75N96025R00003 Amendment 0002.pdf
PDF 277 KB Posted
- Solicitation number
- 75N96025R0003
About this file
This is Amendment 0002 to solicitation 75N96025R0003 for Pathology Support services at the National Institute of Environmental Health Sciences (NIEHS). The amendment responds to a contractor question about Article L.1 General c. Level of Effort (pp. 69-71) regarding incrementally increasing labor hours across the base period and option periods. NIEHS acknowledges there was an error in the original solicitation regarding the labor hours and has corrected it in an attached document "Amendment 0002 - 75N96025R00003 Pathology RFP". The amendment is issued by the NIH/NIEHS Office of Acquisition in Durham, NC, with an effective date of 12/17/2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0002 - 75N96025R00003 Pathology RFP.pdf | ||
| 75N96025R00003 Amendment 0001.pdf | ||
| Amend 0001 - 75N96025R00003 Pathology RFP.pdf | ||
| Att1_Proposal Intent Form.pdf | ||
| 75N96025R0003 RFP for Pathology.pdf | ||
| Att11_Small Business Participation Commitment Document (SBPCD).pdf | ||
| Att7_Experience Form_final.docx | DOCX document | |
| Att8_Biographical Sketch.pdf | ||
| Att2_Statement of Work.docx | DOCX document | |
| Att16_NIH2706.pdf | ||
| Att6_Sample Research Outlines.docx | DOCX document | |
| Att12_Business Proposal Template.xlsx | XLSX spreadsheet | |
| Att4_Section K - Reps and Certs.pdf | ||
| Att14_Disclosure of Lobbying Activities.pdf | ||
| Att5_Summary-Related-Activities.pdf | ||
| Att10_Historical Small Business Utilization.pdf | ||
| Att13_Point of Contact.pdf | ||
| Att9_PPQ_final.docx | DOCX document | |
| Att15_Instructions2706.pdf | ||
| Att3_NIH Form 2043.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
NIEHS-OA
See Block 14 continuation on next page.
National Institutes of Health National Institute of Environmental Health Sciences Office of Acquisition 530 Davis Drive Durham, NC 27713
75N96025R0003
1 3
12/17/2024
12/06/2024
SF30, Block 14 Continuation Page
Amendment 0002:
The purpose of this amendment is to:
1) Respond to a question received in response to the solicitation (included on next page).
All other terms and conditions remain the same.
Note: red font indicates additions, red strikethrough indicates deletions.
Attachments:
- Amend 0002 - 75N96025R00003 Pathology RFP
SF30, Block 14 Continuation Page
Responses to Pre-Proposal Inquiries:
RFP
Page #
Section Paragraph Question Response
pp. 69‐71 Ar cle L.1 General
c. Level of Effort
We no ced for Ar cle L.1 General c Level of Effort
(pp. 69‐71) that the labor hours for base period plus op on period 1‐9; Op onal LOE; and all Elec ve Op ons increase incrementally each year.
Is it intended to have the increase occur this way for each op on? It reads to us like we’ll need 1‐2 FTEs to start and then increase by a percent FTE each year therea er. In our experience, the cost of an FTE would incrementally increase through the life of the contract but the Level of Effort (hours) would not. Could you clarify this increase, please?
An error in the original solicita on has been corrected. See a achment "Amendment 0002 ‐ 75N96025R00003 Pathology RFP".
File details come from the government source that posted it. Updated .