This document is a Pre-Proposal Inquiries and Answers record for Amendment A00002 under Solicitation 75H701-26-R-00014 for the Zuni Quarters Sewer Improvement project located in Zuni, New Mexico (Project No. AQ18ZS002). The Indian Health Service Division of Engineering Service is issuing this amendment, with Shaukat Syed serving as the document owner. The file contains 48 questions and official IHS-approved responses addressing contractor inquiries regarding project specifications, site conditions, materials, and bidding requirements. Key clarifications include: the Owner will conduct site monitoring and verification; no SWPPP is required as the project disturbs less than one acre; MOXIE admixture is required for new manholes per specifications; asphalt removal and replacement quantities have been amended in the revised price schedule; the contractor is responsible for locating a suitable waste disposal site; New Mexico Gross Receipts Tax has been added to the price schedule; the Buy American Act applies per FAR Clauses 52.225-9 and 52.225-10; construction water costs will be coordinated with the Facility Engineer and may require a modification after award; SDR-35 PVC pipe is acceptable for 4-inch service lines; and manhole testing is required and incidental to the unit price.

Additional key requirements include: separate trenches are mandated for parallel water and sewer installations with specific separation standards; the sewer lines must remain operational during construction with a bypass plan required; survey is needed for Red Line As-Builts at project conclusion; TERO costs must be confirmed through the Zuni Tero office; marker posts are required for all manholes; the contractor must locate approved borrow areas for earth fill; unforeseen site conditions will be addressed under FAR 52.236-2 Differing Site Conditions; and proposals must be submitted in two volumes utilizing Lowest Price Technically Acceptable (LPTA) source selection procedures per Section L.10. The price schedule (Attachment J03 - Rev.2 dated January 26, 2026) has been corrected for swapped bid item quantities, and Company Specialized Experience Construction Form (Attachment J04 - Rev.1) has been corrected and provided with this amendment.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment of Solicitation Amendment A00002 under Solicitation 75H701-26-R-00014 Zuni Quarters Sewer Improvement

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-26-R-00014

PROJECT: Zuni Quarters Sewer Improvement LOCATION: Zuni, NM

PROJECT NO: AQ18ZS002

DOCUMENT

OWNER: Shaukat Syed PHONE: 516-361-4989 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

Amendment A00001 dated 01/21/2026

1. RFP

I was looking into the Zuni Quarters Sewer Improvement Project and was wondering if the materials testing and inspections will be required by the GC or the Owner for this project?

COR The Owner will conduct site monitoring and verify with submittals from contractor.

2. RFP Will a SWPPP be required? COR No, the project is not disturbing more than 1-acre of land.

3. RFP Will MOXIE be required for all new manholes? Per IHS spec. COR Please see B01 Attachment 1a - Technical provisions and B01 Attachment 1b- Details.

4. RFP Will there be any requirements for asphalt removal & replacement? If so, can quantities be provided? COR

Yes, the price schedule and Section C have been amended.

Please see revised Section C and B01 Attachment J03 - Price Schedule_Rev.1 dated January 20, 2026.

5. RFP Is the contractor to assume all native materials to be suitable for backfill? COR No, please see B01 Attachment J01a – Technical provisions that outline the backfill provisions.

6. RFP Does the owner have a disposable waste site for concrete/asphalt products? COR No, the contractor is to locate a suitable and acceptable site for waste disposal.

7. RFP

Will there be any taxes associated with this project? If so, can percentages be provided and will this be part of bid schedule under total cost or is the contractor to add after total cost?

CO

Yes, the Price schedule has be amended to show New Mexico Gross Receipts Tax for the location. Please see B01 Attachment J03 - Price Schedule_Rev.1 dated January 20,

8. RFP Who owns jurisdiction of existing roadways? Has a permit for road cuts been obtained or required? COR Indian Health Service is the owner of the roadway. No permits are required for work.

9. RFP Will there be any requirements for rock excavation?

COR At the present location, there is none needed.

10. RFP

Will this project require a traffic control plan? If so, can details be provided.

COR

There is no traffic control plan. The contractor is to produce it in collaboration with IHS Zuni Service Unit, Facility Engineer and COR after award.

Zuni Quarters Sewer Improvement

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-26-R-00014

PROJECT: Zuni Quarters Sewer Improvement LOCATION: Zuni, NM

PROJECT NO: AQ18ZS002

DOCUMENT

OWNER: Shaukat Syed PHONE: 516-361-4989 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

11. RFP

Will this project require Buy America Act? Or will import materials be sufficient?

CO Per FAR Clauses 52.225-9 and 52.225-10, Buy American Act applies.

12. RFP Is there any cost for construction water and where is the source?

COR

The cost for construction water has not been identified. It will be coordinated with the Facility Engineer and COR. If necessary, a modification will be issued after the award once the cost has been identified.

13. RFP The bid schedule calls for 8” SCH-40 PVC Pipe. Will SDR-35 be allowed? COR Yes, per the construction drawings, page C-1, Piping

Schedule No. 1

14. RFP Will the new 4” sewer service lines be SCH-40 or SDR-35 PVC? COR

All service line piping shall be 4 inches PVC unless otherwise directed. Pipe shall be nominal size, SDR-35, 0.125-inch minimum wall thickness. See B01 Attachment J01a – Technical provisions.

15. RFP

Will there be any coating requirements for the refurbishing of existing manhole? Is this existing manhole constructed with precast concrete or block?

COR

Please see B01 Attachment J01a – Technical provisions for manhole requirements. If concrete is cracked, then Moxie is to be included in the admixture. Please refer to Page 2 of Section 06 - Gravity Sanitary Sewer Technical Provisions

16. RFP Will the landscape restoration require any seeding? If so. Can seed mix and quantities be provided? COR There is no seed or quantity mixture as the landscaping is xeriscaped and nothing has been done to the areas.

17. RFP Is there a survey control point near project jobsites so construction staking for new sewer main can be performed? COR Yes, the control points are located at the SW corner of the intersection of B Avenue and 6th Street.

18. RFP

Was there any specific additives needed to be added to the concrete for the manholes? Does the specbook/handbook state whether or not the additive Delvo needs to be added to the concrete for the manholes?

COR

Yes, please see B01 Attachment J01a – Technical provisions.

and B01 Attachment 1b- Details. The admixture on page 2 of the Specification for Section 06 - Gravity Sanitary Sewers does mention Moxie 1800 Super-Admix.

19. RFP Is there a spec book/handbook that can be made available? COR Yes, please see B01 Attachment J01a – Technical provisions

Zuni Quarters Sewer Improvement

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-26-R-00014

PROJECT: Zuni Quarters Sewer Improvement LOCATION: Zuni, NM

PROJECT NO: AQ18ZS002

DOCUMENT

OWNER: Shaukat Syed PHONE: 516-361-4989 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

20. RFP

Is the government open to running sewer in the middle of the road vs the side through the sidewalks. It would be a much cleaner approach than having to go through driveways, fences, curb & gutter, etc.

COR Yes, but a comprehensive traffic plan and safety plans will need to be submitted for consideration

21. RFP Will we need to keep the sewer live during construction? COR Yes, the sewer line is to remain in operation during construction.

22. RFP Is there a Geo-Tech report available for the project? Specifically, is any hard dig anticipated? COR There is no Geo Tech report available.

23. RFP Are we permitted to cast square-shaped manholes in place? COR No, the specifications do not allow for square manholes.

Amendment A00002 dated 01/27/2026

24. RFP

Sheet C-1 Profile 6th Street Sewer line “A” shows note “reconnect service line as required by field verification”. It appears this service line is already connected to existing SAS to remain in place. If so, why reconnect? Please clarify.

COR

The note “RECONNECT EXISTING SERVICE LINE TO NEW MAIN” is currently connected to the existing sewer line; the existing sewer line is to be removed and replaced with New Line A, as indicated in Piping Schedule 1.

25. RFP

Sheet C-1 does not show elevation profile of existing SAS main on line “A” and line “B”. Since most of this work is existing line tie in work, won’t the existing SAS main be at same location and elevation as new SAS main? While SAS line “A” is on a new alignment this does not appear to be the case for Line “B”. Please confirm.

COR

The existing Line SAS is to be removed and replaced with Line A and Line B. The elevations should remain the same as before.

26. RFP

Is sewer service in all existing homes or bldg. tie ins to be completed in this work in current use and operation? If so, will continued operation be required when exist system must be removed and replaced? How long can service be down? Can adjustment to alignment be made with engineer approval to allow continued operation?

COR

Yes, all housing units are connected to the SAS Lines and are to remain in service. Service can be down when transfer of existing SAS line, that will be coordinated with the Facility Engineer and CEO for housing occupants’ notice. Yes, adjustment to alignments may be considered and approved by Facility Engineer and COR.

27. RFP

On Sheet C-1 Gen Note 5:

a. “.. separate trenches will be required in all cases (this shall be effective even though one line has been installed prior to the other)” Please clarify if this will apply and if so, how this is to be

COR

a. Separate trenches are required in all cases for parallel water and sewer installations. Reduced horizontal separation (<10 feet) is only permitted with increased vertical separation (minimum 18 inches) and does not allow a shared trench.

Zuni Quarters Sewer Improvement

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-26-R-00014

PROJECT: Zuni Quarters Sewer Improvement LOCATION: Zuni, NM

PROJECT NO: AQ18ZS002

DOCUMENT

OWNER: Shaukat Syed PHONE: 516-361-4989 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

implemented for sewer and water less than 10 feet apart or water less than two feet above?

b. On same note, at water sewer crossings: water line to be three feet above sewer. Will rerouting water, even service lines be expected. Will change order costs be allowed for these unknown conditions. Please clarify.

c. On same note what happens when nine feet of cast iron pipe interferes with other utilities or obstructions, roadway, buildings, etc.?

d. On same note, what will be done at service tie ins where 10’ separation is not possible when service entry into an existing building where stub out service locations cannot be changed?

Where minimum vertical separation cannot be met, additional protective construction is required in accordance with the specifications.

b. b. Per B01 Attachment J01a – Technical provisions Section 06 - Gravity Sanitary Sewers, TP-606 (Water and Sewer Line Separation Requirements), pages 5–6, when water lines cross sewer lines, the water line shall be installed above the sewer line with a minimum vertical separation of 18 inches (measured pipe O.D. to pipe O.D.). These requirements apply to mains, laterals, and service lines.

Where the required vertical separation cannot be achieved, additional protective measures are required, including reconstruction of the sewer with ductile iron pipe or approved concrete encasement in accordance with TP-606.C.

In addition, Technical provisions Section 01 – Trench Excavation & Backfill, TP-107.A.6, page 4, states that any existing water or sewer services that intersect or interfere with new pipelines shall be rerouted by the Contractor as directed by the Owner or Owner’s Representative.

If unforeseen site conditions are encountered, they will be addressed in accordance with FAR 52.236-2 Differing Site Conditions.

c. The required ductile iron pipe length at crossings shall be installed as specified. Conflicts with utilities, structures, roadways, or buildings shall be resolved by the Contractor through approved adjustments or methods.

d. Where 10-foot separation is not feasible at existing buildings with fixed stub-outs, service lines may be installed

Zuni Quarters Sewer Improvement

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-26-R-00014

PROJECT: Zuni Quarters Sewer Improvement LOCATION: Zuni, NM

PROJECT NO: AQ18ZS002

DOCUMENT

OWNER: Shaukat Syed PHONE: 516-361-4989 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

with reduced separation in accordance with Technical Provision -705, subject to Owner approval. Required vertical separation and jointless pipe conditions must be met.

28. RFP Bid Item #2 and #3 - estimated quantities appear to be swapped. Please confirm. COR

Correct. The estimated quantities were mistakenly switched.

The price schedule has been corrected. Please see B01 Attachment J03 - Price Schedule_Rev.2 dated January 26, 2026.

29. RFP Bid Item #12 - Remove and replace curb and gutter for 30LF. Where does this occur or located? COR On Line B near MH#11, when work crosses the road.

30. RFP

Bid Item #17 Reconnect service line to housing 6th street. Will this be 4” service line same as Bid Item #11 and will any added length of added line work be covered in Bid Item 11, or is this a completely separate and independent bid item to be estimated?

COR

This item is separate and on Line A, and not part of line B.

This is the duplex housing unit at the intersection of 6th Street and C Ave.

31. RFP Bid Item #18- Remove and replace concrete driveways- 1CY. Where does this occur or located? COR The concrete driveways occur for Line A; the duplex housing unit at the intersection of 6th Street and C Ave.

32. RFP

Bid Item #19- Landscape, restoration – 4CY. Is this in coordination with Keyed Note#5. Restore landscaping in kind? Please clarify if this is for vegetation, soils, gravel, cover, etc. Also, there are four Key Note#5 locations on line “A” and one on line “B”, for a total of 5. Should the quantity be 5 CY? Please confirm.

COR No, the drawings on Line A only have 4 Keyed notes for landscaping for Keyed Note 5.

33. RFP Staging area: Where can staging area be located and will it require fencing? COR Staging will be set for the south parking lot of the facility. A site map will be sent to indicate location.

34. RFP Water: Where is water available and what is the cost? COR Please see the answer to Question #12.

35. RFP As discussed during pre-bid – No soils report is available or completed for this project. Please confirm. COR Correct. No soils or Geo-Tech report is available or has been completed for this project.

Zuni Quarters Sewer Improvement

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-26-R-00014

PROJECT: Zuni Quarters Sewer Improvement LOCATION: Zuni, NM

PROJECT NO: AQ18ZS002

DOCUMENT

OWNER: Shaukat Syed PHONE: 516-361-4989 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

36. RFP

Natural gas, ex utilities in project area. Will general locations be provided? We understand 1 call procedure but more for estimating purposes.

COR Please see B01 Attachment J01c - Boundary Survey Plat.

37. RFP As discussed during pre-bid - No road permits expected, but Zuni Utility Authority may require tie in permit. Please confirm. COR No, the tie-ins occur on sewer lines owned by IHS and are on existing lines.

38. RFP Is survey expected at anytime pre or post construction? Assume not due to scope of work and lack of survey design data. Please confirm. COR Yes, survey is needed for Red line As-Builts at conclusion of project.

39. RFP What is the TERO cost? COR The TERO will need to be confirmed by the contractor and contact through the Zuni Tero office. Please see Section H.48 of the solicitation for further information.

40. RFP Is there any local approved borrow areas near site for earth fill and at what cost? COR

The government has not identified or confirmed any local approved borrow areas. It is the contractor’s responsibility to locate one.

41. RFP What specification will apply to this project? COR Please see B01 Attachment J01a – Technical provisions.

42. RFP MH testing – will this be required? COR

Yes, Per Technical Provisions Section 06, TP-612 (Measurement and Payment), manhole testing is incidental to the installation of manholes and is included in the applicable unit price. Manhole testing is required for all manholes.

Testing shall be performed prior to backfilling using approved methods.

43. RFP As discussed during pre-bid Rock Ex. is not anticipated but can be covered in a change order if encountered. Please confirm. COR

If unforeseen site conditions are encountered, they will be addressed in accordance with FAR 52.236-2 Differing Site Conditions.

44. RFP Is Traffic Control Plan or signage required? COR Please see answer to Question #10.

45. RFP

Can system be diverted or shut down for tie in work or will pumping sewage be required to keep system operable during existing main line interruption?

COR Yes, the sewer lines are to remain in operation; a bypass plan will be needed.

Zuni Quarters Sewer Improvement

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-26-R-00014

PROJECT: Zuni Quarters Sewer Improvement LOCATION: Zuni, NM

PROJECT NO: AQ18ZS002

DOCUMENT

OWNER: Shaukat Syed PHONE: 516-361-4989 DOCUMENTS:

DATE: DEPARTMENT: IHS/DES

Item No.

46. RFP Will marker posts for MHs be required? COR

Yes, Per Technical Provisions Section 06 – Gravity Sanitary Sewers, TP-603.E (Marker Post), page 4, Marker posts for manholes are required. Standard metal marker posts shall be used outside roadway rights-of-way. Carsonite markers shall be used within rights-of-way, as specified. Marker posts are incidental to the work and not a separate pay item.

47. RFP

Bidding documents Solicitation 75H701-26-R-00014 (page 42-44 of 50) request proposal delivered in two volumes. Volume 1 - Technical Proposal Paragraph D requires explanation to be provided per Attachment J04, Company Specialized Experience Form, which was not provided. There is Attachment J07 same title in the bid docs. Is that the one to use. On that item our understanding during Pre-Bid, that this was a lowest bid award only, so is Volume 1 required for this proposal?

CO

B01 Attachment J04 - Company Specialized Experience Construction Form was provided when the solicitation was posted. The title on page 1 was incorrect and has been corrected. Please see B01 Attachment J04 - Company Specialized Experience Construction Form_Rev.1 dated January 26, 2025.

Volume I and II are required as stated in Section L.9 since this acquisition will utilize Lowest Price Technically Acceptable (LPTA) source selection procedures in accordance with FAR 15.101-2. Please review Section L.10 and Section M for further information.

48. RFP

This is the same case for Price Breakout on Volume II - Price Proposal (page 46 of 50) referencing Attachment J03, which is not provided, unless the Bid Schedule is sufficient for this. Please Confirm

CO

Attachment J03 Price Breakout is the same as Attachment J03 Price Schedule, which is listed in Section J and provided when the solicitation was posted. Attachment J03, Price Breakout on page 46 of 50 of the solicitation will be renamed to Attachment J03, Price Schedule as per this amendment.

Please see B01 Attachment J03 - Price Schedule_Rev.2 dated January 26, 2026.