2026 Micro Surfacing Type II & III Technical Specifications
This document comprises technical specifications for a City of Bend, Oregon street preservation project involving the application of highly modified emulsified asphalt (HIMA) micro surfacing. The work encompasses approximately 34,135 square yards of Type III micro surfacing for rut filling and approximately 78,515 square yards or 9 lane miles of Type II micro surfacing as a lane seal across multiple city streets. The project is designated as Project No. ST26MS and is governed by the 2021 Oregon Standard Specifications for Construction with supplemental special provisions. Work is intended to be completed during nighttime hours between 8:00 p.m. and 5:00 a.m. Sunday through Thursday, with no scheduled work on Fridays or Saturdays. Traffic control and accommodations for public access are critical components, with specific requirements for lane closures, pedestrian facility management, and notification procedures to residents and emergency services. The specifications detail comprehensive requirements for surface preparation, material composition, application methodology, equipment specifications, quality control testing, and cure time management to ensure a homogeneous mat that provides skid-resistant surface texture throughout its service life.
The specifications establish strict material and equipment requirements including aggregate gradation standards, asphalt emulsion specifications (PMCQS-1EP type), and mineral filler composition with mandatory quality control testing protocols. Contractors must submit approved mix designs at least ten calendar days prior to commencing work, participate in calibration of mixing equipment before production, and construct test strips of 500 to 750 feet in length for engineer approval before full-scale production begins. Application rates are specified at 22–26 pounds per square yard for Type II and 24–28 pounds per square yard for Type III micro surfacing, with tolerances strictly enforced. Environmental controls include erosion and sediment management, dust control during street cleaning, and waste material disposal requirements. The contractor bears responsibility for snow and ice removal on affected streets when accumulations exceed specified thresholds, property damage repairs caused by contractor operations, and cleanup of residual micro surfacing from curbs and utility structures. Payment is structured on a unit price basis per square yard of street surface covered, with all associated costs for materials, labor, equipment, surface preparation, property owner notification, and traffic control included within the contract unit price.
View the file
Other files for this state and local contract opportunity
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2026 Micro Surfacing Type II & III
City Project No. ST26MS
Exhibit F - Special Provisions to the 2021 Oregon Standard Specifications for Construction (OSS) and Design Standard Drawings.
Technical and Supplemental Specifications
City of Bend 710 NW Wall Street, Bend, Oregon 97703
Table of Contents
PART 00200 – TEMPORARY FEATURES AND APPURTENANCE
Section 00210 - Mobilization
Section 00220 - Accommodations for Public Traffic
Section 00221 - Common Provisions for Work Zone Traffic Control
Section 00222 – Temporary Traffic Control Signs
Section 00223 - Work Zone Traffic Control Labor and Vehicles
Section 00224 - Temporary Traffic Channelizing Devices
Section 00225 - Temporary Pavement Markings
Section 00226 - Temporary Roadside Barriers and Impact Attenuators
Section 00231 - Temporary Access Road
Section 00270 - Temporary Fences
Section 00280 - Erosion and Sediment Control
Section 00290 - Environmental Protection
PART 00300 – ROADWORK
Section 00310 - Removal of Structures and Obstructions
Section 00320 - Clearing and Grubbing
Section 00330 - Earthwork
Section 00331 - Subgrade Stabilization
Section 00340 - Watering
Section 00440 - Commercial Grade Concrete
Section 00470 - Manholes, Catch Basins, and Inlets
Section 00480 - Drainage Curbs
Section 00490 - Work on Existing Sewers and Structures
PART 00600 – BASES
Section 00620 - Cold Plane Pavement Removal
Section 00640 - Aggregate Base and Shoulders
PART 00700 – WEARING SURFACES
Section 00950 - Removal of Electrical Systems
TECHNICAL SPECIFICATIONS
Boiler Plate changes from ODOT to 2021 Oregon Standard Specifications for construction are considered Special provisions when Added to Volume II Bidding and Contract Documents.
2021 Oregon Standard Specifications for Construction
Available from the ODOT website:
https://www.oregon.gov/odot/Business/Pages/Standard_Specifications.aspx
EXHIBIT A
Special Provisions for the Technical Specifications for the 2021 Oregon Standard Specifications for the Construction (OSS) – Technical Specifications
PART 00200 – TEMPORARY FEATURES AND APPURTENANCE
Section 00210 - Mobilization
Comply with Section 00210 of the Standard Specifications.
End of Section
Special Provisions to the 2021 OSS Section 00220 - Accommodations for Public Traffic
Section 00220 - Accommodations for Public Traffic
Comply with Section 00220 of the Standard Specifications modified as follows:
00220.02(a) General Requirements –
Replace the bullet that begins “Do not stop or hold vehicles…” with the following:
• Do not stop or hold vehicles within the work zone for durations longer than allowed in the approved traffic control plan.
Add the following bullets to the end of the bullet list:
• Notify the Engineer a minimum of 7 Calendar Days prior to activating any traffic control changes. Include contact information for the TCS and Site Manager in the notice.
• Temporary steel plating is not allowed between November 1st and March 1st. Removal all steel plates 24-hours prior to a forecasted snow event of greater than 1 inch.
• When performing trench excavation or other excavation across or adjacent to a Traffic Lane on a roadway having a pre-construction posted speed greater than 35 mph, backfill the excavation, install surfacing, and open the roadway to traffic by the end of each work shift. Install a "BUMP" (W8-1-48) sign approximately 100 feet before the backfilled area and a "ROUGH ROAD" (W8-8-48) sign approximately 500 feet ahead of the "BUMP" sign. If this requirement is not met, maintain all necessary lane or shoulder closures and provide additional TCM, including flagging, at no additional cost to the Agency. Do not use temporary steel plating to reopen the roadway.
• Before activating a modified traffic signal, revising lane usage, implementing new roadway geometry, or removing a "STOP" sign, protect traffic by installing "NEW TRAFFIC PATTERN AHEAD" (W23-2) signing according to 00222.40. Keep the signs in place for 30 Calendar Days after completing the modifications.
• When excavation or paving operations create an abrupt edge, protect traffic by installing "ABRUPT EDGE" (CW21-7) signs every 500 feet.
• When flagging operations may extend traffic queues onto the railroad crossing, protect traffic at the intersection of N/A and N/A by providing an additional flagger. Position additional flagger signs according to the "Advance Flagger for Extended Traffic Queues" configuration shown on the Standard Drawings. Do not allow traffic to stop on the railroad crossing.
00220.02(b) Temporary Pedestrian Accessible Route Plan –
Delete the bullet that begins “For intersection Work…”
Replace the bullet that begins “Limit pedestrian detour…” with the following:
• Limit pedestrian detour lengths to the shortest available accessible route.
Add the following bullet:
• Limit closure of pedestrian facilities to the duration established in the pre con schedule.
00220.03(b) Closures - Add the following bullet to the end of the bullet list:
• Floatable Natural Waterway - A minimum of 35 Calendar Days before restricting or closing the public access site(s), listed below:
• Public Access Location - _________________ (as shown).
Submit to the Engineer, in writing, when the closure(s) or restriction(s) have ended.
00220.03(b) Closures –
• Lanes – A minimum of 72 hours before a lane closure begins.
• Roads – A minimum of 72 hours before closure. Also, notify in writing, all affected emergency services, school districts, and US Postal Service a minimum of 72 hours before any closure.
Replace the bullet that begins “Pedestrian Facilities – A minimum of 14 Calendar Days…” with the following bullet:
• Pedestrian Facilities - A minimum of 72 hours before closing a sidewalk, Multi-Use Path, or other pedestrian facility. After receiving written approval, provide 48 hours’ public notification before the closure.
Replace the bullet that begins “Bicycle Facilities – A minimum of 14 Calendar Days…” with the following bullet:
• Bicycle Facilities - A minimum of 72 hours before closing a bicycle lane. After receiving written approval, provide 48 hours’ public notification before the closure.
Add the following paragraph to the end of the subsection:
Provide a minimum of 48 hours’ notice to occupants of properties fronting a street where more than half the street will be closed to vehicular traffic. Coordinate street closure with all affected individuals and public agencies.
00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:
One or more Traffic Lanes may be closed on scheduled dates between 8:00 p.m. and 5:00 a.m. when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):
00220.40(e)(2) Opened Lanes – Replace the sentence that begins “Keep all Traffic…” with the following paragraph:
Maintain two-way traffic at all times unless otherwise allowed. Streets shall remain open for two-way traffic at all times when the Contractor is not performing work unless otherwise allowed. Maintain access to approaches to all properties except for short periods necessary for the progress of the construction. Keep all Traffic Lanes and pedestrian facilities open during the following periods:
The Intent for this project is to complete all work at night during the hours of 8 p.m. to 5 a.m.
Sunday through Thursday. No scheduled work will be allowed on Friday or Saturday.
Provide a detailed map of road closures, provide No Parking signs and Door Hangers to each resident that is going to be affected.
Do not close any traffic lanes and remove all barricades and objects from the roadway during the following periods:
(1) Weekdays – Between 5:00 a.m. and 8:00 p.m. Monday through Friday
(2) Weekends – Between 6:30 p.m. on Friday and 7:00 a.m. on Monday
00220.40(e)(2)(b) Special Events - Add the following to the end of this subsection:
The following special events will occur during this Project:
Downtown Events – every Friday, Saturday and Sunday for life of Contract, and/ or any events that would fall within the project.
Add the following subsection:
00220.60(a)(1) Contractor Responsibility – Add the following paragraph and bullets to the end of the subsection:
Provide snow and ice removal for all streets with traffic control or channeling devices deployed within a travel lane and all streets where the existing pavement has been disturbed according to the following:
• Maintain a map showing snow removal boundaries and submit the map to the Engineer a minimum of 24-hours prior to a forecast showing snow accumulation exceeding 2 inches.
• When directed, provide snow and ice removal when accumulations exceed 2 inches on arterial and collector streets and 6 inches on local streets.
• Plow streets from curb to curb, or edge of pavement to edge of pavement where no curbs exist. Use equipment designed for such plowing including road graders, front end loaders, truck-mounted plows. Provide lights and beacons and appropriate signage for operating on public roads. Broadcast crushed basalt traction material on post-plowed surfaces in accordance with current City standards. Keep storm drains clear of snow and ice.
• Push the snow toward the side of the street. Minimize blocking of driveways and burying sidewalks. Do not push snow into natural surface bodies of water.
• Damage to public or private property caused by the Contractor’s snow removal will be repaired at the Contractor’s expense.
00220.90 Payment – Replace this subsection, except subsection number and title, with the following:
Section 00221 - Common Provisions for Work Zone Traffic Control
Section 00221 - Common Provisions for Work Zone Traffic Control
Comply with Section 00221 of the Standard Specifications modified as follows:
00221.06 Traffic Control Plan – Add the following sentences after the sentence that begins “The Contractor will…”:
The Contractor will have to submit their TCP to the city of Bend for approval. Submit the following full traffic control plans for approval, five calendar days before the preconstruction conference
Traffic will be permitted to be stopped or held under flagging for ___ minutes within the work zone.
00221.40 General – Add the following paragraph to the end of the subsection:
In addition to the roles having authority per Section 00150, the City of Bend Street Maintenance Supervisor and uniformed police officers, have authority to orally temporarily suspend work for failure to maintain traffic control devices.
Section 00222 – Temporary Traffic Control Signs
00222.00 Scope - In addition to the requirements of Section 00221, this Work consists of furnishing, installing, moving, operating, maintaining, inspecting, and removing temporary signs.
Materials
00222.10 Temporary Signs - Furnish temporary signs meeting the requirements of the "Acceptable" category shown in the ATSSA Quality Guidelines for Temporary Traffic Control Devices and Features handbook, available from the ATSSA website. Use materials and fabricate signs conforming to Section 00940, Section 02910 and the following:
(a) Size and Shape - Use standard size and shape signs meeting the requirements of 00221.01(c) unless otherwise specified or ordered. Double-face signs will not be allowed except for the flagger "STOP/SLOW" paddle. For diamond shaped warning signs, use 48 by 48 inch signs unless otherwise shown or specified.
(b) Type - Use ASTM Type VIII or IX sheeting from the QPL for fluorescent orange retroreflective sheeting on temporary warning signs and ASTM Type III or IV sheeting from the QPL for all other fluorescent colored retroreflective sheeting on temporary signs, unless otherwise indicated in this Section or in the TCP. Fabricate these signs on one of the following materials: New sheet aluminum sign blanks. New extruded aluminum panels. Used sheet aluminum sign blanks that are without bends, tears, holes, or dents and that have been cleaned to bare metal. 3/4 inch high-density overlay plywood. 3/4 inch medium-density overlay plywood.
(c) Folding or Turning Signs - Temporary signs on posts may be the folding or turning type as long as they can be locked when not in use so the sign message is not visible to any traffic.
(d) Roll-up Signs - Use roll-up signs with retroreflective roll-up sign sheeting from the
QPL.
00222.11 Sign Supports:
(a) Wood Sign Posts - Use wood sign posts in the sizes and quantities as shown on the Standard Drawings and according to 02110.40, except posts may be untreated.
(b) Portable Sign Supports - Use portable sign supports from the QPL and conforming to the following:
• Free standing.
• Capable of supporting signs in vehicle-caused turbulence and in winds common to the area where they are used. If additional ballast is required to maintain the signs in an upright position, use sandbags to anchor the sign support legs. Place a sandbag filled with loose sand (approximately 25 pounds) across the bottom of each leg as needed.
(c) Temporary Barrier Sign Supports - Use concrete barrier sign supports that meet the following:
• Conform to the Standard Drawings.
• Attach securely to the top of the concrete barrier.
• Support a maximum 12 square feet of total sign area.
(d) Temporary Sign Supports - Fabricate and use TSS as shown on the Standard Drawings and according to 02110.40, except posts may be untreated.
(e) Perforated Steel Square Tube Sign Supports - Use perforated steel square tube (PSST) sign supports from the QPL and as shown on the Standard Drawings. For PSST sign supports mounted on portland cement concrete surfaces, use surface mounted post anchors according to the manufacturer's recommendations.
00222.12 Sign Covers:
(a) Temporary Signs - Use sign covers for temporary signs that meet the following requirements:
• From the QPL or made from one of the following materials:
• One-piece plywood.
• Geotextile fabric.
• Large enough to completely cover the sign and attached rider signs.
• Easy to attach to and remove from the sign without damaging the sign face.
• Black and non-reflective.
• Opaque to prevent message visibility under day and nighttime conditions.
(b) Permanent Signs - Sign covers for permanent signs shall conform to Section 00941.
00222.13 Sign Flags - Sign flags shall be:
• Fluorescent red-orange.
• Square 16 by 16 inches or larger.
• Made from an acceptable tightly woven fabric or plastic sheeting.
00222.14 Sign Flag Boards - Use sign flag boards as shown on the Standard Drawings.
00222.15 Temporary Electrical Signs - Furnish electrical signs meeting the following requirements:
(a) Sequential Arrow Signs - Use Type "C" sequential arrow signs from the QPL.
(c) Portable Changeable Message Signs - Use PCMS from the QPL.
(d) Radar Speed Trailers - Use radar speed trailers with a Type 2 panel from the QPL, Conditional List, or as approved. Construction
00222.40 Temporary Signs - Once temporary signs have been accepted and paid for on the Project, do not remove them from the Project, until directed by the Engineer.
For all temporary warning signs use fluorescent orange retroreflective sheeting background.
Install all temporary signing according to the Plans, Section 00940, the MUTCD, the Sign Policy and Guidelines for the State Highway System, FHWA Standard Highway Sign manual and the following:
Speed Signs - Use speed signs as follows:
(1) Advisory Speed Signs - Install advisory speed warning signs or riders as shown or directed.
(2) Regulatory Speed Zone Signs - Install and maintain regulatory speed zone signs as directed and according to the "Temporary Speed Zone Order" signed by the State Traffic Engineer.
When regulatory speed zone signs are used, cover conflicting existing regulatory speed zone signs with sign covers according to Section 00941. Cover or remove temporary regulatory speed zone signs and restore the original speed zone signs according to the "Temporary Speed Zone Order" and when directed.
If an existing regulatory speed zone sign displaying the original speed is 1,000 feet or less beyond the limits of the temporary speed zone, additional temporary regulatory speed zone signs displaying the original speed are not required.
(b) Roll-up Signs - Roll-up signs may be used at a single location for no more than 48 consecutive hours. Place roll-up signs within the active Work Area on portable roll-up sign supports. Remove all inappropriate roll-up signs at the end of each shift.
(c) Inconsistent Temporary Signs - Ensure that all temporary signs are properly used and consistent with the work zone. Cover all inconsistent temporary signing until the sign messages are applicable to the Work that is beginning. When signage is no longer required for staging or shift Work, remove all temporary signs, sign flag boards, supports, sign covers, and ballast associated with the staging or shift Work.
When temporary sign messages conflict with work zone conditions, traffic patterns, or other staging configurations, but signs are needed later in Project, do the following:
• Turn or cover the signs so the message is not visible to any traffic.
• Remove or cover sign flag boards.
• When covering signs and sign flag boards, use covers meeting the requirements of 00222.12.
When it is determined that only minor Work remains on the Project and the work area does not encroach on Traffic Lanes or Shoulders, do the following:
• Remove all temporary signs, including the advance construction and Project identification signs.
• Remove all sign flag boards and ballasts.
• Use roll up signs on portable sign supports for minor or short duration Work.
(d) Permanent Signing - When permanent sign messages conflict with adjacent temporary signing, work zone conditions, traffic patterns or other staging configurations, do the following:
• Turn or cover the signs so the message is not visible to any traffic.
• When covering signs, use sign covers meeting the requirements of 00222.12(b).
When work zone conditions change and permanent sign messages no longer conflict with temporary signing, uncover permanent signs. Install or uncover appropriate permanent signing as required, before changing traffic control staging.
(e) Temporary Sign Placement - Place temporary signs as shown, specified, and directed:
• Install a "TRUCKS" (W11-10) sign with an 18 inch "500 FEET" (W16-4P) plaque, approximately 500 feet before each point of access of all noncommercial stockpile sites, work zone staging area, material sources, waste areas, and plant set-up areas to a public Roadway.
• When a through road intersects the work zone, place a "ROAD WORK AHEAD" (W20-
1) sign in advance of the intersection at sign spacing "A" from the "TCD Spacing Table" shown on the Standard Drawings, or as shown in the TCP. These signs do not require sign flag boards, unless otherwise directed.
• When a cold planed Pavement surface is used by traffic, install the following temporary signs:
o "BUMP" (W8-1) sign approximately 100 feet in advance of the transverse paving edge.
o "GROOVED PAVEMENT" (W8-15) sign with a 24 inch "Motorcycle" (W8-15P) rider in advance of the “BUMP” sign at sign spacing "A" from the "TCD Spacing Table" shown on the Standard Drawings, or as shown in the TCP.
Face signs toward incoming traffic and install them before opening the cold planed surface area to Public Traffic. Protect exposed transverse and longitudinal cold planed Pavement edges according to 00221.07(c).
00222.41 Sign Supports:
(a) Wood Sign Posts - Except as provided in the following (b) through (f), mount all temporary signs on wood sign posts as shown.
• When sign posts are installed in Rock, a shorter post may be used if the post is installed in a buried concrete footing at least 12 inches in diameter and 2 feet deep.
(b) Portable Sign Supports - Use portable sign supports as follows:
• When signs are needed at a single location for no more than 48 consecutive hours.
• Positioned so the lowest point of the sign is at least 1 foot above the Roadway surface.
• With roll-up signs.
• With ballast to prevent tipping of the signs in high wind.
Turn, cover, or remove signs at the end of each work shift when the condition is no longer in effect.
(c) Temporary Barrier Sign Supports - Mount signs on temporary barrier so the:
• Lowest point of the sign is at least 7 feet above the Roadway surface.
• Temporary sign and post are held securely to temporary barrier by an approved device.
• Sign can be turned and locked in a position parallel to the flow of traffic when not in use.
(d) Temporary Sign Supports - Use TSS as follows:
• When signs are needed at a single location for more than 48 consecutive hours.
• When not practicable to post mount due to location or when Utility conflicts exist.
• Provide reflective sheeting on TSS posts as shown in the Standard Drawings.
• Do not tip over any TSS that is exposed to traffic, unless approved by the Engineer or the TSS is protected from traffic by a barrier system. Position TSS as shown on the Standard Drawings or in the TCP.
• When not in use, locate TSS as far from Public Traffic as practicable and turn away from traffic, or cover the sign. Do not cover reflective sheeting on the TSS posts.
(e) Perforated Steel Square Tube Sign Supports - Perforated steel square tube sign supports may be used as a substitute for wood sign posts. Install perforated steel square tube sign supports as shown on the Standard Drawings. For PSST sign supports mounted on portland cement concrete surfaces, use surface mounted post anchors according to the manufacturer's recommendations.
(f) Existing Facility Sign Supports - When mounting temporary signs on existing facilities, install signs as shown on the Standard Drawings or other mounting methods approved by the Engineer.
00222.45 Temporary Electrical Signs - Provide and install temporary electrical signs as follows:
(a) Sequential Arrow Signs - Use the sequential arrow signs as follows:
• To indicate a lane closure only. Use one sequential arrow sign for each lane being closed.
• Install where the sign is visible from 1/2 mile minimum.
• Mount at a height of 7 feet from bottom of sign to ground.
• Do not use on 2-Lane, 2-Way Roadway.
• For Shoulder Work use caution mode only.
• Provide a solar/battery power source.
(b) Portable Changeable Message Signs - Use PCMS according to the Oregon Portable Changeable Message Sign Handbook and as follows:
• Program concise accurate messages according to the Oregon Portable Changeable Message Sign Handbook.
• Install beyond the outside Shoulder, behind existing barrier or guardrail, as shown in the TCP, or as directed when conditions do not allow the PCMS to be located beyond the Traffic Lane.
• Install the PCMS device where it can be seen from 1/2 mile minimum. The PCMS message should be legible from 800 feet in the daytime and 600 feet at night.
• Mount so that the bottom of the sign is 7 feet above the ground.
• Program so that the entire message is displayed within 8 seconds.
• Use a maximum of two panels to display an entire message.
• Separate two PCMS used in sequence by 1,000 feet minimum.
• Messages shall not scroll horizontally or vertically across the face of the sign.
• When the PCMS is not being used to display any messages for more than 5 consecutive Calendar Days, remove the PCMS from the Roadway and locate the device at least 30 feet from the edge of the nearest Traffic Lane, place behind a barrier system, or as directed.
• Provide a solar/battery power source.
• Obtain approval from the Engineer / Project Manager before displaying or altering messages.
• Type B, Mini PCMS use is limited to locations where the preconstruction posted speed is 40 mph or less.
Measurement Work covered under this Section will be measured according to the following:
Method “B” – Lump Sum Basis – Under this method, no measurement of quantities will be made.
Payment
00222.91 Payment, Lump Sum or Incidental Basis - When the Contract Schedule of Items does not indicate payment for Work performed under this Section, no separate or additional payment will be made. Payment will be included in payment according to 00221.98 or 00221.99.
Comply with Section 00222 of the Standard Specifications modified as follows:
00222.40(e) Temporary Sign Placement - Add the following to the end of the bullet list:
• When the horizontal clearance for the Roadway is less than 19 feet, install horizontal clearance (CW21-12-48) signs, identifying the narrowest width of the Roadway. Locate these horizontal clearance signs as shown or as directed.
• When the vertical clearance is less than 15 feet 6 inches, install low clearance (W12-2-48) and (OW12-2-36) signs. The clearance shown on the signs shall be 4 inches less than the shortest height of the opening. Locate these low clearance signs as shown or as directed.
• When construction requires bicycles to use the Traffic Lanes, install a "Bicycle ON
ROADWAY" (CW11-1) symbol sign on 1/2 mile spacing through the affected area. Keep the signs in place until completion of the Shoulder or bikeway final surface.
Section 00223 - Work Zone Traffic Control Labor and Vehicles
Section 00223 - Work Zone Traffic Control Labor and Vehicles
Comply with Section 00223 of the Standard Specifications.
Comply with Section 00223 of the Standard Specifications modified as follows:
00223.23 Automated Flagger Assistance Device - In the sentence that begins "Submit the following information…", replace the words "21 Calendar Days" with the words "14 Calendar Days ".
00223.80(b)(1) Flaggers – Add the following paragraph to the end of the subsection:
Flaggers not approved by the Engineer or included on the approved traffic control plan and schedule will not be measured for payment.
Section 00224 - Temporary Traffic Channelizing Devices
Section 00224 - Temporary Traffic Channelizing Devices
Comply with Section 00224 of the Standard Specifications.
Section 00225 - Temporary Pavement Markings
Comply with Section 00225 of the Standard Specifications.
Section 00226 - Temporary Roadside Barriers and Impact Attenuators
Comply with Section 00226 of the Standard Specifications.
Section 00226 - Temporary Roadside Barriers and Impact Attenuators
Section 00228 - Temporary Pedestrian and Bicyclist Routing
Comply with Section 00228 of the Standard Specifications modified as follows:
Section 00231 - Temporary Access Road
Section 00231 - Temporary Access Road
Description
Maintenance
Section 00270 - Temporary Fences
Comply with Section 00270 of the Standard Specifications.
Section 00280 - Erosion and Sediment Control
Comply with Section 00280 of the Standard Specifications modified as follows:
00280.00 Scope - Add the following two paragraphs to the end of this subsection:
When applicable, obtain an NPDES 1200-C Permit from the authorizing local jurisdiction for the Project or phase.
When applicable, comply with the WPCF UIC Permit or rule authorization requirements in its absence. Copies of any local or state agency/government permit(s) are available from the permitted agency/government and may be more stringent than these Specifications.
00280.05 Erosion and Sediment Control Plan on Non-Agency Controlled Lands – Replace the bullet that begins “A Contractor-developed ESCP…” with the following bullet:
• A Contractor-developed ESCP for each unique site covered under applicable Federal, state, or local permits or regulations.
00280.16(a) Construction Entrances – Replace the “Aggregate” bullet with the following bullet:
• Aggregate – Furnish 3-6 inch aggregate for construction entrances. If tracking of aggregate onto the street is of concern, 6-8 inch stone can be used. Material will be visually accepted in the field.
00280.30 Erosion and Sediment Control Manager –
Replace the bullet that begins “Monitor water quality…” bullet with the following bullet:
• Monitor water quality in receiving streams and UICs in the vicinity of the Project Site.
Add the following paragraph after the paragraph that begins “Provide the ESCM name…”:
The ESCM, or designee, must be able to respond to the site within 90 minutes of notification during storm events. Include the storm response plan in the ESCP.
00280.41(c) Wet Season Work and Temporary Work Suspension – Add the following paragraph to the end of the subsection:
Wet season work is defined as work between October 1 and June 30.
00280.42(a) Soil Exposure Limitations – Replace this subsection, except for the subsection number and title, with the following:
• East of the Cascades (October 1 through June 30) – Stabilize all other areas within 5 days of exposure.
• East of the Cascades (July 1 through September 30) – Stabilize construction areas within 10 days of exposure.
00280.42(b) Temporary Stabilization –
Replace the first bullet with the following:
• Every 5 days (October 1 through June 30), every 10 days (July 1 through September 30), or more frequently as needed or directed.
Delete the bullet that begins “Upon approval, active…”.
00280.63(c) Paved Areas – Add the following sentence to the end of the subsection:
Street washing is not permitted.
00280.70 Removal – Add the following paragraph to the end of the subsection:
The cost of damage to public right-of-way or private property resulting from not removing erosion control materials will be at the Contractor’s expense.
Section 00290 - Environmental Protection
Section 00290 - Environmental Protection
Comply with Section 00290 of the Standard Specifications modified as follows:
00290.20(c)(2) Clean Fill - Add the following paragraph to the end of this subsection:
Manage all excavated soil that does not meet the definition of clean fill according to Section 00294.
00290.20(c)(3)(a) Burnable Materials – Delete this subsection.
00290.20(c)(3)(b) Woody Matter – Delete this subsection
00290.30(a)(1) General – Replace the bullet that begins “Comply with the…” with the following bullet:
• Comply with the erosion prevention and sediment control requirements of Section 00280, local requirements, and all applicable DEQ NPDES 1200 Permit requirements.
Section 00310 - Removal of Structures and Obstructions
PART 00300 – ROADWORK
Section 00310 - Removal of Structures and Obstructions
Comply with Section 00310 of the Standard Specifications.
00310.41 Removal Work: (a) General - Where an abutting Structure or part of a Structure is to be left in place, make clean, smooth, vertical cuts with a saw or other approved cutting device. Avoid operations that may damage any portion of the remaining Structure.
Section 00320 - Clearing and Grubbing
Comply with Section 00320 of the Standard Specifications modified as follows:
00320.40(b)(3) Vegetation and Materials to be Saved – Add the following to the end of this subsection:
Where the plans call for the preservation of trees, provide a tree preservation plan a minimum of 7 Calendar Days prior to beginning clearing and grubbing. Include, at a minimum, the following in the tree preservation plan:
Method of protecting each tree Trimming procedure Watering schedule Root cutting procedure
The Contractor shall routinely water the preservation zone to keep the area moist
As soon as possible, but not more than two weeks prior to any required construction in a preservation zone per the exceptions above, thoroughly saturate the preservation zone with water.
When necessary to excavate or trench through a preservation zone, trim all roots exposed by the excavation. Do not tear or pull roots from the ground with construction equipment but cleanly saw them immediately when exposed by the equipment. An exception shall be rock saws. However; however, rock saws shall be operated to minimize the shattering of roots.
Section 00320 - Clearing and Grubbing
Backfill trenches in a preservation zone as soon as possible to minimize the drying of exposed roots. Where trenches need to be open longer than six hours, cover with burlap and keep moist exposed roots on the trench wall sides.
00320.42 Disposal of Matter - Replace this subsection, except for the subsection number and title, with the following:
Dispose of all matter and debris according to 00290.20. Open burning of materials is prohibited within the City limits.
00320.42 Ownership and Disposal of Matter - Vegetation and natural material designated for preservation and salvage are the property of the Agency. All other matter and debris accumulated from clearing and grubbing operations become the Contractor’s property at the place of origin. Dispose of all matter and debris according to 00290.20.
Section 00330 - Earthwork
Comply with Section 00330 of the Standard Specifications modified as follows:
00330.14 Selected Granular Backfill - Delete the sentence that begins “Reclaimed glass meeting the requirements of Section 02695…”
00330.15 Selected Stone Backfill - Delete the sentence that begins “Reclaimed glass meeting the requirements of Section 02695…”
00330.41(a)(4) Excess Materials - Replace this subsection, except for the subsection number and title, with the following:
If the quantities of excavated materials are greater than required to construct embankments and to do all filling and backfilling, the Contractor may use the remaining materials to uniformly widen embankments or to flatten slopes in a manner satisfactory to the Engineer.
00330.43(b) Moisture-Density Testable Materials – Add the following to the end of the subsection:
(3) Place moisture-density testable material in nearly horizontal layers with thickness as necessary to meet the requirements of Section 00330.43(b)(2)(b) but not more than 18 inches.
00330.80 Measurement – Add the following bullet:
• Lump sum basis, no measurement of quantities will be made. Approximately ____ Cubic Yards of earthwork will be required on this project.
00330.92 Kinds of Incidental Earthwork - Add the following bullet(s) to the end of the bullet list:
• Excess material used to widen embankments or flatten slopes according to 00330.41(a)(4).
• Earthwork required for driveways and road approaches. Earthwork for driveways and road approaches will be that which is outside the Neat Line limits shown on the typical sections.
Add the following subsection:
00330.95 Earthwork Lump Sum Basis Payment – Earthwork will be paid for at the Contract lump sum amount for the item “Earthwork”.
Section 00331 - Subgrade Stabilization
Section 00331 - Subgrade Stabilization
Comply with Section 00331 of the Standard Specifications.
Section 00340 - Watering
Section 00340 - Watering
Comply with Section 00340 of the Standard Specifications modified as follows:
00340.10 Water – Add the following to the end of this subsection:
For a charge, the City can provide water from a fire hydrant or similar source within the City’s water service area. Application for a hydrant meter permit is available through the City Permit Center.
Section 00440 - Commercial Grade Concrete
Comply with Section 00440 of the Standard Specifications modified as follows:
00440.11 Proportions – Add the following to the end of the bullet list:
• Fiber - ½ bag per yard for curb and flat work
00440.12 Properties of Commercial Grade Concrete –
In the bullet that begins “Entrained Air…” replace “4.0 to 7.0 percent” with “4.5 to 7.5 percent”.
In the bullet that begins “Compressive Strength…” replace “3,000 psi” with “4,000 psi”.
00440.40(b) Placing - Add the following bullet to the end of the bullet list:
• When haul time or placement conditions warrant exceeding the time of discharge, submit a detailed breakdown of the estimated time needed from batching to discharge of a load along with the measures that will be taken to ensure slump, temperature and uniformity will be maintained. Submit in advance to establish a new time limit at the Engineer’s discretion.
00440.40(d) Weather - Replace this subsection, except for the subsection number and title, with the following:
Do not place CGC when the air temperature is below 35 °F or above 100 °F without approval.
Section 00440 - Commercial Grade Concrete
Protect CGC from freezing if the air temperature is expected to drop below 35 °F during the first 5 Calendar Days after placement.
When the air temperature exceeds 90 °F, place concrete in accordance with ACI 305R-10.
Section 00470 - Manholes, Catch Basins, and Inlets
Section 00470 - Manholes, Catch Basins, and Inlets
Comply with Section 00470 of the Standard Specifications modified as follows:
Section 00480 - Drainage Curbs
Comply with Section 00480 of the Standard Specifications.
Section 00490 - Work on Existing Sewers and Structures
Section 00490 - Work on Existing Sewers and Structures
Comply with Section 00490 of the Standard Specifications modified as follows:
00490.43 Abandoning Pipes in Place - Replace this subsection, except for the subsection number and title, with the following:
Abandoning pipe in place is not allowed. All abandoned utilities are required to be removed and disposed of properly, unless otherwise approved by the Engineer.
When pipe abandonment is approved, drain abandoned pipes and plug watertight. Plug abandoned pipes with gasketed mechanical plugs or grout seals, as directed. Where abandoned pipes connect to sewer manholes, install the plugs or seals from the inside of the manhole and reshape the channel to conform to the Standard Drawings.
Fill abandoned pipes greater than 12 inches diameter with sand, controlled low-strength material meeting the requirements of 00442, or other approved material.
00490.48 - Adjusting Boxes, Cleanout Lids and Similar Structures – DELETE this subsection and REPLACE with the following:
Raise or lower boxes, lids and similar structures by one of the following methods:
• Resetting the entire structure on a firm foundation.
• Adding extensions of like material below the original structure if raising the structure to a point where it would not enclose or protect its contents.
Section 00620 - Cold Plane Pavement Removal
PART 00600 – BASES
Section 00620 - Cold Plane Pavement Removal
Comply with Section 00620 of the Standard Specifications modified as follows:
00620.40(e) Warning Signs - Replace this subsection, except for the subsection number and title, with the following:
Provide warning signs as required where abrupt or sloped drop-offs occur at the edge of the existing or new surface according to Sections 00221 and 00222.
00620.43 Maintenance Under Traffic - Replace this subsection, except for the subsection number and title, with the following:
Traffic will be allowed on the cold planed surface up to 7 Calendar Days after removing the existing surface. Sweep and clean the cold planed surface before opening to traffic.
Submit a plan describing how drainage will be maintained while traffic is on the cold planed surface at least 7 Calendar Days prior to cold planing.
00620.80 Measurement – ADD the following at the end of this subsection:
At the end of each shift, the Contractor is required to provide the quantities of Cold Plane Pavement Removal performed to the City. Documentation to be provided to inspector to verify finial quantities for billing. If Cold plane removal is not provided before paving is completed the quantities shown on the plans will be used for billing purposes. City of Bend project manager will provide excel cold plane removal spread sheet to be filled out at the end of each shift.
Section 00640 - Aggregate Base and Shoulders
Comply with Section 00640 of the Standard Specifications modified as follows:
00640.41 Hauling and Placing - Add the following paragraph to the end of this subsection:
Prior to the placement of base rock, completely install, grout, seat, backfill, set to finish grade, and compact test around all structures (e.g. manholes, utilities, catch basins).
00640.90 Payment – Replace this subsection, except for the subsection number and title, with the following:
The accepted quantities of Aggregates will be paid for at the Contract unit price, per unit of measurement, for the following items:
Pay Item Unit of Measurement
(a) Aggregate Base ................................................................. Ton
(b) Aggregate Shoulders ........................................................ Ton
No separate or additional payment will be made for water used to obtain proper compaction and in the care of the Work.
When the Contract Schedule of Items does not indicate payment for Work performed under this Section, no separate or additional payment will be made. Payment will be included in payment made for the appropriate items under which this Work is required.
PART 00700 – WEARING SURFACES
Section 00706 - Emulsified Asphalt Highly Modified Micro Seal Surfacing
Description
00706.00 Scope - Delete and Replace with the following:
Highly Modified Micro Seal Specifications-
Description: The Contractor shall furnish all labor, equipment, material, supplies, signage, traffic control, and other incidentals necessary to provide a Highly Modified Micro Seal. The Highly Modified Micro Seal shall consist of a mixture of an approved Highly Modified PMCQS-1EP emulsified asphalt, mineral aggregate, water, and specified additives, proportioned, mixed and uniformly spread over a properly prepared asphalt surface. The completed Highly Modified Micro Seal shall result in a homogeneous mat, adhered firmly to the prepared surface, and act as a skid-resistant surface texture throughout its service life.
00706.02 Abbreviations:
ISSA - International Micro Surfacing Association ASSHTO - American Association of State Highway and Transportation officials
Materials
00706.10 - Delete and Replace with the following:
Asphalt Emulsion: The asphalt emulsion for Highly Modified Micro Seal shall be a Quick Setting type -PMCQS-I EP ( Polymer Modified, Cationic Quick Set-1EP) the specification for the asphalt emulsion is in accordance with the material properties and test methods as specified In the Emulsion Table Below for PMCQS-1EP.
TEST ON EMULSION PMCQS-1EP
Test Procedure Specification
AASHTO min max Asphalt Base Properties
ODSR, kPa (G*/sin δ, 10 rad./sec), 76°C T315 1.00
Tests on Emulsion
Viscosity, Saybolt-Furol, 122°F (50°C), seconds T59 15 150 Sieve Test, % T59 0.1
Residue by Evaporation, % T59 62
Residue Properties from Low Temperature Evaporation(1) R-78 Procedure B
ODSR, kPa (G*/sin δ, 10 rad./sec), 76°C T315 1.0
ODSR, deg (phase angle δ, 10 rad./sec), 76°C T315 60
(1) After recovering the residue from AASHTO R-78 Procedure B, the sample may be annealed prior to testing to remove any excess moisture and provide a consistent sample.
The annealing can be accomplished by placing 20 grams of residue in a 6 oz. metal container (approx. 3-inch diameter) and heating to 163°C for no more than 15 minutes.
The sample should be stirred with a spatula every 5 minutes. The sample can then be poured directly into a 25mm DSR silicone mold for evaluation.
00706.11 The highly modified emulsion shall be compatible with the mix design developed for the high performance Highly Modified Micro Seal. Each shipment of emulsified asphalt shall be accompanied by a certificate of analysis or certificate of compliance from the manufacturer.
Asphalt Storage: Any emulsified asphalt storage container used by the Contractor shall be suitable and be constructed so as to prevent water from entering the asphalt. An acceptable heating system shall be provided if necessary to prevent the emulsified asphalt from freezing, but the asphalt emulsion shall not be heated to a temperature greater than 130 F after manufacturing.
00706.12 - Delete and Replace with the following:
706.12 Aggregate - The mineral aggregate used shall be manufactured crushed stone such as granite, slag, limestone, chat, or other high-quality aggregate, or combination thereof.
To assure the material is totally crushed, 100 percent of the parent aggregate will be larger than the largest stone in the gradation to be used. The aggregate shall meet the following test requirements: The finished product shall be clean, uniform in quality and free from wood, bark, roots and other deleterious materials. It may be necessary during stockpiling to improve the properties of the mineral aggregate. For this purpose only, crushed fines from the aggregate source may be used but only in the minimum amount needed to meet mix design tolerances and workability. When tested in accordance with ASTM Designation D2419, the total aggregate blend shall have a sand equivalent of not less than 45. The aggregate shall consist of 100% crushed rock. The mineral aggregate shall conform to the following grading limits.
Gradation Table – Aggregate (percent passing) (a) (b)
Sieve Size TYPE II TYPE III Tolerance 3/8" 100 100 + or – 5% No. 4 90-100 70-90 + or – 5% No. 8 65-90 45-70 + or – 5%
No. 16 45-70 28-50 + or – 5% No. 30 30-50 19-34 + or – 5% No. 50 18-30 12-25 + or – 4%
No. 100 10-21 7-18 + or – 3% No. 200 5-15 5-15 + or – 2%
(a) Meets ISSA gradation.
(b) If oversize material is present, screening through a ¼” screen will be required prior to delivery to the Micro machine. If clay balls are present, the aggregate may not be used.
Resistance to Degradation (ASTM C131grading D) 20% maximum loss Soundness of Aggregate (ASTM C88) 15% maximum loss Sand Equivalent (ASTM D 2419) 45 Minimum LA Abrasion (AASHTO T96) 20% maximum loss
Stockpiling of Aggregate: Precautions shall be taken to ensure that a stockpile does not become contaminated with oversized rock, clay or silt or collect excessive amounts of moisture. The stockpiles shall be placed on hard surfaces (Asphalt and Or Concrete surface or other unyielding surface as to prevent contamination) and in an area that drains readily.
Segregation of the aggregate will not be permitted. The stockpile and staging area should be as close as possible to Job location.
00706.13 Additives and Mineral Filler - Delete and Replace with the following:
Additives: Any material added to the Highly Modified Micro Seal mixture or any of the component materials shall be approved by the Project Manager prior to use, and the Contractor shall furnish a statement describing the additive, its purpose and quantity to be used.
The quantities of additives shall be initially predetermined by the mix design and field adjustments, if required, shall be approved by the Project Manager. Mixture break retardant (used with the PMCQS-I EP Emulsion) shall only be used in the amount needed to improve workability of the mix.
Mineral filler, for example, Portland cement, hydrated lime, limestone dust, fly-ash or other approved filler, if required by the mix design, shall meet the requirements of ASTM D242. The type and amount, if necessary, shall be determined by the mix design. And shall be considered as part of the dry aggregate
00706.14 Water - Delete and Replace with the following:
All water used with the Highly Modified Micro Seal mixture shall be potable. The Contractor shall ensure that the water planned for use shall be compatible with the Highly Modified Micro Seal mixture. If the contractor elects to obtain water from fire hydrants, the contractor shall obtain, install and use an approved construction water meter and pay such fees and service charges as are normally charged by the water department.
00706.15 Job Mix Formula - Delete and Replace with the following:
706.15 Mix Design: A minimum of 10 calendar days prior to accomplishing any Highly Modified Micro Sealing, the Contractor shall submit a signed original of a mix design for approval by the Project Manager. The mix design shall be developed using the specific materials intended for use on the project Previous mix designs shall not be accepted unless authorized by the Project Manager. Once the materials are approved, no substitution will be permitted unless first tested and approved by the laboratory preparing the mix design.
The design shall be performed in accordance with International Micro Surfacing Association (ISSA) and these special provisions for Highly Modified Micro Seal". The mix design shall be developed such that the treated area will be opened to traffic within 2 to 3 hours after placement of the Highly Modified Micro Seal mixture.
The Mix design laboratory shall be ASSHTO accredited and Knowledgeable in performing Micro seal and Micro Surfacing Mix designs .
Other laboratories may be approved by the Project Manager if they have the capability to perform the required tests and demonstrate satisfactory experience performing Highly Modified Micro Seal mix designs.
As a minimum, the mix design report shall include the following information:
Aggregates: Results of Quality tests (Los Angeles Wear, Sand Equivalent, etc.)
Gradation
Asphalt: Results of Specification tests Residual Asphalt % by Weight of Dry Aggregate (8.5-13.5 Type II, 7.5-12.0 Type III)
Water: Percentage by weight of dry aggregate (Report design quantity and minimum and maximum limits)
Mineral Filler (if necessary): Type to be used Percentage by weight of dry aggregate (Report design quantity and minimum and maximum limits) Additives (if necessary): Type to be used Percentage by weight of dry aggregate (Report design quantity and minimum and maximum limits)
Results of Tests on Highly Modified Micro Seal Mixtures:
*The mixing test and set time test should be done at the highest temperatures expected during construction.
The laboratory report shall include the quantitative effects of moisture content on the unit weight of the aggregate. In addition to the laboratory report, abraded Cantabro Micro test samples shall be submitted by the contractor from the Cantabro Test.
Highly Modified Micro Seal Mixtures Test Mixture Control Tolerance
Types
I II III
Range for Residual Asphalt, % (1) +/-0.5% 10-
8.0 13.5
7.0
Range for Mineral Filler, % (1) +/-0.5% 0-3.0 Test Method ISSA TB # (2) Specification Wet Track Abrasion Loss, 1 Hour Soak, g/ft2, Maximum TB 100 38 Excess Asphalt by LWT, g/ft2, Maximum TB 109 50 Mixing Time, Seconds, 77°F, Minimum TB 113 180 Set Time, 30 Minutes, kg-cm, Minimum TB 139 12 Early Rolling Traffic Time, 60 Minutes, kg-cm, Minimum
TB 139 20
Water Resistance, 30 Minutes TB 102 No Discoloration Wet Stripping Test, % Coating, Minimum TB114 90 System Compatibility TB 115 Pass Mixture Testing To be Conducted at Recommended Job Mix Formula
Cantabro Mass Loss, %, Maximum (3) TX 245-F 2.0 Bulk Specific Gravity (3) AASHTO T166 2.100-2.400 Ideal CT, peak load, lb-force, Minimum (4) ASTM D 8225 2000 Ideal CT, Index, Minimum (4) ASTM D 8225 100
1. Percent residual asphalt and percent mineral filler shall be based on weight of dry aggregate.
2. Reference to ISSA TB means…