8-05 BID SCHEDULE - WORKSHEET.xlsx

XLSX spreadsheet 9 KB Posted

Attached to
IFB - VERNON WORTHEN PARK PLAYGROUND TILE REPLACEMENT
Solicitation number
26-312
Issued by
Washington County, Utah

About this file

This is a Bid Schedule Worksheet for the City of St. George, Utah's Vernon Worthen Park Playground Tile Replacement project. The scope of work encompasses site preparation for new safety surfacing, including mobilization, environmental protection, and traffic control as lump sum items. The project requires excavation of 10,250 square feet of road base, removal of 130 cubic yards of existing subgrade, removal and reprocessing of 12 inches of subgrade material with compaction to 95% standard, placement of 4 inches of untreated base course (130 cubic yards), and application of 4 inches of concrete slurry (130 square feet).

The City of St. George requires all bids to be accompanied by a bid bond equal to 5% of the total bid amount, issued by a surety company licensed to conduct business in Utah and submitted on a bond form acceptable to the city. The city reserves the right to reject any or all proposals or waive any formality or technicality in the bidding process. No specific response due dates, site visit requirements, pre-bid conferences, or award dates are indicated in the worksheet provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Worksheet

Item DescriptionQuantity RequiredUnit of Measure
Mobilization1LUMP
Environmental Protection1LUMP
Traffic Control1LUMP
Excavation of Road Base10250SQ FT
Remove Existing Subgrade130CY
Remove and Reprocess 12" Subgrade and Compact to 95%130CY
4" Untreated Base Course130CY
4" Concrete Slurry130SQ FT