The document is a set of architectural and engineering renovation drawings for the Michigan Department of Natural Resources (DNR), specifically for the Cusino Sara/Shingleton Wildlife Office Bunk House Renovations located at E 12340 Highway M-28 West in Shingleton, Michigan. The project involves comprehensive renovations to a bunk house, including kitchen remodeling, bathroom updates, electrical and mechanical system improvements, and various structural modifications. Key renovation elements include relocating cabinets, installing new appliances (refrigerator and electric range to be purchased by DNR), replacing countertops, adding a new pantry unit, updating lighting, installing new ceramic tile flooring, repairing plaster, painting walls and ceilings, and adding safety features like smoke/carbon monoxide detectors.
The drawings, prepared by Sanders & Czapski Associates, LLC, provide detailed plans for a complete interior renovation, with specific focus on second-floor spaces including kitchen, bathrooms, and bedrooms. The project involves mechanical, electrical, and plumbing upgrades, with detailed specifications for equipment replacement, fixture installations, and structural modifications. The file includes comprehensive technical drawings with elevation details, mechanical plans, electrical layouts, and plumbing specifications. The project appears to be funded by the DNR and involves modernizing and improving the functionality of the existing bunk house facility, with an emphasis on updating infrastructure, improving living conditions, and potentially enhancing energy efficiency and safety standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ar ch ite ct ur e l an ds ca pe ar ch ite ct ur e h ist or ic pr es er va tio n
C ou nt ry
L an e
M ar qu et te , M ich iga n
Ph on e:
.4
.2 o r 9
.2
.3 ww w.
S an de rs
-C za ps ki.
co m
N
Ken Stamp
N
Keynotes:
1. Remove existing 48" base cabinet and 48" wall cabinet and relocate to opposite wall.
2. Existing 18" and 36" base cabinets to remain.
3. Existing 18" wall cabinets to remain.
4. Existing 42" base cabinet and 42" wall cabinet to remain. Remove door on base cabinet to suit corner unit arrangement.
5. Relocated 48" base cabinet and 48" wall cabinet.
6. New 18" wide x 24" deep x 6'-9" high casework pantry unit (to match existing wood cabinets). Contractor to verify height.
7. New plastic laminate countertop.
8. New soffit. New range exhaust hood vent to run through soffit.
9. New range exhaust hood with light, vent to exterior.
10. New two-compartment stainless steel sink and new faucet.
11. New electric range - to be purchased by DNR.
12. New refrigerator - to be purchased by DNR.
13. Repair broken window glass.
14. New lighting in Kitchen.
15. Repair damaged plaster in Bedroom #1.
16. Paint walls and ceilings in Kitchen, Hallway, Bath, Bedrooms #1 and #2.
Repair any damaged plaster as required.
17. Existing water closet to remain. Remove to install new tile flooring and reinstall.
18. Existing cabinet heater to remain. Remove to install new tile and re-install.
19. Existing vanity base re-installed with new vanity top and new faucet.
20. New 60" x 30" shower base. New ceramic tile on walls in shower.
21. Install new exhaust fan with light that exhausts to the outside. Both fan and light shall turn on with a single switch.
22. Existing 1'-10" wide x 2'-8" high vinyl casement window to remain.
23. Install new ceramic tile flooring in Bathroom.
24. Install new flooring in Kitchen and Hallway - Bid Alternate #1.
25. New smoke/carbon monoxide detectors (hard wired). Three required.
26. Existing telephone to remain.
27. Remove and relocate fire extinguisher.
28. New countertop with open space below.
29. New marble threshold.
30. 15" towel bar.
31. 24" towel bar.
32. Coat / robe hooks (4).
33. Soap dish.
34. Tempered glass shower enclosure and door.
ar ch ite ct ur e l an ds ca pe ar ch ite ct ur e h ist or ic pr es er va tio n
C ou nt ry
L an e
M ar qu et te , M ich iga n
Ph on e:
.4
.2 o r 9
.2
.3 ww w.
S an de rs
-C za ps ki.
co m
N
Demolition Keynotes:
1. Remove plastic laminate countertops.
2. Remove 48" base cabinet unit.
3. Remove 48" wall cabinet unit.
4. Remove sink and faucet.
5. Existing refrigerator and electric range to be removed by the owner.
6. Remove the (unvented) range exhaust hood.
7. Remove and relocate the wall mounted fire extinguisher.
8. Remove surface mounted light fixtures.
9. Remove and replace vanity top and faucets. Existing vanity base will be re-used. Remove vanity base to install new flooring and re-install.
10. Remove bathtub/shower unit.
11. Remove 12"x12" vinyl floor tile.
12. Remove and relocate the 30" wall cabinet
13. Remove 12x12 floor tile in Kitchen and Hallway - Bid Alternate #1
14. Remove tile in Bathroom shower compartment only.
4'-2" high tile on other walls to remain.
ar ch ite ct ur e l an ds ca pe ar ch ite ct ur e h ist or ic pr es er va tio n
C ou nt ry
L an e
M ar qu et te , M ich iga n
Ph on e:
.4
.2 o r 9
.2
.3 ww w.
S an de rs
-C za ps ki.
co m
File details come from the government source that posted it. Updated .