Enclosure No 3 - Statement of Work - 7-B187-Q-00016-00.pdf

PDF 169 KB Posted

Download PDF, 169 KB

Attached to
On-Site Industrial Services
Solicitation number
7-B187-P-00016-00
Issued by

About this file

This is a Statement of Work (SOW) for RFP No. 7-B187-P-00016-00 establishing a Time-and-Materials (T&M) Blanket Purchasing Agreement for industrial services at Argonne National Laboratory (ANL). The contract covers a three-year period (one base year plus two option years) and encompasses services including abatement, scaffolding, floor tile removal, window replacement, glazing removal, insulation, and surface preparation and coatings. All work must be performed by qualified personnel with appropriate certifications and comply with applicable federal regulations including NESHAP (40 CFR 61, Subpart M) and OSHA asbestos standards (1926.1101). The Contractor must maintain a primary shop facility within 25 miles of Argonne and provide a warranty covering both materials and workmanship.

Work is ordered on an as-needed basis through individual Call Records or Service Requests, with the Contractor required to submit written quotes within two business days (preferably 24-48 hours) of each request. Pricing must strictly adhere to a pre-negotiated Price Schedule, with any non-scheduled costs requiring written approval before order placement. Invoices are billed per individual order or service completed and must be submitted to Accounts Payable at ap@anl.gov after technical approval by the ANL Technical Representative. The SOW specifies detailed technical requirements for Class II asbestos work practices, window glass and lead paint removal, floor tile removal (not exceeding 160 square feet), Class I glove bag pipe insulation removal, and coatings application. All Contractor personnel must carry valid government-issued photo identification (REAL ID or Passport), be U.S. citizens, complete Argonne Contractor Safety Orientation training, and obtain gate passes. The contract requires submission of technical proposals detailing in-house local branch workforce capabilities, at least five comparable local client accounts, and field personnel qualifications and certifications.

View the file

Other files

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. 7-B187-P-00016-00

Enclosure No. 3

APPENDIX B – Statement of Work ANL Industrial Services Contract

November 4, 2026

1.0 Purpose

This Statement of Work (SOW) establishes a Time-and-Materials (T&M) Blanket Purchasing Agreement for industrial services at Argonne National Laboratory (ANL), ordered as needed through individual Call Records or Service Requests. Services include abatement, scaffolding, floor tile removal, window replacement, glazing removal, insulation, and surface preparation and coatings. The qualified Contractor shall provide all labor, materials, equipment, and expertise required for safe, compliant, and high-quality performance.

No work shall involve new construction, expansion, or modification of facilities or systems beyond their original design & function.

2.0 Scope of Services

The Contractor shall provide the following services on an as-ordered basis.

2.1 Insulation Services

• Provide installation, repair, and removal of insulation for piping, ductwork, vessels, tanks, and equipment.

• Utilize insulation materials appropriate to project specifications and operational requirements.

2.2 Abatement Services

• Perform abatement of hazardous materials, including asbestos, lead, and mold, in accordance with all applicable federal, state, and local regulations.

• Provide all necessary containment, removal, and clearance testing.

2.3 Scaffolding Services

• Provide engineering and design for scaffolding solutions tailored to project requirements.

• Erect and dismantle scaffolding in compliance with OSHA and industry standards.

2.4 Floor Tile Removal

• Remove floor tiles, including asbestos-containing tiles, using approved abatement procedures.

• Provide proper containment, removal, and disposal of asbestos-containing materials.

2.5 Window Replacement

• Remove and replace windows.

• Ensure all installations meet facility and code requirements.

2.6 Window Glazing Removal

• Remove window glazing, including asbestos-containing glazing, using approved abatement procedures.

2.7 Surface Preparation and Coatings

• Prepare surfaces and apply coatings to piping, vessels, tanks, structural steel, floors, and concrete.

• Use industry-approved surface preparation methods (e.g., cleaning, blasting, priming).

• Apply coatings in accordance with manufacturer specifications and project requirements.

The coating type will be specified per job requirement.

➢ Technical Proposal Requirement: The Contractor shall provide a detailed description of their in-house local branch workforce, including the types of trades, specialized skills, and equipment available to self-perform the work listed in the Scope of Services section of the SOW. The proposal should clearly indicate the extent to which the contractor can self-perform work and the utilize resources available at the local office level.

3.0 Performance Requirements

• All work shall be performed by qualified personnel with appropriate certifications and training.

• All services shall comply with applicable codes, standards, and safety regulations.

o NESHAP: 40 CFR 61, Subpart M o 1926.1101 - Asbestos

• The Contractor shall provide cost estimates at no additional cost to Argonne.

• The Contractor shall coordinate scheduling with the ANL Technical Representative to minimize disruption to operations.

• All tools, equipment, and personal protective equipment (PPE) are subject to inspection by the ANL Technical Representative prior to use.

• The Contractor shall provide a warranty covering both materials and workmanship.

• The Contractor shall maintain a primary shop facility within 25 miles of Argonne to ensure timely access to technical support, parts, materials, service personnel, and equipment.

➢ Technical Proposal Requirement: The Contractor shall include a list of at least five (5) local client accounts it currently services that are most comparable in size and scope to Argonne.

4.0 Tasks and Ordering Procedures

4.1 Establishment of Agreement

Argonne will establish a Time-and-Materials (T&M) Blanket Purchasing Agreement with a qualified Contractor. The agreement sets forth pre-negotiated labor rates, material handling, and terms and conditions. No work is authorized under this agreement until an individual Call Record or Service Requests is issued and acknowledged.

4.2 Service Requests

• The Contractor shall respond to service requests issued via "Specific Call Records" by the ANL Technical Representative (Coordinator), Authorized Personnel, or the Procurement Representative.

4.3 Quotation Submission

• Following each request, the Contractor shall submit a written quote within two (2) business days, preferably within 24 to 48 hours.

• Each quote shall include:

o A detailed description of items or scope of work.

o Itemized labor, tooling, and material costs consistent with the contract pricing in the agreed-upon Price Schedule.

o Estimated completion and delivery lead times.

4.4 Authorization to Proceed

• No work beyond diagnostic or quoting activities shall proceed without written authorization from the Argonne Technical Representative or Authorized Procurement Personnel.

• Authorization will be documented through a Call Record or Service Request Release number, which the Technical Representative issues to the Contractor before work begins.

4.5 Job Issuance and Coordination

• The Technical Representative will obtain a job-cost quote for the work to be performed.

https://www.ilga.gov/commission/jcar/admincode/077/077008550D02200R.html https://www.ilga.gov/commission/jcar/admincode/077/077008550D02200R.html https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1101

• The Technical Representative will issue a Call Record or Service Request Release number to the Contractor before work starts.

• The Contractor shall coordinate site access, scheduling, and shutdowns with the Technical Representative.

5.0 Training and Certification Requirements

All technicians must hold current certifications relevant to their scope of work, including but not limited to:

• Asbestos, lead, and mold abatement certifications

• OSHA Lead Awareness Training

• IDPH 40-hour Asbestos Abatement Contractor/Supervisor training

• IDPH license for asbestos project designers, inspectors, workers, supervisors, and contractors

• OSHA 10/30 training

• Lockout/Tagout (LOTO) training (current and within the last three years)

• Scaffolding competent person

• Confined Space Entry

• Fall protection training

• Aerial manlift training

• Annual Argonne Contractor Safety Orientation (CSO) training

Technicians must complete the Argonne CSO and review and sign the Job Safety Analysis (JSA) before beginning work.

➢ Technical Proposal Requirement: The Contractor shall include the qualifications and training of its field personnel designated for this work, including local union training, certifications, and relevant credentials or licenses.

6.0 Deliverables, Timing, Location, and Documentation

6.1 Deliverables

• Written quotes for each service request (Section 4.3).

• Work plans for each Service Request.

• Abatement reports, clearance testing results, scaffolding certifications, and coating application records, as applicable.

• Summary report upon completion detailing work performed, materials used, and any issues encountered or resolved.

• Invoices in accordance with Section 7.0.

6.2 Timing

• Quotes: within two (2) business days of request (target 24 to 48 hours).

• Documentation: all documentation shall be submitted to the designated Technical Representative within one (1) week of project completion.

6.3 Location

• Documentation and quotes shall be submitted to the Technical Representative identified on the applicable Service Request.

6.4 ANL Technical Representative Responsibilities

• Coordinate site access and scheduling.

• Review and approve work plans and documentation.

• Inspect tools, equipment, and PPE prior to use.

• Conduct final inspection and acceptance of completed work.

• Provide gate passes for ANL site access.

• Provide containers and disposal for asbestos and window glazing materials.

• Provide Argonne CSO training.

• Issue Call Record or Service Request Release number.

7.0 Pricing and Invoicing

7.1 Pricing

• Pricing must strictly adhere to the agreed-upon Price Schedule.

• Any non-scheduled costs or expedited fees must be approved in writing by Argonne prior to order placement.

• All negotiated volume or contract discounts must be reflected on the resulting Purchase Order and invoice.

7.2 Invoicing Procedure

1. Billing Basis: Invoices must be billed per individual order or service completed.

2. Review and Approval: Invoices must first be emailed to the initiating Argonne Technical

Representative or Authorized Personnel for review and technical approval.

3. Final Submission: Upon technical approval, invoices shall be submitted directly to Accounts

Payable at ap@anl.gov.

7.3 Invoice Requirements

Each invoice must clearly specify the following:

1. Purchase Order (PO) Number with Call/Release Number

2. Date(s) of Service or Order

3. Detailed Item Description / Scope of Service

4. Labor Categories and Itemized Unit Quantities

5. Itemized Materials, Tooling, and Outside Service Charges

6. Total Invoice Amount

8.0 Technical Safety and Work Practice Requirements

8.1 Class II Asbestos Work Practices

• Use vacuum cleaners equipped with HEPA filters for collection of all debris and dust containing Asbestos-Containing Material (ACM) and Presumed Asbestos-Containing Material

(PACM).

• Place critical barriers over all openings to the regulated area, and position impermeable drop cloths beneath all removal activity.

• Implement wet methods or wetting agents to control employee exposures during handling, mixing, removal, cutting, application, and cleanup. Technicians must use wet methods unless infeasibility is demonstrated (e.g., electrical hazards or equipment malfunction).

• Clean up and dispose of asbestos-contaminated waste and debris promptly. Store materials in leak-tight containers provided by Argonne.

• Work must be supervised by a competent person.

8.2 Window Glass, Caulk, and Lead Paint Removal

• Regulate the area with barrier tape and proper signage. Seal off the removal area and shut off any forced-air heating systems.

• Workers shall wear appropriate PPE, including disposable suits, a minimum of ½-mask respirators with HEPA-filtered cartridges and/or dual cartridge filters (organic vapor/HEPA), safety glasses, and cut-resistant gloves.

• When required, erect a negative pressure enclosure (NPE) using 6-mil flame-retardant plastic, HEPA-equipped air filtration machines (exhaust locations determined before project start), and an attached 3-chamber decontamination unit and 2-chamber waste-out unit.

• Maintain at least 4 air changes per hour in the NPE and a minimum of −0.02 inches of water column pressure differential relative to outside pressure, verified by manometric measurements.

• Asbestos-containing caulk removal shall not exceed 260 linear feet. Removal beyond this quantity triggers a 10-day NESHAP notification.

• Installation of replacement glass panes in existing frame openings is included in this work.

8.3 Floor Tile Removal

• Remove floor tile in whole pieces using hand tools and chemical removal of associated mastic. Use of a heat gun is permitted.

• Required PPE includes ½-mask respirators with HEPA filters, disposable suits, gloves, hard hats, and safety glasses. An eyewash station must be present in the work area.

• Regulate the area using barrier tape, signage, and 6-mil plastic as needed.

• When required, erect an NPE meeting the requirements in Section 8.2.

• Bag all waste properly and place it in Argonne-provided drums or containers for disposal.

• Shall not exceed 160 square feet of asbestos-containing floor tile and/or mastic.

8.4 Class I Work Practices: Glove Bag Pipe Insulation and Fitting Removal

• Specifications:

o Glove bags shall be made of 6-mil seamless plastic at the bottom and be designed for their intended use. Modifications or sliding along a pipe are not permitted.

• Work Practices:

o Each glove bag must completely cover the circumference of the pipe or structure and be smoke-tested for leaks before use.

o Do not use glove bags on surfaces exceeding 150 °F.

o Collapse glove bags by removing air with a HEPA vacuum before disposal.

o Before commencing operations, wrap and seal loose or friable materials near the glove bag in two layers of 6-mil plastic or render them intact.

o Connect any waste bag to the collection bag using hose or material capable of withstanding ACM waste and water pressure.

o Use a sliding valve or equivalent device to separate the waste bag from the hose when disconnecting.

o Class I glove bag removal requires at least two people.

• Disposal:

o Transport bagged waste in a covered rolling container through the building. Place it in a drum or container for disposal.

o Clean the area by wet-wiping and/or HEPA-vacuuming before indoor air clearance.

o Dumpsters, drums, and containers will be provided by Argonne.

8.5 Exposure Monitoring

• Argonne may require an independent third-party collection of OSHA personal monitoring samples during abatement.

• Samples shall be sent to a laboratory accredited by NIST NVLAP and analyzed using PCM.

• Employee exposure determinations shall be based on breathing-zone air samples representative of the 8-hour TWA and 30-minute short-term exposure of each employee.

8.6 Coatings

• Prepare surfaces, apply coatings per the manufacturer's application requirements, and finish dried coatings as needed.

9.0 Quality Assurance

• The Contractor shall maintain a quality program appropriate to the services provided.

• All work is subject to inspection and surveillance by the ANL Technical Representative.

• The Contractor shall report any deviations or non-conformances to the Technical Representative promptly and in writing. Non-conformance reports will be documented in the procurement file.

• Final inspection and acceptance will be conducted by the ANL Technical Representative.

• Materials and workmanship are covered under the Contractor's warranty (Section 3.0).

10.0 Government-Owned Property

• No government-furnished property is provided under this SOW, except for the containers, drums, and dumpsters for asbestos and window glazing waste identified in Section 6.4, and gate passes for site access.

• Any government-owned property issued to the Contractor is subject to the Argonne property requirements in PD-150, Control of Government Property, and LMS-MNL-18, Property Management.

11.0 Security

• All Contractor Personnel must carry a valid government-issued photo identification (REAL ID or Passport).

o All vendor representatives accessing the site must be U.S. citizens.

• The Contractor's personnel shall obtain and display Argonne gate passes for site access.

• Personnel must complete the Argonne CSO and sign the JSA before beginning work.

• Work must comply with Argonne site security and access procedures.

• All vehicles are subject to inspection by site security personnel at all entry gates.

12.0 Place of Performance

• Work will be performed at Argonne National Laboratory, 9700 South Cass Avenue, Lemont, Illinois, and at other Argonne-designated locations as specified on each Service Request.

• Work involving the Contractor's shop facilities (within 25 miles of Argonne) will be identified on the applicable Service Request.

13.0 Period of Performance

• The period of performance shall be three (3) contract years (one [1] base year plus two [2] option years), commencing upon formal award and contract execution.

o Performance will align with the applicable fiscal calendar years.

• Individual Call Records or Service Requests may specify their own performance period for work completion.

• Argonne is not obligated to issue a minimum volume of work under this agreement.

Enclosure No. 3
APPENDIX B – Statement of Work
ANL Industrial Services Contract
November 4, 2026
1.0 Purpose
2.0 Scope of Services
2.1 Insulation Services
2.2 Abatement Services
2.3 Scaffolding Services
2.4 Floor Tile Removal
2.5 Window Replacement
2.6 Window Glazing Removal
2.7 Surface Preparation and Coatings
3.0 Performance Requirements
4.0 Tasks and Ordering Procedures
4.1 Establishment of Agreement
4.2 Service Requests
4.3 Quotation Submission
4.4 Authorization to Proceed
4.5 Job Issuance and Coordination
5.0 Training and Certification Requirements
6.0 Deliverables, Timing, Location, and Documentation
6.1 Deliverables
6.2 Timing
6.3 Location
6.4 ANL Technical Representative Responsibilities
7.0 Pricing and Invoicing
7.1 Pricing
7.2 Invoicing Procedure
7.3 Invoice Requirements
8.0 Technical Safety and Work Practice Requirements
8.1 Class II Asbestos Work Practices
8.2 Window Glass, Caulk, and Lead Paint Removal
8.3 Floor Tile Removal
8.4 Class I Work Practices: Glove Bag Pipe Insulation and Fitting Removal
8.5 Exposure Monitoring
8.6 Coatings
9.0 Quality Assurance
10.0 Government-Owned Property
11.0 Security
12.0 Place of Performance
13.0 Period of Performance