This document is an Amendment (Amendment No. 00001) to a solicitation for the Alaska Area Indian Health Service, focusing on clarifying cable and speaker quantities for a procurement. The amendment provides detailed answers to questions about specific part numbers, including General Cable Cat 6, Belden Cat 6A, Belden Plenum Audio Cable, and in-ceiling speakers. Key clarifications include:

For cable items, the quantities specified are in feet, not full spools, and contractors should charge only for the estimated cable used. For example, the RFQ calls for 50 feet of Belden Cat 6A cable and 100-200 feet of General Cable Cat 6. For speakers (part number C-IC6), the quantity of 6 lines means 3 pairs, totaling 6 speakers. A cable budget breakdown is provided, showing cable requirements for an AD Office and Conference Room, with total cable lengths specified for different cable types and locations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 00001

The purpose of this amendment is to answer questions received. See attached Questions and Answers. The SOW is hereby updated to reflect the changes made due to questions received.

Alaska Area Indian Health Service 4141 Ambassador Drive, Suite 300 Anchorage, AK 99508

75H70825Q00002

1 3

09/03/2025

08/25/2025

XX

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

Questions and Answers:

Item No. 5

1. Part number 7131101 comes in a spool of 1000ft and in the RFQ it states a quantity of 100; is this to mean a total of 100 feet is needed?

Part number 7131101 (General Cable Cat 6, 1000 ft spool): The RFQ quantity of 100 refers to 100 feet required, not 100 spools. Contractors should charge only for the estimated amount of cable used, not full spools.

2. Part number 10GX53F0091000, comes in a 1000ft spool. Is the quantity to mean 50 feet?

Part number 10GX53F0091000 (Belden Cat 6A, 1000 ft spool): The RFQ quantity of 50 refers to 50 feet required, not 50 spools. Contractors should charge only for the estimated amount of cable used, not full

Item No. 10

1. Part Number C-IC6 states the following, “In-Ceiling, Indoor 6.5” Coaxial Loudspeaker, White (priced individually, but sold in pairs).” There are six lines of this item; do you want 6 total speakers or 12 total speakers?

Part number C-IC6 (In-Ceiling 6.5” Speakers): The speakers are sold in pairs. The RFQ quantity of 6 equals 3 pairs, for a total of 6 speakers required.

2. Part number 6200UE877U1000, comes in a 1000ft spool. There are six lines of 25; does this mean 25ft for each line and a total of 150ft?

Part number 6200UE877U1000 (Belden Plenum Audio Cable, 1000 ft spool): The RFQ quantity represents 150 feet total (6 lines of 25 feet each). Contractors should charge only for the estimated amount of cable used, not full spools.

Item No. 13

1. Part number 7131101comes in a spool of 1000ft and in the RFQ it states a quantity of 100 and there are two lines of this item; is this to mean a total of 100 feet is needed per line?

Part number 7131101 (General Cable Cat 6, 1000 ft spool): The RFQ quantity of 100 per line equals 100 feet per line. With two lines, the requirement is 200 feet total. Contractors should charge for the estimated amount of cable used, not full spools.

2. Part number 10GX53F0091000, comes in a 1000ft spool. Is the quantity to mean 50 feet?

Part number 10GX53F0091000 (Belden Cat 6A, 1000 ft spool): The RFQ quantity of 50 refers to 50 feet total, not 50 spools. Contractors should charge only for the estimated amount of cable used, not full

Cable Budget Breakdown for Reference

AD Office:

• Belden 10GX53F0091000: 50 ft

• General Cable 7131101: 100 ft

Conference Room:

• Belden 10GX53F0091000: 50 ft

• Belden 6200UE877U1000: 150 ft

• General Cable 7131101: 200 ft