7th St Pond 03_30_22 1.pdf

PDF 4 MB Posted

Attached to
JOHN DAY PONDS DREDGING PROJECT
Solicitation number
S-63500-00003680
Issued by
Gilliam County, Jacksonville City, Oregon

About this file

This document is a technical drawing and project description for the 7th Street Pond Dredging project being conducted by the Oregon Department of Fish and Wildlife (ODFW) in John Day, Oregon. The project scope includes fencing off the work area, dredging muck from the pond to restore the original depth, pumping the muck into dewatering bags, and returning the area to its original condition after dredging is complete. The pond has an original volume of 9.0 acre-feet, with a mean depth of 11.7 feet and a surface area of 0.7 acres. The muck layer has an average depth of 8.10 feet, leaving a 2.9 foot water depth on average. The project will dredge the pond to its original depth.

The project location is in John Day, Oregon within Grant County. The project manager is Bryce Hansen of ODFW. Contractors will be required to follow the regulations of the Oregon Utility Notification Center. No bid due date, award date, or contract term is provided in the documents.

View the file

Other files

File Type Posted
Holiday Pond 03_30_22 1.pdf PDF
Notice of Intent to Award~7.docx DOCX document
ITB for John Day Ponds Dredging. doc.pdf PDF
SOLE SOURCE Remote Outdoor Lockers.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7 TH STREET POND

7 TH STREET POND DREDGING

101 NE 7 TH STREET

JOHN DAY, OR 97845

T

H

S

R

E

E

T

PRELIMINARY

DRAWING

NOT FOR

CONSTRUCTION

F i s h

W i l d l i f e

O R

E G

O N

O re g o n

D E

P A

R T

M E

N T

O F

F

IS

H A

N D

W

IL

D L

IF

E

F

IS

H D

IV

IS

IO

N

E N

G

IN

E E

R

IN

G S

E C

T

IO

N

F

A

IR

V

IE

W

IN

D U

S T

R

IA

L D

R

IV

E S

E S

A L

E M

O

R E

G O

N

-1

(5

-6

(5

-6

CHIEF ENGINEER

FILE #:

SHEET

OF

CHECKED BY:

DRAWN BY:

DESIGN BY:

DATE:

R E

V D

A T

E D

E S

C R

I P

T I O

N

T

H

S

T R

E E

T

P

O N

D

T

H

S

T R

E E

T

P

O N

D

D

R E

D G

I N

G

T I T

L E

N

O T

E

A

N D

M

P

BPH

BPH

RLM

2022-001

MARCH 30, 2022

PROJECT

LOCATION

LOCATION MAP VICINITY MAP

GENERAL INFORMATION

OWNER: JDCC PARKS AND RECREATION

PO BOX 762, 841

NW BRIDGE

ST. JOHN DAY, OR 97845

TAX INFO: SEC 13S31E23 GRANT COUNTY

LOT 1100

SCOPE OF WORK

1. FENCE OFF WORK AREA FROM PUBLIC

2. DREDGE MUCK OUT OF POND BACK TO ORIGINAL DEPTH

3. PUMP MUCK INTO BIO BAGS FOR DEWATERING

4. AFTER DREDGING AND REMOVAL OF SPOILS RETURN ALL AREAS ON WITCH WORK WAS DONE, BACK TO ORIGINAL CONDITION

5. REMOVE FENCING

ATTENTION EXCAVATORS

OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER (OUNC). THOSE

RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THESE RULES FROM

THE CENTER BY CALLING THE ADMINISTRATION NUMBER 503-232-1987, OR IN PERSON AT 1415 SE ANKENY, PORTLAND, OREGON

97214-1471 (ALSO THE OUNC MAILING ADDRESS). ONLINE INFORMATION IS AVAILABLE AT www.digsafelyoregon.com.

YOU MUST NOTIFY THE CENTER AT LEAST TWO (2) BUSINESS DAYS BEFORE COMMENCING EXCAVATION. CALL OUNC TOLL

FREE AT 800-332-2344 OR FAX OUNC AT 503-293-0826.

ONLINE OUNC SERVICE TICKET REQUESTS ARE AVAILABLE AT www.callbeforeyoudig.org.

DIG SAFELY!!

FACILITY MANAGER

STEPHAN CHARETTE - DISTRICT FISH BIOLOGIST

Oregon Department of Fish and Wildlife John Day District Fish Biologist PO Box 9, John Day, OR 97845

TEL: (541) 573-6582

EMAIL: Stephan.R.CHARETTE@odfw.oregon.gov

PROJECT MANAGER

OWNER'S AUTHORIZED REPRESENTATIVE

BRYCE HANSEN - R&E CONSTRUCTION PROJECT MANAGER

OREGON DEPARTMENT FISH AND WILDLIFE

4034 FAIRVIEW INDUSTRIAL DR. SE, SALEM, OR 97302

TEL: (971) 600-7480

EMAIL: bryce.p.hansen@odfw.oregon.gov

PROJECT

LOCATION

SHEET INDEX

TITLE, NOTES AND MAP

2 POND SITE PLAN

3 MAP OF WORK AREAS

4 DEPTH DATA AND DATA POINTS MAP

C:\Users\hansenbr\Desktop\7th St Pond\CAD Files\7th St Pond.dwg, 3/30/2022 10:29:40 AM, AutoCAD PDF (General Documentation).pc3

PRELIMINARY

DRAWING

NOT FOR

CONSTRUCTION

F i s l d l i f e

O R

E G

O N

O re g o n

D E

P A

R T

M E

N T

O F

F

IS

H A

N D

W

IL

D L

IF

E

F

IS

H D

IV

IS

IO

N

E N

G

IN

E E

R

IN

G S

E C

T

IO

N

F

A

IR

V

IE

W

IN

D U

S T

R

IA

L D

R

IV

E S

E S

A L

E M

O

R E

G O

N

-1

(5

-6

(5

-6

CHIEF ENGINEER

FILE #:

SHEET

OF

CHECKED BY:

DRAWN BY:

DESIGN BY:

DATE:

R E

V D

A T

E D

E S

C R

I P

T I O

N

T

H

S

T R

E E

T

P

O N

D

T

H

S

T R

E E

T

P

O N

D

D

R E

D G

I N

G

P O

I T

E

P

L

BPH

RLM

2022-001

MARCH 30, 2022

SCALE: NTS

MAP IMAGE OF OF EXISTING POND LOCATION

2 SCALE: NTS

EXISTING POND SITE DETAIL

EXISTING PAVED

TRAIL

AREAS OF FOCUS

WHEN DREDGING

ADA CANTILEVERED

DECK

LIB TRUCK PAD

PARKING LOT

R

E

E

T

EXISTING PAVED

TRAIL

AREAS OF FOCUS

WHEN DREDGING

ADA CANTILEVERED

DECK

LIB TRUCK PAD

PARKING LOT

R

E

E

T

SHEDSHED

C:\Users\hansenbr\Desktop\7th St Pond\CAD Files\7th St Pond.dwg, 3/30/2022 10:29:40 AM, AutoCAD PDF (General Documentation).pc3

PRELIMINARY

DRAWING

NOT FOR

CONSTRUCTION

F i s l d l i f e

O R

E G

O N

O re g o n

D E

P A

R T

M E

N T

O F

F

IS

H A

N D

W

IL

D L

IF

E

F

IS

H D

IV

IS

IO

N

E N

G

IN

E E

R

IN

G S

E C

T

IO

N F

A

IR

V

IE

W

IN

D U

S T

R

IA

L D

R

IV

E S

E S

A L

E M

O

R E

G O

N -1

(5

-6

(5

-6

CHIEF ENGINEER

FILE #:

SHEET

OF

CHECKED BY:

DRAWN BY:

DESIGN BY:

DATE:

R E

V D

A T

E D

E S

C R

I P

T I O

N

T

H

S

T R

E E

T

P

O N

D

T

H

S

T R

E E

T

P

O N

D

D

R E

D G

I N

G

M A

P

O

F

W

O R

K

A

R E

A S

BPH

CLM

RLM

2022-001

MARCH 30, 2022

POTENTIAL DEWATERING AREAS

SIZE OF MARKED AREA IS 70' X 160'

7th STREET POND

ORIGINAL POND SIZE: 9.2

ACER FEET

STAGING AREA FOR

EQUIPMENT

SCALE:

" = 1'-0" ON 22" X 34"

SITE MAP MARKED WITH WORK AREAS

C:\Users\hansenbr\Desktop\7th St Pond\CAD Files\7th St Pond.dwg, 3/30/2022 10:29:41 AM, AutoCAD PDF (General Documentation).pc3

HWL

HWL

PRELIMINARY

DRAWING

NOT FOR

CONSTRUCTION

F i s l d l i f e

O R

E G

O N

O re g o n

D E

P A

R T

M E

N T

O F

F

IS

H A

N D

W

IL

D L

IF

E

F

IS

H D

IV

IS

IO

N

E N

G

IN

E E

R

IN

G S

E C

T

IO

N

F

A

IR

V

IE

W

IN

D U

S T

R

IA

L D

R

IV

E S

E S

A L

E M

O

R E

G O

N

-1

(5

-6

(5

-6

CHIEF ENGINEER

FILE #:

SHEET

OF

CHECKED BY:

DRAWN BY:

DESIGN BY:

DATE:

R E

V D

A T

E D

E S

C R

I P

T I O

N

T

H

S

T R

E E

T

P

O N

D

T

H

S

T R

E E

T

P

O N

D

D

R E

D G

I N

G

D E

P T

H

D

A T

A

A

T

A

P

O I N

M

P

RLM

2022-001

MARCH 30, 2022

SCALE:

" = 1'-0" ON 22" X 34"

POND MAP WITH DEPTH POINTS OF WATER / MUCK

EXISTING GRADE

SLOPE

' X 1' AROUND

POND PERIMETER

POND 9.0 ACER FEET OF VOLUME, WATER

DEPTH MEAN 11'-7", AND SURFACE AREA

OF 0.70 ACERS

MUCK LAYER FOR DREDGING

SCALE: NTS

ORIGINAL POND PROFILE

SCALE: NTS

POND PROFILE WITH MUCK LAYER

7 TH STREET POND DEPTH DATA

POINT LOCATION

WATER DEPTH: TOP

OF SURFACE TO TOP

OF MUCK

MUCK DEPTH: TOP OF

MUCK TO ORIGINAL

POND BOTTOM

TOTAL DEPTH

1 3'-0" 10'-0" 13'-0"

2 3'-0" 9'-0" 12'-0"

3 1'-6" 7'-6" 9'-0"

4 2'-0" 9'-0" 11'-0"

5 3'-0" 9'-0" 12'-0"

6 3'-0" 9'-0" 12'-0"

7 3'-6" 8'-6" 12'-0"

POINT 1

POINT 2

POINT 3

POINT 4

POINT 5

POINT 6

POINT 7

NOTES: PONDS MEAN IS 11'-7" WITH A SURFACE AREA OF 0.70 ACERS

NOTES:

· PONDS MUCK LAYER MEAN 8'-10"

· PONDS WATER DEPTH FOR SURFACE TO TOP OF MUCK MEAN IS 2'-9"

· DREDGE POND TO ORIGINAL DEPTH

POND 9.0 ACER FEET OF VOLUME, WATER

DEPTH MEAN 11'-7", AND SURFACE AREA

OF 0.70 ACERS

SLOPE

' X 1' AROUND

POND PERIMETER

C:\Users\hansenbr\Desktop\7th St Pond\CAD Files\7th St Pond.dwg, 3/30/2022 10:29:42 AM, AutoCAD PDF (General Documentation).pc3

Sheets and Views
7th St Pond-TITLE SHEET
7th St Pond-S1
7th St Pond-S2
7th St Pond-S3

File details come from the government source that posted it. Updated .