B05 Amendment 2.pdf

PDF 109 KB Posted

Attached to
Georgeville Well Drilling
Solicitation number
75H70125Q00027
Issued by

About this file

This document is an Amendment (Amendment 2) to Solicitation 75H70125Q00027 for a Georgeville Well Drilling project issued by the Indian Health Service. The amendment incorporates six Request for Information (RFI) responses addressing contractor questions about the project, including ground survey requirements, well cuttings disposal, tree/limb removal, pump testing procedures, water quality testing, and temporary fencing. The key RFI responses clarify that the contractor must: obtain exact utility locations from Yakama Nation Tribal Water and Sewer Program, dispose of cuttings on-site, remove small trees/limbs with Contracting Officer approval, conduct test pumping with percolation outside Jenkins Creek, perform required water quality testing per technical specifications, and can install temporary fencing during construction. The offer due date remains unchanged at 2pm Pacific Time on 7/10/2025, with all other terms and conditions remaining the same.

View the file

Other files

File Type Posted
B05 Amendment 6.pdf PDF
B05 Amendment 5.pdf PDF
B05 Amendment 4.pdf PDF
B05 Amendment 3.pdf PDF
B05 Amendment 1.pdf PDF
Attachment 3 Drawings.pdf PDF
Attachment 5 Release of Claims.pdf PDF
Attachment 6 WH 347 Payroll.pdf PDF
Attachment 7 Bid Schedule.xlsx XLSX spreadsheet
Attachment 1 Wage Determination.pdf PDF
B01 25Q00027.pdf PDF
Attachment 2 Specifications.pdf PDF
Attachment 4 Self Performed Calculation Sheet.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00002

Thupten Tsering

The purpose of amendment 2 to solicitation 75H70125Q00027 is the following:

1. Incorporate RFI responses 1-6.

2. The offer due date remains unchanged at 2pm Pacific Time on 7/10/2025.

3. All other terms and conditions remain unchanged.

4. See SF30 Continuation Page.

Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104

See Item 6

TBD

75H70125Q00027

PO-21-N27

1 2

07/01/2025

06/16/2025

Number Contractor Question Contractor Comment COR Response

Will we need a ground survey to ensure we will not hit any piping that might be underground?

We will have to move the drilling spot so we have room behind and on the side of the hole to safely move tooling in and out.

Per Drawing Sheet 2, General Note 1: "The Contractor shall be responsible for obtaining exact locations and elevations of all utilities from the owners of the respective utilities." Please contact the Yakama Nation Tribal Water and Sewer Program at 509‐865‐5121 Ext. 4604 for existing water line location.

2 Cuttings from the well.

Can we place cuttings in the swell directly behind the proposed well spot, or do we need to remove them off‐site?

Cuttings can be disposed onsite as long as they don't impede future site usage.

Can we remove limbs and possibly a few trees in the area around the well site?

This is to get our rig in, mast up and area to safely drill around the proposed well site.

Limbs and small diameter (< 3") trees may be removed as necessary. Consult with Contracting Officer prior to removing any tree 3" or larger in diameter.

Pump off, are we allowed to do the well pump test into the creek?

If we cannot pump into the creek, this will drastically increase the overall cost, as containment systems and water removal will need to be put in place

Direct discharge is not allowed into Jenkins Creek.

However, percolation outside of the creek is acceptable. Discharge of test pumping water shall be directed away from existing wells and surface water. A test pumping plan submittal from the Contractor is be required to detail how test pumping will be performed.

Water quality testing of well water is required upon completion of well. See Technical Specifications Section 32 21 01 Part 3.09 and Exhibit 2 for required sampling requirements and a full list of Water Quality Sampling Parameters.

Sampling and water quality analysis of pump testing water is not required.

Would we be allowed to put up a temporary fence before the culvert during this project?

Temporary fencing is acceptable before the culvert during construction activities.

What water quality tests are needed? can a field test be accepted, as this could account for substantial standby time while waiting for test results to be sent back?

B05 Amendment 2
RFI's