7434003 DrawingsAsOne.pdf
PDF 7 MB Posted
- Attached to
- Update HVAC Building 1281
- Solicitation number
- N400857434003
About this file
These documents are detailed architectural and engineering design drawings for updating the HVAC systems at Building 1281, Marine Corps Air Station Cherry Point in North Carolina. The project, commissioned by Naval Facilities Engineering Command, involves comprehensive mechanical and electrical system upgrades, including replacing rooftop units (RTUs), modifying control systems, and updating various building systems.
The comprehensive set of drawings includes demolition plans, first floor and roof plans, detailed mechanical and electrical schematics, and equipment schedules. Key scope elements include replacing three-way control valves with two-way valves, refurbishing existing rooftop units, installing new variable frequency drives (VFDs), updating control sequences, and performing system balancing and testing. The project aims to improve the building's HVAC efficiency, with specific attention to kitchen areas, air handling units, and building-wide temperature and ventilation control systems. The work is scheduled for completion by July 25, 2025, with Summer Consultants Inc. serving as the design engineering firm.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7434003 RFP.pdf | ||
| 7434003 SpecsAsOne.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
LAY DOWN AREA
MAIN GATE PASS AND
ID OFFICE
ROOSEVELT BLVD.
PROJECT LOCATION
BUILDING 1281
SLOCUM GATE
BUILDING
BUILDING
BEAUFORT RD.
E STREET
ROOSEVELT BLVD
PROJECT LOCATION
2ND AVE.
E STREET
4TH AVE.
ROOSEVELT BLVD
PROJECT LOCATION
2ND AVE.
FI
LE
N
AM
E:
OU
R
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :50
:48 P
M
XX
X.
XX
1.0
G
-0
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
C O
VE
R
S H
EE
T
G-001
SHEET
NUMBER SHEET TITLE NAVFAC
DWG NO.
G-001 COVER SHEET 12913289
M-001 SYMBOLS AND ABBREVIATIONS 12913290
MD101 FIRST FLOOR PLAN - DEMOLITION 12913291
MD102 ROOF PLAN - DEMOLITION 12913292
MD401 ENLARGED KITCHEN PLAN - DEMOLITION 12913293
MD402 KITCHEN RCP - DEMOLITION 12913294
M-101 FIRST FLOOR PLAN 12913295
M-102 ROOF PLAN 12913296
M-401 ENLARGED KITCHEN PLAN 12913297
M-402 KITCHEN RCP 12913298
M-501 DETAILS 12913299
M-502 DETAILS 12913300
M-601 SCHEDULES 12913301
M-602 SCHEDULES 12913302
M-701 CONTROLS COVER 12913303
M-702 CONTROLS 12913304
M-703 CONTROLS 12913305
M-704 CONTROLS 12913306
M-705 CONTROLS 12913307
M-706 CONTROLS 12913308
M-707 CONTROLS 12913309
E-001 SYMBOLS AND ABBREVIATIONS 12913310
E-101 FIRST FLOOR PLAN 12913311
E-102 ROOF PLAN 12913312
E-401 ENLARGED KITCHEN PLAN 12913313
UPDATE PUBLIC HOUSE HVAC SYSTEMS,
CHERRY POINT, NORTH CAROLINA
WORK ORDER NO.
BUILDING 1281
VICINITY MAPLOCATION MAP DRAWING INDEX
MARINE CORPS AIR STATION
7434003
N N 01 12913289
(E)
LC
SEQUENCING NOTES SYMBOLS CONT'D SYMBOLS CONT'D GENERAL SYMBOLSABBREVIATIONS
SYMBOLS
RL
RS
PIPE TURN UP
PIPE TURN DOWN
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
DIRECTION OF FLOW
PIPE CAP
PIPE CLEANOUT
WALL PIPE CLEANOUT
FLOOR CLEANOUT
FLOOR DRAIN
C.O.
W.C.O.
F.C.O.
FL.D.
GATE VALVE
GLOBE VALVE
SWING CHECK VALVE
TWO-WAY CONTROL VALVE
THREE-WAY CONTROL VALVE
STRAINER
UNION
SAFETY RELIEF VALVE
FLOW MEASURING VALVE
COMBINATION FLOW MEASURING
AND BALANCING VALVE
BALANCING VALVE
BALL VALVE
BUTTERFLY VALVE
MOTORIZED BUTTERFLY VALVE
MANUAL AIR VENT 3/8" BALL VALVEM.A.V.
THERMOMETER AND WELL
PRESSURE GAUGE
WYE STRAINER WITH CAPPED
BLOWDOWN VALVE
RECTANGULAR DUCT
SIZE TRANSITION
RIGID ROUND DUCT
SIZE TRANSITION
DUCT TRANSITION FROM
SQUARE TO ROUND
DUCT WITH SMOKE DETECTORSD
DUCT ELBOW WITH
TURNING VANES
FLEXIBLE DUCTWORK. 5 FEET MAXIMUM
LENGTH, SIZE AS INDICATED OR SCHEDULED
SQUARE CEILING DIFFUSER WITH FLEXIBLE
DUCT(5' MAXIMUM LENGTH) SAME SIZE AS
DIFFUSER NECK SIZE. DIFFUSER SIZE PER
SCHEDULE UNLESS OTHERWISE NOTED.
PROVIDE CONICAL SPIN-IN TAP WITH
BALANCING DAMPER AT CIRCULAR DUCT.
NUMBER INDICATES BALANCING AIRFLOW CFM.
CEILING REGISTER, SIZE PER SCHEDULE UNLESS
OTHERWISE NOTED. NUMBER INDICATES
BALANCING AIRFLOW CFM.
SUPPLY AIR DIFFUSER, 24x24 FACE AREA, SUITABLE FOR 2'x4' TILE CEILING.
PERFORATED CEILING PANEL, 24x24 FACE AREA, SUITABLE FOR 2'x4' TILE CEILING.
CENTRIFUGAL FAN OR
PUMP BY APPLICATION
DOOR LOUVER
3/4" DOOR UNDERCUT
RETURN AIR SYMBOL
NUMBER INDICATES CFM
SUPPLY AIR SYMBOL
NUMBER INDICATES CFM
THERMOSTAT
U
L
CR
HUMIDITY SENSOR
NORTH ARROW
COLUMN BUBBLE
DESIGNATION
REVISION CLOUD WITH REVISION
NUMBER DESIGNATION
BREAKLINE
MATCHLINE DESIGNATIONM A T C H L I N E A-A
DEMOLITION LINETYPE
CENTERLINE
CENTERLINE SYMBOL
EXISTING
POINT OF CONNECTION TO EXISTING
POINT OF TERMINATION OF REMOVAL
NOTE NUMBER
EXHAUST OR RETURN DUCT UP
EXHAUST OR RETURN DUCT DOWN
SUPPLY DUCT UP
SUPPLY DUCT DOWN
ROUND DUCT UP
ROUND DUCT DOWN
A.D.
DUCT WITH ACCESS DOOR,
MINIMUM 16x16
DUCT WITH MANUAL BALANCING DAMPER.
PROVIDE ACCESS DOOR MINIMUM (DUCT
WIDTH MINUS 2") WIDE BY 16" LONG.M.B.D.
DUCT WITH FLEXIBLE CONNECTION
UP DUCT TRANSITION UP
DUCT TRANSITION DOWNDN.
DUCT RISERISE
T
H
M
A.D. ACCESS DOOR
A.F.F. ABOVE FINISHED FLOOR
AFMS AIRFLOW MEASURING STATION
AHU AIR HANDLING UNIT
ARCH. ARCHITECTURAL
A.P. ACCESS PANEL
APPROX. APPROXIMATELY
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
C COMMON
C.C. COOLING COIL
C.D. CEILING DIFFUSER
CFM CUBIC FEET PER MINUTE
C.G. CEILING GRILLE
C.O. CLEANOUT
CW DOMESTIC COLD WATER
D.B. DRY BULB
db DECIBEL
DDC DIRECT DIGITAL CONTROL
DESIG. DESIGNATION
DIA DIAMETER
DN. DOWN
(E) EXISTING
E.A.T. ENTERING AIR TEMPERATURE
E.D.B. ENTERING DRY BULB
EFF. EFFICIENCY
E.G. EXHAUST GRILLE
EHO EMERGENCY HVAC OFF
ENT. ENTERING
E.S.P. EXTERNAL STATIC PRESSURE
E.W.B. ENTERING WET BULB
E.W.T. ENTERING WATER TEMPERATURE
EXIST. EXISTING
°F DEGREES FAHRENHEIT
FL.D. FLOOR DRAIN
FLR. FLOOR
FPM FEET PER MINUTE
FT. FEET
GPM GALLONS PER MINUTE
H.C. HEATING COIL
HP HORSEPOWER
HW DOMESTIC HOT WATER
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
Hz HERTZ
IN. INCHES
L.A.T. LEAVING AIR TEMPERATURE
LBS. POUNDS
L.D.B. LEAVING DRY BULB
L.W.T. LEAVING WATER TEMPERATURE
MAX. MAXIMUM
M.B.D. MANUAL BALANCING DAMPER
MER MECHANICAL EQUIPMENT ROOM
MIN. MINIMUM
M.O.D. MOTOR OPERATED DAMPER
NC NOISE CRITERIA
N.C. NORMALLY CLOSED
N.I.C. NOT IN CONTRACT
N.O. NORMALLY OPEN
O.A. OUTSIDE AIR
P.D. PRESSURE DROP
PH PHASE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
R.A. RETURN AIR
R.G. RETURN GRILLE
RPM REVOLUTIONS PER MINUTE
S.A. SUPPLY AIR
SD SMOKE DETECTOR
S.P. STATIC PRESSURE
T.G. TRANSFER GRILLE
TYP. TYPICAL
V VOLTS
VAV VARIABLE AIR VOLUME
VOL. VOLUME
W.B. WET BULB
W.C. WATERCOLUMN
ARROW INDICATES
TRUE NORTH AND/OR
PROJECT NORTH
N
M101
N
8'0 1/8"=1'-0"
UNIQUE PLAN OR
DETAIL NUMBER
ON THIS DRAWING NORTH ARROW
NAME OF PLAN OR DETAIL
ALL DRAWINGS WHERE
DETAIL IS REFERENCED
GRAPHIC SCALE OF
PLAN OR DETAIL
SECTION IDENTIFICATION
INDICATES DIRECTION
OF CUTTING PLANE
NUMBER INDICATES SECTION
SHEET NUMBER WHERE
SECTION IS DRAWN
2-PART REFERENCE DETAIL IDENTIFICATION:
SHEET NUMBER WHERE
DETAIL/SECTION IS DRAWN
NUMBER INDICATES
DETAIL/SECTION
FLOOR PLAN
M101, M1022
FLOOR PLAN AND DETAIL TITLES:
M101
REFRIGERANT LIQUID
REFRIGERANT SUCTION
ROOM NUMBER DESIGNATION.1234CWS
DOMESTIC COLD WATERCW
CWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSATE DRAIND
G GAS PIPING
HW DOMESTIC HOT WATER
HWR HEATING WATER RETURN
HEATING WATER SUPPLYHWS
MAKE-UP WATERMU
1. SEQUENCING OF CONSTRUCTION
1.1 MAINTAIN HEATING AND/OR COOLING THROUGHOUT THE
FACILITY DURING OCCUPIED HOURS. COORDINATE WITH THE
GOVERNMENT FOR ANY TEMPORARY SHUTDOWN. CONDUCT
TEMPORARY SHUTDOWN OF HEATING/COOLING SYSTEMS
DURING UNOCCUPIED HOURS TO THE GREATEST EXTENT
PRACTICAL. PROVIDE A MINIMUM OF 2 WEEKS NOTICE TO
GOVERNMENT FOR ANY ANTICIPATED SHUTDOWN.
1.2 AVAILABLE CONSTRUCTION HOURS ARE LIMITED TO
NIGHTS AND MORNING HOURS FROM 2200 THE NIGHT PRIOR
TO 1000 HOURS THE FOLLOWING MORNING.
1.3 ALL CONSTRUCTION ACTIVITY MUST BE CLEANED AND THE
SPACE RETURNED TO PRIOR CONDITIONS BEFORE BUILDING
OCCUPIED HOURS (1000 HOURS).
1.4 PROVIDE DUST PROTECTION FOR KITCHEN EQUIPMENT
AND ENSURE ALL PREPARATION SURFACES AND EQUIPMENT
ARE PROTECTED FROM CONSTRUCTION ACTIVITIES. ANY
DAMAGE TO FURNITURE OR EQUIPMENT IN THE SPACE AS A
RESULT OF CONSTRUCTION ACTIVITIES MUST BE REPAIRED
OR REPLACED AT CONTRACTOR'S EXPENSE.
1.5 PROVIDE TEMPORARY FILTER MEDIA ON RETURN AIR
OPENINGS WHERE DUCT CONSTRUCTION ON ACTIVE
SYSTEMS ARE PARTIALLY COMPLETE AT THE END OF A SHIFT.
PROVIDE AS MUCH NEW DUCTWORK PRIOR TO
DISCONNECTION OF EXISTING GRILLES AND BRANCH TAPS.
2. CONTROLS MODIFICATIONS
2.1 COORDINATE PROGRAMMING FOR ADDITIONAL
EQUIPMENT POINTS LISTS AND BAS GRAPHICS DISPLAY WITH
EXISTING CONTROLS AND BUILDING MAINTENANCE PROVIDER.
EXISTING BAS CONTROLS ARE JOHNSON CONTROLS
METASYS. EXISTING CONTROLS SERVICE PROVIDER IS
JOHNSON CONTROLS, INC (JCI).
2.2 PROVIDE CONTROLS EQUIPMENT INCLUDING END DEVICES
AND CONTROLLERS COMPATIBLE WITH JCI METASYS.
2.3 PROVIDE UNIT PRICES FOR THE FOLLOWING END DEVICE
REPLACEMENT. FOR BIDDING PURPOSES AND IN ADDITION TO
EXPLICIT WORK ON DRAWINGS, PROVIDE THE FOLLOWING
END DEVICE REPLACEMENT AS PART OF BASE BID:
- 1 DUCT TEMPERATURE SENSOR
- 1 HYDRONIC CHILLED WATER TEMPERATURE SENSOR
- 2 DUCT DIFFERENTIAL PRESSURE SENSORS
- 2 SPACE HUMIDITY SENSORS
- 1 AIR FLOW MEASURING STATION (AFMS)
- 1 ACTUATOR FOR DAMPER
- 1 ACTUATOR FOR HYDRONIC CONTROL VALVE
ANY DEVICE REPLACEMENT BEYOND THE QUANTITIES ABOVE
WILL BE PROVIDED PER SUBMITTED UNIT PRICE SCHEDULE.
3. TEST AND BALANCE
3.1 PERFORM PRE-TEST AND BALANCE (PRE-TAB) ON EXISTING
KITCHEN HEAT PUMP SPHP-1 PRIOR TO ANY DUCT
MODIFICATIONS TO THE UNIT. THE PRE-TAB PERFORMANCE
SERVES AS THE BASELINE PERFORMANCE RELATIVE TO
ORIGINAL DESIGN INTENT. PROVIDE REPORT AND IDENTIFY
ANY EXISTING AIRFLOW OR CAPACITY DEFICIENCIES TO THE
GOVERNMENT. CONDUCT PRE-TAB AFTER UNIT CLEANING
AND PRIOR TO COMMENCING DUCT MODIFICATIONS.
3.2 IN ADDITION TO SYSTEMS AND EQUIPMENT PROVIDED
UNDER THIS CONTRACT, TEST AND BALANCE SCOPE
INCLUDES ALL EXISTING SYSTEMS. EXISTING DESIGN
AIRFLOWS AND EQUIPMENT SCHEDULES ARE PROVIDED ON
THE DRAWINGS FOR BALANCING PURPOSES. OUTDOOR AIR
AND BUILDING PRESSURIZATION AIRFLOWS HAVE BEEN
MODIFIED UNDER THIS CONTRACT. NOTIFY THE GOVERNMENT
OF ANY EXISTING EQUIPMENT DEFICIENCY THAT PREVENTS
THE COMPLIANCE OF BALANCING EXISTING EQUIPMENT
WITHIN 10% OF DESIGN AIRFLOW.
4. COMMISSIONING
4.1 COMMISSIONING IS INCLUDED IN THIS CONTRACT.
COMMISSIONING INCLUDES BOTH NEW AND EXISTING
SYSTEMS IN THEIR ENTIRETY. EXISTING AND MODIFIED
SEQUENCES WILL BE TESTED DURING COMMISSIONING
PROCESS. PROVIDE CORRECTIVE ACTIONS FOR ALL
CONTROLS AND AIR/WATER BALANCE DEFICIENCIES
IDENTIFIED DURING COMMISSIONING PROCESS. THIS IS
EXCLUSIVE OF DEFICIENCIES IDENTIFIED THAT EXCEED
EXISTING SYSTEM EQUIPMENT CAPACITIES OR CAPABILITIES.
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :19
:11 P
M
XX
X.
XX
1.0
M
-0
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
SY
M
BO
LS
A N
D A
BB
R
EV
IA
TI
O
N S
M-001
12913290
A B C D E F G H
MD401
T
T
T
T
TT
T
T T
T T
T
T
TT
TT
(E)EF-2
(E)16x16 UP TO
(E)EF-1 ON ROOF
(E)VAV-2 (E)VAV-3 (E)VAV-4
(E)VAV-5
(E)VAV-6
(E)VAV-7
(E)VAV-8
(E)CH-1
(E)VAV-9
(E)VAV-10
(E)VAV-11
(E)VAV-12 (E)VAV-14
(E)VAV-15
(E)VAV-17
(E)MSI-2
(E)MSO-2
(E)MSO-1
(E)EMERGENCY
HVAC OFF SWITCH
(E)VAV-1
GAMING
STORAGE
STORAGE
JANITOR
STORAGE
LOUNGE
OFFICE
CELLULAR SWITCH RM
SEATING
POOL HALL
PROMENADE
VESITBULE
VESITBULE
STORAGE133
MECH RM
MEETING
THEATER
(E)VAV-19
(E)VAV-16
(E)MSI-1
MD402
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :19
:33 P
M
XX
X.
XX
1.0
M
D1
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
FI
R
ST
F
LO
O
R P
LA
N
D
EM
O
LI
TI
O N
MD101
N
32'0 16' 1/16"=1'-0"
FIRST FLOOR PLAN - DEMOLITION1
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING
EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE
START OF CONSTRUCTION.
NOTES
SEE MD401 AND MD402 FOR DEMOLITION WORK. NO WORK
THIS SHEET. MECHANICAL SYSTEMS SHOWN FOR
REFERENCE ONLY.
12913291
(E)RTU-3
(E)RTU-2
(E)RTU-1
(E)ROOF HATCH
(E)CWS
(E)CWR(E)HWR
(E)HWS
(E)EF-1
SEE DETAIL 1/M-501.
SEE DETAIL 2/M-501.SEE DETAIL 3/M-501.
SUPPLY FAN VFD
EXHAUST FAN VFD
(E)16x82 SUPPLY PLENUM 20x82x40 DN.
(E)16x82 RETURN PLENUM 20x82x40 DN.
62x32x36 (E)16x82 SUPPLY PLENUM (E)16x82 RETURN PLENUM
(E)18x82 SUPPLY PLENUM
(E)18x82 RETURN PLENUM
14x70x40 DN.
40x36
60x30x36 24x82x40 DN.
(E)48x2448x24
16x80x30 DN.
36x2438x24
2 SUPPLY FAN VFD
(E)36x20
48x24 UP 14x70x40 DN.
(E)30x26(E)24x20
30x26 UP
(E)38x16
(E)ROOF DRAIN. RECONNECT DRAIN PIPE
FROM OVERFLOW TO THE ROOF DRAIN.
(E)48x24
(E)ROOF DRAIN. REMOVE CAP BELOW ROOF
AND RECONNECT TO DRAIN PIPE. SEE 4/M-501
FOR DETAILS.
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :19
:48 P
M
XX
X.
XX
1.0
M
D1
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
R O
O F
PL
AN
D
EM
O
LI
TI
O N
MD102
N
8'0 16' 1/8"=1'-0"
ROOF PLAN - DEMOLITION1
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING
EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE
START OF CONSTRUCTION.
NOTES
DEMOLISH 3-WAY CONTROL VALVE. DISCONNECT PIPING
AT POINTS INDICATED.
REMOVE VFD, SEE ELECTRICAL.
DEMOLISH DUCT, INSULATION, HANGERS, SUPPORTS AND
APPURTENANCES COMPLETE TO POINTS INDICATED.
KEY PLAN
NO SCALE
N
12913292
(E)KEF-2
(E)EXHAUST HOOD
(E)SPHP-1
12.5 TON
(E)KSF-1
OA
(E)KEF-1
EA
T
(E)MSI-1
(E)CH-1
(E)16x16 UP TO
(E)EF-1 ON ROOF
(E)VAV-12
(E)ROOF
HATCH
WOMEN'S TLT
PROMENADE
SMP DESK
ELECTRICAL
IT
MECH RM
ELECTRICAL ENCLOSURE
CELLULAR SWITCH RM
OFFICE
OFFICE115
OFFICE
KITCHEN
MEN'S TLT
VESTIBULE
VESTIBULE
PROMENADE
OFFICE
PREP
FREEZER
CORR.
LIQUOR STOR.1
DISHWASH AREA
(E)EMERGENCY
HVAC OFF SWITCH
(E)ROOF DRAIN. REMOVE CAP AND RECONNECT
TO DRAIN PIPE. SEE 4/M-501 FOR DETAILS.
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :20
:10 P
M
XX
X.
XX
1.0
4 M
D4
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
EN
LA
R G
ED
K
IT
C
H
EN
P
LA
N
D
EM
O
LI
TI
O
N
MD401
N
8'0 16' 1/8"=1'-0"
ENLARGED KITCHEN PLAN - DEMOLITION
MD1011
KEY PLAN
NO SCALE
N
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING
EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE
START OF CONSTRUCTION.
NOTES
DEMOLISH DUCT, INSULATION, HANGERS, SUPPORTS AND
APPURTENANCES COMPLETE TO POINTS INDICATED.
12913293
(E)KEF-2
(E)EXHAUST HOOD
(E)SPHP-1
12.5 TON
(E)KSF-1
(E)KEF-1
EA
(E)MSI-1
(E)CH-1
(E)VAV-12
(E)ROOF
HATCH
WOMEN'S TLT
PROMENADE
SMP DESK
ELECTRICAL
IT
MECH RM
ELECTRICAL ENCLOSURE
CELLULAR SWITCH RM
TRAINING
OFFICE115
STORAGE
KITCHEN
MEN'S TLT
VESTIBULE
VESTIBULE
PROMENADE
OFFICE
PREP
FREEZER
CORR.
LIQUOR STOR.
DISHWASH AREA
(E) (E)
(E) (E)
(E) (E)
(E) (E)
(E)
(E) (E)
(E) (E)
(E)
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 1 1:2
0:0 1 P
M
XX
X.
XX
1.0
M
D4
.D W
G
A
B
C
D
2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D E
P A
R T
M E
N T
O
F
T
H E
A V
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C Q
U I S
I T
I O
S
D
I V
I S
I O
N M
C A
S
C
H E
R R
Y
P
O I N
T
C
H E
R R
Y
P
O I N
T
N
C
B U
I L D
I N
G
U P
D A
P
U B
L
U
V A
C
S
Y S
T E
M S
N A
V A
L
F
A C
I L I T
I E
S
E
N G
I N
E E
R I N
G
C
O M
M A
N D
M A
R I N
E
C
O R
A
T I O
N
C
H E
R R
Y
P
O I N
T
N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
K I T
C H
E M
O L
I T
I O
N
MD402
N
8'0 16' 1/8"=1'-0"
KITCHEN RCP - DEMOLITION
MD1011
KEY PLAN
NO SCALE
N
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING
EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE
START OF CONSTRUCTION.
NOTES
REMOVE AND RELOCATE CEILING TILES WITHIN INDICATED
SPACES TO ACCOMMODATE FOR WORK ABOVE CEILING.
12913294
M-401
T
T
T
T
TT
T
T T
T T
T
T
TT
TT
A B C D E F G H
GAMING
STORAGE
STORAGE
JANITOR
STORAGE
LOUNGE
OFFICE
CELLULAR SWITCH RM
SEATING
POOL HALL
PROMENADE
VESITBULE
VESITBULE
STORAGE133
MECH RM
MEETING
THEATER
(E)EF-2
(E)16x16 UP TO
(E)EF-1 ON ROOF
(E)VAV-2 (E)VAV-3 (E)VAV-4
(E)VAV-5
(E)VAV-6
(E)VAV-7
(E)VAV-8
(E)VAV-9
(E)VAV-10
(E)VAV-11
(E)VAV-12 (E)VAV-14
(E)VAV-15
(E)VAV-17
(E)MSI-2
(E)MSO-2
(E)MSO-1
(E)EMERGENCY
HVAC OFF SWITCH
(E)VAV-1
(E)VAV-19
(E)VAV-16
(E)MSI-1
M-402
(TYP. OF
17)
315 CFM,
TYP. 3
315 CFM,
TYP. 3
425 CFM,
TYP. 2
425 CFM,
TYP. 2
295 CFM,
TYP. 2
290 CFM,
TYP. 2
525 CFM,
TYP. 2
H
(E)CH-1
245100150
330 330
245 245
100100
980 CFM,
TYP. 4
1200 CFM,
TYP. 4
180 180
355 350
355 355
355 355
355 355
1065 CFM,
TYP. 4
33090
175 180
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :20
:36 P
M
XX
X.
XX
1.0
M
-1
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
FI
R
ST
F
LO
O
R P
LA
N
M-101
GENERAL NOTES
G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS
CONTRACT UNLESS SPECIFICALLY MARKED EXISTING,
EXIST., OR (E).
G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING
EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE
START OF CONSTRUCTION.
NOTES
TEST AND BALANCE FAN TO DESIGN CFM SHOWN AND
PROVIDE REPORT OF ANY DEFICIENCIES.
TEST AND BALANCE VAV BOX TO AIRFLOW AND WATER
FLOWS PER EXISTING VAV SCHEDULE ON DRAWING M-601.
BALANCE AIRFLOWS TO CFMS INDICATED FOR ROOMS 119,
123 AND 124.
PROVIDE HUMIDITY SENSOR IN ROOM 123.
N
32'0 16' 1/16"=1'-0"
FIRST FLOOR PLAN1
12913295
(E)RTU-3
(E)RTU-2 (E)RTU-1
(E)ROOF HATCH
(E)CWS
(E)CWR(E)HWR
(E)HWS
SUPPLY FAN 8510 CFM
RETURN FAN
8510 CFM
SUPPLY FAN
5785 CFM
RETURN FAN
5785 CFM
SUPPLY FAN
9610 CFM
RETURN FAN
9610 CFM
(E)EF-1
1350 CFM
(E)ROOF DRAIN. RECONNECT DRAIN PIPE
FROM OVERFLOW TO THE ROOF DRAIN.
SEE DETAIL 1/M-501.
SEE DETAIL 2/M-501.SEE DETAIL 3/M-501.
SUPPLY FAN VFD
SUPPLY FAN VFD
(E)16x82 SUPPLY PLENUM 20x46 DN.
(E)16x82 RETURN PLENUM (E)16x82 SUPPLY PLENUM (E)18x82 SUPPLY PLENUM
(E)18x82 RETURN PLENUM
48x24(E)36x20
18x48 DN.
48x18
46x20
(E)48x24
(E)30x26(E)24x20
16x30 DN.
30x16
16x30 DN.
(E)16x82 RETURN PLENUM
4 2
4 2
24x48 DN.
48x24 20x50 DN.
50x20
(E)38x16
(E)ROOF DRAIN. REPLACE DOME WITH NEW.
REMOVE CAP BELOW ROOF AND RECONNECT
TO DRAIN PIPE. SEE 4/M-501 FOR DETAILS.
EXHAUST FAN VFD 3
30x16 4 (E)48x24
V-3
V-2 V-1
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :20
:49 P
M
XX
X.
XX
1.0
M
-1
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
R O
O F
PL
AN
M-102
GENERAL NOTES
G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS
CONTRACT UNLESS SPECIFICALLY MARKED EXISTING,
EXIST., OR (E).
G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING
EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE
START OF CONSTRUCTION.
NOTES
REPLACE 3-WAY CONTROL VALVE WITH 2-WAY VALVE.
CONNECT PIPING AT POINTS INDICATED.
TEST AND BALANCE FAN TO DESIGN CFM SHOWN AND
PROVIDE REPORT OF ANY DEFICIENCIES.
REPLACE VFD. BALANCE FAN AND VFD UPON
REPLACEMENT.
PROVIDE MINIMUM OF 8 INCHES BETWEEN THE BOTTOM
OF DUCT AND THE ROOF SURFACE.
N
8'0 16' 1/8"=1'-0"
ROOF PLAN1
KEY PLAN
NO SCALE
N
12913296
A B C D E F G
(E)EXHAUST HOOD
(E)SPHP-1
12.5 TON
(E)KSF-1, 2730 CFM
OA
(E)KEF-1
EA
(E)ROOF
HATCH
T
(E)MSI-1
(E)CH-1
(E)16x16 UP TO
(E)EF-1 ON ROOF
(E)VAV-12
WOMEN'S TLT
PROMENADE
SMP DESK
ELECTRICAL
IT
MECH RM
ELECTRICAL ENCLOSURE
CELLULAR SWITCH RM
OFFICE
OFFICE115
OFFICE
KITCHEN
MEN'S TLT
VESTIBULE
VESTIBULE
26x20
TG-1
110x8
8x8
10x8
EG-1
EG-1
RG-1
RG-1
8x8
PROMENADE
OFFICE
PREP
FREEZER
DISHWASH AREA
CORR.
LIQUOR STOR.
(E)KEF-2
RG-1
20x20 LOUVER
EF-3
(E)EMERGENCY
HVAC OFF SWITCH
RG-1
RG-1
20x16
685 CFM 2
4312 CFM 2
TG-1
TG-1
TG-1
(E)ROOF DRAIN. REMOVE CAP AND RECONNECT
TO DRAIN PIPE. SEE 4/M-501 FOR DETAILS.
20x14
30x10 30x10
M.O.D.
170160
TH
280 280
365 365 365
250250
80165
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :21
:11 P
M
XX
X.
XX
1.0
M
-4
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
EN
LA
R G
ED
K
IT
C
H
EN
P
LA
N
M-401
N
8'0 16' 1/8"=1'-0"
ENLARGED KITCHEN PLAN
M-1011
KEY PLAN
NO SCALE
N
GENERAL NOTES
G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS
CONTRACT UNLESS SPECIFICALLY MARKED EXISTING,
EXIST., OR (E).
G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING
EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE
START OF CONSTRUCTION.
NOTES
PROVIDE POWER CONTROL RELAY FOR INTERLOCKING
FAN OPERATION WITH EXISTING EHO. UPON EHO
ACTIVATION, FAN SHALL BE DE-ENERGIZED.
TEST AND BALANCE FAN TO DESIGN CFM SHOWN AND
PROVIDE REPORT OF ANY DEFICIENCIES.
INSULATE ALL EXISTING MAKEUP AIR DUCTWORK.
PROVIDE FULL DUCT CLEANING OF ALL EXISTING KITCHEN
UNIT DUCTWORK BEFORE PERFORMING TAB ON THE
COMPLETE SYSTEM.
PROVIDE FULL CLEANING OF EXISTING KITCHEN UNIT
SPHP-1. CLEAN COILS, DRAIN PANS, ETC. TO REFURBISH
UNIT.
12913297
(E)SPHP-1
12.5 TON
(E)KEF-1
(E)ROOF
HATCH
T
(E)CH-1
WOMEN'S TLT
PROMENADE
SMP DESK
ELECTRICAL
IT
MECH RM
ELECTRICAL ENCLOSURE
CELLULAR SWITCH RM
TRAINING
OFFICE115
STORAGE
MEN'S TLT
VESTIBULE
VESTIBULE
PROMENADE
FREEZER
DISHWASH AREA
CORR.
LIQUOR STOR.
PREP
KITCHEN
OFFICE
(E)
(E)
(E) (E)
(E)
(E)
(E)
(E)
(E)
(E) (E)
(E) (E)
(E)
(E) (E) (E) (E)
(E) (E) (E)
(E)
(E)
(E) (E)
(E) (E)
(E)
(E)
(E)
(E) (E)
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :21
:29 P
M
XX
X.
XX
1.0
M
-4
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
KI
TC
H
EN
R C
P
M-402
N
8'0 16' 1/8"=1'-0"
KITCHEN RCP
M-1011
GENERAL NOTES
G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS
CONTRACT UNLESS SPECIFICALLY MARKED EXISTING,
EXIST., OR (E).
G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING
EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE
START OF CONSTRUCTION.
NOTES
REPLACE CEILING TILES WITHIN INDICATED SPACES.
KEY PLAN
NO SCALE
N
12913298
NO SCALE
RTU-1
DETAIL
MD102,M-1021
NO SCALE
RTU-2
DETAIL
MD102,M-1022
NO SCALE
RTU-3
DETAIL
MD102,M-1023
NO SCALE
ROOF DRAIN
DETAIL
MD102,M-102,MD401,M-4014
REMOVE 3-WAY CONTROL
VALVE ON RTU-3 CHILLED
WATER RETURN. PROVIDE
2-WAY CONTROL VALVE
AND REINSULATE. REMOVE
BYPASS PORT PIPING BACK
TO SUPPLY MAIN, CAP AND
REINSULATE.
REMOVE 3-WAY CONTROL
VALVE ON RTU-1 CHILLED
WATER RETURN. PROVIDE
2-WAY CONTROL VALVE
AND REINSULATE. REMOVE
BYPASS PORT PIPING BACK
TO SUPPLY MAIN, CAP AND
REINSULATE.
REMOVE 3-WAY CONTROL
VALVE ON RTU-2 CHILLED
WATER RETURN. PROVIDE
2-WAY CONTROL VALVE
AND REINSULATE. REMOVE
BYPASS PORT PIPING BACK
TO SUPPLY MAIN, CAP AND
REINSULATE.
REMOVE CAP AND
RECONNECT DRAIN PIPE.
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :22
:18 P
M
XX
X.
XX
1.0
M
-5
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
D
ET
AI
LS
M-501
GENERAL NOTES
G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS
CONTRACT UNLESS SPECIFICALLY MARKED EXISTING,
EXIST., OR (E).
G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING
EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE
START OF CONSTRUCTION.
NOTES
NONE.1
12913299
JOINT IS NOT ALLOWED ON TOP
DUCT WRAP INSULATION
FOIL TAPE OVER STAPLES
STAPLES
6 MIL DRY THICKNESS (MIN.)
BRUSH ON SEALANT OVER TAPE
JOINT LOCATED
ON SIDE OR
BOTTOM OF
DUCTWORK
USE ONLY AT LAST TAKEOFF
BEFORE OUTLETS & ONLY
WHERE ROUND RUNOUTS ARE
INDICATED ON THE DRAWINGS.
USE ONLY AT LAST TAKEOFF
BEFORE OUTLETS & ONLY
WHERE RECTANGULAR
RUNOUTS ARE INDICATED ON
THE DRAWINGS.
MAIN DUCT
6"
MAIN DUCT
6"
45°
45°
BRANCH DUCT
MANUAL BALANCING DAMPER
BRANCH DUCT
MANUAL BALANCING DAMPER
RECTANGULAR
ROUND
NO SCALE
BRANCH CONNECTIONS
DETAIL
NO SCALE
SEALING OF INTERIOR DUCT WRAP INSULATION - TYP.
DETAIL
AIR FLOW
TOP ACCESS PANEL
DUCT DIRECT DRIVE
FAN MOTOR
FLEXIBLE CONNECTION
(TYP)
NO SCALE
CENTRIFUGAL IN-LINE FAN
DETAIL
SEALANT
BIRDSCREEN
6"DEEP LOUVER
EXTENDED SILL PLATE
(E)EXTERIOR WALL
∠ 2"x2"x3/16" GALVANIZED
NO SCALE
EXHAUST LOUVER
DETAIL
TOLCO
MOUNTING FLANGE
OR BRACKET (TYP.
OF FOUR)
ROD COUPLING
(TYP. OF FOUR)
3/8" ALL THREAD
ROD (TYP. OF FOUR)
SUPPORT FAN FROM
STRUCTURAL BEAM ABOVE.
TOLCO
BEAM
CLAMP
(E)AHU COOLING COIL
COOLING COIL PIPING - DEMOLITION
COOLING COIL PIPING
(E)AHU COOLING COIL
AUTOMATIC CONTROL VALVE
(E)BALANCING VALVE
AUTOMATIC CONTROL VALVE
PROVIDE
STRAIGHT PIPE
(E)BALANCING VALVE
NO SCALE
COOLING COIL VALVE REPLACEMENT
DETAIL
T-BAR CEILING GRID
OPPOSED
BLADE
DAMPER
STAINLESS STEEL DRAW BANDDUCT COLLAR
AS DIFFUSER
SIZE SAME
NECK.
FLEXIBLE DUCT
STAINLESS STEEL DRAW BAND
MBD
SHEETMETAL DUCT
PROVIDE 24x24 T-BAR LAY-IN PANEL WITH
OPENING SIZED FOR OVERALL GRILLE SIZE AS
SPECIFIED ON THE AIR DEVICE SCHEDULE.
PROVIDE RECTANGULAR CEILING GRILLE, SQUARE TO
ROUND TRANSITION, NECK SIZE PER GRILLE SCHEDULE.
SEE DRAWINGS FOR CFM.
NO SCALE
CEILING GRILLE CONNECTION
DETAIL
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :22
:31 P
M
XX
X.
XX
1.0
M
-5
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
D
ET
AI
LS
M-502 12913300
FAN SCHEDULE
UNIT
NO.
TYPE WHEEL
DIA.
(IN.)
AIRFLOW
(CFM)
T.S.P.
(IN. W.G.) RPM BHP
MAX.
MOTOR
HP
ELEC.
DATA
(V/PH/HZ)
SERVICE LOCATION NOTES
EF-3 IL - 550 0.34 1080 0.16 1/6 115/1/60 DISHWASHER KITCHEN B,C,D,E
NOTES
A
A. IL = INLINE, CENTRIFUGAL FORWARD CURVED, DIRECT
DRIVE
B. INSTALL PER MANUFACTURERS RECOMMENDATIONS.
C. PROVIDE WITH REMOTE DISCONNECT.
D. SEE 3/M-502 FOR DETAILS.
E. PROVIDE WITH FLEXIBLE DUCT CONNECTIONS.
AIR DEVICE SCHEDULE
SYMBOL DESIG.
AIRFLOW
(CFM)
NECK
SIZE
(INCHES)
OVERALL
SIZE
(INCHES)
MAX. S.P.
DROP
(IN. W.G.)
MAX.
N.C.
HORIZONTAL
THROW @
100 FPM
FACE TYPE NOTES
RG-1 200-1200 22x22 24x24 0.04 20 - PERFORATED A,B
EG-1 275 22x22 24x24 0.04 20 - PERFORATED A
TG-1 500 30x10 0.04 20 - PERFORATED
NOTES
C
A. INSTALL PER DETAIL 6/M-502.
B. ALL DUCTED RETURN GRILLES.
C. ALL AIR DEVICES TO BE PAINTED. COORDINATE EXACT
PAINT COLOR WITH EXISTING.
MINIMUM
DEMAND CONTROL VENTILATION SCHEDULE
OUTSIDE AIR (CFM)
RTU-1
SYSTEM
MAXIMUM
21501390
RTU-2
RTU-3
(E)FAN SCHEDULE
(E)SHELL-AND-TUBE HOT WATER CONVERTER SCHEDULE
(E)CIRCULATING PUMP SCHEDULE
(E)STEAM CONDENSATE PUMP SCHEDULE
(E)VAV BOX SCHEDULE
(E)GRILLE, REGISTER & DIFFUSER SCHEDULE
(E)MINISPLIT SYSTEM AIR CONDITIONER SCHEDULE
(E)RV-1
PROVIDE SAFETY RELIEF VALVE. BODY SHALL BE CONSTRUCTED OF CAST IRON. GUIDE RING
SHALL BE CONSTRUCTED OF BRASS, THE DISC SHALL BE CONSTRUCTED OF SST AND THE
STEM SHALL BE STEEL PLATED. THE SET PRESSURE SHALL BE 25 PSI. BASIS OF DESIGN IS
WATSON McDANIEL WSVI SERIES.
CONTROL VALVE SCHEDULE
UNIT NO. VALVE
NO. SERVICE TYPE
FLOW
(GPM) CV
MAX P.D.
(FT. W.G.) NOTES
RTU-1 V-1 COOLING 2 WAY 82 39.4 10
RTU-2 V-2 COOLING 2 WAY 82 39.4 10
RTU-3 V-3 COOLING 2 WAY 63 30.3 10
NOTES
A. NOT USED.
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :22
:41 P
M
XX
X.
XX
1.0
M
-6
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
SC
H
ED
U
LE
S
M-601 12913301
(E)ROOF TOP HVAC UNIT SCHEDULE
(E)BASE BOARD ELECTRIC UNIT HEATER SCHEDULE
(E)DUCT CONSTRUCTION AND LEAK TEST SCHEDULE
(E)AIR COOLED CHILLER SCHEDULE
(E)AIR SEPARATOR/EXPANSION TANK SCHEDULE
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :22
:51 P
M
XX
X.
XX
1.0
M
-6
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
SC
H
ED
U
LE
S
M-602 12913302
WALL-MOUNTED CARBON DIOXIDE SENSOR. MOUNT
ADJACENT TO ROOM TEMPERATURE SENSOR.
M
AMS-#
ES-#
WALL-MOUNTED HUMIDITY TRANSMITTER. MOUNT ADJACENT TO ROOM
TEMPERATURE SENSOR.
FLOW METER
(TURBINE-STYLE)
AMS-#
1. PROVIDE THE FOLLOWING AUTOMATIC ALARM AT OWS EVERY MARCH 1ST AND
SEPTEMBER 1ST: "IN CONFORMANCE WITH THE UFCs AND IN ORDER TO SAVE
ENERGY, BUILDING SENSORS MUST BE CALIBRATED AND CLEANED AT REGULAR
INTERVALS. OUTSIDE AIR, DUCT, AND UNIT-MOUNTED TEMPERATURE, HUMIDITY,
AND ENTHALPY SENSORS SHOULD BE CALIBRATED ANNUALLY. AIR-FLOW
MEASURING STATIONS SHOULD BE CLEANED EVERY SIX MONTHS."
2. INSPECT, CALIBRATE, AND ADJUST AS NECESSARY TO PLACE IN PROPER
WORKING ORDER ALL EXISTING DEVICES WHICH ARE TO BE REUSED.
AIR OR WATER DIFFERENTIAL PRESSURE SWITCH, BY APPLICATION.
PROVIDE AIR SWITCH PER DETAIL 4/M-701/M-701. PROVIDE WATER
SWITCH PER DETAIL 6/M-701/M-701.
DIFFERENTIAL PRESSURE GAUGE, CONNECT TO STATIC
PRESSURE TAPS IN ACCORDANCE WITH DETAIL 3/M-701/M-701.
AIR OR WATER DIFFERENTIAL PRESSURE TRANSMITTER, BY APPLICATION.
PROVIDE AIR TRANSMITTER PER DETAIL 4/M-701/M-701. PROVIDE WATER
TRANSMITTER PER DETAIL 6/M-701/M-701.
LOW TEMPERATURE DETECTION FREEZESTAT, MANUAL RESET, WITH
20 FOOT ELEMENT. PROVIDE PER DETAILS 1/M-701/M-701 AND
2/M-701/M-701.
DUCT MOUNTED ELECTRONIC TEMPERATURE SENSOR WITH 20
FOOT AVERAGING ELEMENT. PROVIDE PER DETAILS 1/M-701/M-701
AND 2/M-701/M-701.
DUCT MOUNTED ELECTRONIC TEMPERATURE SENSOR WITH
RIGID STEM ELEMENT. PROVIDE PER DETAIL 2/M-701/M-701.
PIPE MOUNTED INSERTION TYPE ELECTRONIC
TEMPERATURE SENSOR WITH WELL.
WALL-MOUNTED ELECTRONIC TEMPERATURE SENSOR
DUCT MOUNTED CARBON DIOXIDE SENSOR. PROVIDE PER DETAIL
2/M-701/M-701.
DUCT MOUNTED ELECTRONIC RELATIVE HUMIDITY TRANSMITTER
PROVIDE PER DETAIL 2/M-701/M-701.
CURRENT SWITCH
END SWITCH
BINARY INPUT OR OUTPUT POINT
ANALOG INPUT OR OUTPUT POINT
NETWORK CONNECTION
THERMOMETER.
ELECTRIC TO PNEUMATIC SOLENOID VALVE
MOUNTED IN INSTRUMENTATION PANEL,
COIL VOLTAGES AS INDICATED ON WIRING
DIAGRAMS.
DUCT MOUNTED ENTHALPY TRANSMITTER
PROVIDE PER DETAIL 2/M-701/M-701.
GENERAL REQUIREMENTS
SYMBOLS & ABREVIATIONS
AI ANALOG INPUT
ANALOG OUTPUTAO
BI BINARY INPUT
BINARY OUTPUTBO
CLG COOLING
CHANGE OF VALUECOV
Cx COMMISSIONING
HEATINGHTG
I/O INPUT/OUTPUT
NETWORK VARIABLE INPUTNVI
NVO NETWORK VARIABLE OUTPUT
SETPOINTSP
HAND-OFF-AUTO SWITCH
MOTOR
NORMALLY OPEN CONTACTS
NORMALLY CLOSED CONTACTS
RELAY COIL
STARTER HOLDING COIL
THERMAL MOTOR SWITCH
PNEUMATIC TUBING
EXISTING PNEUMATIC TUBING
MOTOR STARTER
NC
NOEP#
C
FAN OR PUMP, BY APPLICATION
EMERGENCY HVAC OFF (SYSTEM VARIABLE)
OUTSIDE AIR TEMPERATURE SENSOR (SYSTEM VARIABLE)
OUTSIDE AIR ENTHALPY TRANSMITTER (SYSTEM VARIABLE)
VARIABLE FREQUENCY DRIVE
AIRFLOW MEASURING STATION - THERMAL DISPERSION TYPE
AIRFLOW MEASURING STATION - PIEZOMETRIC TYPE
R#
SYMBOLS & ABBREVIATIONS CONT'D
CONTROL AIR MAIN CONNECTION
OPPOSED BLADE DAMPER.D-#
D-# PARALLEL BLADE DAMPER.
A-#
DAMPER OR VALVE ACTUATOR.
2 WAY CONTROL VALVE (BALL OR GLOBE AS SPECIFIED).
V-#
3 WAY CONTROL VALVE (BALL OR GLOBE AS SPECIFIED).
V-#
HYDRONIC PIPING
AIR OR WATER FLOW PATH
FILTER OR COIL (AS LABELED)
M
A O
H
EN-#
VFD-#
DP-#
DPT-#
FZ-#
T-#
TS-#
TS-#
CD-#
HT-#
CS-#
EHO
TS-OA
EN-OA
RS-#
HT-#
CD-#
BUTTERFLY VALVE.
JUNCTION BOX AND COVER
CONDUIT TO
FIELD PANEL
FLEXIBLE METAL
CONDUIT TO
OTHER DEVICES,
IF NEEDED
FLEXIBLE CONDUIT BETWEEN
JUNCTION BOX AND DEVICE
TO ALLOW REMOVAL, MINIMUM
LENGTH OF 3 FT.
PROVIDE BRACKET IN
ACCORDANCE WITH
NOTE: DO NOT USE DEVICE AS A JUNCTION BOX. DO NOT
WIRE THRU DEVICE TO OTHER DEVICES
18 GAUGE GALVANIZED SHEET METAL
BRACKET ATTACHED TO DUCT WITH
FOUR #8 x 0.75" SHEET METAL SCREWS
PROVIDE RIGID FIBERGLASS INSULATION
WITH VAPOR BARRIER, THICKNESS TO
MATCH ADJACENT INSULATION
SEAL VAPOR TIGHT WITH
VAPOR BARRIER MASTIC
ATTACH DEVICE TO BRACKET
WITH SHEET METAL SCREWS
PROVIDE RIGID FIBERGLASS INSULATION
WITH VAPOR BARRIER, THICKNESS TO
MATCH ADJACENT INSULATION
M-701
NO SCALE
DEVICE MOUNTING BRACKET
DETAIL
M-7011
NO SCALE
DUCT MOUNTED SENSOR
DETAIL
M-7012
2 WAY CONTROL VALVE (BALL OR GLOBE AS SPECIFIED) WITH
PILOT POSITIONER.
3 WAY CONTROL VALVE (BALL OR GLOBE AS SPECIFIED).
WITH PILOT POSITIONER. DAMPER ACTUATOR WITH PILOT POSITIONER.
A-#
V-#
V-#
THE EXISTING CONTROL SYSTEM IS JOHNSON CONTROLS METASYS. PROVIDE NEW EQUIPMENT TO
INTEGRATE NEW HARDWARE, NEW SOFTWARE, AND NEW SEQUENCES. MODIFY EXISTING
PROGRAMMING AND SYSTEM GRAPHICS TO ACCOMMODATE THE NEW EQUIPMENT AND SEQUENCES.
THE EXISTING SEQUENCES OF OPERATIONS ARE MODIFIED AS FOLLOWS:
INSERTIONS ARE UNDERLINED AND BOLDED AND ARE NEW SEQUENCES REQUIRED TO IMPLEMENT
UNDER THIS CONTRACT.
DELETIONS ARE STRIKE-THROUGH AND BOLD AND ARE SEQUENCES REQUIRED TO BE DELETED OR
DISABLED FROM EXISITNG CONTROLS UNDER THIS CONTRACT.
MODIFICATIONS TO EXISTING SEQUENCE OF
OPERATIONS
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :23
:01 P
M
XX
X.
XX
1.0
M
-7
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
C O
N
TR
O
LS
C O
VE
R
M-701 12913303
RTU-1,2,3 CONTROL SCHEMATIC
AMS-X
OUTSIDE AIRFLOW MEASURING STATION
CD-X
OCCUPIED
SYSTEM DEFAULT SCHEDULE
ALL SYSTEMS
SYSTEM
UNOCCUPIED
OTHERWISEMON-SAT
0900-2400
OCCUPIED
SYSTEM DEFAULT SCHEDULE
VAV-RTU
SYSTEM
UNOCCUPIED
68 HEATING
75 COOLING
-- HEATING
-- COOLING
NOTE: TEMPERATURE SETPOINTS
SHALL BE ADJUSTABLE
KITCHEN 68 HEATING
85 COOLING
-- HEATING
-- COOLING
INSTALL AIRFLOW MEASURING
STATION ON ALL RTU INTAKES
FOR OUTDOOR AIR
PROVIDE CARBON DIOXIDE
SENSORS ON ALL RTU
RETURN AIR DUCTS
2-WAY CONTROL VALVE, V-X
CARBON DIOXIDE SENSOR
EXISTING EQUIPMENT POINTS LISTS - FOR REFERENCE ONLY
DESCRIPTION
AIRFLOW MEASURING STATION, QTY. 3
NO
D
DC
C
ON
NE
CT
IO
N
CO
MM
IS
SI
ON
IN
G
FR
EQ
UE
NC
Y
OP
ER
AT
IN
G
FR
EQ
UE
NC
Y
ANALOG BINARY
INPUT TO DDC OUTPUT FROM DDC
ANALOG BIN. LIMIT
ALARMS
WARNING
TRENDING
30%60%
PO
IN
T
NA
ME
AMS-X
CD-X
HT-X
V-X
CARBON DIOXIDE SENSOR, QTY. 3 X
TE
MP
ER
AT
UR
E
PR
ES
SU
RE
HU
MI
DI
TY
AI
RF
LO
W
S
EN
SO
R
CA
RB
ON
D
IO
XI
DE
LE
VE
L
PO
SI
TI
ON
ST
AT
US
DI
FF
ER
EN
TI
AL
P
RE
SS
UR
E
FA
UL
T
CU
RR
EN
T
SE
NS
IN
G
RE
LA
Y
EN
D
SW
IT
CH
DA
MP
ER
P
OS
IT
IO
N
SP
EE
D
VA
LV
E
PO
SI
TI
ON
SE
T
PO
IN
T
AD
JU
ST
ME
NT
OF
F-
ON
OP
EN
-C
LO
SE
FA
IL
HI
GH
LO
W
HI
GH
LO
W
RETURN AIR HUMIDITY, QTY. 3
CONTROL VALVE & POSITION FEEDBACK, QTY. 3
X X
15min15min 15min15min 15min15minX
HT-X
INSTALL DUCT MOUNTED
HUMIDITY SENSOR ON ALL
RTUS.
RTU-1,2,3 MODIFIED POINTS LISTS
X 15min15min
GENERAL NOTES
1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
2. FOR PURPOSES OF SYSTEM REBALANCING - CONTROLS CONTRACTOR MUST COORDINATE WITH TAB CONTRACTOR IN ORDER TO DETERMINE THE BALANCED PRESSURE SETPOINT FOR EXISTING DUCT STATIC PRESSURE SENSOR (DPT). BALANCED PRESSURE IS
DEFINED AS THE PRESSURE READING AT THE DPT WITH THE UNIT AT DESIGN CONDITIONS.
3. EXISTING RTU IS DAIKIN MODEL OAH. COORDINATE WITH MANUFACTURER TO ENSURE ANY WORK CONDUCTED WITHIN THE UNIT IS IN
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND DOES NOT VOID WARRANTY.
4. TREND DATA WAS NOT PREVIOUSLY INITIATED FOR HVAC SYSTEMS WITHIN THE BUILDING. PROVIDE TREND DATA OR THE ABILITY TO COLLECT TREND DATA FOR NEW AND EXISTING CONTROLS POINTS AS INDICATED IN PROVIDED POINTS LISTS SCHEDULES.
TT-X
COOLING COIL LAT, QTY. 3TT-X X X 15min15min
INSTALL TEMPERATURE
SENSOR DOWNSTREAM OF
COOLING COIL
HT-R1
(SPACE HUMIDITY,
ROOM 123)
30%60%HT-R1 RTU-2 SPACE HUMIDITY X 15min15min
PROVIDE HUMIDITY SENSOR
IN ROOM 123. SEE M-101 FOR
LOCATION.
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :23
:13 P
M
XX
X.
XX
1.0
M
-7
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
C O
N
TR
O
LS
M-702 12913304
MODIFIED SEQUENCE OF OPERATION (RTU-1, 2, 3)
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :23
:22 P
M
XX
X.
XX
1.0
M
-7
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
C O
N
TR
O
LS
M-703 12913305
AIR COOLED CHILLER CONTROL SCHEMATIC
T-1
REMOVE CHILLED WATER
RETURN TEMPERATURE
SENSOR. PROVIDE
TEMPERATURE SENSOR.
RE-USE EXISTING CONTROL
WIRING TO BAS.
DPT-1
REMOVE CHILLED WATER DIFFERENTIAL
PRESSURE SENSOR. PROVIDE
DIFFERENTIAL PRESSURE SENSOR.
REUSE EXISTING CONTROL WIRING TO
BAS.
EXISTING EQUIPMENT POINTS LISTS - FOR REFERENCE ONLY
GENERAL NOTES
1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
2. FOR PURPOSES OF SYSTEM REBALANCING - CONTROLS CONTRACTOR MUST COORDINATE WITH TAB CONTRACTOR IN ORDER TO DETERMINE THE BALANCED PRESSURE SETPOINT FOR DIFFERENTIAL STATIC PRESSURE SENSOR, DPT-1. BALANCED PRESSURE IS
DEFINED AS THE PRESSURE READING AT THE DPT WITH THE UNIT AT DESIGN CONDITIONS.
3. EXISTING AIR COOLED CHILLER IS DAIKIN MODEL AGZ100EDSEPVG00. COORDINATE WITH MANUFACTURER TO ENSURE ANY WORK, START-UP, SHUT-DOWN AND OPERATIONS DURING CONSTRUCTION IS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
4. TREND DATA WAS NOT PREVIOUSLY INITIATED FOR HVAC SYSTEMS WITHIN THE BUILDING. PROVIDE TREND DATA OR THE ABILITY TO COLLECT TREND DATA FOR NEW AND EXISTING CONTROLS POINTS AS INDICATED IN PROVIDED POINTS LISTS SCHEDULES.
OCCUPIED
SYSTEM DEFAULT SCHEDULE
ALL SYSTEMS
SYSTEM
UNOCCUPIED
OTHERWISEMON-SAT
0900-2400
DESCRIPTION
CHILLED WATER DIFFERENTIAL PRESSURE SENSOR
NO
D
DC
C
ON
NE
CT
IO
N
CO
MM
IS
SI
ON
IN
G
FR
EQ
UE
NC
Y
OP
ER
AT
IN
G
FR
EQ
UE
NC
Y
ANALOG BINARY
INPUT TO DDC OUTPUT FROM DDC
ANALOG BIN. LIMIT
ALARMS
WARNING
TRENDING
PO
IN
T
NA
ME
DPT-1
TE
MP
ER
AT
UR
E
PR
ES
SU
RE
HU
MI
DI
TY
AI
RF
LO
W
S
EN
SO
R
CA
RB
ON
D
IO
XI
DE
LE
VE
L
PO
SI
TI
ON
ST
AT
US
DI
FF
ER
EN
TI
AL
P
RE
SS
UR
E
FA
UL
T
CU
RR
EN
T
SE
NS
IN
G
RE
LA
Y
EN
D
SW
IT
CH
DA
MP
ER
P
OS
IT
IO
N
SP
EE
D
VA
LV
E
PO
SI
TI
ON
SE
T
PO
IN
T
AD
JU
ST
ME
NT
OF
F-
ON
OP
EN
-C
LO
SE
FA
IL
HI
GH
LO
W
HI
GH
LO
W
AIR COOLED CHILLER MODIFIED POINTS LISTS
X 15min15min COOLING COIL LAT, QTY. 3T-1 X 15min15min
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :23
:32 P
M
XX
X.
XX
1.0
M
-7
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
C O
N
TR
O
LS
M-704 12913306
MODIFIED SEQUENCE OF OPERATION - AIR COOLED CHILLER
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :23
:42 P
M
XX
X.
XX
1.0
M
-7
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
C O
N
TR
O
LS
M-705 12913307
MODIFIED SEQUENCE OF OPERATION - HEAT EXCHANGER
DESCRIPTION
START/STOP, STATUS
NO
D
DC
C
ON
NE
CT
IO
N
CO
MM
IS
SI
ON
IN
G
FR
EQ
UE
NC
Y
OP
ER
AT
IN
G
FR
EQ
UE
NC
Y
ANALOG BINARY
INPUT TO DDC OUTPUT FROM DDC
ANALOG BIN. LIMIT
ALARMS
WARNING
TRENDING
PO
IN
T
NA
ME
CS-1
EHO EMERGENCY HVAC OFF X
TE
MP
ER
AT
UR
E
PR
ES
SU
RE
HU
MI
DI
TY
AI
RF
LO
W
S
EN
SO
R
CA
RB
ON
D
IO
XI
DE
LE
VE
L
PO
SI
TI
ON
ST
AT
US
DI
FF
ER
EN
TI
AL
P
RE
SS
UR
E
FA
UL
T
CU
RR
EN
T
SE
NS
IN
G
RE
LA
Y
EN
D
SW
IT
CH
DA
MP
ER
P
OS
IT
IO
N
SP
EE
D
VA
LV
E
PO
SI
TI
ON
SE
T
PO
IN
T
AD
JU
ST
ME
NT
OF
F-
ON
OP
EN
-C
LO
SE
FA
IL
HI
GH
LO
W
HI
GH
LO
W
EF-3 POINTS LISTS
X COVCOV
GENERAL
OCCUPIED/UNOCCUPIED CYCLE: THE OCCUPIED OR UNOCCUPIED CYCLE SHALL BE SELECTED BY
THE DDC CONTROLLER TIME CLOCK FUNCTION. IT WILL RUN CONTINUOUS ON BUILDING TIME
CLOCK DURING OCCUPIED HOURS.
UNOCCUPIED CYCLE: THE FAN SHALL STOP AND DAMPER D-1 SHALL CLOSE.
OCCUPIED CYCLE: THE FAN SHALL START AND DAMPER D-1 SHALL OPEN.
FAN OPERATION: THE EXHAUST FAN SHALL BE STARTED AND STOPPED THROUGH THE BAS.
CURRENT SWITCH CS-1 SHALL INDICATE OPERATION.
EMERGENCY HVAC OFF: ON ACTIVATION OF THE EMERGENCY HVAC OFF SWITCH (EHO), THE FAN
SHALL STOP AND THE DAMPER SHALL RETURN TO ITS NORMAL POSITION.
PROVIDE INTERLOCKED CONTROL DAMPER ACTUATOR ALSO INTERLOCKED TO FAN.
120 VAC
MOTOR
RATED RELAY
BAS
D-1
NL1
D-1 N.C.
EF-3
FLOW DIAGRAM
WIRING DIAGRAM
DISHWASHING FAN EF-3
CS-1
X
X COVCOV
EXISTING EQUIPMENT POINTS LISTS - FOR REFERENCE ONLY
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :23
:52 P
M
XX
X.
XX
1.0
M
-7
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
C O
N
TR
O
LS
M-706 12913308
SEQUENCE OF OPERATION - KITCHEN EQUIPMENT
DESCRIPTION
HEAT PUMP SPHP-1 STATUS
PIZZA OVEN HOOD EXHAUST FAN STATUS, KEF-2
NO
D
DC
C
ON
NE
CT
IO
N
CO
MM
IS
SI
ON
IN
G
FR
EQ
UE
NC
Y
OP
ER
AT
IN
G
FR
EQ
UE
NC
Y
ANALOG BINARY
INPUT TO DDC OUTPUT FROM DDC
ANALOG BIN. LIMIT
ALARMS
WARNING
TRENDING
85°F 60°F
PO
IN
T
NA
ME
CS-1
CS-2
CS-3
KITCHEN HOOD EXHAUST FAN STATUS, KEF-1 X
TE
MP
ER
AT
UR
E
PR
ES
SU
RE
HU
MI
DI
TY
AI
RF
LO
W
S
EN
SO
R
CA
RB
ON
D
IO
XI
DE
LE
VE
L
PO
SI
TI
ON
ST
AT
US
DI
FF
ER
EN
TI
AL
P
RE
SS
UR
E
FA
UL
T
CU
RR
EN
T
SE
NS
IN
G
RE
LA
Y
EN
D
SW
IT
CH
DA
MP
ER
P
OS
IT
IO
N
SP
EE
D
VA
LV
E
PO
SI
TI
ON
SE
T
PO
IN
T
AD
JU
ST
ME
NT
OF
F-
ON
OP
EN
-C
LO
SE
FA
IL
HI
GH
LO
W
HI
GH
LO
W
MAKE-UP AIR FAN STATUS, KSF-1
KITCHEN SPACE TEMPERATURE
KITCHEN SPACE HUMIDITY
CS-4
TT-1
HT-1
X X
X X 60% 30%
15min15min 15min15min 15min15min 15min15min 15min15min
COVCOV
X XEMERGENCY OFF, QTY. 4EHO-X COVCOV
X
KITCHEN AREA EQUIPMENT POINTS LISTS
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 5 :24
:02 P
M
XX
X.
XX
1.0
M
-7
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
DER DER RAP
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
07/25/2025
C O
N
TR
O
LS
M-707 12913309
FI
LE
N
RE
F:
PL
OT
D
AT
E:
7/2
9/2
5 1 :22
:32 P
M
XX
X.
XX
1.0
E
-0
.D W
G
A
B
C
D
1 2 3 4 5
1 2 3
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW
SY
M
DE
SC
RI
PT
IO
N
DA
TE
AP
PR
CHK
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
OF
EPROJECT NO.:
AS NOTED
<<PM/DM>>
BRANCH MANAGER
CHIEF ENG/ARCH
<<XX>>
4325 Lake Boone Train|Suite 301|Raleigh, NC 27607
(984) 204-4500 | www.summerconsultants.com
SUMMER
CONSULTANTS
I N C O R P O R A T E D
4 5
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
MC
AS
C
HE
RR
Y
PO
IN
T, N
C
CH
ER
RY
P
OI
NT
, N
C
FA
C
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
A
C Q
U
IS
IT
IO
N S
D
IV
IS
IO
N M
C
AS
C H
ER
R
Y
PO
IN
T
- C H
ER
R
Y
PO
IN
T, N C
BU
IL
DI
NG
UP
DA
TE
P
UB
LI
C
HO
US
E
HV
AC
S
YS
TE
M S, N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
MA
RI
NE
C
OR
PS
A
IR
S
TA
TI
ON
, C
HE
RR
Y
PO
IN
T, N
C
7434003
NICHOLAS A. HALL
PATRICK FAULKNER
WM WM RS
07/25/2025
ABBREVIATIONS
A AMPERES.
AF FRAME SIZE IN AMPERES.
AFF ABOVE FINISHED FLOOR.
AHU AIR HANDLING UNIT.
AT TRIP SIZE IN AMPERES.
AWG. AMERICAN WIRE GAUGE.
BLDG. BUILDING.
CAB. CABINET.
C/B CIRCUIT BREAKER.
COR CONTRACTING OFFICER REPRESENTATIVE.
CWP COLD WATER PUMP.
(D) EXISTING TO BE DEMOLISHED.
DOAS DEDICATED OUTDOOR AIR SYSTEM
DTW DUAL TEMPERATURE WATER
(E) EXISTING TO REMAIN.
EC EMPTY CONDUIT.
EMT ELECTRICAL METALLIC TUBING.
FCU FAN COIL UNIT.
FLA FULL LOAD AMPERES.
FMCP FIRE ALARM / MASS NOTIFICATION CONTROL PANEL
FVNR FULL VOLTAGE NON-REVERSING.
GRD. GROUND CONDUCTOR.
GEC GROUNDING ELECTRODE CONDUCTOR.
H-O-A HAND-OFF-AUTOMATIC
SELECTOR SWITCH.
HWP HEATING WATER PUMP.
KAIC THOUSAND AMPERE
INTERRUPTING CAPACITY.
KW KILO-WATTS.
MECH. MECHANICAL.
MDP MAIN DISTRIBUTION PANELBOARD
MH MAN HOLE
M.L.O. MAIN LUGS ONLY.
N/A NOT APPLICABLE.
N.E.C NATIONAL ELECTRICAL CODE.
NEMA NATIONAL ELECTRICAL
MANUFACTURER'S ASSOCIATION.
NFSS NON-FUSED SAFETY SWITCH.
P NUMBER OF POLES.
PH. NUMBER OF PHASES.
SUS SANDHILLS UTILITY SERVICE
TYP. TYPICAL.
TRNS MASS NOTIFICATION TRANSCEIVER
UH UNIT HEATER.
U.L. UNDERWRITER'S LABORATORIES.
UON UNLESS OTHERWISE NOTED.
V VOLTAGE.
VFD VARIABLE FREQUENCY DRIVE.
WP WEATHERPROOF, OR
NEMA 3R ENCLOSURE.
GENERAL SYMBOLS
NORTH ARROW
COLUMN BUBBLE
DESIGNATION
REVISION CLOUD WITH REVISION
NUMBER DESIGNATION
BREAKLINE
MATCHLINE DESIGNATION
NOTE NUMBER
ARROW INDICATES
TRUE NORTH AND/OR
PROJECT NORTH
N
E-101
N
8'0 1/8"=1'-0"
UNIQUE PLAN OR
DETAIL NUMBER
ON THIS DRAWING NORTH ARROW
NAME OF PLAN OR DETAIL
ALL DRAWINGS WHERE
DETAIL IS REFERENCED
GRAPHIC SCALE OF
PLAN OR DETAIL
SECTION IDENTIFICATION
INDICATES DIRECTION
OF CUTTING PLANE
NUMBER INDICATES SECTION
SHEET NUMBER WHERE
SECTION IS DRAWN
2-PART REFERENCE DETAIL IDENTIFICATION:
SHEET NUMBER WHERE
DETAIL/SECTION IS DRAWN
NUMBER INDICATES
DETAIL/SECTION
FLOOR PLAN
E-101, E-1022
FLOOR PLAN AND DETAIL TITLES:
E-101
Ø PHASE.
M A T C H L I N E A-A
ELECTRICAL SYMBOLS
E EXISTING FEEDER
M 1,3,5
BRANCH CIRCUIT CONDUIT AND CONDUCTORS RUN EXPOSED ON
WALLS AND CEILINGS. SIZE IN ACCORDANCE WITH N.E.C. RACEWAY
SHALL BE MINIMUM 3/4" EMT, AND CONDUCTORS SHALL BE MINIMUM
SIZE #12 AWG COPPER WITH THHN/THWN INSULATION, UNLESS
OTHER SIZES ARE SPECIFICALLY NOTED.
HOME RUN TO PANEL. NUMBER OF ARROWS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .