751_25407.AGY_Drawings_SeulChoix_KeepersHouse.pdf

PDF 3 MB Posted

Attached to
751/25407. AGY; Seul Choix - Roof Re-shingle
Solicitation number
RFQ 171 250000000615 2
Issued by
Shiawassee County, Michigan

About this file

This is a set of architectural drawings for a roof reshingle project at Seul Choix Keeper's House and Boathouse, owned by the Michigan Department of Natural Resources (MDNR) at Indian Lake State Park in Manistique, Michigan. The project involves removing existing asphalt and metal shingles down to the existing sheathing and installing new roofing materials on two structures. The Keeper's Residence roof work encompasses an estimated 3,360 square feet and includes removal of existing asphalt, metal shingles, felt underlayment, flashing, and drip edge, followed by application of 15-pound felt, ice and water shield membrane at eaves and valleys, new shingles, drip edge on the entire perimeter, and color-matched flashing around two chimneys and one vent pipe outlet. The Boathouse roof work covers an estimated 703 square feet and requires similar removal and replacement procedures, with installation of color-matched metal drip edge around the entire perimeter. Both projects require the contractor to verify exact measurements and roof penetration locations, maintain a caution-taped work area to restrict public access, secure all tools and materials daily, and conduct final ground cleanup of all fasteners and debris.

The contractor assumes full responsibility for all measurements and materials procurement. The drawings indicate general roof configurations and are dated August 11, 2025, with project contact information provided by Dennis Green (MDNR) and Julia Cogger, PLA, at the Indian Lake State Park location. No pricing terms, set-asides, incumbent information, funding sources, or contract award dates are specified in this drawing document, which serves as the technical specification and site plan reference for potential bidders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

North

SEUL CHOIX : KEEPER’S HOUSE + BOATHOUSE ROOF RESHINGLE 05.12.2025

REGIONAL MAP

LAKE SUPERIOR

LAKE

MICHIGAN

LAKE

HURON

DULUTH

MINNEAPOLIS

MADISON

MILWAUKEE

GREEN BAY

GRAND RAPIDS

LANSING

DETROIT

PROJECT

SITE

MARQUETTE

HOUGHTON

SAULT STE. MARIE

HWY

LOCATION

PROJECT SITE

OWNER: MDNR

INDIAN LAKE STATE PARK

8970 CO HWY 442

MANISTIQUE, MI 49854

PROJECT CONTACT

DENNIS GREEN

906-341-2355

JULIA COGGER, PLA

517-420-9749

905 S SEUL CHOIX POINT ROAD

GULLIVER, MI 49840

DTMB FILE NO:

751/25407.AGY

SHEET 1 OF 3

28'

28'

12' 12'

18'

15'

10'

11'

10'

8'-6"

29'-6"

26'

11'

9'

6'

10'-2"

North

SEUL CHOIX : KEEPER’S RESIDENCE ROOF

Existing Chimneys

NOTES:

• REMOVE EXISTING ASPHALT AND METAL SHINGLES AND FELT

UNDERLAYMENT DOWN TO THE EXISTING SHEATHING.

• REMOVE EXISTING FLASHING AND DRIP EDGE.

• APPLY NEW LAYER OF 15 LB FELT OVER ENTIRE ROOF. INSTALL NEW LAYER

OF ICE AND WATER SHIELD MEMBRANE AT ALL EAVES AND VALLEYS

EXTENDING FROM EAVE TO A POINT 36” INSIDE OF EXISTING EXTERIOR

WALL LINE.

• INSTALL NEW SHINGLES.

• INSTALL NEW DRIP EDGE ON ENTIRE PERIMETER OF ROOF.

• INSTALL COLOR MATCHED FLASHING IN ALL VALLEYS AND AROUND ALL

ROOF PERFORATIONS INCLUDING TWO CHIMNEYS AND VENT PIPE OUTLET.

• THE ENTIRE WORK AREA SHOULD BE CAUTION TAPED/FENCED OFF SO THE

PUBLIC DOES NOT ENTER.

• ALL TOOLS, LADDERS, SCAFFOLDING, DEBRIS, ETC. SHALL BE SECURELY

STORED AT THE END OF EACH WORKDAY.

• THE GROUNDS SHALL BE CLEANED OF ALL FASTENERS AND DEBRIS AT THE

END OF THE PROJECT.

• CONTRACTOR IS RESPONSIBLE FOR ALL MEASUREMENTS AND MATERIALS.

ROOF PLAN INDICATES GENERAL ROOF

CONFIGURATION ONLY. IT WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO

VERIFY EXACT MEASUREMENTS AND

LOCATION OF ROOF PENETRATIONS.

08.11.2025

ESTIMATED ROOF AREA: 3,360SF

SHEET 2 OF 3

This section of roof currently has metal shingles and will be removed and replaced with shingles matching the remainder of the roof.

17’

37’

North

SEUL CHOIX : BOATHOUSE ROOF

NOTES:

• REMOVE EXISTING ASPHALT AND FELT

UNDERLAYMENT DOWN TO THE EXISTING SHEATHING.

• REMOVE EXISTING FLASHING AND DRIP EDGE.

• APPLY NEW LAYER OF 15 LB FELT OVER ENTIRE ROOF.

INSTALL NEW LAYER OF ICE AND WATER SHIELD

MEMBRANE AT ALL EAVES AND VALLEYS EXTENDING

FROM EAVE TO A POINT 36” INSIDE OF EXISTING

EXTERIOR WALL LINE.

• INSTALL NEW SHINGLES.

• INSTALL NEW COLOR MATCHED METAL DRIP EDGE

ON ENTIRE PERIMETER OF ROOF.

ROOF PLAN INDICATES GENERAL ROOF

CONFIGURATION ONLY. IT WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO

VERIFY EXACT MEASUREMENTS AND

LOCATION OF ROOF PENETRATIONS.

KEEPER’S HOUSE

BOATHOUSE

PARKING

North

08.11.2025

ESTIMATED ROOF AREA: 703SF

SHEET 3 OF 3