This document is a Pricing Sheet and contains details related to a federal contract opportunity for the Tribal Home Visiting Resources Institute for Excellence (THRIVE) contract. The contract is to provide technical assistance support for the Tribal Maternal, Infant, and Early Childhood Home Visiting (Tribal MIECHV) Program, administered by the Department of Health and Human Services Administration for Children and Families.
The Pricing Sheet outlines the contract line item numbers (CLINs), periods of performance, labor categories and estimated hours, as well as direct costs for materials, subcontracts, travel, and other direct costs. The total estimated contract value over the base period and five option periods is $0. The contract has a base period from August 15, 2024 to March 31, 2025, followed by five one-year option periods. Pricing is provided at the labor category level for each period.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet Summary
Attachment 3 - Pricing Sheet
| Period | CLIN | Cost | Fixed Fee | Price | Period of Performance |
| BASE | 0001 | $0 | $0 | $0 | August 15, 2024 - March 31, 2025 |
| 0002 | $0 | $0 | $0 | August 15, 2024 - September 30, 2025 | |
| OPTION 1 | 1001 | $0 | $0 | $0 | April 1, 2025 - March 31, 2026 |
| 1002 | $0 | $0 | $0 | May 15, 2025-November 14, 2026 | |
| OPTION 2 | 2001 | $0 | $0 | $0 | April 1, 2026 - March 31, 2027 |
| 2002 | $0 | $0 | $0 | May 15, 2026-November 14, 2027 | |
| OPTION 3 | 3001 | $0 | $0 | $0 | April 1, 2027-March 31, 2028 |
| 3002 | $0 | $0 | $0 | May 15, 2027-November 14, 2028 | |
| OPTION 4 | 4001 | $0 | $0 | $0 | April 1, 2028-March 31, 2029 |
| 4002 | $0 | $0 | $0 | May 15, 2028-August 14, 2029 | |
| OPTION 5 | 5001 | $0 | $0 | $0 | March 15, 2029-September 30, 2029 |
| TOTAL | $0 | $0 | $0 |
Rates
| RATES |
| Labor |
| Category | Base | Option 1 | Option 2 | Option 3 | Option 4 | Option 5 | |
| Corp Monitor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Project Director | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Senior Level Task Lead | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| TA Specialist III | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| TA Specialist II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Senior Dissemination Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Editor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Administrative Assistant/Project Support | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Dissemination Associate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| IT/Web Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Indirects | |||||||
| Fringe | 0% | ||||||
| Labor Overhead | 0% | ||||||
| Material Overhead | 0% | ||||||
| ODC Overhead | 0% | ||||||
| G&A | 0% |
| Fee | ||
| CPFF | 0% |
BASE
| Period of Performance: | August 15, 2024 - March 31, 2025 | |||
| BASE (CLIN 0001) | ||||
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Corp Monitor | 250 | Hours | $0.00 | $0 |
| Project Director | 1,320 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 700 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1,320 | Hours | $0.00 | $0 |
| TA Specialist III | 1,320 | Hours | $0.00 | $0 |
| TA Specialist III | 1,320 | Hours | $0.00 | $0 |
| TA Specialist III | 1,320 | Hours | $0.00 | $0 |
| TA Specialist III | 1,320 | Hours | $0.00 | $0 |
| TA Specialist III | 800 | Hours | $0.00 | $0 |
| TA Specialist III | 800 | Hours | $0.00 | $0 |
| TA Specialist III | 800 | Hours | $0.00 | $0 |
| TA Specialist II | 800 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 800 | Hours | $0.00 | $0 |
| Editor | 455 | Hours | $0.00 | $0 |
| Administrative Assistant/Project Support | 1,320 | Hours | $0.00 | $0 |
| Dissemination Associate | 800 | Hours | $0.00 | $0 |
| IT/Web Specialist | 500 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | $0 | |||
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | $0 |
| MATERIALS | ||||
| Materials | 1 | Each | $0.00 | $0 |
| Subtotal Materials | 0 | $0 | ||
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | $0 |
| OTHER DIRECT COSTS | ||||
| Subcontracts | 1 | each | $0.00 | $0 |
| Travel | 1 | each | $0.00 | $0 |
| Subtotal ODC | $0 | |||
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | $0 |
| Subtotal | $0 | |||
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | $0 | |||
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | $0 |
| Period of Performance: | August 15, 2024 - September 30, 2025 | |||
| BASE CLIN 0002 | ||||
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Senior Level Task Lead | 580 | Hours | $0.00 | $0 |
| TA Specialist III | 480 | Hours | $0.00 | $0 |
| TA Specialist II | 480 | Hours | $0.00 | $0 |
| TA Specialist III | 480 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 480 | Hours | $0.00 | $0 |
| Dissemination Associate | 480 | Hours | $0.00 | $0 |
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| Subtotal Direct Labor | $0 | |||
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | $0 |
| MATERIALS | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| Subtotal Materials | $0 | $0 | ||
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | $0 |
| OTHER DIRECT COSTS | ||||
| Subcontracts | 1 | each | $0 | $0 |
| Consultants - i.e. Experts/Speakers/Presenters | 1 | each | $0 | $0 |
| Travel | 1 | each | $0 | $0 |
| Promotional Materials and Supplies | 1 | Each | $0 | $0 |
| Meeting Space | 1 | Each | $0 | $0 |
| Audio Visual | 1 | Each | $0 | $0 |
| Printing | 1 | Each | $0 | $0 |
| Training Materials | 1 | Each | $0 | $0 |
| Website | 1 | Each | $0 | $0 |
| Subtotal ODC | $0 | |||
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost |
| Subtotal | ||||
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | ||||
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee |
OP1
| Period of Performance: | April 1, 2025 - March 31, 2026 | |||
| Optional Period 1 (CLIN 1001) | ||||
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Corp Monitor | 300 | Hours | $0.00 | $0 |
| Project Director | 1920 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1020 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist II | 1312 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 1312 | Hours | $0.00 | $0 |
| Editor | 600 | Hours | $0.00 | $0 |
| Administrative Assistant/Project Support | 1912 | Hours | $0.00 | $0 |
| Dissemination Associate | 1312 | Hours | $0.00 | $0 |
| IT/Web Specialist | 600 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | $0 | |||
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | $0 |
| MATERIALS | |||
| Materials | 1 | Each | $0 |
| Subtotal Materials | $0 | ||
| Material Overhead | Mat Cost | 0% | $0 |
| Total Materials Cost | $0 |
| OTHER DIRECT COSTS | $0 | |||
| Subcontracts | 1 | each | $0 | |
| Travel | 1 | each | $0 | |
| Subtotal ODC | $0 | |||
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | $0 |
| Subtotal | |||
| G&A | $0 | Subtotal | 0% |
| Total Costs | |||
| Fixed Fee | $0 | Total Cost | 0% |
| Estimated Cost Plus Fixed Fee |
| Period of Performance: | May 15, 2025-November 14, 2026 | |||
| Optional Period 1 (CLIN 1002) | ||||
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Senior Level Task Lead | 900 | Hours | $0.00 | $0 |
| TA Specialist III | 608 | Hours | $0.00 | $0 |
| TA Specialist II | 608 | Hours | $0.00 | $0 |
| TA Specialist III | 608 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 608 | Hours | $0.00 | $0 |
| Dissemination Associate | 608 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | $0 | |||
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | $0 |
| MATERIALS | |
| $0 | |
| $0 | |
| $0 | |
| $0 |
| Subtotal Materials | $0 | $0 | ||
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | $0 |
| OTHER DIRECT COSTS | ||||
| Subcontracts | 1 | each | $0 | $0 |
| Consultants - i.e. Experts/Speakers/Presenters | 1 | each | $0 | $0 |
| Travel | 1 | each | $0 | $0 |
| Promotional Materials and Supplies | 1 | Each | $0 | $0 |
| Meeting Space | 1 | Each | $0 | $0 |
| Audio Visual | 1 | Each | $0 | $0 |
| Printing | 1 | Each | $0 | $0 |
| Training Materials | 1 | Each | $0 | $0 |
| Website | 1 | Each | $0 | $0 |
| Subtotal ODC | $0 | |||
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | $0 |
| Subtotal | $0 | |||
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | $0 | |||
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | $0 |
OP2
| Period of Performance: | April 1, 2026 - March 31, 2027 | |||
| Optional Period 2 (CLIN 2001) | ||||
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Corp Monitor | 300 | Hours | $0.00 | $0 |
| Project Director | 1920 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1020 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist II | 1312 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 1312 | Hours | $0.00 | $0 |
| Editor | 600 | Hours | $0.00 | $0 |
| Administrative Assistant/Project Support | 1912 | Hours | $0.00 | $0 |
| Dissemination Associate | 1312 | Hours | $0.00 | $0 |
| IT/Web Specialist | 600 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | $0 | |||
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | $0 |
| MATERIALS | ||||
| Materials | 1 | Each | $0.00 | $0 |
| Subtotal Materials | 0 | $0 | ||
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | $0 |
| OTHER DIRECT COSTS | ||||
| Subcontracts | 1 | each | $0.00 | $0 |
| Travel | 1 | each | $0.00 | $0 |
| Subtotal ODC | $0 | |||
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | $0 |
| Subtotal | $0 | |||
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | $0 | |||
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | $0 |
| Period of Performance: | May 15, 2026-November 14, 2027 | |||
| Optional Period 2 (CLIN 2002) | ||||
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Senior Level Task Lead | 900 | Hours | $0 | |
| TA Specialist III | 608 | Hours | $0 | |
| TA Specialist III | 608 | Hours | $0 | |
| TA Specialist II | 608 | Hours | $0 | |
| Senior Dissemination Specialist | 608 | Hours | $0 | |
| Dissemination Associate | 608 | Hours | $0 |
| Subtotal Direct Labor | $0 | |||
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | $0 |
| MATERIALS | |
| $0 | |
| $0 |
| Subtotal Materials | $0 | $0 | ||
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | $0 |
| OTHER DIRECT COSTS | ||||
| Subcontracts | 1 | each | $0 | $0 |
| Consultants - i.e. Experts/Speakers/Presenters | 1 | each | $0 | $0 |
| Travel | 1 | each | $0 | $0 |
| Promotional Materials and Supplies | 1 | Each | $0 | $0 |
| Meeting Space | 1 | Each | $0 | $0 |
| Audio Visual | 1 | Each | $0 | $0 |
| Printing | 1 | Each | $0 | $0 |
| Training Materials | 1 | Each | $0 | $0 |
| Website | 1 | Each | $0 | $0 |
| Subtotal ODC | $0 | |||
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | $0 |
| Subtotal | $0 | |||
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | $0 | |||
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | $0 |
OP3
| Period of Performance: | April 1, 2027-March 31, 2028 | |||
| Optional Period 3 (CLIN 3001) | ||||
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Corp Monitor | 300 | Hours | $0.00 | $0 |
| Project Director | 1920 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1020 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist II | 1312 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 1312 | Hours | $0.00 | $0 |
| Editor | 600 | Hours | $0.00 | $0 |
| Administrative Assistant/Project Support | 1912 | Hours | $0.00 | $0 |
| Dissemination Associate | 1312 | Hours | $0.00 | $0 |
| IT/Web Specialist | 600 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | $0 | |||
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | $0 |
| MATERIALS | ||||
| Materials | 1 | Each | $0.00 | $0 |
| Subtotal Materials | 0 | $0 | ||
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | $0 |
| OTHER DIRECT COSTS | ||||
| Subcontracts | 1 | each | $0.00 | $0 |
| Travel | 1 | each | $0.00 | $0 |
| Subtotal ODC | $0 | |||
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | $0 |
| Subtotal | $0 | |||
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | $0 | |||
| Fixed Fee | $0 | Total Cost | 5% | $0 |
| Estimated Cost Plus Fixed Fee | $0 |
| Period of Performance: | May 15, 2027-November 14, 2028 | |||
| Optional Period 3 (CLIN 3002) | ||||
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Senior Level Task Lead | 960 | Hours | $0.00 | $0 |
| TA Specialist III | 960 | Hours | $0.00 | $0 |
| TA Specialist III | 960 | Hours | $0.00 | $0 |
| TA Specialist II | 960 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 960 | Hours | $0.00 | $0 |
| Dissemination Associate | 960 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | $0 | |||
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | $0 |
| MATERIALS | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| $0 | ||||
| Subtotal Materials | $0 | $0 | ||
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | $0 |
| OTHER DIRECT COSTS | ||||
| Subcontracts | 1 | each | $0 | $0 |
| Consultants - i.e. Experts/Speakers/Presenters | 1 | each | $0 | $0 |
| Travel | 1 | each | $0 | $0 |
| Promotional Materials and Supplies | 1 | Each | $0 | $0 |
| Meeting Space | 1 | Each | $0 | $0 |
| Audio Visual | 1 | Each | $0 | $0 |
| Printing | 1 | Each | $0 | $0 |
| Training Materials | 1 | Each | $0 | $0 |
| Website | 1 | Each | $0 | $0 |
| Subtotal ODC | $0 | |||
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | $0 |
| Subtotal | ||||
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | $0 | |||
| Fixed Fee | $0 | Total Cost | 5% | $0 |
| Estimated Cost Plus Fixed Fee | $0 |
OP4
| Period of Performance: | April 1, 2028-March 31, 2029 | |||
| Optional Period 4 (CLIN 4001) | ||||
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Corp Monitor | 300 | Hours | $0.00 | $0 |
| Project Director | 1920 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1020 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1920 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| TA Specialist II | 1312 | Hours | $0.00 | $0 |
| TA Specialist III | 1312 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 1312 | Hours | $0.00 | $0 |
| Editor | 600 | Hours | $0.00 | $0 |
| Administrative Assistant/Project Support | 1912 | Hours | $0.00 | $0 |
| Dissemination Associate | 1312 | Hours | $0.00 | $0 |
| IT/Web Specialist | 600 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | $0 | |||
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | $0 |
| MATERIALS | ||||
| Materials | 1 | Each | $0.00 | $0 |
| Subtotal Materials | $0 | $0 | ||
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | $0 |
| OTHER DIRECT COSTS | ||||
| Subcontracts | 1 | each | $0.00 | $0 |
| Travel | 1 | each | $0.00 | $0 |
| Subtotal ODC | $0 | |||
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | $0 |
| Subtotal | $0 | |||
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | $0 | |||
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | $0 |
| Period of Performance: | May 15, 2028-August 14, 2029 | |||
| Optional Period 4 (CLIN 4002) | ||||
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Senior Level Task Lead | 900 | Hours | $0.00 | $0 |
| TA Specialist III | 608 | Hours | $0.00 | $0 |
| TA Specialist III | 608 | Hours | $0.00 | $0 |
| TA Specialist II | 608 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 608 | Hours | $0.00 | $0 |
| Dissemination Associate | 608 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | $0 | |||
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | $0 |
| MATERIALS | |
| $0 |
| Subtotal Materials | 0 | $0 | ||
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | $0 |
| OTHER DIRECT COSTS | ||||
| Subcontracts | 1 | each | $0 | $0 |
| Consultants - i.e. Experts/Speakers/Presenters | 1 | each | $0 | $0 |
| Travel | 1 | each | $0 | $0 |
| Promotional Materials and Supplies | 1 | Each | $0 | $0 |
| Meeting Space | 1 | Each | $0 | $0 |
| Audio Visual | 1 | Each | $0.00 | $0 |
| Printing | 1 | Each | $0 | $0 |
| Training Materials | 1 | Each | $0 | $0 |
| Website | 1 | Each | $0 | $0 |
| Subtotal ODC | $0 | |||
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | $0 |
| Subtotal | $0 | |||
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | $0 | |||
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | $0 |
OP5 6 Month Option
| Period of Performance: | March 15, 2029-September 30, 2029 | |||
| Option Period 5 CLIN 5001 | ||||
| LABOR | Pool | Unit of Measure | Hourly Rate | Amount |
| Corp Monitor | 150 | Hours | $0.00 | $0 |
| Project Director | 1120 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 560 | Hours | $0.00 | $0 |
| Senior Level Task Lead | 1,120 | Hours | $0.00 | $0 |
| TA Specialist III | 1,120 | Hours | $0.00 | $0 |
| TA Specialist III | 1,120 | Hours | $0.00 | $0 |
| TA Specialist III | 1,120 | Hours | $0.00 | $0 |
| TA Specialist III | 1,120 | Hours | $0.00 | $0 |
| TA Specialist III | 1,120 | Hours | $0.00 | $0 |
| TA Specialist III | 560 | Hours | $0.00 | $0 |
| TA Specialist III | 560 | Hours | $0.00 | $0 |
| TA Specialist III | 560 | Hours | $0.00 | $0 |
| Senior Dissemination Specialist | 560 | Hours | $0.00 | $0 |
| Editor | 400 | Hours | $0.00 | $0 |
| Administrative Assistant/Project Support | 560 | Hours | $0.00 | $0 |
| Dissemination Associate | 560 | Hours | $0.00 | $0 |
| IT/Web Specialist | 415 | Hours | $0.00 | $0 |
| Subtotal Direct Labor | $0 | |||
| Fringe | $0 | DL Cost | 0% | $0 |
| Labor Overhead | $0 | DL Cost | 0% | $0 |
| Total Labor Cost | $0 |
| MATERIALS | ||||
| Materials | 1 | Each | $0.00 | $0 |
| Subtotal Materials | 0 | $0 | ||
| Material Overhead | $0 | Mat Cost | 0% | $0 |
| Total Materials Cost | $0 |
| OTHER DIRECT COSTS | ||||
| Subcontracts | 1 | each | $0.00 | $0 |
| Travel | 1 | each | $0.00 | $0 |
| Subtotal ODC | $0 | |||
| ODC Overhead | $0 | ODC Cost | 0% | $0 |
| Total ODC Cost | $0 |
| Subtotal | $0 | |||
| G&A | $0 | Subtotal | 0% | $0 |
| Total Costs | $0 | |||
| Fixed Fee | $0 | Total Cost | 0% | $0 |
| Estimated Cost Plus Fixed Fee | $0 |
File details come from the government source that posted it. Updated .