

F O

R P

H

ATUFOETA

T S

R E

E

NI

GNELANOIS

WINWARD M.

PACKER

No. 375080

A L L I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S A

N D

P L A

N S

I N

D

IC

A T

E D

O R

R E

P R

E S

E N

T E

D B

Y T

H

IS

D R

A W

IN

G

A R

E O

W N

E D

B Y

A N

D T

H E

P R

O P

E R

T Y

O F

W H

W E

N G

IN

E

E R

IN

G

I N

C

A N

D W

E R

E C

R E

A T

E D

E

V O

L V

E D

A

N D

D E

V E

L O

P E

D F

O R

U S

E O

N A

N D

I N

C O

N N

E C

T

IO

N W

IT

H

T H

E S

P E

C

IF

IE

D

P R

O J E

C T

N

O N

E O

F T

H E

I D

E A

S

D E

S

IG

N S

A

R R

A N

G E

M E

N T

S O

R P

L A

N S

S H

A L L B

E U

S E

D B

Y O

R D

IS

C

L O

S E

D T

O A

N Y

P E

R S

O N

F

IR

M

O

R C

O R

P O

R A

T

IO

N F

O R

A N

Y P

U R

P O

S E

W H

A T

S O

E V

E R

W

IT

H O

U T

W R

IT

T

E N

C O

N S

E N

T O

F W

G

IN

E

E R

IN

G

I N

C

W R

IT

T

E N

D

IM

E N

S

IO

N S

O N

T H

E S

E D

R A

W

IN

G S

S H

A L L H

A V

E P

R E

C E

D E

N C

E O

V E

R S

C A

L E

D

IM

E N

S

IO

N S

C

O N

T R

A C

T O

R S

S H

A L L V

E R

IF

Y

A N

D B

E R

E S

P O

N S

IB

L E

F O

R A

L L D

IM

E

N S

IO

N

S A

N D

C O

N D

IT

IO

N S

O N

T H

E J

O B

A N

D T

H

IS

O F

F

IC

E M

U S

T B

E N

O T

IF

IE

D O

F A

N Y

V A

R

IA

T

IO

N F

R O

M T

H E

D

IM

E N

S

IO

N S

A N

D C

O N

D

IT

IO

N

S S

H O

W N

B Y

T H

E S

E D

R A

W

IN

G S

W

A R

N

IN

G

R E

P R

O D

U C

T

IO

N H

E R

E O

F I S

A C

R

IM

IN

A

L O

F F

E N

S E

U N

D E

R

U

.S .C

S

E C

U N

A U

T H

O R

IZ

E

D D

IS

C

L O

S U

R E

M A

Y C

O N

S T

IT

U

T E

T R

A

C R

E T

M

IS

A P

P R

O P

R

IA

T

IO

N I N

V

IO

L A

T

IO

N O

F I .C

.2 -2

-3 -1

E T

S

E Q

A

N D

O T

H E

R L

A W

S

1 2 3 4 5

D

C

B

A

1 2 3 4 5

D

C

B

A

CONSULTANTS

CODE REVIEW STAMP

PROJECT NAME & ADDRESS

MARK DATE REVISION

PROJECT MANAGER:

DRAWN BY:

CHECKED BY:

DATE:

WHW PROJECT NUMBER:

09/02/2026MO

WP

09/02/26

26094

CL

MECHANICAL

LEGEND AND

GENERAL NOTES

MG001

OTTER CREEK

MAINTENANCE HVAC

DFCM #27134510

480 UT-22, Antimony, UT 84712

DIVISION OF FACILITIES

CONSTRUCTION AND

MANAGEMENT

Jason Van Ausdal

09/09/2026