75H71526R00006 - Amendment 2.pdf
PDF 270 KB Posted
- Attached to
- Replace HVAC units (7) at Mashpee Service Unit
- Solicitation number
- 75H71526R00006
About this file
This document is Amendment 2 to Solicitation 75H71526R00006, issued by the Nashville Area Office on July 13, 2026, containing final questions and answers for a construction project located in Mashpee, Massachusetts.
The solicitation calls for the furnishing and installation of seven new HVAC units: two in the Dental building, three in the Admin building (including server room), and two in the Clinic building. The Basis of Design specifies a Trane model 4DCY4048B1096AA, with offerors permitted to propose equal alternative units meeting specified cooling and heating loads defined in Section B(a). The contract requires performance and payment bonds and is subject to Davis-Bacon wage requirements with a construction wage determination covering Barnstable County, Massachusetts. The project is located on tribal trust land held by the government, eliminating permitting requirements and tribal TERO-related fees. Work must be completed within 180 days from the date of award, with construction hours limited to Monday through Friday, 8:00 a.m. to 4:30 p.m., excluding federal holidays and weekends. Site visits were scheduled for August 3 and August 6, 2026, between 9:00 a.m. and 11:59 a.m. and 2:00 p.m. and 3:30 p.m. ET; attendance is evaluated as a proposal factor but does not disqualify non-attendees. Offerors must submit technical documentation including manufacturer specifications, AHRI certification, warranty information, electrical requirements, and installation instructions with their initial proposals. Pricing must be submitted on the SF-1449, though offerors may include itemized schedules. The project is tax-exempt and requires compliance with FAR 52.223-23 and HHSAR 352.223-71 regarding sustainability and energy efficiency standards. Buy American Act requirements per FAR 52.225-9 apply, with a 65 percent domestic content requirement for items delivered in calendar years 2024 through 2028.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 75H71526R00006.pdf | ||
| 75H71526R00006 - Amendment 1.pdf | ||
| 75H71526R00006.pdf | ||
| Attachment 1 - WD 2015-4045.pdf | ||
| Attachment 3 - SF-25.pdf | ||
| Attachment 4 - SF-25A.pdf | ||
| Attachment 2 - WH 347.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
75H71526R00006 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Nashville TN 37214 711 Stewarts Ferry Pike Nashville Area Office
07/13/20260002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/13/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
*** Amendment 2 - Final Question and Answer ***
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ANDREW A. RHOADES
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Question Could you please confirm if any TERO-related fees, compliance requirements, or other tribal requirements will apply?
Answer NO
Question Which wage basis applies, and if Davis-Bacon, will a construction wage determination covering Barnstable County, Massachusetts be issued by amendment?
Answer Yes, amendment published with Q&A
Question How many new units are to be furnished and installed, and in which buildings?
Answer 7 TOTAL --> (2) DENTAL, (3) ADMIN - INCLUDES SERVER ROOM, (2) CLINIC
Question Section C.l.i states completion shall not exceed 180 days from notice to proceed; Section
L.f states award plus 90 days. Please confirm the binding completion period for scheduling.
Answer
Question Sir is this solicitation ID # 75H71526R00006 located in Mashpee, Massachusetts?
Answer YES
Question Could you please clarify whether the prime contractor must attend the site visit, or if it is acceptable for one of our subcontractors to attend on the prime contractor's behalf?
Answer A subcontractor may attend but should sign in as a representative for your company.
Question Who handles the GC decision for ownership Answer Acronym not defined and we do not understand the question.
Question Is there a scheduled site visit or walk-through for interested contractors? If so, what is the date and time?
Answer Yes, 03AUG26 and 06AUG26 between the hours of 9:00-11:59 AM and 2:00-3:30 PM ET
Question Are there specific brand or performance requirements for the replacement units, or should I propose units that meet the design cooling/heating loads?
Answer Defined in Section B(a) of the solicitation document on Page 3
Question Will there be restricted access to the buildings, or specific requirements for work during operational hours at the medical and dental facilities?
Answer CONSTRUCTION HOURS FOR THIS CONTRACT WILL FOLLOW SERVICE UNIT
OPERATIONAL HOURS (MONDAY - FRIDAY: 8AM-4:30PM) NO FEDERAL
HOLIDAYS, NO WEEKENDS.
Question Is there an anticipated start date or specific completion deadline for this project?
Answer 180 Days from date of award
Question Are there specific local permits or licensing requirements for this site that I should account for in my pricing?
Answer NONE
Question What are the security clearance requirements for workers entering medical/dental facilities?
Answer DAILY CHECK-INS UPON ARRIVAL AND BEFORE DEPARTURE.
Question Where will equipment staging and the disposal of the existing units (Trane/Bard) occur?
Answer ON SITE IN DESIGNATED SPOTS WITHIN THE PARKING LOT. ANY WASTE /
MATERIALS SHALL NOT REMAIN ON SITE PAST ONE WEEK AFTER COMPLETION.
Question Do you need to provide a submittal package for the new units (cut sheets/specs) for approval before purchase?
Answer YES
Question Are there specific requirements regarding the transition from existing controls to the new units?
Answer Controls are addressed in Section C(d)(i)(3) on Page 4 of the solicitation document.
Question Does the project require compliance with any specific sustainability or energy efficiency standards beyond standard mechanical codes?
Answer Note the inclusion of RFO FAR 52.223-23 and HHSAR 352.223-71 under Part II, Section
I on Page 29 of the solicitaiton document.
↓ FINAL ROUND OF QUESTION AND ANSWER ↓
Question Is a bid guarantee required?
Answer A performance and payment bond are required.
Question Per Statement of Work, Facility and Security Requirements, Item IV, “Contractors are required to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted.” Please confirm if contractors who did not attend the site visit will be disqualified from bidding.
Answer Site visit attendance is a portion of the proposal factor so, you are not disqualified.
Question Please confirm pricing is to be submitted on the SF1449 and the government has not provided a separate bid schedule.
Answer This is correct, a schedule was not included so you will put pricing on the SF-1449.
Offerors may also include their own schedule with itemized costs.
Question Can one person "triple hat" as Superintendent, SSHO and QC Manager?
Answer The government will allow personnel to perform multiple roles only to the extent permitted by the solicitation and applicable safety, industry and contract requirements. Any individual proposed to serve in multiple capacities must meet the qualification requirements for the positions.
Question Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?
Answer This would be a bilateral agreement after award if a contract modificaiton for extension was justified and needed.
Question Please provide the site visit attendee sign-in sheet.
Answer N/A
Question (If building is occupied) Are there any phasing requirements? How many people will be in the building? Are there any temporary heating/cooling requirements?
Answer BUILDINGS WILL NOT BE OCCUPIED, BUT WE REQUEST ONLY ONE BUILDING BE
DONE AT A TIME SO WE HAVE PLACEMENT FOR THE STAFF. Contractor is required to keep critical equipment rooms cooled (medical fridges, server rooms, perishable medical supplies) to prevent damage or loss, and shall phase installation or install equipment in a manner in coordination with clinical staff to limit overall HVAC outage, minimize disruption and reduce risk of damage due to hazards, debris, weather etc.
Question Please confirm the manufacturer of the existing roofing system and who carries the current warranty of the roofing system.
Answer Roofs were recently replaced (2026) with new membrane systems. These membrane roofs are affixed directly to sheathing, matching existing design. Manufacturer of roof system is “mule-hide fully adhered TPO system”
Question Please confirm whether asbestos or lead is present on this project, and if so, provide the relevant documentation.
Answer We are unaware of any asbestos of lead present.
Question Is this project tax exempt?
Answer Yes, refer to page 29 on the solicitation pdf.
Question When do you anticipate on site work starting?
Answer Final installation dates shall be coordinated with site staff
Question Are third party inspections required?
Answer Not at this time.
Question Is permitting required?
Answer Permitting is not required as the Government buildings are on land held in trust.
Question Are partitioning, dust containment, and/or negative air machines required for this project?
Answer Contractor shall ensure containment and appropriate safety measures to safeguard building during replacement of HVAC units.
Question Is any landscaping restoration required for this project? For example; topsoil, seeding, and fertilizer.
Answer Please read the clauses to be included. On Page 29 FAR 52.236-9 " Protection of
Existing Vegetation, Structures, Equipment, Utilities, and Improvements" was included.
From the clause: " The Contractor shall repair any damage, including those that are the property of a third party."
Question Regarding the submittal requirements for "Equal" equipment listed in Section C(e)(i), could the Government please clarify the required timing for these items?
Specifically, are the six items (Manufacturer technical data, AHRI certification, Warranty documentation, Electrical requirements, Installation instructions, and the Comparison demonstration) required to be included with the initial bid submittal for evaluation purposes, or are these intended to be provided post-award as part of the standard material submittal process?
Answer Preferably, submit these items with your proposal. If the technical requirements cannot be determined from your submission the proposal may not be evaluated.
Question The solicitation specifies the Trane model 4DCY4048B1096AA as the Basis of Design
(Section C, page 4) and also incorporates FAR 52.225-9 Buy American—Construction Materials (Section I, page 24).Could the Government please clarify if the HVAC units proposed must strictly qualify as "Domestic Construction Material" as defined in FAR 52.225-9?Specifically, if a contractor proposes the Basis of Design (Trane) or an "Equal" (such as Carrier), and those units are manufactured outside of the United States or do not meet the domestic component cost percentage, will they be accepted? If the Basis of Design unit itself is not domestically manufactured, has the Government already issued a determination that the Buy American Act restriction is inapplicable to these commercial HVAC units?
Answer The guidance for your question is in the FAR clause 52.225-9. If the offered items are within the range "the percentage will be 65 percent for items delivered in calendar years 2024 through 2028" and if not, does the item qualify under 52.225-9(b).