751-15248.SMD - Wilson SP Beach House Roof - BID DWGS - PT3.pdf
PDF 2 MB Posted
- Solicitation number
- RFQ 171 210000000500 4
- Issued by
- Clare County, Michigan
About this file
This file consists of construction design and engineering drawings prepared by MacMillan Associates Consulting Engineers for the Department of Natural Resources, specifically for the Wilson State Park Beach House Roof Replacement & Restoration project located in Harrison, Michigan. The project, identified by contract number 751/15248.SMD, involves comprehensive roof framing plans, structural details, and electrical demolition and revision plans dated September 2021 at the 90% design review phase. The scope of work includes the replacement and restoration of the roof structure utilizing wood trusses spaced at 2-foot on-center intervals, roof sheathing installation, timber beam repairs, and post base replacements. The project incorporates structural engineering designs conforming to the 2015 Michigan Building Code, with specified roof snow loads of 34 PSF for sloped roofs, wind uplift design criteria of 115 MPH exposure D, and detailed requirements for dimensional lumber framing, plywood sheathing, and wood truss fabrication by an approved supplier.
The electrical work component encompasses the demolition of existing electrical panels and equipment, installation of new lighting control systems, conduit routing for interior and exterior applications, and branch circuit reconfiguration. The project specifies equipment standards including THHN wiring in EMT conduit for interior spaces and metal rigid conduit for exterior areas, with all work to comply with the 2017 National Electric Code, 2015 Michigan Building Code, and 2017 State of Michigan Electrical Code. The State of Michigan Department of Technology, Management and Budget, Design and Construction Division, under the direction of Adam P. Lach, RA, Director of State Facilities Administration, is overseeing the project. The design firm contact is WTA Architects located in Saginaw, Michigan, with coordinating engineer services from the contact address in Bay City, Michigan.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOF FRAMING PLAN
1/4"=1'-0"
NORTH
SHEET NUMBERPROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET TITLE
PRELIMINARY
NOT FOR CONSTRUCTION
COPYRIGHT 2021C
Saginaw, Michigan 48607 100 S Jefferson Ave, Suite 601
WTAARCH.COM
ARCHITE SCT
DATENO. REVISION
PROJECT TITLE
51023
INDEX NO.
751/15248.SMD
FILE NO.
00412
CONTRACT NO.
(989) 894-4300 F (989) 894-9930 www.macmillanassociates.com
714 EAST MIDLAND STREET BAY CITY, MICHIGAN 48706
MacMILLAN ASSOCIATES
CONSULTING ENGINEERS
DEPARTMENT OF NATURAL RESOURCES
WILSON STATE PARK
BEACH HOUSE
ROOF REPLACEMENT & RESTORATION:
HARRISON, MICHIGAN
2015104
SEPT, 2021
989 752 8107
P L U R I B U E
S U N U M
C I R C U M S P I C E
S I Q U EREI S PENI NSUL AM A MOE NA M
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
9/3/21PHASE 500 90% REVIEW
ROOF FRAMING PLAN,
DETAILS, NOTES AND
SCHEDULE
DFR
S2.01
GENERAL
1. VERIFY DIMENSIONS BEFORE COMMENCING WORK. REPORT DISCREPANCIES TO THE ARCHITECT.
2. VERIFY OPENINGS IN THE FRAMING PLANS WITH THE ARCHITECTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS.
3. ALL WORK SHALL CONFORM TO MICHIGAN BUILDING CODE 2015.
4. DESIGN LOADS
A. DESIGNED IN ACCORDANCE WITH MICHIGAN BUILDING CODE 2015.
B. ROOF SNOW LOAD: GROUND SNOW LOAD PG = 40 PSF
SLOPED ROOF SNOW LOAD, PF = 34 PSF
SNOW EXPOSURE FACTOR, CE = 1.0
SNOW LOAD IMPORTANCE FACTOR, I = 1.0
THERMAL FACTOR, CT = 1.2
UNBALANCED SNOW LOAD, SEE DIAGRAM THIS SHEET
WOOD FRAMING
1. DIMENSIONAL FRAMING MATERIAL SHALL BEAR THE GRADE MARK OF AN ALSC APPROVED
AGENCY, KILN DRIED, AND HAVE THE FOLLOWING MINIMUM STRESS GRADE:
2x4: SPRUCE-PINE-FIR, CONSTRUCTION GRADE OR BETTER.
2x6 AND LARGER: HEM-FIR #2 OR BETTER.
2. ROOF RAFTERS ANCHORED TO CONTINUOUS PLATES WITH ONE SIMPSON H3 ANCHOR UNLESS
NOTED OTHERWISE.
3. WOOD TO BE IN CONTACT WITH CONCRETE, MASONRY, OR GRADE SHALL BE PRESSURE TREATED.
PLYWOOD SHEATHING
1. PLYWOOD/OSB FOR ROOF DECK SHALL BE 5/8" THICK APA RATED SHEATHING.
2. ROOF SHEATHING FASTENED WITH 8D COMMON NAILS AT 6” O.C. AT PANEL EDGES AND
INTERMEDIATE SUPPORTS UNLESS NOTED OTHERWISE.
3. PANELS SHALL BE LAID IN A STAGGERED PATTERN, CONTINUOUS OVER TWO SPANS.
WOOD TRUSSES
1. WOOD TRUSSES SHALL BE DESIGNED AND FABRICATED PER TRUSS PLATE INSTITUTE, INC.
SPECIFICATIONS.
2. DESIGN LOADS FOR TRUSSES SHALL BE:
TOP CHORD LIVE LOAD - 34 PSF (SEE DIAGRAM THIS SHEET FOR UNBALANCED SNOW LOAD)
TOP CHORD DEAD LOAD - 15 PSF
BOTTOM CHORD DEAD LOAD - 5 PSF
BOTTOM CHORD LIVE LOAD - 5 PSF
TOP CHORD WIND UPLIFT - DESIGN IN ACCORDANCE WITH 2015 MICHIGAN BUILDING CODE 115 MPH, EXPOSURE D. DEPENDENT ON EFFECTIVE WIND AREA AND ZONE. LOADS SHALL BE COMBINED PER
2015 MICHIGAN BUILDING CODE LOAD COMBINATIONS.
3. SHOP DRAWINGS FOR TRUSSES SHALL BE PREPARED BY THE SUPPLIER AND SUBMITTED TO THE
ARCHITECT/ENGINEER FOR APPROVAL. SHOP DRAWINGS SHALL BE PREPARED UNDER THE
SUPERVISION AND SHALL BE CERTIFIED BY A REGISTERED PROFESSIONAL ENGINEER IN THE
STATE WHERE THE PROJECT IS LOCATED.
4. TRUSSES SHALL BE ANCHORED TO SUPPORTS WITH ONE SIMPSON H2.5A ANCHOR EACH END
UNLESS NOTED OTHERWISE.
5. LIMIT OVERHANG MEMBER DEFLECTION TO L/180.
6. LATERAL WEB BRACING DESIGN AND CONNECTIONS BY TRUSS MANUFACTURER.
7. TRUSSES SHALL BE DESIGNED FOR MAXIMUM BEARING PRESSURE OF 405 PSI.
8. TEMPORARY BRACING TO BE CONTRACTORS RESPONSIBILITY. CONFORM TO ALL APPLICABLE
CODES AND STANDARDS. INTERNAL TEMPORARY BRACING SHALL REMAIN AS PERMANENT
BRACING.
MARK SIZE
WH1 (2) 2x6
MIN BEARING
(1) STUD EACH END
2x 2x
2x 2x
RIDGE
G T
GT
GT
2x
2x
R
ID
G E
2x 2x
2x2x
GTGT
GT
VALL
EYVALLEY
H1 H1 H1 H1
H
H
H
H
H1 H1 H1 H1
H
H
H
H
H
H
S2.01
LEGEND
H1 - WOOD HEADER - SEE SCHEDULE THIS SHEET
GT - GIRDER TRUSS
VALLEY FRAMING AT 2'-0" O.C.,
SEE DETAIL 1/S2.01
5/8" APA RATED SHEATHING
WOOD TRUSSES AT 2'-0" O.C.
2x 2x
5/8" APA RATED SHEATHING
WOOD TRUSSES AT 2'-0" O.C.
WOOD TRUSSES AT 2'-0" O.C.
WOOD TRUSSES AT 2'-0" O.C.
S2.01
S2.01
EX WOOD ROOF FRAMING
UNBALANCED SNOW LOAD DIAGRAM
NOTE:
DISTRIBUTION SHALL BE
LC RIDGE
10 PSF
50 PSF
4'-6"
34 PSF
APPLIED ON EITHER SIDE
OF THE RIDGE.
UNBALANCED LOAD
TRUSS BEARING
3/4"=1'-0"
(1)SIMPSON H2.5A HANGER
WOOD TRUSSES AT 2'-0" O.C.
ROOF SHEATHING,
SEE PLAN
EXISTING 2x6 STUD WALL
VERIFY EXISTING
(2)2x TOP PLATE
S2.01
PLAN VIEW - BEAM SPLICE
3/4"=1'-0"
3"
1'-0"
TIMBER BEAM, PRESSURE
TREATED POLE GRADE
RED PINE. FIELD TREAT
CUTS WITH BORATE RODS
CUT OFF EXCESS BOLT,
TOUCH -UP GALVANIZED
EXISTING TIMBER BEAM
SQUARE GALVANIZED
WASHER, SUNK IN
MATCH EXISTING
(4)3/4" DIAMETER,
GALVANIZED BOLTS (NOT
THREADED ROD). 3" O.C.
EACH WAY
S2.01
TIMBER POST BASE REPAIR
3/4"=1'-0"
EXISTING CONCRETE
SLAB ON GRADE8" LONG GALVANIZED
CONCRETE SCREWS AT 8" O.C.
EXISTING STEEL PLATE
TO BE REMOVED
SEALANT
EXISTING TIMBER POST
3 LOCATIONS
REMOVE LOWER
PORTION OF EXISTING
POST AND GROUT.
REPLACE WITH STUD
TREATED POLE GRADE
RED PINE, 4" THICK
BORATE ROD AT 8" O.C.
SEALANT
REMOVE EXISTING GROUT
EXISTING CONCRETE
FOOTING (ASSUMED)
5/16" DIAMETER GRK RSS
SCREW 8" LONG AT 8" O.C.
AT PERIMETER OF POST
4" 4"
S2.01
POST BASE REPLACEMENT
3/4"=1'-0"
EXISTING CONCRETE
SLAB ON GRADE
8" LONG GALVANIZED
CONCRETE SCREWS AT 8" O.C.
SEALANT
EXISTING TIMBER POST
1 LOCATION
(6)#4 BARS, EMBED 6"
INTO EXISTING
CONCRETE WITH HILTI
HY-200 EPOXY
EXISTING CONCRETE
FOOTING (ASSUMED)
4"
EXISTING MASONRY WALL
#3 TIES AT 8" O.C. VERTICAL
CONCRETE PIER, MATCH
DIAMETER OF EXISTING
TIMBER POST
REMOVE EXISTING
ROTTED POST UP TO 2"
ABOVE TOP OF ADJACENT
MASONRY WALL
S2.01
FIRST FLOOR ELECTRICAL DEMOLITION PLAN
NORTH
EX
PANEL A
EX
PANEL B
EX 60A
DISCONNECT
EX UGE
EX
O
VH
D
EX RISER MAST
EX
EX
EX
EX
EX
SHEET NUMBERPROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET TITLE
PRELIMINARY
NOT FOR CONSTRUCTION
COPYRIGHT 2021C
Saginaw, Michigan 48607 100 S Jefferson Ave, Suite 601
WTAARCH.COM
ARCHITE SCT
DATENO. REVISION
PROJECT TITLE
51023
INDEX NO.
751/15248.SMD
FILE NO.
00412
CONTRACT NO.
(989) 894-4300 F (989) 894-9930 www.macmillanassociates.com
714 EAST MIDLAND STREET BAY CITY, MICHIGAN 48706
MacMILLAN ASSOCIATES
CONSULTING ENGINEERS
DEPARTMENT OF NATURAL RESOURCES
WILSON STATE PARK
BEACH HOUSE
ROOF REPLACEMENT & RESTORATION:
HARRISON, MICHIGAN
2015104
SEPT, 2021
989 752 8107
P L U R I B U E
S U N U M
C I R C U M S P I C E
S I Q U EREI S PENI NSUL AM A MOE NA M
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
9/3/21PHASE 500 90% REVIEW
FIRST FLOOR ELECTRICAL
DEMOLITION PLAN
BAV
E1.01
DEMOLITION KEYED NOTES
EC SHALL DISCONNECT POWER AND ALL
BRANCH WIRING TO THE OLD PANEL B TO THEN
COMPLETELY REMOVE THE PANEL. EC SHALL
FIELD VERIFY ALL EXISTING BRANCH CIRCUITS
STILL BEING UTILIZED TO THEN RELOCATE
THOSE CIRCUITS OVER TO PANEL A.
EC SHALL DISCONNECT AND REMOVE THE
EXISTING LIGHT FIXTURE. REMOVE THE
ASSOCIATED LOCAL SWITCHES AND WIRING
BACK TO THE PANEL.
EC SHALL DISCONNECT AND REMOVE THE
EXISTING 60AMP FEED AS SHOWN. REMOVE
ALL ASSOCIATED CONDUIT, WIRING, POLES,
MASTS ETC BACK TO PANEL.
M
EX METER
2 2 2
2 2
EX
PANEL A NEW LC1
FIRST FLOOR ELECTRICAL REVISED PLAN
1/4"=1'-0"
NORTH
SHEET NUMBERPROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET TITLE
PRELIMINARY
NOT FOR CONSTRUCTION
COPYRIGHT 2021C
Saginaw, Michigan 48607 100 S Jefferson Ave, Suite 601
WTAARCH.COM
ARCHITE SCT
DATENO. REVISION
PROJECT TITLE
51023
INDEX NO.
751/15248.SMD
FILE NO.
00412
CONTRACT NO.
(989) 894-4300 F (989) 894-9930 www.macmillanassociates.com
714 EAST MIDLAND STREET BAY CITY, MICHIGAN 48706
MacMILLAN ASSOCIATES
CONSULTING ENGINEERS
DEPARTMENT OF NATURAL RESOURCES
WILSON STATE PARK
BEACH HOUSE
ROOF REPLACEMENT & RESTORATION:
HARRISON, MICHIGAN
2015104
SEPT, 2021
989 752 8107
P L U R I B U E
S U N U M
C I R C U M S P I C E
S I Q U EREI S PENI NSUL AM A MOE NA M
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
9/3/21PHASE 500 90% REVIEW
FIRST FLOOR ELECTRICAL
REVISED PLAN
BAV
E2.01
M
EX METER
A A
A A
SM
SM
SM
SM
A
A
AA
A
AA
BW
BW
BW
BBBB A-9
KEYED NOTES
EC SHALL UTILIZE THE UPPER RIDGE BEAM TO
ROUTE ALL NEW CONDUITS ACROSS THE OPEN
PAVILION AREA TO THE TOILET AND BASEMENT
AREAS.
INSTALL THE NEW LIGHTING CONTROL PANEL
HERE AS SHOWN TO CONTROL THE EXTERIOR
LIGHTS.
GENERAL NOTES
1. EC SHALL INSTALL ALL NEW THHN WIRING IN
EMT CONDUIT IN ALL INTERIOR SPACES.
2. EC SHALL INSTALL ALL NEW THHN WIRING IN
METAL RIGID CONDUIT IN ALL EXTERIOR
AREAS ALONG WITH THE OPEN PAVILION
AREA AND THE BASEMENT STORAGE AREA.
3. ALL CONDUIT SHALL BE ROUTED
CONCEALED WITHIN WALL AND ABOVE
CEILINGS WHERE POSSIBLE.
4. WHERE CONDUIT HAS TO BE INSTALLED
ALONG THE OPEN TIMBER STRUCTURE THE
CONDUIT SHALL BE INSTALLED ON THE
UPPER SIDE OF THE LOG IN AN EFFORT TO
CONCEAL THE CONDUIT AS MUCH AS
POSSIBLE. CONDUIT SHALL ALSO BE
PAINTED TO MATCH TIMBER STAIN COLOR.
2GFI
A-11
A-13
A-12
A-12
A-12
GFI
A-14
BASEMENT FLOOR ELECTRICAL REVISED PLAN
NORTH
SHEET NUMBERPROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET TITLE
PRELIMINARY
NOT FOR CONSTRUCTION
COPYRIGHT 2021C
Saginaw, Michigan 48607 100 S Jefferson Ave, Suite 601
WTAARCH.COM
ARCHITE SCT
DATENO. REVISION
PROJECT TITLE
51023
INDEX NO.
751/15248.SMD
FILE NO.
00412
CONTRACT NO.
(989) 894-4300 F (989) 894-9930 www.macmillanassociates.com
714 EAST MIDLAND STREET BAY CITY, MICHIGAN 48706
MacMILLAN ASSOCIATES
CONSULTING ENGINEERS
DEPARTMENT OF NATURAL RESOURCES
WILSON STATE PARK
BEACH HOUSE
ROOF REPLACEMENT & RESTORATION:
HARRISON, MICHIGAN
2015104
SEPT, 2021
989 752 8107
P L U R I B U E
S U N U M
C I R C U M S P I C E
S I Q U EREI S PENI NSUL AM A MOE NA M
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
9/3/21PHASE 500 90% REVIEW
BASEMENT FLOOR
ELECTRICAL DEMOLITION
AND REVISED PLAN
BAV
E2.02
DEMOLITION KEYED NOTES
EC SHALL DISCONNECT POWER AND ALL
BRANCH WIRING TO THE OLD PANEL B TO THEN
COMPLETELY REMOVE THE PANEL. EC SHALL
FIELD VERIFY ALL EXISTING BRANCH CIRCUITS
STILL BEING UTILIZED TO THEN RELOCATE
THOSE CIRCUITS OVER TO PANEL A.
EC SHALL DISCONNECT AND REMOVE THE
EXISTING LIGHT FIXTURE. REMOVE THE
ASSOCIATED LOCAL SWITCHES AND WIRING
BACK TO THE PANEL.
BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN
1/4"=1'-0"
NORTH
2 2
S
A A
A
A
A
GFI
A-14A-12
SHEET NUMBERPROJECT NUMBER
PROJECT DATE
CHECKED BY
SHEET TITLE
PRELIMINARY
NOT FOR CONSTRUCTION
COPYRIGHT 2021C
Saginaw, Michigan 48607 100 S Jefferson Ave, Suite 601
WTAARCH.COM
ARCHITE SCT
DATENO. REVISION
PROJECT TITLE
51023
INDEX NO.
751/15248.SMD
FILE NO.
00412
CONTRACT NO.
(989) 894-4300 F (989) 894-9930 www.macmillanassociates.com
714 EAST MIDLAND STREET BAY CITY, MICHIGAN 48706
MacMILLAN ASSOCIATES
CONSULTING ENGINEERS
DEPARTMENT OF NATURAL RESOURCES
WILSON STATE PARK
BEACH HOUSE
ROOF REPLACEMENT & RESTORATION:
HARRISON, MICHIGAN
2015104
SEPT, 2021
989 752 8107
P L U R I B U E
S U N U M
C I R C U M S P I C E
S I Q U EREI S PENI NSUL AM A MOE NA M
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
9/3/21PHASE 500 90% REVIEW
ELECTRICAL ONE LINE AND
SCHEDULES
BAV
E3.01
120 Transformer Power Dedicated Circuit (A-10)
SPARE
Cooper Greengate
LK4-120NO
EXTERIOR LIGHTS (A-9)
LiteKeeper 4
ELECTRICAL CONTROL PANEL LC1 DETAIL
NONE
(CONTROLLED TIME OF DAY)
(CONTROLLED BY PHOTOCELL DUSK TO DAWN)
(CONTROLLED TIME OF DAY)
(CONTROLLED TIME OF DAY)
ELECTRICAL SYMBOLS LIST
1x4 LIGHT FIXTURE
WALL MOUNTED LIGHT FIXTURE
PENDANT LIGHT FIXTURE
MOTION SENSOR SWITCH
DUPLEX RECEPTACLE
QUADPLEX RECEPTACLE
NON-FUSED DISCONNECT SWITCH
PANELBOARD
UNDERGROUND ELECTRICAL
GROUND FAULT INTERRUPTER
EXISTING
SM
UGE
GFI
EX
LIGHTING FIXTURE SCHEDULE
TYPE DESCRIPTION
A 4' LINEAR LED. 7" WIDE, 38 WATT, 4600 LUMEN, 4000 DEG K,
POLYCARBONATE VANDAL RESISTANCE LENS, WHITE END
CAPS.
METALUX #4NLW4040C OR EQUAL.
B LED PENDANT. LARGE BEACON STEM MOUNTED ALUMINUM
FIXTURE POWDER COATED BRONZE, 12"STEM 27" SHADE, 42
WATT LED, 3000°K, 6" DIA FROSTED ACRYLIC LENS WITH
FROSTED SEAL OPTICAL COMPARTMENT LENS.
TEKA # LBS-S-SD27-LED-X47-BZP-A-HSR OR EQUAL
BW LED WALL MOUNTED FIXTURE.SAME AS TYPE B EXCEPT WALL
MOUNTED WITH 12" SHADE, 20 WATT LED 3000°K.
TEKA # BMW-SD12-L16-BZP-CRW OR EQUAL.
EX
PANEL B
(OLD
MAIN
PANEL)
MEX
METER
EX
PANEL A
6'-0"
NEW 10'x3/4"
COPPER
GROUND ROD
NEW 10'x3/4"
COPPER
GROUND ROD
(3) #3
(1) #8 GND
1 1/4"C
RISER DIAGRAM
MASTER ELECTRICAL DRAWINGS SPECIFICATIONS
BASIC ELECTRICAL REQUIREMENTS
A. Furnish all equipment, materials, articles, items, operations or methods listed, mentioned or scheduled on drawings, these specifications, manufacturer's installation instructions and include all labor, materials, equipment and incidentals necessary for complete installation and operation.
B. LAYOUT OF THE WORK
Examine the site and all the drawings before proceeding with the layout and installation of this work. Confer and cooperate with the other trades on the job so all parts will be installed in proper relationship. Precise locations of parts to coordinate with other work is the responsibility of the Contractor.
C. INTERFERENCES
The Contractor shall confer with other trades regarding location of equipment, fixtures, conduit, switches, outlets, etc., in order that there may be no interference in the installation of the work of any trades or delay in the progress of any work.
D. MATERIALS AND WORKMANSHIP
All materials and equipment furnished for installation on this project shall be new and in strict accordance with this specification. All packaged materials shall be delivered in the original containers which show the manufacturer's name and the identifying designations as to size, quality, etc. Materials delivered to the job in unmarked or mutilated packages will be ordered to be removed from the site at once. Materials or equipment judged as "damaged" by the Architect or Engineer shall be removed from the job. All electrical equipment shall bear the Underwriter's Label.
E. GUARANTEES
All equipment and work performed shall be guaranteed for one year from time of substantial completion of project, unless directed otherwise in Division 1.
F. SUBMITTALS
Submit electronic files.
Proposed Products List: Include Products specified in the following Sections
G. REGULATORY REQUIREMENTS
Conform to applicable Building Code.
Conform to requirements of NFPA 70, 2017 National Electric Code, 2015 Michigan Building Code, 2017 State of Michigan Electrical Code, 2009 ANSI 117.1, 2015 Michigan Energy Code, and Local Codes.
Equipment: U.L. tested and approved for its purpose.
The Electrical Contractor shall obtain and pay for all permits and inspection fees. Copies of the Certificate of Inspection are to be provided to the Owner after final inspection and approval from authorities having jurisdiction.
H. TEMPORARY SERVICES
The Contractor shall provide and maintain wiring for all interior construction lighting and power to meet OSHA Standards. Contractor shall provide and maintain all required lamps and guards. Contractor's power tools, cords, etc. shall be in strict accordance with National Electrical Code 2017, Article 590.
I. OPERATION AND MAINTENANCE MANUALS
Two (2) bound sets of Operating and Maintenance Manuals are to be submitted to the Architect/Engineer for approval. Manuals are to include electrical distribution parts lists and all other parts lists and maintenance procedures as well as operating instructions on all equipment supplied.
CONDUIT
A. Metal conduit.
B. Liquidtight flexible rigid steel conduit.
C. Electrical metallic tubing.
D. Nonmetal conduit. SCH 40 or HDPE.
E. 3/4" Minimum size.
F. Underground Installations:
1. Use Schedule 40 PVC non-metallic conduit or seamless HDPE direct burial conduit.
G. Exterior Locations: Use galvanized rigid steel conduit for all outside installation. Use applicable fittings.
H. Dry Interior Locations:
1. Use EMT type conduit, set screw couplings and connectors.
2. Use rigid steel for dry interior with applicable fittings as noted or shown on the drawings.
I. One 1" minimum size for data.
INSTALLATION
A. Install nonmetallic conduit in accordance with manufacturer's instructions.
B. Arrange supports to prevent misalignment during wiring installation.
C. Support conduit using coated steel or malleable iron straps, lay-in adjustable hangers, clevis hangers, and split hangers.
D. Group related conduits; support using conduit rack.
Construct rack using steel channel; provide space on each for 25 percent additional conduits.
E. Fasten conduit supports to building structure and surfaces.
F. Do not support conduit with wire or perforated pipe straps. Remove wire used for temporary supports.
G. Do not attach conduit to ceiling support wires.
H. Arrange conduit to maintain headroom and present neat appearance.
I. Route conduit parallel and perpendicular to walls or building centerlines.
J. Route conduit installed above accessible ceilings parallel and perpendicular to walls.
K. Maintain adequate clearance between conduit and piping.
INTERFACE WITH OTHER PRODUCTS
A. Use firestop caulk where conduit passes through fire rated floors and walls. Refer to Architectural plans for locations.
BUILDING WIRE AND CABLE
A. Building wire and cable.
B. Metal clad cable (MC).
C. Description: Single conductor insulated wire.
D. Conductor: Copper.
E. Insulation Voltage Rating: 600 volts.
F. Insulation: Type THHN/THWN 75ºC.
INSTALLATION
A. Use conductor size not smaller than 12 AWG for power and lighting circuits.
B. Use 10 AWG conductors for 20 ampere, 120 volt branch circuits longer than 100 feet.
C. Neatly train and lace wiring inside boxes, equipment, and panelboards.
D. All power wiring shall be installed in conduit.
FIELD QUALITY CONTROL
A. Verify continuity of each branch circuit conductor.
BOXES
A. Branch device boxes. Sheet Metal Boxes: As the general project requirement for branch power and low voltage systems. Use 4" square steel box, with single gang device. Non-metallic box is not acceptable in fire rated walls and or general project installation.
B. Pull and junction boxes. NEMA 1 enclosure for interior locations. NEMA 3R for exterior locations.
INSTALLATION
A. Coordinate mounting heights and locations of outlets mounted above counters, benches, and backsplashes.
B. Use flush mounting device box in finished areas.
C. Do not install flush mounting box back-to-back in walls;
provide minimum 6 inches separation. Provide minimum 24 inches separation in acoustic rated walls.
D. Do not fasten boxes to ceiling support wires.
E. Support boxes independently of conduit.
F. Use cast aluminum box in exterior locations. Provide metallic "in-use" cover.
WIRING DEVICES
A. Wall switches.
B. Receptacles.
C. Device plates.
WALL SWITCHES
A. Manufacturers:
1. Pass & Seymour.
2. Leviton.
3. Bryant.
B. Description: NEMA WD 1, Heavy-Duty, AC only general-use snap switch.
C. Body and Handle: Device color shall be from standard colors.
D. Ratings:
1. Voltage: 120/277 volts, AC.
2. Current: 20 amperes.
RECEPTACLES
A. Manufacturers:
1. Pass & Seymour.
2. Leviton.
3. Bryant.
B. Description: NEMA WD 1, Heavy-duty specification grade duplex receptacle.
C. Device Body: Color to be determined from standard colors.
D. GFCI Receptacle: Convenience duplex receptacle with integral ground fault circuit interrupter to meet regulatory requirements.
E. Provide WR rated receptacles for exterior locations.
INSTALLATION
A. Install devices plumb and level.
B. Install switches with OFF position down.
C. Install receptacles with grounding pole on bottom.
D. Connect wiring device grounding terminal to outlet box with bonding jumper or branch circuit equipment grounding conductor where specified.
E. Connect wiring devices by wrapping conductor around screw terminal.
F. Provide a dedicated neutral conductor for each receptacle circuit. Shared neutrals shall not be permitted.
G. Install wall switch 48 inches to top of the box above finished floor.
H. Install convenience receptacle and/or voice/data outlet 16 inches as a minimum to bottom of the box above finished floor.
FIELD QUALITY CONTROL
A. Test each receptacle device for proper polarity.
B. Test each GFCI receptacle device for proper operation.
PRODUCT REQUIREMENTS
A. Materials and Finishes: Provide adequate corrosion resistance.
B. Provide materials, sizes, and types of anchors, fasteners and supports to carry the loads of equipment and conduit. Consider weight of wire in conduit when selecting products.
C. Anchors and Fasteners:
1. Concrete Structural Elements: Use expansion anchors.
2. Steel Structural Elements: Use beam clamps.
3. Concrete Surfaces: Use self-drilling anchors and expansion anchors.
4. Hollow Masonry, Plaster, and Gypsum Board Partitions: Use toggle bolts and hollow wall fasteners.
5. Solid Masonry Walls: Use expansion anchors.
6. Sheet Metal: Use sheet metal screws.
7. Wood Elements: Use wood screws.
INSTALLATION
A. Install products in accordance with manufacturer's instructions.
ELECTRICAL IDENTIFICATION
A. Nameplates and labels.
B. Wire and cable markers.
C. Panelboard directory.
NAMEPLATES AND LABELS
A. Nameplates: Engraved three-layer laminated plastic, black letters on white background, 1/4" letter height, 1 1/2" minimum tag width and 4 1/2" maximum tag length.
B. Locations:
1. Panelboards
2. Disconnect switches
3. VFDs
4. Motor starters
WIRE MARKERS
A. Manufacturers:
1. Brady or equal.
B. Description: Tape or tubing type wire markers.
C. Locations: Each conductor at panelboard.
PANELBOARD DIRECTORY
A. Use factory supplied directory cards. Provide typewritten circuit loads per code requirements. Hand written directory is not acceptable.
INTERIOR LUMINAIRES
A. Interior luminaires per schedule.
REFERENCES
A. LED Standards LM70, LM79, LM80.
B. NFPA 101 - Life Safety Code, current adopted edition.
DRIVERS
A. LED drivers shall include a factory disconnecting means in accordance with 2017 NEC 410-130G.
INSTALLATION
A. Install suspended luminaires using pendants supported from swivel hangers. Provide pendant length required to suspend luminaire at indicated height.
B. Support luminaires independent of ceiling framing.
C. Locate recessed ceiling luminaires as indicated on reflected ceiling plan.
D. Install surface mounted luminaires and exit signs plumb and adjust to align with building lines and with each other. Secure to prevent movement.
E. Install recessed luminaires to permit removal from below.
F. Install recessed luminaires using accessories and firestopping materials to meet regulatory requirements for fire rating.
G. Install clips to secure recessed grid-supported luminaires in place at a minimum of (4) points of attachment to prevent movement.
H. Wire exit lights and emergency lighting as noted and shown on the drawings.
LIGHTING CONTROL
A. Furnish and install occupancy sensors, power packs, room controllers, relay panels, low-voltage switching and wiring as scheduled and specified.
SPARE
SPARE
File details come from the government source that posted it. Updated .