This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a lighting project at a hospital, specifically the Eagle Butte lighting project (Solicitation Number 75H70125R00060). The amendment addresses several key technical considerations, including the need to abandon the existing auto-dimming lighting system, replace indirect hallway lighting with LED flat panels, and potentially modify track and tiles to accommodate new lighting fixtures. The document confirms that two specific Federal Acquisition Regulation (FAR) clauses remain unchanged in the solicitation.
The amendment extends the proposal due date to 19 September 2025 and provides responses to contractor questions about lighting implementation challenges. One notable instruction directs potential bidders to contact the TERO (Tribal Employment Rights Office) Director, Phil Knife, at 605-964-8376 to obtain current TERO fees. The solicitation is being issued by the Division of Engineering Services in Seattle, Washington, with a project number of 131154, and involves modifications to the hospital's existing lighting infrastructure.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B03 Prebid Meeting Sign In.pdf | ||
| B05 75H70125R00060 Amendment 01.pdf | ||
| B01 Attachment J02 Light Schedule.pdf | ||
| B01 Attachment J03 Self Performed Calculation Sheet.docx | DOCX document | |
| B01 Attachment J01 Lighting Locations.pdf | ||
| B01 RFP 75H70125R00060.pdf | ||
| B01 Attachment J06 Past Performance Questionnaire.docx | DOCX document | |
| B01 Attachment J05 Company Specialized Experience Form.docx | DOCX document | |
| B01 Attachment J07 IHS IEE Representation Form.pdf | ||
| B01 Attachment J04 Wage Decision SD20250024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A000002
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The reason for this amendment is to provide answers to questions and to extend the due date of the proposal to 19 September 2025.
See Summary of Changes
Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104
See block 6
75H70125R00060
131154
1 2
09/10/2025
08/04/2025
SUMMARY OF CHANGES
75H70125R00060
A. Amendment 01 incorrectly stated that the following FAR clauses and provisions were updated or deleted via the Revolutionary FAR Overhaul (RFO). These clauses are not authorized for RFO Deviation at this time. This amendment is to correct these clauses and remove the Deviation from them. The following remain unchanged in the solicitation:
i. 52.225‐10 Notice of Buy American Requirement‐Construction Materials [in Section L]
ii. 52.225‐13 Restrictions On Certain Foreign Purchases
B. Answers to the following questions are as follows:
1. We found that all the lighting in the hospital is fed from dimming control boxes and the lighting is dimmed according to the light outside, (Sunny or Cloudy) With that said, there has to be dimming wires and dimming florescent ballasts throughout the facility.
Most dimming switches for florescent are not compatible with LED. They cause a flicker.
On top of that even if we can use the control boxes for the hospital, the rooms they want to install the dimmers on will not work correctly tied in with the system.
The only way we see this working is to eliminate the auto dimming for the whole hospital and then dim the areas that they are asking for.
Response: The auto dimming system would have to be abandoned.
2. The indirect lighting in the hallways are something that we need to look into getting rid of and install LED flat panels.
With that said there will be a lot of track and tiles for these edges.
There are references in the specs about this type of change when the fixtures are not suitable.
Response: Yes, with the removal of the indirect lighting, the track and tiles will need to be changed to match the LED flat panels.
3. What are the TERO fees for the eagle butte lighting project?
Response: Please contact the TERO Director, Phil Knife, 605‐964‐8376, for the most current TERO fees.
C. Extend the due date for proposals to 19 September 2025.