Enclosure No 5 - Evaluation Criteria - 7-B187-Q-00016-00.pdf
PDF 183 KB Posted
- Attached to
- On-Site Industrial Services
- Solicitation number
- 7-B187-P-00016-00
- Issued by
-
Department of Energy Office of Science
About this file
This document is Enclosure No. 5: Evaluation Criteria for RFP No. 7-B187-P-00016-00 issued by Argonne National Laboratory (ANL-830) on March 10, 2025, with an evaluation date of October 12, 2026.
The evaluation will follow Argonne National Laboratory's approved procurement policies using a best value tradeoff approach, prioritizing the highest technically acceptable proposal with the lowest evaluated cost. The Technical Proposal is weighted as more important than both the Cost Proposal and Business Management Proposal, though all three components will significantly influence the award decision. The Laboratory may select a higher-cost proposal if its perceived technical advantages justify the additional expense. Three technical evaluation criteria are listed in descending order of importance: Criterion 1—Company Capabilities, requiring vendors to demonstrate their ability to provide all required services from Section 2.0 of the Statement of Work without subcontractor reliance, with detailed descriptions of in-house local branch workforce, specialized trades, skills, and equipment; Criterion 2—Technician Technical Ability & Training Profile, requiring documentation of field personnel qualifications, relevant certifications, safety certifications, applicable licenses, and local union training details; and Criterion 3—Company Experience, requiring vendors to provide a list of at least five local client accounts currently serviced that are compatible in size and scope to Argonne.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. 7-B187-P-00016-00 ANL-830 March 10, 2025
Enclosure No. 5
Evaluation Criteria October 12, 2026
I. Evaluation will be conducted in accordance with the Argonne National Laboratory approved
Procurement policies based on the Evaluation Criteria set forth below:
II. Overall Relative Importance of Proposal Parts
The Technical Proposal is of greater importance to the Cost Proposal and Business Management Proposal. While the Cost Proposal and Business Management Proposal may not be the controlling factor for the award, they will be a significant part of the Laboratory’s selection decision.
The Laboratory shall select for an award based on the principles of best value tradeoffs. The best value is expected to result from selection of the highest technical acceptable proposal with the lowest evaluated proposed cost. It may be in the best interest of the Laboratory to consider award to other than the offeror with the lowest evaluated proposed cost if the perceived technical advantages of a higher evaluated proposed cost proposal merit the additional higher proposed cost.
III. Evaluation Criteria
A. Technical Proposal
The Laboratory will use the following technical evaluation criteria, listed in Descending order to evaluate the merit of the Desirable Requirements:
CRITERION 1 – Company Capabilities
Basis for Evaluation:
o Ability to provide all required services located in Section 2.0 Scope of Services section of SOW without reliance on subcontractors o Local branch office workforce, equipment, and infrastructure
Offeror to Provide for Evaluation:
➢ The vendor shall provide a detailed description of their in-house local branch workforce, including the types of trades, specialized skills, and equipment available to self-perform the work listed in the Scope of Services section of the SOW. The proposal should clearly indicate the extent to which the contractor can self-perform work and the utilize resources available at the local office level.
CRITERION 2 – Technician Technical Ability & Training Profile o Relevant qualifications & certifications o Safety certifications
RFP No. 7-B187-P-00016-00 ANL-830 March 10, 2025 o Any applicable licenses o Technical training background of service personnel
➢ The vendor shall include in their technical proposal the qualifications and training of their field personnel designated to perform work under this Scope of Work. This information may encompass details of local union training, certifications, and any relevant credentials or licenses.
CRITERION 3 – Company Experience o Company experience o Other large commercial/industrial customers currently under contract
➢ The vendor shall include, as part of their technical proposal, a list of at least five local client accounts they currently service that are most compatible in size and scope to Argonne.
File details come from the government source that posted it. Updated .