Attachment_G-_Amend_002_-_Q_A_0002.pdf

PDF 111 KB Posted

Attached to
Structured Network Cabling Services
Solicitation number
75N99026R00002
Issued by

About this file

This document is Amendment 002 to Solicitation 75N99026R00002 for Structured Cabling services at the NIEHS Research Triangle Park in North Carolina. The amendment addresses seven key questions from potential offerors, providing clarifications about project requirements including conduit installation, wire mold datacom cover supply, patch panel utilization, and technical specifications. Notably, the government requires the contractor to install a 4" conduit out of an existing junction box, x-ray the floor, core drill, use EMT conduit, match gray electrical outlet faceplates, and utilize existing patch panels.

The solicitation's proposal due date has been extended to December 29, 2025 at 12:00 PM EST, providing additional time for bidders following the site visit. The project involves structured cabling work in a research facility, with specific technical requirements around conduit installation, cable management, and infrastructure modifications in communication and server rooms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 75N99026R00002 – Amend 002 Page 1 of 1

Attachment G - Amend 002 - Structured Cabling Solicitation Q&A

The following constitutes amendment 002 to Solicitation 75N99026R00002 for

Structured Cabling services at the NIEHS Research Triangle Park, NC.

See Offeror’s questions and government responses below.

1. All 4 existing sleeves into Comm Room F003 are 100 % full. Who is responsible for adding an additional 4” Sleeve? These feed from the 3x3 box in interstitial area that is jammed.

This contract will need to install another 4” conduit out of the side of the existing junction box to the data room below. This contract will need to x ray the floor and core drill as well.

2. Who is supplying the wire mold datacom cover for each room?

The wire mold datacom cover is to be supplied by this contract per SOW

Section III.2.ii.

3. Conduit is needed in lower level for the NAE drop. Who is responsible for the conduit installation? Existing tray is at 25’ AFF and install will require lift and core boring through conduit.

This conduit is required by this contract. See Amendment 001 answer 9.

4. What is the conduit requirement: EMT or Rigid?

EMT

5. All electrical outlets are gray in color. Are we matching for faceplates?

Yes

6. The only spot available for new patch panels is in rack 1 at bottom of rack. Is there where we should install any additional patch panels?

Existing patch panels shall be utilized. Port locations in server room will be provided at a later date.

7. Given the short time between the site visit and the bid due date, will there be a bid date extension?

Yes, proposal due date has been extended to December 29, 2025 at

12.00PM EST