This is Amendment 0001 to Solicitation 75H71525R00006 issued by the Nashville Area Office, extending the bid due date from August 8, 2025 to August 13, 2025. The amendment also changes the required number of copies from 0 to 1 and includes responses to contractor questions about a pharmacy security system installation project.

The questions and answers reveal this is a project to install professional PIR/motion detectors, door security systems (strikes, card readers, door contacts), and video surveillance equipment in a pharmacy facility. Contractors asked about electrical conduit layouts, coverage requirements, existing infrastructure, and camera specifications. The government consistently referred bidders to building as-built drawings and video surveillance submittals for technical details. Key clarifications include that motion detector coverage must include all access areas and hallways in the pharmacy, existing conduit is stubbed out into drop ceilings for cable runs on J hooks, and contract options will be evaluated per FAR 52.217-5. Offerors must acknowledge receipt of this amendment prior to the new bid due date to avoid rejection of their proposals.

View the file

Other files

File Type Posted
75H71525R00006.pdf PDF
Attachment 1 - SOW.pdf PDF
Attachment 2 - Phrases_ Clauses_ and Instructions.pdf PDF
Attachment 3 - IHS IEE Form.pdf PDF
Attachment 5 - WD - VA20250170.pdf PDF
Attachment 6 - WH 347.pdf PDF
75H71525R00006.pdf PDF
Attachment 4 - WD - VA20250171.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

75H71525R00006 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Nashville TN 37214 711 Stewarts Ferry Pike Nashville Area Office

07/10/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/10/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Time extension along with question responses.

LIST OF CHANGES:

Bids due date : 08-AUG-25 changed to 13-AUG-25

Copies : 0 changed to 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

ANDREW A. RHOADES

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

1. Question: Do you have a drawing set that includes the electrical conduit layout?

a. Answer: See building as-builts

2. Question: Section 4.1.1 – Professional PIR/Motion Detectors providing sufficient space coverage:

a. Could you please clarify whether “sufficient coverage” refers only to windows and hallways, or to full facility coverage throughout all interior areas?

i. Answer: This would be all access areas and hallways in the pharmacy.

3. Question: On the prints there shows conduit already in place running to all doors (Door strike, Rex, Door contact, and Card reader). These walls are all finished and thus covering up any work done inside the wall. I see on each door a blank plate where the card reader would go but cannot verify if and exactly where the other conduit may be on these doors. I didn't see any marking for where they may be stubbed out inside the wall.

a. Answer: See attached building as-builts. Conduit was terminated to locations indicated on drawings at all doors in preparation for PIV/card system installation.

4. Question: Does the conduit for all doors run directly to an IT closet or is it all just stubbed out directly above the door in the ceiling?

a. Answer: See building as-builts. Generally, conduit is stubbed out into the drop ceiling for cabling to be run on J hooks.

5. Question: On site there are a bunch of motion detectors on the ceiling, are these tied to a lighting system?

a. Answer: See building as-builts.

6. Question: What VMS (video monitoring system) are you currently using on site? I know you have

Avigilon cameras, using the same VMS?

a. Answer: See building video surveillance submittals.

7. Question: There are a few areas with a hard ceiling (sheetrock, no drop tile) do these areas have conduit/path to feed wires past them?

a. Answer: See building as-builts

8. Question: Could you please provide the full specifications for the cameras referenced in this requirement?

a. Answer: See building video surveillance submittals.

9. Question: How are the options in the solicitation going to be evaluated?

a. Answer: FAR 52.217-5 was included in the solicitation