B05 Amend A00002.pdf
PDF 811 KB Posted
- Attached to
- Upgrade Fire Alarm and Devices at Pine Ridge
- Solicitation number
- 75H70124R00006
About this file
This is an SF30 Amendment to solicitation 75H70125R00006 for upgrading fire panel and devices at Pine Ridge Hospital, along with responses to pre-bid meeting questions. The amendment includes two sets of Q&A responses - Amendment 1 posted on 11/22/2024 and Amendment 2 posted on 11/27/2024.
Key technical clarifications include: magnetic door holders must be switched to 120V power supply systems; new conduit must be 2-hour fire rated and colored red; the hospital will handle 48-hour fire watch periods with contractor responsible beyond that; 10% spare initiating devices and 5% spare alarming devices must be provided; a workstation for zone testing and diagnostics is required. The amendment confirms the project is not tax exempt, restrooms are available for contractor use, and reiterates that offerors are responsible for determining applicable state/local taxes and TERO fees (4% of contract price and $250 work permit per employee). The amendment does not extend the original proposal due date.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
SF30 CONTINUATION OF BLOCK NARRATIVE
SUMMARY OF CHANGES
Solicitation Number 75H70125R00006 is hereby amended to address the following:
1. Provide responses to questions submitted by offeror (2 pages)
NOTICE TO OFFERORS: Offerors must acknowledge receipt of any and all amendments by number and date on their cover letter in their offer or by submitting a signed copy of the SF30. All other terms and conditions remain unchanged.
END OF SUMMARY OF CHANGES
Pre-Bid Meeting Questions and Answers
Upgrade Fire Panel and Devices in Pine Ridge Hospital
75H70125R00006 Item # Question Response
Q&A Amendment 1 posted on 11/22/2024
1 What should be done with magnetic door holders regarding voltage systems? There are several existing doors that run on a 24volt system, what should the new system be?
All magnetic door holders in the hospital should be switched over to 120v power supply systems if they are not already 120v. See appendix B for locations of door holding devices.
2 What fees are there involved with this contract?
There is a 4% TERO fee, but what else must be done to work on a contract in Pine Ridge Hospital?
All offerors are responsible for allowing for all applicable state, local taxes and fees within their bids and to perform their own due diligence in ascertaining them.
3 Most strobes and alarming devices in the hospital are currently wall mounted. Should any new strobing devices also be wall mounted? Must the existing strobes be used?
It is not a requirement to keep the existing strobes mounted on the wall and they can be ceiling mounted. It is up to the contractor on their method of alarming as long as it is approved during the design phase for spacing and meeting relevant codes.
4 Can any conduit that has it’s wiring taken from service due to new alarming system be abandoned?
Conduit cannot be abandoned in the ceiling. If there is no live wire use in any conduit above the ceiling as a result of this project demolishing old systems or changing the system, that conduit and wire must be removed.
5 What color conduit is to be used? Any new conduit installed to house fire alarming system wiring must be 2-hour fire rated and colored red. All new wiring shall be put in new conduit where required. As the SOW reads, once fire alarming wiring reaches the zone in which it will terminate, it no longer needs to be housed in conduit.
6 For what duration of time is the hospital willing to facilitate a facility wide fire watch during construction before the contractor is responsible for fire watch?
The hospital will handle any consecutive 48-hour fire watch. Any fire watching exceeding 48 hours in length will be required to be covered by the contractor after the first 48 hours.
7 Do the IT server rooms have suppression and alarming fire systems?
The IT server rooms have traditional water fire suppression systems. There appears to be no alarming or initiating devices in the IT rooms.
8 How are the door holders to be controlled/zoned? Door holders should be tied into the zone in which they reside. If the door is on the barrier of two zones, both zones should be able to communicate with the door holder or be able to be initiated/activated by both zones.
9 Does each alarming device need to be self-addressable? This would give only one company the ability to accomplish this as it is a patented technology.
The ability to find faults in alarming devices and control only zones of alarming devices is the intention of the self-addressable device requirement. If the proposed alarming system can be addressable to a zone wherein the zone in which the faults are occurring can be easily identified, or the functioning of all alarming devices within a zone are controllable independent from the remainder of the facility, it will be acceptable for this project requirement.
In essence, all zones have their own alarming circuits.
Pre-Bid Meeting Questions and Answers
Upgrade Fire Panel and Devices in Pine Ridge Hospital
75H70125R00006 10 Is it a requirement to install an enunciator at a
Nurses station?
The facility does not want an enunciator at a Nurse’s station. It is also not a requirement according to the local Life Safety Expert Kevin Beliese.
11 Are spare initiating and alarming devices a deliverable of this contract? And if so, how many?
For initiating devices, an amount equaling 10% of the total installed devices in the facility shall be given to the facility as spares. For alarming devices, an amount equaling 5% of the total installed alarming devices in the facility shall be given to the facility as spares.
12 Is a workstation such as a True Site workstation be a requirement for this project and included in the bid?
A workstation with the capabilities to perform zone testing, diagnostics, fire drills, etc. should be a part of the bid of this project.
13 Can a drawing set of all panels in the hospital be provided?
See Drawings named “Power Distribution Panel Locations”
Amendment 2, posted on 27 November 2024 14 Is this project tax exempt? No 15 Are restrooms available for contractor use? Yes 16 Pg. 9 of RFP 75H70125R00006 under section 6.
Miscellaneous part D. Tribal requirements.
a. The only costs listed are as follows:
i. 4% on the total contract price.
ii. $250 work permit for each employee.
b. Contractor has tried multiple times to contact the TERO office phone number given with zero response.
i. Please confirm these are the only costs that need to be accounted for.
ii. If there are other costs not listed that are required, please list those specifically as TERO office has not provided a response to contractor.
All offerors are responsible for allowing for all applicable state, local taxes and fees within their bids and to perform their own due diligence in ascertaining them.
Refer to the RFP document for costs associated with
TERO.
| ADPAA4.tmp |
| END OF SUMMARY OF CHANGES |
| SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK |
| 1. Project Description |
| 3. Submittals |
| 4. Schedule/Meetings |
| 5. Miscellaneous |
| a. |
| b. |
| c. |
| d. |
| e. |
| f. |
| 6. Payments to the Contractor |
| 7. IHS Personnel |
| 8. Invoice Format |
| 9. Closeout Documents |
| SECTION F – DELIVERIES OR PERFORMANCE |
| ADP6CB2.tmp |
| END OF SUMMARY OF CHANGES |
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: A00002 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: Taylor M. Kanthack |
| Description[0]: |
Please see continuation page.
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: Indian Health Service (IHS) |
Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1650 Seattle, WA 98104
| NameandAddress[0]: |
| AdministeredBy[0]: See item 6 |
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: 75H70125R00006 |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 4 |
| EffectiveDate[0]: 11/27/2024 |
| Dated9B[0]: 11/05/2024 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: 1 |
| NotExtended[0]: Off |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: |
| CopiesReturned[0]: |
File details come from the government source that posted it. Updated .