| Period | CLIN | Cost | Fixed Fee | Price | Period of Performance |
| BASE | 0001 | $0 | $0 | $0 | August 15, 2024 - March 31, 2025 |
| 0002 | $0 | $0 | $0 | August 15, 2024 - September 30, 2025 |
| OPTION 1 | 1001 | $0 | $0 | $0 | April 1, 2025 - March 31, 2026 |
| 1002 | $0 | $0 | $0 | May 15, 2025-November 14, 2026 |
| OPTION 2 | 2001 | $0 | $0 | $0 | April 1, 2026 - March 31, 2027 |
| 2002 | $0 | $0 | $0 | May 15, 2026-November 14, 2027 |
| OPTION 3 | 3001 | $0 | $0 | $0 | April 1, 2027-March 31, 2028 |
| 3002 | $0 | $0 | $0 | May 15, 2027-November 14, 2028 |
| OPTION 4 | 4001 | $0 | $0 | $0 | April 1, 2028-March 31, 2029 |
| 4002 | $0 | $0 | $0 | May 15, 2028-August 14, 2029 |
| OPTION 5 | 5001 | $0 | $0 | $0 | March 15, 2029-September 30, 2029 |
| TOTAL | $0 | $0 | $0 | |
Rates
| Category | Base | Option 1 | Option 2 | Option 3 | Option 4 | Option 5 |
| Corp Monitor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Project Director | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Level Task Lead | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TA Specialist III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TA Specialist II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Dissemination Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Editor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Administrative Assistant/Project Support | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Dissemination Associate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| IT/Web Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Indirects | | | | | | | |
| Fringe | 0% | | | | | |
| Labor Overhead | 0% | | | | | |
| Material Overhead | 0% | | | | | |
| ODC Overhead | 0% | | | | | |
| G&A | 0% | | | | | |
BASE
| Period of Performance: | August 15, 2024 - March 31, 2025 | | | |
| BASE (CLIN 0001) Tasks 1-10 | | | | |
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Corp Monitor | 250 | Hours | $0.00 | $0 |
| Project Director | 1,320 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 700 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1,320 | Hours | $0.00 | $0 |
| TA Specialist III | 1,320 | Hours | $0.00 | $0 |
| TA Specialist III | 1,320 | Hours | $0.00 | $0 |
| TA Specialist III | 1,320 | Hours | $0.00 | $0 |
| TA Specialist III | 1,320 | Hours | $0.00 | $0 |
| TA Specialist III | 800 | Hours | $0.00 | $0 |
| TA Specialist III | 800 | Hours | $0.00 | $0 |
| TA Specialist III | 800 | Hours | $0.00 | $0 |
| TA Specialist II | 800 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 800 | Hours | $0.00 | $0 |
| Editor | 455 | Hours | $0.00 | $0 |
| Administrative Assistant/Project Support | 1,320 | Hours | $0.00 | $0 |
| Dissemination Associate | 800 | Hours | $0.00 | $0 |
| IT/Web Specialist | 500 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | | | | $0 |
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | | | | $0 |
| MATERIALS | | | | |
| Materials | 1 | Each | $0.00 | $0 |
| Subtotal Materials | 0 | | | $0 |
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | | | | $0 |
| OTHER DIRECT COSTS | | | | |
| Subcontracts | 1 | each | $0.00 | $0 |
| Travel | 1 | each | $0.00 | $0 |
| Subtotal ODC | | | | $0 |
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | | | | $0 |
| Subtotal | | | | $0 |
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | | | | $0 |
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | | | | $0 |
| Period of Performance: | August 15, 2024 - September 30, 2025 | | | |
| BASE CLIN 0002 Tasks 11-12 | | | | |
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Senior Level Task Lead | 580 | Hours | $0.00 | $0 |
| TA Specialist III | 480 | Hours | $0.00 | $0 |
| TA Specialist II | 480 | Hours | $0.00 | $0 |
| TA Specialist III | 480 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 480 | Hours | $0.00 | $0 |
| Dissemination Associate | 480 | Hours | $0.00 | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| Subtotal Direct Labor | | | | $0 |
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | | | | $0 |
| MATERIALS | | | | |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| Subtotal Materials | $0 | | | $0 |
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | | | | $0 |
| OTHER DIRECT COSTS | | | | |
| Subcontracts | 1 | each | $0 | $0 |
| Consultants - i.e. Experts/Speakers/Presenters | 1 | each | $0 | $0 |
| Travel | 1 | each | $0 | $0 |
| Promotional Materials and Supplies | 1 | Each | $0 | $0 |
| Meeting Space | 1 | Each | $0 | $0 |
| Audio Visual | 1 | Each | $0 | $0 |
| Printing | 1 | Each | $0 | $0 |
| Training Materials | 1 | Each | $0 | $0 |
| Website | 1 | Each | $0 | $0 |
| Subtotal ODC | | | | $0 |
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | | | | |
| Subtotal | | | | |
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | | | | |
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | | | | |
OP1
| Period of Performance: | April 1, 2025 - March 31, 2026 | | | |
| Optional Period 1 (CLIN 1001) Tasks 1-10 | | | | |
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Corp Monitor | 300 | Hours | $0.00 | $0 |
| Project Director | 1920 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1020 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist II | 1312 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 1312 | Hours | $0.00 | $0 |
| Editor | 600 | Hours | $0.00 | $0 |
| Administrative Assistant/Project Support | 1912 | Hours | $0.00 | $0 |
| Dissemination Associate | 1312 | Hours | $0.00 | $0 |
| IT/Web Specialist | 600 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | | | | $0 |
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | | | | $0 |
| MATERIALS | | | |
| Materials | 1 | Each | $0 |
| Subtotal Materials | | | $0 |
| Material Overhead | Mat Cost | 0% | $0 |
| Total Materials Cost | | | $0 |
| OTHER DIRECT COSTS | | | | $0 |
| Subcontracts | 1 | each | | $0 |
| Travel | 1 | each | | $0 |
| Subtotal ODC | | | | $0 |
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | | | | $0 |
| Subtotal | | | |
| G&A | $0 | Subtotal | 0% |
| Total Costs | | | |
| Fixed Fee | $0 | Total Cost | 0% |
| Estimated Cost Plus Fixed Fee | | | |
| Period of Performance: | May 15, 2025-November 14, 2026 | | | |
| Optional Period 1 (CLIN 1002) Tasks 11-12 | | | | |
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Senior Level Task Lead | 900 | Hours | $0.00 | $0 |
| TA Specialist III | 608 | Hours | $0.00 | $0 |
| TA Specialist II | 608 | Hours | $0.00 | $0 |
| TA Specialist III | 608 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 608 | Hours | $0.00 | $0 |
| Dissemination Associate | 608 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | | | | $0 |
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | | | | $0 |
| Subtotal Materials | $0 | | | $0 |
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | | | | $0 |
| OTHER DIRECT COSTS | | | | |
| Subcontracts | 1 | each | $0 | $0 |
| Consultants - i.e. Experts/Speakers/Presenters | 1 | each | $0 | $0 |
| Travel | 1 | each | $0 | $0 |
| Promotional Materials and Supplies | 1 | Each | $0 | $0 |
| Meeting Space | 1 | Each | $0 | $0 |
| Audio Visual | 1 | Each | $0 | $0 |
| Printing | 1 | Each | $0 | $0 |
| Training Materials | 1 | Each | $0 | $0 |
| Website | 1 | Each | $0 | $0 |
| Subtotal ODC | | | | $0 |
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | | | | $0 |
| Subtotal | | | | $0 |
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | | | | $0 |
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | | | | $0 |
OP2
| Period of Performance: | April 1, 2026 - March 31, 2027 | | | |
| Optional Period 2 (CLIN 2001) Tasks 1-10 | | | | |
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Corp Monitor | 300 | Hours | $0.00 | $0 |
| Project Director | 1920 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1020 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist II | 1312 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 1312 | Hours | $0.00 | $0 |
| Editor | 600 | Hours | $0.00 | $0 |
| Administrative Assistant/Project Support | 1912 | Hours | $0.00 | $0 |
| Dissemination Associate | 1312 | Hours | $0.00 | $0 |
| IT/Web Specialist | 600 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | | | | $0 |
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | | | | $0 |
| MATERIALS | | | | |
| Materials | 1 | Each | $0.00 | $0 |
| Subtotal Materials | 0 | | | $0 |
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | | | | $0 |
| OTHER DIRECT COSTS | | | | |
| Subcontracts | 1 | each | $0.00 | $0 |
| Travel | 1 | each | $0.00 | $0 |
| Subtotal ODC | | | | $0 |
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | | | | $0 |
| Subtotal | | | | $0 |
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | | | | $0 |
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | | | | $0 |
| Period of Performance: | May 15, 2026-November 14, 2027 | | | |
| Optional Period 2 (CLIN 2002) Tasks 11-12 | | | | |
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Senior Level Task Lead | 900 | Hours | | $0 |
| TA Specialist III | 608 | Hours | | $0 |
| TA Specialist III | 608 | Hours | | $0 |
| TA Specialist II | 608 | Hours | | $0 |
| Senior Dissemination Specialist | 608 | Hours | | $0 |
| Dissemination Associate | 608 | Hours | | $0 |
| Subtotal Direct Labor | | | | $0 |
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | | | | $0 |
| Subtotal Materials | $0 | | | $0 |
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | | | | $0 |
| OTHER DIRECT COSTS | | | | |
| Subcontracts | 1 | each | $0 | $0 |
| Consultants - i.e. Experts/Speakers/Presenters | 1 | each | $0 | $0 |
| Travel | 1 | each | $0 | $0 |
| Promotional Materials and Supplies | 1 | Each | $0 | $0 |
| Meeting Space | 1 | Each | $0 | $0 |
| Audio Visual | 1 | Each | $0 | $0 |
| Printing | 1 | Each | $0 | $0 |
| Training Materials | 1 | Each | $0 | $0 |
| Website | 1 | Each | $0 | $0 |
| Subtotal ODC | | | | $0 |
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | | | | $0 |
| Subtotal | | | | $0 |
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | | | | $0 |
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | | | | $0 |
OP3
| Period of Performance: | April 1, 2027-March 31, 2028 | | | |
| Optional Period 3 (CLIN 3001) Tasks 1-10 | | | | |
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Corp Monitor | 300 | Hours | $0.00 | $0 |
| Project Director | 1920 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1020 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist II | 1312 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 1312 | Hours | $0.00 | $0 |
| Editor | 600 | Hours | $0.00 | $0 |
| Administrative Assistant/Project Support | 1912 | Hours | $0.00 | $0 |
| Dissemination Associate | 1312 | Hours | $0.00 | $0 |
| IT/Web Specialist | 600 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | | | | $0 |
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | | | | $0 |
| MATERIALS | | | | |
| Materials | 1 | Each | $0.00 | $0 |
| Subtotal Materials | 0 | | | $0 |
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | | | | $0 |
| OTHER DIRECT COSTS | | | | |
| Subcontracts | 1 | each | $0.00 | $0 |
| Travel | 1 | each | $0.00 | $0 |
| Subtotal ODC | | | | $0 |
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | | | | $0 |
| Subtotal | | | | $0 |
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | | | | $0 |
| Fixed Fee | $0 | Total Cost | 5% | $0 |
| Estimated Cost Plus Fixed Fee | | | | $0 |
| Period of Performance: | May 15, 2027-November 14, 2028 | | | |
| Optional Period 3 (CLIN 3002) Tasks 11-12 | | | | |
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Senior Level Task Lead | 960 | Hours | $0.00 | $0 |
| TA Specialist III | 960 | Hours | $0.00 | $0 |
| TA Specialist III | 960 | Hours | $0.00 | $0 |
| TA Specialist II | 960 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 960 | Hours | $0.00 | $0 |
| Dissemination Associate | 960 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | | | | $0 |
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | | | | $0 |
| MATERIALS | | | | |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| | | | $0 |
| Subtotal Materials | $0 | | | $0 |
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | | | | $0 |
| OTHER DIRECT COSTS | | | | |
| Subcontracts | 1 | each | $0 | $0 |
| Consultants - i.e. Experts/Speakers/Presenters | 1 | each | $0 | $0 |
| Travel | 1 | each | $0 | $0 |
| Promotional Materials and Supplies | 1 | Each | $0 | $0 |
| Meeting Space | 1 | Each | $0 | $0 |
| Audio Visual | 1 | Each | $0 | $0 |
| Printing | 1 | Each | $0 | $0 |
| Training Materials | 1 | Each | $0 | $0 |
| Website | 1 | Each | $0 | $0 |
| Subtotal ODC | | | | $0 |
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | | | | $0 |
| Subtotal | | | | |
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | | | | $0 |
| Fixed Fee | $0 | Total Cost | 5% | $0 |
| Estimated Cost Plus Fixed Fee | | | | $0 |
OP4
| Period of Performance: | April 1, 2028-March 31, 2029 | | | |
| Optional Period 4 (CLIN 4001) Tasks 1-10 | | | | |
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Corp Monitor | 300 | Hours | $0.00 | $0 |
| Project Director | 1920 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1020 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist II | 1312 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 1312 | Hours | $0.00 | $0 |
| Editor | 600 | Hours | $0.00 | $0 |
| Administrative Assistant/Project Support | 1912 | Hours | $0.00 | $0 |
| Dissemination Associate | 1312 | Hours | $0.00 | $0 |
| IT/Web Specialist | 600 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | | | | $0 |
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | | | | $0 |
| MATERIALS | | | | |
| Materials | 1 | Each | $0.00 | $0 |
| Subtotal Materials | $0 | | | $0 |
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | | | | $0 |
| OTHER DIRECT COSTS | | | | |
| Subcontracts | 1 | each | $0.00 | $0 |
| Travel | 1 | each | $0.00 | $0 |
| Subtotal ODC | | | | $0 |
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | | | | $0 |
| Subtotal | | | | $0 |
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | | | | $0 |
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | | | | $0 |
| Period of Performance: | May 15, 2028-August 14, 2029 | | | |
| Optional Period 4 (CLIN 4002) Tasks 11-12 | | | | |
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Senior Level Task Lead | 900 | Hours | $0.00 | $0 |
| TA Specialist III | 608 | Hours | $0.00 | $0 |
| TA Specialist III | 608 | Hours | $0.00 | $0 |
| TA Specialist II | 608 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 608 | Hours | $0.00 | $0 |
| Dissemination Associate | 608 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | | | | $0 |
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | | | | $0 |
| Subtotal Materials | 0 | | | $0 |
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | | | | $0 |
| OTHER DIRECT COSTS | | | | |
| Subcontracts | 1 | each | $0 | $0 |
| Consultants - i.e. Experts/Speakers/Presenters | 1 | each | $0 | $0 |
| Travel | 1 | each | $0 | $0 |
| Promotional Materials and Supplies | 1 | Each | $0 | $0 |
| Meeting Space | 1 | Each | $0 | $0 |
| Audio Visual | 1 | Each | $0.00 | $0 |
| Printing | 1 | Each | $0 | $0 |
| Training Materials | 1 | Each | $0 | $0 |
| Website | 1 | Each | $0 | $0 |
| Subtotal ODC | | | | $0 |
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | | | | $0 |
| Subtotal | | | | $0 |
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | | | | $0 |
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | | | | $0 |
OP5 6 Month Option
| Period of Performance: | March 15, 2029-September 30, 2029 | | | |
| Option Period 5 CLIN 5001 | | | | |
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Corp Monitor | 150 | Hours | $0.00 | $0 |
| Project Director | 1120 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 560 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1,120 | Hours | $0.00 | $0 |
| TA Specialist III | 1,120 | Hours | $0.00 | $0 |
| TA Specialist III | 1,120 | Hours | $0.00 | $0 |
| TA Specialist III | 1,120 | Hours | $0.00 | $0 |
| TA Specialist III | 1,120 | Hours | $0.00 | $0 |
| TA Specialist III | 1,120 | Hours | $0.00 | $0 |
| TA Specialist III | 560 | Hours | $0.00 | $0 |
| TA Specialist III | 560 | Hours | $0.00 | $0 |
| TA Specialist III | 560 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 560 | Hours | $0.00 | $0 |
| Editor | 400 | Hours | $0.00 | $0 |
| Administrative Assistant/Project Support | 560 | Hours | $0.00 | $0 |
| Dissemination Associate | 560 | Hours | $0.00 | $0 |
| IT/Web Specialist | 415 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | | | | $0 |
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | | | | $0 |
| MATERIALS | | | | |
| Materials | 1 | Each | $0.00 | $0 |
| Subtotal Materials | 0 | | | $0 |
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | | | | $0 |
| OTHER DIRECT COSTS | | | | |
| Subcontracts | 1 | each | $0.00 | $0 |
| Travel | 1 | each | $0.00 | $0 |
| Subtotal ODC | | | | $0 |
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | | | | $0 |
| Subtotal | | | | $0 |
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | | | | $0 |
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | | | | $0 |