Amendment 00002_75H701-21-R-00005.pdf
PDF 16 MB Posted
- Attached to
- Billings Area Asphalt and Concrete Repair
- Solicitation number
- 75H701-21-R-00005
About this file
This document summarizes a federal contract solicitation for asphalt and concrete repair services. The Indian Health Service is seeking proposals for Billings Area Asphalt and Concrete Repair projects located across facilities in Montana and Wyoming. The NAICS code is 238990 for specialty trade contractors, with a size standard of $16.5 million. The magnitude of construction is estimated between $1 million to $5 million. Proposals are due by January 18, 2021 at 2:00 PM local time. Questions regarding this solicitation should be directed to the contract specialist by December 28, 2020. A non-mandatory site visit will also be held. The solicitation is set aside exclusively for small businesses.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 10
Indian Health Service - DES 701 Fifth Avenue, Suite 1600 MS/24 Seattle, WA 98104
SEE BLOCK 6
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
75H701-21-R-00005
9B. DATED (SEE ITEM 11)
12/04/2020
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
Amendment 00002 01/05/2021 TBD
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUMMARY OF CHANGES:
The purpose of Amendment 00002 is to:
1. Incorporate the IHS' responses to the Pre-Proposal Inquiries.
2. The proposal due date remains unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Andrew E. Hart, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
01/05/2021 Previous edition unusable STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Amendment of Solicitation Amendment A00002 under Solicitation 75H701-21-R-00005 Project No. BI19AO200Z6, Billings Area Asphalt and Concrete Repair Project
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-21-R-00005
PROJECT:
Billings Area Asphalt and Concrete Repair
LOCATION: Montana and Wyoming
PROJECT NO: BI19AO200Z6
DOCUMENT
OWNER: Rita Langager PHONE: (406) 998-7220 DOCUMENTS:
DATE: 01/05/2021 DEPARTMENT: IHS/OEHE/DFM
Item No.
Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response
Amendment A00001 dated 12/28/2020
1.
Specs:
312000- 2.1.D, sheet
Can asphalt millings be used as leveling course? TR Asphalt millings may be used as a leveling course so long as the millings meet the gradation requirements of 95% passing a 1 ½” sieve and not more than 8 percent passing a No. 200 sieve.
2. General Can we shut down the lots during construction if so how long? TR
The nature of the work implies that the lots will need to be fully or partially shut down during construction.
The Contractor shall submit a proposed duration during applicable preconstruction meetings. If the duration is not acceptable to the Facility Manager, the actual duration will need to be negotiated.
3.
Specs:
312000 – 3.8.C, sheet
What happens if we hit areas of subgrade that does not have enough or any suitable material? TR
312000-3.8.C.2 states “Provide additional base material as required to meet final elevations and grades.” On asphalt that is removed and replaced, it is assumed that small amounts of base material will be removed along with asphalt, and the Contractor is responsible to provide minor amounts as necessary to meet grade. If a situation arises where it is apparent that the existing asphalt was not installed to grades shown in drawings and additional material is required, or a situation where it existing material is not suitable.
The Contractor should request that a Change Order be negotiated.
4. Drawings – sheet 5.1
At Wolf Point Clinic #4 replace asphalt w/ concrete PMT is marked with #3 on site map? TR
The new concrete section is mismarked on the current sheet 5.1. A new set of plans will be issued with the issue corrected.
Project No. BI19AO200Z6, Billings Area Asphalt and Concrete Repair Project
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-21-R-00005
PROJECT:
Billings Area Asphalt and Concrete Repair
LOCATION: Montana and Wyoming
PROJECT NO: BI19AO200Z6
DOCUMENT
OWNER: Rita Langager PHONE: (406) 998-7220 DOCUMENTS:
DATE: 01/05/2021 DEPARTMENT: IHS/OEHE/DFM
Item No.
5. Drawings – Sheet 7.1
The comment “Do not remove or disturb pavement within 6” of edge of staircase pads at columns will leave uncompleted work. TR
Sheets 7.1,7.2, and 12.2 have been changed. New footers have been added to support the existing staircase which will be temporarily moved by contractor to complete work. Additionally, the sidewalk adjacent to the staircase has been widened.
7.2 was changed to reflect a change in striping. A detail has been added to 12.2 describing the footings.
A set of photos has been added to the documents to clarify conditions near the stairwell.
Amendment A00002 dated 01/05/2021
6. General We are having trouble getting in touch with the Crow and Ft. Peck TERO to find out fees to include on the project TR
Updated information on Ft. Peck TERO:
Director: Barry Bighorn 406-768-2461 E-mail: bbighorn@fortpecktero.org Compliance Officer:
Adrian Spotted Bird 406-768-2458 Main Office: Raquel White Hawk: 406-768-2464
Updated information on Crow TERO:
Director: Dana Old Coyote 406-665-5247 E-mail: dana.oldcoyote@crow-nsn.gov
7. General
They have a business license, work permits which are normal. They are wanting 3% to 4% added on to the overall project. Do we include this fee for each one on the total project or add the fee for just their locations?
TR
TERO regulations are applicable to the reservation in which the work is being performed. Applicable fees should be calculated based on the work performed on the applicable reservation.
mailto:bbighorn@fortpecktero.org mailto:dana.oldcoyote@crow-nsn.gov
Project No. BI19AO200Z6, Billings Area Asphalt and Concrete Repair Project
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-21-R-00005
PROJECT:
Billings Area Asphalt and Concrete Repair
LOCATION: Montana and Wyoming
PROJECT NO: BI19AO200Z6
DOCUMENT
OWNER: Rita Langager PHONE: (406) 998-7220 DOCUMENTS:
DATE: 01/05/2021 DEPARTMENT: IHS/OEHE/DFM
Item No.
8.
Specifications
– Section 321723 – 3.1.B
Can we stripe the day after the paving is done or do we need to wait 30 days? We normally stripe the day after paving and have good luck with the lot being clean and no traffic on it.
TR
The reason for the 30 day delay is that fresh oil tends to remain on the surface immediately after paving and can affect the quality of striping. If a contractor has a paint product that he believes will resist that effect, we could allow immediate painting, however, payment for painting would be withheld for thirty days at which time the striping would be reinspected.
If striping has degraded during the 30 day period, restriping will be required.
9. Drawings – Sheet 7.1
The concrete under the stairway in Lodge Grass is not to be disturbed is the way I read the plans, just want to confirm. TR Amendment A00001 addresses this question. Please refer to this amendment.
10. Drawings – general
Do we need to replace all the parking blocks or just the broken ones.
If we could get a number on each location that would need to be replaced that would help.
TR
All of the existing parking blocks shall be replaced.
The number includes 5 at Hays, 22 at Pryor, and 5 at Lame Deer.
11. Drawings – Sheet 4.1
Could we get a bid quantity for the sewer leak in Hays so we don’t have to put extra money in to protect us against unforeseen problems?
TR
We can add the following allowances for the sewer leak in Hays:
Up to 8 hours exploratory excavation to locate the leak.
Up to 10 feet of 8” sewer pipe for leak repair (including bedding).
Up to 2 cy of compacted base material.
Up to 10 cy of compacted backfill.
Project No. BI19AO200Z6, Billings Area Asphalt and Concrete Repair Project
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-21-R-00005
PROJECT:
Billings Area Asphalt and Concrete Repair
LOCATION: Montana and Wyoming
PROJECT NO: BI19AO200Z6
DOCUMENT
OWNER: Rita Langager PHONE: (406) 998-7220 DOCUMENTS:
DATE: 01/05/2021 DEPARTMENT: IHS/OEHE/DFM
Item No.
12. Drawings -general
The detail drawings show replace base material as needed when replacing the asphalt and concrete. If base is needed could this be a change order so we don’t have to put extra money in for material that is not needed?
TR Please refer to Amendment A00001, item 3, which addresses this question.
| LG clarification photos.pdf |
| LG2 |
| LG3 |
| LG4 |
| LG5 |
| LG6 |