751-20119.JBB_ Dorsey Lake Rd Bridge Addendum #1.pdf
PDF 313 KB Posted
- Solicitation number
- RFQ 171 230000000712 2
- Issued by
- Alger County, Michigan
About this file
This is Addendum No. 1 to a bridge replacement project issued by the Michigan Department of Natural Resources (MDNR) in partnership with the Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division. The addendum pertains to the Dorsey Lake Road Bridge Replacement project in Rock River Township, Alger County, Michigan, and was issued on August 30, 2023. A mandatory pre-bid meeting was held on August 22, 2023, at 8:00 a.m. EDT via Microsoft Teams. Attendance at this pre-bid meeting was mandatory for bidders, and the attendance record is attached to the addendum. Eleven representatives from nine firms and two state agencies attended the virtual meeting, including personnel from Coleman Engineering, Payne & Dolan, Spence Brothers, FA Industrial, Triest Forest Products, Smith Construction, and Grand River Construction.
This addendum serves to amend, expand, and modify the contract documents for the Dorsey Lake Road Bridge Replacement project. All provisions contained in this addendum become part of the contract documents with the same force and effect as if originally incorporated. Contractors are required to list all addenda by number on their bid form to ensure conformity. Any deletions, additions, substitutions, or revisions referenced in the addendum include all labor, materials, methods, and modifications necessary for complete performance of the work. This addendum consists of two pages and does not contain specific pricing terms, set-asides, or funding information within the document itself.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
File No. 751/20119.JBB Michigan Department of Natural Resources
Dorsey Lake Road Bridge Replacement Rock River Township (Alger County), Michigan 49885
August 30, 2023
Contractor shall list all addenda by number on the bid form to ensure conformity in the bid.
Plans, specifications and/or proposals are herein amended, expanded and/or modified, as hereinafter described, and become a part of the contract documents with the same force and effect as if incorporated, therein, originally. Any contrary provisions contained, or referred to, in the plans and/or specifications, shall remain applicable unless overridden by this Addendum.
Revised or contrary provisions herein shall not affect any other part of the contract documents and any deletions, additions, substitutions and/or revisions mentioned, shall include all labor, materials, methods, modifications, etc., required for complete performance of the work.
This Addendum No. 1 consists of 2 pages.
MANDATORY PRE-BID MEETING
Mandatory pre-bid meeting attendance record is attached to this addendum.
END OF ADDENDUM NO. 1
Attachment:
Mandatory pre-bid meeting attendance record
DTMB-0441 (R 19.02)
MEETING ATTENDANCE RECORD
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration
Design and Construction Division
PROJECT DESCRIPTION/LOCATION DATE TIME
FILE NUMBER CONTRACT NUMBER MEETING PLACE
PLEASE PRINT YOUR NAME FIRM YOU REPRESENT EMAIL ADDRESS TELEPHONE NUMBER
Jeff Barsch
Sharon Conley Michael Brodeur Scott Nowack
Derek Collar Zach Lange
Ted Nelson Mike Mottes Matt Beaupied John Daavettila
Colin Zieman
DTMB
DNR
DNR
Coleman Engineering Coleman Engineering
Payne & Dolan Spence Brothers FA Industrial Triest Forest Products Smith Construction Grand River Construction barschj@michigan.gov conleys2@michigan.gov brodeurm@michigan.gov snowack@coleman-engineering.com dcollar@coleman-engineering.com zlange@walbecgroup.com tednelson@spencebrothers.com mbeaupied87@gmail.com johnd@smith49855.net czieman@grandriverconstruction.com
906-251-0727
517-284-5855 906-201-1090 906-282-5946
906-869-1041 906-458-8167 231-357-5208 906-265-2100 906-235-4919 906-235-2097
517-240-9660
8-22-2023 8:00 A.M. EDT
751/20119.JBB Virtual Pre-Bid Meeting via Microsoft Teams
MDNR Dorsey Lake Road Bridge Replacement, Alger County, MI m.mottes@fais.build
File details come from the government source that posted it. Updated .