751-20119.JBB_Dorsey Lake Road Bridge_Plans 8-11-2023.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ 171 230000000712 2
- Issued by
- Alger County, Michigan
About this file
This document is a comprehensive set of construction plans for the Dorsey Lake Road Bridge Replacement project prepared by Coleman Engineering Company for the State of Michigan Department of Transportation (MDOT). The project involves the complete removal and replacement of an existing wood bridge structure spanning Dorsey Creek, with work beginning at project station 1+64.00 and ending at station 4+25.49. The bridge deck will be constructed of 15-inch Douglas Fir-Larch No. 1 lumber, with the superstructure utilizing glue-laminated rails and timber caps. The project includes demolition of the existing wood bridge deck, abutments, rails, curbs, and girders, along with removal and disposal of the existing road base to an 8-inch depth below the proposed road surface. Additionally, the contractor must perform grading, install erosion control measures including silt fencing and sandbag cofferdams, construct new abutments with stone riprap protection, and complete roadway improvements with aggregate base and topsoil restoration. The project area encompasses multiple wetland disturbances totaling approximately 2,388 square feet, requiring coordination with regulatory agencies.
The contractor bears full responsibility for traffic control in accordance with the Michigan Manual on Uniform Traffic Control Devices, including provision of warning signs, barricades, and temporary street closure notifications to local emergency services. All utilities shown on the plans are approximate, and the contractor must call Miss Dig at 1-800-482-7171 a minimum of three full working days prior to excavation to protect underground utilities in compliance with Michigan Public Act 174, 2013. The contractor is responsible for site visits to verify existing conditions, secure construction easements on private property outside the right-of-way, protect and maintain all existing utilities, and coordinate with utility companies regarding any necessary relocations. All timber must be treated with copper naphthenate preservative in accordance with AWPA UC4C specifications, and all hardware must meet applicable ASTM standards with galvanized coatings. Construction shall conform to current MDOT Standard Specifications and Plans unless otherwise noted, with the contractor required to submit shop drawings for all bridge components prior to fabrication.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE: ALL UTILITIES SHOWN ARE APPROXIMATE AND MAY BE INCOMPLETE.
FOR PROTECTION OF UNDERGROUND UTILITIES, AND IN CONFORMANCE
WITH THE PUBLIC ACT 174, 2013, THE CONTRACTOR SHALL CALL TOLL FREE
1-800-242-8511 A MINIMUM OF THREE FULL WORKING DAYS, EXCLUDING
SATURDAYS, SUNDAYS, AND HOLIDAYS, BUT NO MORE THAN 14 CALENDAR
DAYS, PRIOR TO BEGINNING EACH EXCAVATION IN AREAS WHERE PUBLIC
UTILITIES HAVE NOT BEEN PREVIOUSLY LOCATED. ALL "DIGGERS HOTLINE"
PARTICIPATING MEMBERS WILL THUS BE ROUTINELY NOTIFIED.
UTILITY LOCATIONS SHOWN ARE APPROXIMATE AND DOES NOT RELIEVE THE
CONTRACTOR FROM NOTIFYING UTILITY OWNERS WHO MAY OR MAY NOT BE
PART OF THE "DIGGERS HOTLINE" ALERT SYSTEM. THE CONTRACTOR IS
RESPONSIBLE FOR DETERMINING AND CONTACTING ALL UTILITIES,
INCLUDING ANY NOT SHOWN IN THESE PLANS PRIOR TO BEGINNING ANY
CONSTRUCTION.
N O
TE
S
AN
D
LE
GE
N D
LE
GE
N D
F:
\D
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
LE
G
EN
D.
DW
G
FI
LE
N
AM
E
3/
1/
0:
A M
PL
O
T
DA
TE
PL
O
T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
DF
DR
AW
N
B Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
CO
LE
M
AN
E N
G
IN
EE
RI
N G
C O
M
PA
N Y
IR
O
N M
O U
N
TA
IN
IR
O
N W
O O
D
G
RE
EN
B
AY
w w w
.c ol em an
-e ng in ee rin g.
co m
GENERAL PLAN NOTES
TRAFFIC CONTROL NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL RELATED
TO CONSTRUCTION OF THE PROJECT. ALL TRAFFIC CONTROL SHALL BE
PERFORMED IN ACCORDANCE WITH THE LATEST EDITION OF THE MICHIGAN
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES OR MAINTAINING TRAFFIC
SPECIAL PROVISIONS.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ERECTION AND
PLACEMENT OF ALL THE REQUIRED SIGNING AS OUTLINED IN THE ABOVE
MENTIONED MANUAL. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL
SUCH OTHER TRAFFIC CONTROL DEVICES WHICH WILL ADEQUATELY WARN
AND ALERT DRIVERS OF CONSTRUCTION HAZARDS.
3. IN ADDITION TO THE INDICATED WARNING SIGNS AND BARRICADES, TYPE III
BARRICADES WITH AND WITHOUT LIGHTS, SHALL BE PLACED AT PROJECT
LIMITS, OR AS DIRECTED BY THE ENGINEER, IN ACCORDANCE WITH THE
LATEST EDITION OF THE MICHIGAN MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES.
23. GRADING:
24. MATERIALS & TREATMENT:
25. MISCELLANEOUS:
26. CONSTRUCTION NOTES:
1. OWNER OR ENGINEER WILL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR THE MEANS, METHODS, TECHNIQUES, SEQUENCES OR
PROCEDURES REQUIRED OF THE CONTRACTOR TO PERFORM THEIR WORK.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY SECURING AND PROTECTING THE PROJECT SITE. THIS MAY INCLUDE , BUT IS NOT LIMITED TO, CONSTRUCTION PERIMETER FENCING, SIGNAGE, AND PROTECTION OF EXCAVATIONS.
3. THE UTILITIES SHOWN ON THE PLANS ARE INDICATED IN ACCORDANCE WITH AVAILABLE RECORDS (ALL UTILITIES MAY NOT BE SHOWN). THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING EXACT LOCATIONS AND ELEVATIONS OF ALL UTILITIES FROM THE OWNERS OF THE RESPECTIVE UTILITIES. ALL UTILITIES SHALL BE
NOTIFIED AT LEAST 72 HOURS PRIOR TO EXCAVATION.
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH ALL EXISTING CONDITIONS. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND OTHERWISE VERIFY ALL DIMENSIONS AND EXISTING CONSTRUCTION CONDITIONS INDICATED AND/OR SHOWN ON THE DRAWINGS. SHOULD ANY ERROR OR INCONSISTENCY EXIST, THE CONTRACTOR SHALL NOT PROCEED WITH THE WORK AFFECTED UNTIL REPORTING TO ENGINEER
FOR CLARIFICATION OR CORRECTION.
5. ALL OBSTRUCTIONS MAY NOT BE SHOWN ON PLANS. THE CONTRACTOR SHALL VISIT THE SITE AND DETERMINE THE ACTUAL CONDITIONS WITH REGARD TO THE EXISTENCE OF FENCES, DRIVEWAYS, TREES, SIDEWALKS, CULVERTS, UTILITIES AND OTHER MISCELLANEOUS OBSTACLES THAT MAY INTERFERE.
6. ANY INSPECTION BY THE CITY, COUNTY, STATE, FEDERAL, OR ENGINEER SHALL NOT, IN ANY WAY, RELIEVE THE CONTRACTOR FROM ANY OBLIGATION TO PERFORM THE WORK IN STRICT COMPLIANCE WITH THE APPLICABLE CODES, REGULATIONS AND PROJECT CONTRACT DOCUMENTS.
7. ALL WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH CURRENT MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION AND CURRENT MDOT STANDARD PLANS UNLESS SHOWN OTHERWISE IN THIS PLAN SET OR ADDRESSED IN THE TECHNICAL SPECIFICATIONS.
8. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THIS PROJECT IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS INCLUDING SUCH INCIDENTALS AS MAY BE NECESSARY TO MEET THE INTENT OF THE PROJECT CONTRACT DOCUMENTS BUT NOT SPECIFICALLY CALLED OUT THEREIN, ALL APPLICABLE AGENCY REQUIREMENTS, AND ANY OTHER WORK AS MAY BE NECESSARY TO PROVIDE A COMPLETED PROJECT.
9. THE CONTRACTOR SHALL PROTECT AND MAINTAIN ALL EXISTING UTILITIES. ANY DAMAGE TO EXISTING UTILITIES, WHETHER THE UTILITY WAS SHOWN OR NOT ON
THESE PLANS SHALL BE REPAIRED/REPLACED AT THE CONTRACTOR'S EXPENSE.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY OR UTILITIES CAUSED DURING CONSTRUCTION AND SHALL COORDINATE ACTIVITIES WITH UTILITY COMPANIES FOR GAS, TELEPHONE & ELECTRICAL U.G. LOCATIONS & ANY RELOCATIONS AS NECESSARY.
11. FOR PROTECTION OF UNDERGROUND UTILITIES AND IN CONFORMANCE WITH PUBLIC ACT 174, 2013, THE CONTRACTOR SHALL CALL TOLL FREE 1.800.482.7171 A MINIMUM OF THREE FULL WORKING DAYS, EXCLUDING SATURDAYS, SUNDAYS & HOLIDAYS, PRIOR TO BEGINNING EACH EXCAVATION IN AREAS WHERE PUBLIC UTILITIES HAVE NOT BEEN PREVIOUSLY LOCATED. ALL PARTICIPATING "MISS DIG" MEMBERS WILL BE THUS ROUTINELY NOTIFIED. THIS DOES NOT RELIEVE THE CONTRACTOR FROM NOTIFYING UTILITY OWNERS WHO MAY NOT BE PART OF THE "MISS DIG" ALERT SYSTEM.
12. THE CONTRACTOR SHALL COORDINATE WITH THE TELEPHONE & CABLE UTILITY COMPANY FOR CONSTRUCTION NEAR OR CROSSING THE FIBER OPTIC CABLES OR OTHER BURIED PHONE WIRES. CONTRACTOR SHALL HAND DIG NEAR THE CABLE/WIRE AND CONFORM TO ALL PRECAUTIONS SET FORTH BY THE UTILITY FOR FIBER
OPTIC CABLES. WORK NEAR FIBER OPTIC CABLES SHALL NOT BE PAID FOR SEPARATELY.
13. IF DIMENSIONS ARE IN QUESTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING DIMENSION OR OBTAINING CLARIFICATION FROM THE ENGINEER
BEFORE CONTINUING CONSTRUCTION.
14. WHEN CONTRADICTIONS OCCUR BETWEEN PLANS & SPECIFICATIONS, CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE ENGINEER
BEFORE CONTINUING WITH CONSTRUCTION.
15. DURING CONSTRUCTION, DISPOSAL OF EXCESS MATERIAL SHALL NOT BE PERMITTED IN A WETLAND OR ADJACENT AREAS, UNLESS PERMITS ARE OBTAINED FROM
THE APPROPRIATE REGULATORY AGENCIES.
16. CONTRACTOR SHALL NOTIFY THE LOCAL FIRE DEPARTMENT, AMBULANCE SERVICES & ANY OTHER AFFECTED SERVICES 48 HOURS IN ADVANCE OF ANY TEMPORARY STREET CLOSURE & DURATION. UNDER NO CIRCUMSTANCES SHALL A STREET BE CLOSED OVERNIGHT WITHOUT APPROVAL.
17. UNLESS OTHERWISE NOTED ON THE PLANS OR SPECIFICATIONS, REMOVED ITEMS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND DISPOSED OF OFF-SITE.
18. THE CONTRACTOR SHALL KEEP AN APPROVED SET OF PLANS ON THE PROJECT SITE AT ALL TIMES. ANY ALTERATION OR VARIANCE FROM THESE PLANS, EXCEPT MINOR FIELD ADJUSTMENTS NEEDED TO MEET EXISTING FIELD CONDITIONS, SHALL FIRST BE APPROVED BY ENGINEER AND WHEN NECESSARY THOSE AGENCIES AFFECTED BY THE ALTERATION. ANY VARIATIONS FROM THESE PLANS SHALL BE DOCUMENTED ON THE CONSTRUCTION PRINTS AND TRANSMITTED TO ENGINEER.
19. ALL EXISTING PUBLIC LAND SURVEY CORNERS, PROPERTY CONTROLLING CORNERS AND ALIGNMENT CONTROL POINTS SHALL BE LOCATED AND PRESERVED AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. IT MAY BE NECESSARY TO PLACE OR ADJUST MONUMENT BOXES AS REQUIRED.
20. ROW LINES SHOWN ARE APPROXIMATE AND SHOULD BE USED FOR INFORMATION ONLY.
21. SEEDING MIX TYPE SHALL BE TDS.
22. THE CONTRACTOR SHALL NOT PARK ANY VEHICLES OR STORE ANY MATERIALS ON PUBLIC RECREATIONAL PROPERTY UNLESS COORDINATED WITH THE MDNR.
1.800.482.7171
M I SS D I G
QUANTITIES SHOWN ARE FOR INFORMATION PURPOSES ONLY
- DECK TO BE 15” DOUGLAS FIR-LARCH, NO. 1, S1S.
- BRIDGE RAILPOST TO BE DOUGLAS FIR-LARCH, DENSE SELECT STRUCTURAL.
- GLU-LAM RAIL TO BE DOUGLAS FIR, COMB. SYMBOL 24F-V8, DF/DF.
- ABUTMENT CAPS TO BE DOUGLAS FIR-LARCH, NO. 1.
- CURBS & SCUPPERS TO BE DOUGLAS FIR-LARCH, NO. 1.
- BALANCE OF TIMER TO BE DOUGLAS FIR-LARCH, IN ACCORDANCE WITH DESIGN REQUIREMENTS.
- ALL TIMBER IS ROUGH UNLESS OTHERWISE NOTED.
- COPPER NAPHTHENATE (2%) SOLUTION IN HEAVY OIL SHALL BE FURNISHED FOR FIELD TREATING OF WOOD. ALL ABRASIONS AND FIELD CUTS – APPROVED BY C.O.R. –
SHALL BE CAREFULLY TRIMMED AND GIVEN THREE BRUSH COATS OF THE FIELD TREATMENT SOLUTION. WHERE APPROVED FIELD DRILLING OF BOLT OR NAIL HOLES IS REQUIRED, THE HOLES SHALL BE FILLED WITH PRESERVATIVE PRIOR TO INSERTING THE FASTENERS.
- ALTHOUGH ALL PRACTICAL PRE-FRAMING WILL BE DONE PRIOR TO TREATING, SOME CUTTING AND DRILLING WILL BE REQUIRED IN THE FIELD AND FIELD
TREATMENT WILL BE REQUIRED.
- TIMBER PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH AWPA UC4C SPECIFICATIONS. ALL TIMBER SHALL BE COPPER NAPHTHENATE OR ALTERNATE OIL
BASED APPROVED PRODUCT TREATED UNLESS NOTED OTHERWISE.
- HIGH STRENGTH (A449 DOME HEAD BOLTS (3/4” DIA. x 26”) DO NOT HAVE FINS UNDER THE HEAD AT THE SHANK, AND ARE TO BE USED AT THE CURB TO DECK
LOCATION.
- ALL TIMBER TO BE CUT TO EXACT LENGTH, DRESSED TO SIZE REQUIRED AND ALL PRACTICAL FRAMING TO BE DONE PRIOR TO TREATMENT.
- ALL DECK PLANKS SHALL BE PREDRILLED PRIOR TO TREATMENT.
- ALL PLANK FOR DECK PANELS SHALL BE PRECISION END TRIMMED TO LENGTH WITH ¼” UNDERLENGTH & NO OVERLENGTH TOLERANCE PERMITTED.
- DECK PANELS SHALL BE ASSEMBLED WITH 3/8” DIAMETER RING SHANK DOWELS. ALL DOWELS ARE TO BE SIMULTANEOUSLY DRIVEN WITH EQUAL FORCE USING A
MECHANICAL PRESS THE FULL LENGTH OF THE DECK, ENSURING ALL HEADS ARE FLUSH WITH THE SURFACE OF THE TIMBER PLANK. MULTIPLE IMPACT TOOLS ARE
NOT TO BE USED TO SEAT DOWELS BECAUSE OF POTENTIAL FOR WOOD FIBER RUPTURE.
- DECK PANELS WILL BE DELIVERED TO JOB SITE AFTER BEING FULLY ASSEMBLED AT FABRICATION PLANT.
- ALL HARDWARE TO MEET ASTM A307-97 GALVANIZED TO A153. ALL HIGH STRENGTH HARDWARE TO MEET ASTM A325 OR A449 GALVANIZED TO A153. ALL
STRUCTURAL STEEL TO MEET ASTM A36, GALVANIZED TO A123. SMALL DIAMETER HARDWARE NOT AVAILABLE IN HOT DIPPED GALVANIZED COATINGS SHALL
MEET ICC AC 257.
- DOWEL LAMINATED DECK: PLANK “A” IS PLACED FIRST IN ITS FINAL POSITION ON THE TIMBER CAPS. NEXT DRILL THE 11/16” DIA. HOLES THRU THE PANEL AND INTO THE TIMBER CAP IN EACH END OF THE PANEL AT THE LOCATION SHOWN AND FASTEN THE ¾” DIA. DOME HEAD DRIVE SPIKES. NEXT PLACE PANEL “C” SO THAT ITS UPPER SPLICE BLOCK IS DIRECTLY OVER THE LOWER SPLICE BLOCK ON PANEL “A” AND DRAW TIGHT TOGETHER. THEN DRILL THE 9/16” DIA. HOLES THRU THE LOWER SPLICE BLOCK USING THE PREDRILLED HOLES IN THE UPPER SPLICE AS A GUIDE AND DRIVE THE 5/8” DIA. DOME HEAD DRIVE SPIKES. THEN DRILL HOLES THRU THE PANEL AND INTO THE TIMBER CAP AND FASTEN THE ¾” DIA. DOME HEAD DRIVE THEREAFTER, PLACE “B” IN THE SAME MANNER, ENSURING ALL PANELS ARE DRAWN TIGHT TOGETHER BEFORE ANY
FASTENING OCCURS.
- ALL HOLES DRILLED IN THE FIELD WHERE SPIKES ARE USED ARE TO BE 1/16” SMALLER THAN SPIKE SIZE.
- HOLES DRILLED FOR ¾” DIA. LAG BOLTS ARE TO BE 9/16” DIA. FOR THE THREADED PORTION OF THE LAG BOLT AND 13/16” DIA. FOR THE SHANK.
- ANY NUT OR MACHINE BOLT HEAD IN DIRECT CONTACT WITH TIMBER TO HAVE ONE PLATE WASHER BETWEEN NUT & TIMBER, OR BOLT HEAD & TIMBER.
- ANY NUT OR MACHINE BOLT HEAD IN DIRECT CONTACT WITH STEEL TO HAVE ONE CUT WASHER BETWEEN NUT & STEEL, OR BOLT HEAD & STEEL.
- SET THREADS ON ALL BOLTS AT NUT WITH A CENTER PUNCH AFTER TIGHTENING.
- ABUTMENTS TO BE BACKFILLED WITH A CLEAN GRANULAR FILL.
- ALL TIMBER CUT OR DRILLED IN THE FIELD SHALL BE TREATED WITH AN APPROVED PRESERVATIVE.
- CONSTRUCTION REQUIREMENTS SHALL CONFORM TO MDOT STATE SPECIFICATIONS UNLESS OTHERWISE NOTED IN SPECIAL PROVISIONS.
- SUBMIT SHOP DRAWING FOR ALL BRIDGE COMPONENTS. SHOW ALL DIMENSIONS AND FABRICATION DETAILS FOR ALL CUT OR BORED TIMBER, FIELD DRILLING OF HOLES SHALL NOT BE ALLOWED UNLESS OTHERWISE
NOTED ON THE PLANS.
- ALL GRADING, COMBINATIONS, AND SIZE REFER TO DOUGLAS FIR UNLESS SHOWN OTHERWISE ON THE PLANS. THE DESIGN VALUES FOLLOW LRFD SECTION 8.4.1. THESE ARE THE MINIMUM REQUIREMENTS. OTHER
SPECIES MAY BE USED WITH APPROVAL FROM THE OWNER AND ENGINEER AT NO ADDITIONAL COST TO THE OWNER.
- ALL PILING IS TO BE IN ACCORDANCE WITH CURRENT MDOT STATE SPECIFICATIONS.
- ALL DOUGLAS FIR-LARCH TO BE GRADED PER WCLIB STANDARD GRADING RULES.
- ALL HOLES DRILLED FOR BOLTS ARE TO BE 1/16” LARGER THAN BOLT SIZE.
F:
\D
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
EX
IS
TI
N G
.D W
G
FI
LE
N
AM
E
3/
1/
0:
A M
PL
O
T
DA
TE
PL
O
T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
DF
DR
AW
N
B Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
CO
LE
M
AN
E N
G
IN
EE
RI
N G
C O
M
PA
N Y
IR
O
N M
O U
N
TA
IN
IR
O
N W
O O
D
G
RE
EN
B
AY
w w w
.c ol em an
-e ng in ee rin g.
co m
EX
IS
TI
N
G
EX
IS
IT
IN
G
BR
ID
GE
DE
M
O
LI
TI
O
N P
LA
N
EXISTING WOOD BRIDGE DECK, ABUTMENTS, RAIL, CURB AND GIRDERS
TO BE REMOVED AND DISPOSED OF BY CONTRACTOR.
NOTE:
CONTRACTOR TO ENSURE THAT NO DEBRIS
IS ALLOWED TO BE DISCHARGED INTO THE
WATER DURING CONSTRUCTION
REMOVE AND DISPOSE OF EXISTING ROAD BASE,
8" DEPTH BELOW PROPOSED ROAD SURFACE.
WETLAND BOUNDARY
EDGE OF
EX. GRAVEL
EDGE OF
EX. GRAVEL
WETLAND BOUNDARY
60' RIGHT-OF-WAY
60' RIGHT-OF-WAY
CENTERLINE OF DORSEY LAKE RD
20100 40
W
E S
N
DO
RS
EY
C
RE
EK
NOTE:
CONTRACTOR TO PROVIDE SIGNAGE FOR BOTH
DIRECTIONS FOR 'ROAD CLOSED: BRIDGE OUT'
AS PER MUTCD GUIDELINES. INSTALL
'BRIDGE OUT 3 MILES AHEAD' SIGN AT M-94
INTERSECTION. ENSURE OUT OF MDOT ROW
TO AVOID NEED FOR MDOT PERMIT.
EDGE OF
WATER
EDGE OF
WATER
EDGE OF
WATER
EDGE OF
WATER
NOTE:
AREAS OUTSIDE OF THE RIGHT-OF-WAY ARE
PRIVATE LANDS, CONTRACTOR IS RESPONSIBLE
FOR SECURING A CONSTRUCTION EASEMENT
FROM THE PRIVATE LANDOWNER IF WORK IS
PERFORMED OUTSIDE OF THE ROW.
CLEARING LIMITS
CLEARING LIMITS
TYPE III BARRICADES
STAGGERED
TYPE III BARRICADES
STAGGERED
PC
: 3
+8 3.
PT
: 4
+5 0.
F:
\D
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
ER
O
SI
O N
.D W
G
FI
LE
N
AM
E
3/
1/
0:
A M
PL
O
T
DA
TE
PL
O
T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
DF
DR
AW
N
B Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
CO
LE
M
AN
E N
G
IN
EE
RI
N G
C O
M
PA
N Y
IR
O
N M
O U
N
TA
IN
IR
O
N W
O O
D
G
RE
EN
B
AY
w w w
.c ol em an
-e ng in ee rin g.
co m
ER
O
SI
O
N
ER
O
SI
O N
C O
N
TR
O L
PL
ANCENTERLINE OF DORSEY LAKE RD
WETLAND BOUNDARY
60' RIGHT-OF-WAY
SANDBAG COFFERDAM
MIN 3FT. HEIGHT
60' RIGHT-OF-WAY
EDGE OF WATER
WETLAND DISTURBANCE
813 SF
WETLAND DISTURBANCE
873 SF
20100 40
W
E S
N
SLOPE INTERCEPT
SLOPE INTERCEPT
AGGREGATE SURFACE
WETLAND BOUNDARY
DO
RS
EY
C
RE
EKEROSION CONTROL, SILT FENCE
EROSION CONTROL, SILT FENCE
TYPICAL SILT FENCE DETAIL
NOT TO SCALE
NOTE:
AREAS OUTSIDE OF THE RIGHT-OF-WAY ARE
PRIVATE LANDS, CONTRACTOR IS RESPONSIBLE
FOR SECURING A CONSTRUCTION EASEMENT
FROM THE PRIVATE LANDOWNER IF WORK IS
PERFORMED OUTSIDE OF THE ROW.
EDGE OF WATER
EDGE OF WATER
EDGE OF WATER
WETLAND DISTURBANCE
379 SF
WETLAND DISTURBANCE
323 SF
100.12'145.41'
14.00'
14.00'
EDGE OF
EX. GRAVEL
EDGE OF
EX. GRAVEL
RIPRAP, PLAIN*
RIPRAP, PLAIN*
RIPRAP TO BE A COMBINATION OF
BOTH HEAVY AND PLAIN IN ORDER
TO FILL IN VOIDS.
AGGREGATE SURFACE
BEGIN PROJECT
STA 1+64.00
END PROJECT
STA 4+25.49
EDGE OF ROAD
EDGE OF ROAD
SLOPE INTERCEPT
PC
: 3
+8 3.
PT
: 4
+5 0.
F:
\D
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
SI
TE
P
LA
N
.D W
G
FI
LE
N
AM
E
3/
1/
0:
A M
PL
O
T
DA
TE
PL
O
T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
DF
DR
AW
N
B Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
CO
LE
M
AN
E N
G
IN
EE
RI
N G
C O
M
PA
N Y
IR
O
N M
O U
N
TA
IN
IR
O
N W
O O
D
G
RE
EN
B
AY
w w w
.c ol em an
-e ng in ee rin g.
co m
SI
TE
P
LA
N
PR
O
PO
SE
D
BR
ID
GE
P
LA
N
BEGIN PROJECT
STA 1+64.00 END PROJECT
STA 4+25.49
AGGREGATE SURFACE
CENTERLINE OF DORSEY LAKE RD
WETLAND BOUNDARY
WETLAND BOUNDARY
EDGE OF
EX. GRAVEL
EDGE OF
EX. GRAVEL
60' RIGHT-OF-WAY
60' RIGHT-OF-WAY
20100 40
W
E S
N
SLOPE INTERCEPT
SLOPE INTERCEPT
DO
RS
EY
C
RE
EK
EDGE OF WATER
EDGE OF WATER
EDGE OF WATER
EDGE OF WATER
NOTE:
TAPER PROPOSED ROADWAY TO
PROPOSED WIDTH OVER 20 FEET
ON EACH END.
NOTE:
AREAS OUTSIDE OF THE RIGHT-OF-WAY ARE
PRIVATE LANDS, CONTRACTOR IS RESPONSIBLE
FOR SECURING A CONSTRUCTION EASEMENT
FROM THE PRIVATE LANDOWNER IF WORK IS
PERFORMED OUTSIDE OF THE ROW.
100.12'145.41' 14.00'
14.00'
WETLAND DISTURBANCE
813 SF
WETLAND DISTURBANCE
323 SF
WETLAND DISTURBANCE
379 SF
WETLAND DISTURBANCE
873 SF
OM-3L
OM-3R
RIPRAP, PLAIN*
RIPRAP, PLAIN*
RIPRAP TO BE A COMBINATION OF
BOTH HEAVY AND PLAIN IN ORDER
TO FILL IN VOIDS.
OM-3R (36" x 12"), 3 SFT TYPE IIIB, 1-3LB, WOOD POST 4" x 6" (14 FT)
OM-3L (36" x 12"), 3 SFT TYPE IIIB, 1-3LB, WOOD POST 4" x 6" (14 FT)
NOTE:
DIMENSIONS ARE APPROXIMATE.
CONTRACTOR RESPONSIBLE FOR
FINAL DIMENSIONS.
AGGREGATE SURFACE
NOTE:
SIGNS SHALL NOT INFRINGE ON
EDGE OF LANE
1+25.00 2+00.00 3+00.00 4+00.00 4+75.00
.8
.5
.7
.7
.2
.8
.5
.5
.8
.6
.7
.8
2+00 3+00 4+00
-1.80%
3.99%
ST
A
1+
.0
EL
9.
ST
A
4+
.4
EL
9.
VP
C
ST
A
2+
.0
VP
C
EL
0.
VP
I S
TA
+5 0.
VP
I E L
.5
VP
T
ST
A
3+
.0
VP
T
EL
1.
VCL = 100.00
K = 17.28
F:
\D
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
DE
SI
G
N .D
W G
FI
LE
N
AM
E
3/ 1/
0:
A
M
PL
O T
DA
TE
PL
O T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
DF
DR
AW
N
B Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
CO
LE
M
AN
E N
G
IN
EE
RI
N G
C O
M
PA
N Y
IR
O
N M
O U
N
TA
IN
IR
O
N W
O O
D
G
RE
EN
B
AY
w w w
.c ol em an
-e ng in ee rin g.
co m
DE
SI
GN
PR
O
PO
SE
D
PR
O
FI
LE
( IN FEET )
GRAPHIC SCALE
PROPOSED BRIDGE
DECK SURFACE
EXISTING BRIDGE
DECK SURFACE
EXISTING SURFACE
WEST ABUTMENT
STA 3+10
ELEV = 1031.45
EAST ABUTMENT
STA 3+26
ELEV = 1031.16
PROPOSED SURFACE
EXISTING TYPICAL SECTION
SCALE: NONE
STA. 1+64 TO STA. 3+10
STA. 3+24 TO STA. 4+25.49
VARIES
5.0' - 6.5' VARIES
EX. GRAVEL
DORSEY LAKE RD.
CONSTR.
CENTERLINE
EX. SUBBASE
VAR.
VARIES
VARIES
7' 7'
LANE LANE
2.0%
2H:1V (TYP)
PROPOSED CROWN POINT
(POINT OF ROTATION)
PROPOSED TYPICAL SECTION
SCALE: NONE
STA. 1+64 TO STA. 3+10
STA. 3+24 TO STA 4+25.49
EXISTING
GROUND
IN FILLIN CUT
VARIES
5.0' - 6.5'
EX. GRAVEL
VARIESVARIES
2.0%
2H:1V (TYP)
VAR.
DORSEY LAKE RD.
CONSTR.
CENTERLINE
AGGREGATE BASE 23A, 8-INCH
TOP SOIL, SEED,
FERTILIZER, AND
MULCH BLANKET
SUBBASE, 12-INCH
TOP SOIL, SEED,
FERTILIZER, AND
MULCH BLANKET
F:
\D
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
TY
PI
CA
LS
.D
W G
FI
LE
N
AM
E
3/ 1/
0:
A
M
PL
O T
DA
TE
PL
O T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
DF
DR
AW
N
B Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
CO
LE
M
AN
E N
G
IN
EE
RI
N G
C O
M
PA
N Y
IR
O
N M
O U
N
TA
IN
IR
O
N W
O O
D
G
RE
EN
B
AY
w w w
.c ol em an
-e ng in ee rin g.
co m
TY
PI
CA
LS
TY
PI
CA
L
SE
CT
IO
N
S
2+17
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
1030.46
0.00
1030.34
6.00
1030.25 8.27
1028.80
11.17
1030.46
0.00
1030.34 -6.00
1030.25 -8.27
1029.43 -9.91
2.0% 2.0:1
2.0%
2.0:1
2+55
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
1031.19
0.00
1031.07
6.00
1030.98 8.27
1028.72 12.78
1031.19
0.00
1031.07
-6.00
1030.98 -8.27
1029.18
-11.87
2.0%
2.0:1
2.0%
2.0:1
2+83
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
1031.19
0.00
1031.07 6.00
1030.98 8.27
1029.26 11.71
1031.19
0.00
1031.07 -6.00
1030.98 -8.27
1028.37
-13.49
2.0% 2.0:1
2.0%
2.0:1
F:
\D
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
DE
SI
G
N .D
W G
FI
LE
N
AM
E
3/ 1/
0:
A
M
PL
O T
DA
TE
PL
O T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
DF
DR
AW
N
B Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
CO
LE
M
AN
E N
G
IN
EE
RI
N G
C O
M
PA
N Y
IR
O
N M
O U
N
TA
IN
IR
O
N W
O O
D
G
RE
EN
B
AY
w w w
.c ol em an
-e ng in ee rin g.
co m
CR
O
SS
S
EC
TI
O N
S
HE
ET
XS
EC
TI
O
N S
10 FT
3+50
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
1030.06 0.00
1029.94 6.00
1029.85 8.27
1030.06 0.00
1029.94 -6.00
1029.85
-8.27
2.0%2.0%
3+78
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
1029.56
0.00
1029.44 6.00
1029.34 8.27
1028.72
9.52
1029.56
0.00
1029.44 -6.00
1029.34 -8.27
1029.19
-8.58
2.0% 2.0:1
2.0% 2.0:1
4+09
0 10 20 30 40 50 60 700-10-20-30-40-50-60-70
1029.00
0.00
1028.88 5.96
1028.79 8.23
1029.00
0.00
1028.88 -6.04
1028.79
-8.32
2.0%2.0%
CR
O
SS
S
EC
TI
O N
S
HE
ET
F:
\D
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
DE
SI
G
N .D
W G
FI
LE
N
AM
E
3/ 1/
0:
A
M
PL
O T
DA
TE
PL
O T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
DF
DR
AW
N
B Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
CO
LE
M
AN
E N
G
IN
EE
RI
N G
C O
M
PA
N Y
IR
O
N M
O U
N
TA
IN
IR
O
N W
O O
D
G
RE
EN
B
AY
w w w
.c ol em an
-e ng in ee rin g.
co m
XS
EC
TI
O
N S
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
DE
TA
IL
S.
DW
G
FI
LE
N
AM
E
3/
1/
0:
A M
PL
O
T
DA
TE
PL
O
T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
JL
B
DR
AW
N B
Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
DE
TA
IL
S
GE
N
ER
AL
P
LA
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
DE
TA
IL
S.
DW
G
FI
LE
N
AM
E
3/
1/
0:
A M
PL
O
T
DA
TE
PL
O
T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
JL
B
DR
AW
N B
Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
DE
TA
IL
S
EL
EV
AT
IO
N A
N D
PI
LE
L
AY
O U
T
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
DE
TA
IL
S.
DW
G
FI
LE
N
AM
E
3/
1/
0:
A M
PL
O
T
DA
TE
PL
O
T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
JL
B
DR
AW
N B
Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
DE
TA
IL
S
AB
U
TM
EN
T
DE
TA
IL
S
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
DE
TA
IL
S.
DW
G
FI
LE
N
AM
E
3/
1/
0:
A M
PL
O
T
DA
TE
PL
O
T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
JL
B
DR
AW
N B
Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
DE
TA
IL
S
SU
PE
RS
TR
U
CT
U
RE
D
ET
AI
LS
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
DE
TA
IL
S.
DW
G
FI
LE
N
AM
E
3/
1/
0:
A M
PL
O
T
DA
TE
PL
O
T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
JL
B
DR
AW
N B
Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
DE
TA
IL
S
RA
IL
A N
D
CU
RB
D
ET
AI
LS
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
DE
TA
IL
S.
DW
G
FI
LE
N
AM
E
3/
1/
0:
A M
PL
O
T
DA
TE
PL
O
T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
JL
B
DR
AW
N B
Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
DE
TA
IL
S
SU
BS
U
RF
AC
E
EX
PL
O
RA
TI
O
SI
GN
D
ET
AI
LS
DE
TA
IL
S
F:
\D
AT
A\
CA
D
PR
O
JE
CT
S\
M
IC
H
IG
AN
S
TA
TE
O
F _D
TM
B
- D O
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
RE
PL
AC
EM
EN
T\
DW
G \2
8_
DE
TA
IL
S2 .D
W G
FI
LE
N
AM
E
3/ 1/
0:
A
M
PL
O T
DA
TE
PL
O T
BY
DA
N
IE
L
FR
EE
M
AN
ST
AT
E O
F M
IC
HI
GA
N
D
TM
B
DRAWING NO.
DA
TE
:CE
C
SU
RV
EY
ED
B Y:
CH
EC
KE
D
BY
DF
DR
AW
N
B Y:
AO
CA
D
PR
O
JE
CT
CA
D
DR
AW
IN
G:
CA
D
3/
1/
PR
O
JE
CT
DO
RS
EY
L
AK
E
RO
AD
B
RI
DG
E
SH
EE
T N
AM
E:
CO
LE
M
AN
E N
G
IN
EE
RI
N G
C O
M
PA
N Y
IR
O
N M
O U
N
TA
IN
IR
O
N W
O O
D
G
RE
EN
B
AY
w w w
.c ol em an
-e ng in ee rin g.
co m
File details come from the government source that posted it. Updated .