This document is a Question and Answer Matrix for a Flight Manager Training Request for Quotation (RFQ) issued by the U.S. Air Force.
The RFQ seeks contractor support for comprehensive Flight Manager (FM) training at Scott Air Force Base, supporting a total FM cadre of 105 personnel. Key service requirements include: initial qualification training for two classes of 10 students annually (5+ months duration); FAA Aircraft Dispatcher Certification coordination (no more than two courses yearly); administrative in-processing and database management; MDS-specific aircraft training for C-5, C-17, KC-135, KC-10, KC-46, C-130, C-130J, and C-21 platforms; TACC weapon systems and scenario training; 18 scheduled periodic recurrent training classes annually (three nine-hour days per class, up to 10 students each); upgrade qualification training (up to 30 personnel yearly, with Instructor upgrade being historically resource-intensive); curriculum maintenance and development (1-2 updates annually, primarily from MAJCOM); facility management of 33 computer workstations; and monthly status reporting. The incumbent contract (FA4452-21-C-0018, Chenega Defense & Aerospace Solutions, LLC) valued at $6,276,398.05 runs from April 1, 2021 through September 30, 2026. The anticipated new contract period is one four-month base year with four 12-month option periods and a final six-month option. The Government provides Government-Furnished Property including hardware, standard Microsoft Office and Adobe software, and facility access. Contractor personnel require Tier 3 security clearance with SECRET eligibility and CMMC Level 2 certification. Training occurs at Scott AFB building 1948, with contractor personnel required on-site during normal work hours with 24/7 facility access. The proposal submission deadline is May 11, 2026, at 12:00 PM Central Time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pricing Worksheet_Amendment 3.xlsx | XLSX spreadsheet | |
| Pricing Worksheet_Amendment 2.xlsx | XLSX spreadsheet | |
| FMT RFQ_Amendment 2.pdf | ||
| Attachment 2 - Provisions and Clauses_Amednment 2.pdf | ||
| FMT RFQ_Amendment 1.pdf | ||
| Attachment 3 Pricing Worksheet.xlsx | XLSX spreadsheet | |
| Attachment 4.5 CDRL A005.pdf | ||
| FMT RFQ.pdf | ||
| Attachment 4.1 CDRL A001.pdf | ||
| Attachment 5 FMT DD 254.pdf | ||
| Attachment 6 QA Matrix.xlsx | XLSX spreadsheet | |
| Attachment 1 FMT PWS.pdf | ||
| Attachment 2 Provisions and Clauses.pdf | ||
| Attachment 4.2 CDRL A002.pdf | ||
| Attachment 4.3 CDRL A003.pdf | ||
| Attachment 4.4 CDRL A004.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLIGHT MANAGER TRAINING
RFQ
Question/Comment Matrix
Offerors Government Only Question
# Attachment Pg # Par. # Comment/Question Answer
1 RFQ 1
Could the Government provide the current incumbent contractor’s name, contract number, total obligated value, and period of performance for the existing Flight Manager Training support contract?
Chenega Defense & Aerospace Solutions, LLC, FA4452-21-C-0018, $6,276,398.05, PoP - 1 Apr 21-30 Sep 26, including the EOS.
2 PWS 2.10
Please provide the current level of effort in terms of labor hours or full-time equivalents (FTEs) associated with the incumbent contract, broken down by functional areas (e.g., training instructors, administrative staff, program management).
Staffing plan is proprietary to the incumbent.
3 PWS 2.10
How many positions are currently filled versus vacant under the incumbent contract?
Staffing plan is proprietary to the incumbent.
4 PWS 2.1
For Task 1 (Flight Manager Training General), could the Government clarify the expected number of training cycles or courses per year and the average class size? The PWS describes providing an integrated, comprehensive training program and coordinating FAA course schedules, but specific volumes per year would help in resource planning.
Per PWS para 2.4 initial training to support two classes, of 10 students each, per year. Throughout the remainder of the year an overall training program that supports a total FM cadre of 105 Flight Managers.
5 PWS 2.1
Please confirm whether the contractor is responsible for developing new curriculum or only maintaining existing training content. The PWS states that routine changes must be updated within 30 calendar days and significant changes within seven days; does the Government
Maintain current curriculum and develop new (updates/additions) to overall training program, as required.
provide any existing instructional materials or templates to build upon?
6 PWS 2.2
Task 2 specifies that Pipeline training has a five plus month timeline and includes a range of training modules. Could the Government provide historical or expected annual throughput (number of students) and confirm whether the five-month timeline is continuous full-time training for each student?
Per PWS para 2.4 initial training to support two classes of 10 students per year (performing 5+ month Initial Qualification only for newly hired FMs).
Throughout the remainder of the year an overall training program that supports a total FM cadre of 105 Flight Managers.
7 PWS 2.2.1
Task 2.2.1 states the contractor shall coordinate no more than two FAA Aircraft Dispatcher Training courses per year with no more than 10 students per course. Are any additional FAA courses anticipated due to potential surges in hiring, and should the contractor plan to have additional certified instructors available?
No.
8 PWS 2.2.3
Task 2.2.3 notes the contractor may provide hardcopy or electronic training materials for each student. Does the Government have a preference, and who funds printing costs if hardcopy materials are provided?
Per the PWS para 2.2.3, "Contractor shall provide a hardcopy or electronic copy of FAA Student Training Materials for each student…" Historically it has been both hardcopy course materials (standardized by the FAA) and electronic test preparation software, provided by the contractor.
9 PWS 2.3
For Task 3, please clarify the approximate number of new hires or reassignments per year requiring administrative in-processing and account management support. This information will aid in estimating the staffing required.
Per PWS papa 2.4 initial training to support two classes, of 10 students each, per year.
10 PWS 2.3.1
The PWS states that the contractor shall maintain an electronic database to document completion and expiration dates for each FM. Does the Government currently use a specific system or platform for this database, or should the contractor propose and license their own system?
Incumbent maintains spreadsheets, folders, and files on organization Sharepoint file system to track training progress/requirements for all assigned FMs.
11 PWS 2.4
Task 4 allows up to two Initial MQT classes per year with up to 10 students per class. Could the Government provide historical data on how many classes were conducted annually under the incumbent contract and whether there is potential for additional classes during surges?
No. The proposal shall address the requirement stated within the PWS.
12 PWS 2.4.9
Task 4 requires development and maintenance of comprehensive electronic training folders. Does the Government provide a baseline template for these folders, and how much customization is expected from the contractor?
Folders and files created by incumbent are based on tracking overall training/currency requirements as outline in Air Force Manuals 13-255, Vol 1, 2, and 3.
13 PWS 2.4.1–2.4.8
For tasks 2.4.1 through 2.4.8 which involve developing and instructing MDS-specific aircraft training, TACC weapon systems training, scenario training, etc., could the Government clarify the number of instructors (e.g., per course or per subject matter) anticipated?
Are separate instructors required for each MDS or will cross-qualified instructors suffice?
This requirement is performance-based, therefore the Government cannot provide recommended FTE to offerors. The Offeror shall provide their staffing approach that meets the requirements of the PWS.
14 PWS 2.5
Task 5 states that up to 30 personnel will be trained for an upgraded qualification each year. Could the Government confirm if this is an upper limit or an average? Are there any years when more than 30 students were trained?
Per PWS para 2.5, "FM Evaluator, Instructor, Quality Check, Air Traffic Management Coordinator, and any additionally approved MAJCOM specific training" is referring to upgrade training…FMs already qualified/certified who are achieving new/additional upgrade qualifications. UPPER LIMIT.
15 PWS 2.5.1
Could the Government clarify which upgrades (Evaluator, Instructor, Quality Check, Air Traffic Management Coordinator, or other MAJCOM-specific training) historically require the most resources?
Instructor
16 PWS 2.6
Task 6 requires 18 scheduled classes per year with up to 10 FMs per class. Is this schedule considered fixed, or could the number of classes be increased or decreased based on operational
This is fixed, as the Government does not anticipate the quantity to change.
demand? Please provide historical data from the incumbent contract.
17 PWS 2.6
The PWS states each periodic training class shall consist of three nine-hour days (27 hours). Could the Government confirm whether this time includes testing or evaluation, and if additional instructor availability is needed for after-hours support?
The staffing approach to accomplish the work outlined in the PWS is to be decided by the Offeror for the Government to evaluate. Subsequent schedule changes for periodic training shall be coordinated with the 618 AOC (TACC)/MODMS scheduler and the contractor and approved by the COR. The Government will provide seven (7) calendar days’ notice of any special training requirements outside the normal operating hours listed above, i.e., Just-In-Time training referenced in paragraph 2.7.
18 PWS 2.7
For Task 7, could the Government provide the typical frequency of curriculum changes requiring updates within 30 days or seven days? Please provide historical average number of updates per year.
1-2 updates per year, primarily dictated by MAJCOM (AMC).
19 PWS 2.7.1
The PWS mentions that contractor instructors shall observe FM shift operations twice per year to maintain current instruction. How many instructors are expected to participate in these observations (e.g., all instructors or selected individuals), and what is the average duration of each observation?
Based upon Offeror's provided instructors provided in their proposal. An entire shift (workday).
20 PWS 2.8
The PWS states the contractor shall maintain 33 computer workstations and coordinate repairs. Does the Government provide funding for replacement parts and hardware, or should the contractor include these costs? Also, what is the average age and replacement cycle of the current equipment?
Hardware provided, and oftentimes installed, by ACOMS (communication squadron) military staff, with prompting, coordination, and support from contractor.
21 PWS 2.8
Task 8 notes that the training facility is multi-use but no other users will be allowed to configure computer workstations without COR approval. Will the contractor have full access to the facility outside of training classes for maintenance, and are there any
Contractor holds keys to all training facilities, and has access 24/7.
Training facility is not a classified (security controlled) facility, however, it must be locked after hours.
restrictions (e.g., security or scheduling) that could affect timely maintenance?
22 PWS 2.9
Task 9 calls for monthly status reports (MSR) and bi-weekly workstation system status reports. Could the Government clarify whether there is a specific format or template for these reports and whether the contractor will have access to Government systems to submit them?
Per the PWS, the contractor shall provide for the creation of the MSR.
Per CDRL A004, Contractor determines format. The MSR will be submitted to the COR via email
23 PWS 2.9.2–2.9.4
For the place of performance, the PWS specifies that contractor personnel shall be physically available at Scott AFB during normal work hours. Under what circumstances would remote work or alternate locations be authorized, and what approvals would be required?
Remote/telework is not authorized. Only in a contingency, per PWS 2.9.3, would the Contractor be required to work at an alternate place of performance. This would be communicated in writing by the Government, should that scenario arise.
24 PWS 2.9.4
Are there any anticipated travel requirements beyond the local Scott AFB area for meetings, training, or instructor certification?
No.
25 PWS 2.10
The PWS states the contractor shall provide a breakout of proposed manning specifically dedicated to meet the requirements of the PWS. Can the Government share the incumbent’s staffing breakout, including the number of instructors and administrative staff currently used to meet each task?
No
26 PWS 2.10
Does the Government have minimum or recommended FTE requirements per task or subtask? If so, please provide any thresholds or ranges for manning to be considered adequate.
This requirement is performance-based, therefore the Government cannot provide recommended FTE to offerors
27 PWS 2.10
Are there any preferred certifications (e.g., FAA Aircraft Dispatcher, military instructor ratings) beyond those listed in the PWS, and how should the contractor
Documentation of required certification as outline in PWS par 2.10 is sufficient.
document and demonstrate instructor qualifications?
28 PWS 4.1
The PWS notes that contractor personnel must have a Tier 3 security investigation with SECRET eligibility and be enrolled in continuous vetting. Will the Government sponsor clearances for new personnel, or must the contractor hire only individuals already holding the required clearance?
Are interim Secret clearances acceptable for new hires?
No. The Contractor and contractor personnel must have the required clearance at the beginning of performance.
29 PWS 2.4.3;2.8
Will the Government provide access to government-furnished facilities, training equipment, and systems (including GDSS, MAFPS, IMR, ADP and other C4 systems)? If any equipment or software must be contractor-furnished, please identify these items.
Yes, for contractor instructors, however, contractor plays a roll in coordinating access to systems for students (per PWS para 2.3). Student test prep software for FAA certification per 2.2.3.
30 PWS 2.10
Are any specialized training or certifications required for instructors (e.g., Air Operations Center C2 experience, mission planning software expertise) beyond those listed in Section 2.10?
No.
31 PWS 2.8
Does the Government provide software licenses (e.g., flight planning software, Adobe Creative Suite, collaboration platforms) or should the contractor include licensing costs in its pricing? For instance, training may require use of Government-provided software; please clarify for any additional tools.
Standard government provided Microsoft Office and Adobe software is loaded/maintained on workstations by ACOMS (communication squadron) and Air Force Network (AFNET).
32 PWS 2.8
For equipment maintenance and replacement (e.g., workstations, classroom technology), does the Government furnish hardware under GFP or should the contractor budget for acquiring and maintaining equipment?
GFP, per PWS para 8.
33 PWS N/A
Will cloud hosting, testing environments, or other indirect costs be covered by the Government, or should the contractor include these costs in the proposal? If any Government-provided servers or environments exist, please describe them.
No other environments will be required beyond what government provides.
34 RFQ 1
The RFQ indicates that questions are due by 12:00 PM CST on 29 April 26 and quotations are due by 4:00 PM CST on 4 May 26. Given the complexity of the requirement and the need to assemble qualified staff, would the Government consider extending the proposal submission due date to allow more time for preparing a comprehensive response?
Extension will be made for submission due 11 May 26, 12PM Central Time
35 RFQ 1
If this requirement is a recompete of FA4452-21-C-0018, could the Government share lessons learned or performance challenges from the incumbent contract that offerors should address in their approach?
No
36 PWS N/A
Are there any additional requirements, modifications, or changes anticipated during the period of performance that are not explicitly stated in the PWS?
No
37 PWS 3
Are there any Government-Furnished Information (GFI) items (e.g., training materials, system documentation) that will be provided to the contractor at the start of the contract?
Only as outlined in PWS para 8.
38 3 Summary tab
Within the Pricing spreadsheet, on the Summary tab, the Optional EOS (6mo) line item is not pulling in a calculation/amount from the EOS tab. It is also not included in the calculation for the Total line. Does the Government want offerors to correct these errors before submitting their proposals?
Pricing Worksheet updated. EOS amounts will automatically be pulled from Option Period 5, and will auto-calculate to the summary page.
Offerors shall verify that the amounts in the EOS tab are correct.
39 RFP Many Many Throughout the RFQ, the Government refers to time as Central Standard Time Confirming
(CST). Please confirm the Government means Central Daylight Time (CDT).
Attachment
3 Pricing Worksheet
Labor Category
Worksheet
Column D/Labor Rate
Would the Government confirm the definition of "Labor Rate" for the purpose of populating the Labor Category Worksheet. 1) Is this a fully burdened labor rate, or 2) direct labor rate (wage only).
Fully Burdened Labor Rate
Attachment
3 Pricing Worksheet
Labor Category
Worksheet
Column D/Labor Rate
Is the Government looking for the labor rate (defined above) for each Period of Performance, or the initial Base Year rate?
Each PoP. Pricing Worksheet updated
Attachment
3 Pricing Worksheet
Summary Worksheet
Row 9, Column B
Please confirm cell B9 is intentionally left blank and the supporting worksheet labeled "EOS" should not be linked to this cell.
Pricing worksheet updated to link EOS to the summary sheet, B9
43 RFP 1, 4 Sect. 1, Par.
E; Table
There is conflicting guidance as to where to place the Info Sheet for submission. In the RFQ page 1, Sect. 1, Par. E, the requirement is to submit it on Tab 1 of the Pricing Matrix, Attachment 3. However, in the RFP on Page 4, the Info Sheet is to be included in Volume I. Should offerors place the Info Sheet in both locations? If not, we request the Government confirm which location is correct.
Please include info sheet information in Pricing Matrix, TAB 1. RFQ revised
44 PWS &
DD254
Pg. 9; Pg.
PWS Sect.
4.1 / DD254
Block 10.e
The PWS states that contractor personnel working under this effort will be required to access classified information up to the Secret level. However, the DD254 does not indicate Non-SCI intelligence information access in Block 10.e.(2). This appears to be a documentation alignment issue rather than a performance concern.
We request clarification to confirm whether Non-SCI classified access at the Secret level is intended under the DD254, ensuring consistency between the PWS
Intent of clearance requirement is to allow contractor instructors access into 618 AOC (Air Operations Center) facility, which is primarily a SECRET open storage facility. Higher classification is not required as this would only be necessary inside of SCIF areas (where contractor personnel will not be required to work).
requirements and the contract security classification specification.
45 NA NA NA
Will the Government be utilizing AI-enabled software to evaluate submissions and/or to provide debriefs to offerors?
No.
46 NA NA NA
Can the Government confirm if the incumbent contract (FA4452-21-C-0018) has a transition out requirement and if so, how long is the transition and how will the Government manage the transition to ensure data and information is shared.
There is not a phase-in or phase-out for this requirement
47 NA NA NA
Can the Government confirm vendors can utilize secure containerized AI-enabled agents to support development of new training, as indicated in PWS Sections 2.4 & 2.5 & 2.6?
Contractor owned computer hardware/software would be allowed inside of the non-classified training facility only, however, is not authorized to be connected to government owned AFNET systems/networks.
48 NA NA NA
Upon transition in, once contractor personnel are approved and submitted for in processing, what is the average time to get badged and credentialed for full access on site?
Usually within one week, however, timeline largely controlled by AOC security personnel who are required to confirm contractor security clearances prior to authorizing access to facilities and networks.
49 NA NA NA
If incumbent contractor personnel are retained, does this reduce the time for onboarding and on site access?
Yes.
50 NA NA NA
Does the Customer have any plans to move into the Mission Planning Center at Scott AFB?
The 618AOC will be relocating to the Joint Operations Mission Planning Center (113 Ward Drive) this calendar year, however, contractor instructors will continue to provide the majority of training at building 1948 on SAFB.
51 NA NA NA
Does the Customer have an idea of the demographics of the students undergoing the training (i.e. military, civilian, contractor)?
Demographics of students (newly hired FM civilian employees) has always varied, with applicants restricted only by the requirements/limitations of USAJobs announcements for any new FM vacancies.
52 FMT RFQ 1 1
RFP indicates incumbent contract = FA4452-21-C-0018. The latest mod 16 issued in November 2025 funded ~$700K which is about half the historical annual burn, can the Government confirm if training requirements decreased for 2025- 2026 period or if additional funding at historical levels is forthcoming?
Mod 16 only covered a half-year (end of current contract) extension.
53 FMT RFQ 3 3
RFP states, 'The anticipated Period of Performance is one four-month base, four-twelve month option periods, and a final six-month option period'. Can the Government confirm the entire period of performance (base and options) for incumbent contract FA4452-21-C-0018?
The PoP of the incumbent contract is 1 Apr 21 - 30 Sep 26, which includes the optional 6mo EOS.
54 FMT RFQ 5 6
RFP states that individuals must be 'certified as a 618th AOC Flight Management Specialist in accordance with AFMAN 11-255 series'. Please provide a copy of and confirm the latest edition of all (3) Volumes.
MAJCOM just recently renumbered the AFMAN11-255 series publications to AFMAN13-255, Volumes 1-3. (with very little substantive change).
55 FMT RFQ 3 and 4 1
The RFP states: "The quotation should not simply rephrase or restate the Government's requirements but, rather, shall provide convincing rationale to address how the Offeror intends to meet these requirements," and "Provide as specifically as possible with the actual methodology you would use for accomplishing/satisfying the factor."
Can we include any additional documentation to substantiate our statements, as attachments outside of the 5-page limit?
No
56 FMT RFQ 3-4 1
Regarding TAB 1 of the Pricing Matrix, Attachment 3 - does this need to be submitted as part of both Volumes I and II, as TAB 1 of the Pricing Matrix is included as part of Volume I, but it is also
Please include info sheet information in Pricing Matrix, TAB 1. RFQ language will be modified via amendment.
the first page of the excel document for Volume II?
57 PWS 2 2
PWS states, "The contractor shall update all courseware/ presentations in accordance with (IAW) all Air Force/Major Command (MAJCOM) Manuals, Instructions and Directives". Can the Government confirm the courseware / presentations are Government-owned or otherwise available to incoming contractor?
Yes. The majority of the courseware is government owned, although there may be supporting materials that are proprietary to the incumbent.
58 PWS 2 2
PWS states, "timely and responsive to FMs in support of global operations and their 24 hour a day, seven (7) days a week schedule". Can the Government define 'timely and responsive', (i.e. within 4 hours, 8 hours, 12 hours)?
All necessary performance thresholds are outlined in the services summary in the PWS.
59 PWS 2 3
PWS states, "...and integrating training offered by other vendors including Government sources, such as the FAA certified Aircraft Dispatcher Training instructor necessary to ensure all FM candidates successfully earn an FAA Aircraft Dispatcher certification." Please provide an itemized list of all historical and planned 'training offered by other vendors'.
Historically incumbent has sub-contracted FAA Aircraft Dispatcher Certification training through local commercial vendor Flight Safety.
60 PWS 3 4
PWS states, "2.2.1. The contractor shall coordinate no more than two FAA Aircraft Dispatcher Training courses per year."
Can the Government confirm (2) courses were held each of the past 5 years?
No more than 2 courses were conducted. COVID-19 Pandemic and Federal Hiring freezes resulted in reduced student throughput over the past five years.
61 PWS 4 1
PWS states, "The FAA course instructor shall be available outside of scheduled class time to assist students requiring additional training." Can the Government provide explicit requirements for availability, (i.e. 2+ office hours excluding instruction time)?
Varies with individual students knowledge and background of FAA Dispatch course subject matter. Although rare, FAA instructors have historically spent just a little more time with a few students who struggled with some areas of the training.
62 PWS 4 3
PWS states, "The contractor shall use government provided computers, software and associated multimedia equipment."
Please provide computer type / operating systems and all-inclusive list of software and multimedia equipment to be utilized.
Standard Window-based computer workstations with Microsoft Office suites/software mandated by AFNET, and government purchased Command and Control software/systems (like GDSS, Sharepoint, etc.), plus commercially purchased overhead projector systems connected to instructor workstations to display computer images/briefing materials for training.
63 PWS 4 6
PWS states, "2.3.1. Maintain an electronic database with appropriate individual information to effectively document..."
Confirm this database will be up to date upon transition and the type of database (excel, smart sheets, MS Access, etc.)
Yes; Microsoft Office (Word, Excel, Power Point, MS Access) and Adobe
PDF.
64 PWS 5 2
PWS states, "2.4.1. & 2.4.2 & 2.4.4 The contractor shall develop...." Confirm this training must be newly developed and approved by customer prior to deployment. Or do these requirements need to be reworded to 'updated / maintained' only?
Yes. Maintained at first, but continually updated (and occasionally newly developed), as required to support MAJCOM/AFMAN ever-changing training/certification requirements.
65 PWS 5 3
PWS states, "C-5, C-17, KC 135, KC-10, KC-46, C-130, C-130J, C-21) and other airframes as directed by the COR."
Confirm an all-inclusive list of aircraft / airframes as this determines which personnel is adequately qualified to lead training.
This is the current list of MDS, but future platforms are dictated by DoD/DAF.
66 PWS 5-6 Varies
PWS states, "2.4.8. & 2.4.9 The contractor shall develop...." Confirm this training must be newly developed and approved by customer prior to deployment. Or do these requirements need to be reworded to 'updated / maintained' only?
Yes. Maintained at first, but continually updated (and occasionally newly developed), as required to support MAJCOM/AFMAN ever-changing training/certification requirements.
67 PWS 6 3
PWS states, "2.5 The contractor shall develop...." Can the Government confirm the contractor will have access to all the legacy documentation in order to create new training IAW these requirements?
Yes. The majority of the courseware is government owned, although there may be supporting materials that are proprietary to the incumbent.
68 PWS 2 2
Can the Government clarify whether support across all three shifts requires dedicated staffing for each shift, or if coverage is expected on an as-needed basis?
PWS para 1.2 language is to largely support short-notice "Just-in-Time Training" (which is rare). Vast majority of contractor work effort is performed IAW PWS para 5.2
69 PWS 5 2.4.2
Outside of MDS aircraft training for C-5, C-17, KC-135, KC-10, KC-46, C-130, C-
130J, and C-21, what other MDS airframes may require training support?
None at this time.
70 PWS 2 2 Is there a requirement to conduct any of this training virtually or remotely? No
71 PWS 2 2
If there is not a requirement to conduct any of this training virtually or remotely, are there any components that could be completed remotely or virtually?
No
72 PWS 2 2
Are there any historical examples or levels of effort for supporting Just-in-Time or unscheduled training for FAA or Flight Manager requirements?
This is rare, and on average would only occur once a year, requiring about a week of contractor instructor support of all assigned FMs performing shift work.
73 PWS 2 2
Are existing courseware and training materials considered government-owned?
If so, can the awarded team expect to receive these baseline materials as part of the Knowledge Transfer process?
Yes.
74 PWS 2 2
Are there any historical examples or levels of effort for supporting remedial training for students that fail to initially meet certification requirements?
This has only occurred on rare occasions (perhaps 1-2 students per year).
75 PWS 2 2
Are there any historical examples or levels of effort for Breaks-In-Training that have occurred during this period of performance?
Only once…an employee who was allowed to suspend training and authorized Paid Parental Leave due to the birth of a child (a program supported by OPM).
76 PWS 2 2
Is CMMC Level 2 (self-certified or third-party assessed Certified Third-Party Assessor Organization - C3PAO) required for this effort in order to audit and verify that defense contractors handling Controlled Unclassified Information (CUI) meet all 110 NIST SP 800-171 controls?
Yes.
77 1 11 4.5
The PWS describes contractor requirement for compliance IAW DoDI
5200.48. The Department of the Air Force
requires the contractors must demonstrate a CMMC Level 2 certification in SPRS as a condition for award. How will the government determine the contractor's compliance with CMMC 2.0 requirements?
IAW DFARS 252.204-7025
78 2 1
Solicitations that require contractors to comply with CMMC certification requirements for handling and safeguarding CUI typically include DFARS 252.204-7021 and -7025. These DFARS are not included in the list of clauses within the solicitation. Will the government update the solicitation to included these DFARS?
Government added DFARS 252.204-7021 and -7025 to Provisions and Clauses attachment, Attachment 2
79 5 2
The DD254 designated the contractor is responsible for handling and safeguarding CUI. How will the government determine that offerors meet the CMMC requirement and is validated during evaluation of proposals?
Mandatory annual online training on how to properly handle and safeguard CUI is required by all government military, civilian and contractor employee personnel.
In cases where SPRS scores are based on contractor self-assessments, how will the Government mitigate the risk of inflated or unsupported representations?
Government will be verifying the Offeror's compliance IAW DFAR 252.204-7025.
Will the Government differentiate between independently validated cybersecurity postures and self-asserted SPRS scores when assessing overall performance risk?
Please see Clause 252.204-7025 in Attachment 2
Will the Government consider an offeror’s existing CMMC Level 2 (Advanced) certification as evidence of independently validated implementation of all 110 NIST SP 800-171 controls, thereby reducing the need for post-award cybersecurity remediation or reassessment?
Will the Government consider award durability and long-term compliance stability when evaluating offerors with independently validated CMMC Level 2 (C3PAO) certifications?
Would the Government provide historical MSRs in support of the staffing requirements?
No
Would you please provide a copy of the Syllabi for bidders to more accurately staff the requirements?
No. Offerors shall submit their proposal to meet the requirements of the RFQ and PWS.
Where are current instructional materials maintained (ie lesson plans, courseware, slides, etc..)?
On Sharepoint and sharedrive file storage systems.
What platform (Learning Management System) is used to display/conduct courses?
Windows-based workstations accessing files, briefs, and training aids, which is then sent electronically to overhead projectors for display on screens at the front of classrooms.
What is the historic average of course updates and course creations annually? 5-10 minor updates to briefings/courseware each year.
Would the government consider travel required by the DADE to be a separate cost reimbursable CLN
No
Please provide the existing curriculum for each of the FM required courses
Offerors shall submit their proposal to meet the requirements of the RFQ and PWS.
What are the seating capacity and number of classrooms available for FM training courses?
Two classrooms with 10 workstations each.
What is the historic number of more than 1 class being conducted at a time?
2-3 times per year a 5-6 month course may be underway when a three-day Recurring training class is being held at the same time. Only one contractor instructor is presenting a briefing at a time, so other instructors can support (provide presentations) of course material to the other class that is also in session.
93 1 7 2.8.2
The PWS states the contactor is responsible for managing and maintaining the computer equipment (hardware & software) and ensure it is fully functional to include program updates, database upgrades, equipment troubleshooting, workstation configuration, script development, maintaining computer access and required functionality. It also directs the contractor with with Computer Support Administrators and other support personnel to manage and maintain equipment functionality. If these computers are part of the AFNET will the contractor have elevated privileged and ALT tokens with administrator access to manage the computer equipment to load, configure hardware and software (database) configuration and to install security patches? Will the contractor have systems administer privileges to add/remove users from the training systems and change the endpoint standard desktop configuration while joined to the AFNET?
No. Over time previous contractor instructors who supported this requirement and had administrative privileges have lost those privileges due to AFNET restrictions. The role has become more of a "coordination" role with local ACOMS (computer help desk) staff who actually handle most hardware/software replacements and updates. ANY of the contractor instructors could likely perform (or share) this coordination role.