7434003 DrawingsAsOne.pdf

PDF 7 MB Posted

Attached to
Update HVAC Building 1281
Solicitation number
N400857434003
Issued by

About this file

These documents are detailed architectural and engineering design drawings for updating the HVAC systems at Building 1281, Marine Corps Air Station Cherry Point in North Carolina. The project, commissioned by Naval Facilities Engineering Command, involves comprehensive mechanical and electrical system upgrades, including replacing rooftop units (RTUs), modifying control systems, and updating various building systems.

The comprehensive set of drawings includes demolition plans, first floor and roof plans, detailed mechanical and electrical schematics, and equipment schedules. Key scope elements include replacing three-way control valves with two-way valves, refurbishing existing rooftop units, installing new variable frequency drives (VFDs), updating control sequences, and performing system balancing and testing. The project aims to improve the building's HVAC efficiency, with specific attention to kitchen areas, air handling units, and building-wide temperature and ventilation control systems. The work is scheduled for completion by July 25, 2025, with Summer Consultants Inc. serving as the design engineering firm.

View the file

Other files

File Type Posted
7434003 RFP.pdf PDF
7434003 SpecsAsOne.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

LAY DOWN AREA

MAIN GATE PASS AND

ID OFFICE

ROOSEVELT BLVD.

PROJECT LOCATION

BUILDING 1281

SLOCUM GATE

BUILDING

BUILDING

BEAUFORT RD.

E STREET

ROOSEVELT BLVD

PROJECT LOCATION

2ND AVE.

E STREET

4TH AVE.

ROOSEVELT BLVD

PROJECT LOCATION

2ND AVE.

FI

LE

N

AM

E:

OU

R

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :50

:48 P

M

XX

X.

XX

1.0

G

-0

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

C O

VE

R

S H

EE

T

G-001

SHEET

NUMBER SHEET TITLE NAVFAC

DWG NO.

G-001 COVER SHEET 12913289

M-001 SYMBOLS AND ABBREVIATIONS 12913290

MD101 FIRST FLOOR PLAN - DEMOLITION 12913291

MD102 ROOF PLAN - DEMOLITION 12913292

MD401 ENLARGED KITCHEN PLAN - DEMOLITION 12913293

MD402 KITCHEN RCP - DEMOLITION 12913294

M-101 FIRST FLOOR PLAN 12913295

M-102 ROOF PLAN 12913296

M-401 ENLARGED KITCHEN PLAN 12913297

M-402 KITCHEN RCP 12913298

M-501 DETAILS 12913299

M-502 DETAILS 12913300

M-601 SCHEDULES 12913301

M-602 SCHEDULES 12913302

M-701 CONTROLS COVER 12913303

M-702 CONTROLS 12913304

M-703 CONTROLS 12913305

M-704 CONTROLS 12913306

M-705 CONTROLS 12913307

M-706 CONTROLS 12913308

M-707 CONTROLS 12913309

E-001 SYMBOLS AND ABBREVIATIONS 12913310

E-101 FIRST FLOOR PLAN 12913311

E-102 ROOF PLAN 12913312

E-401 ENLARGED KITCHEN PLAN 12913313

UPDATE PUBLIC HOUSE HVAC SYSTEMS,

CHERRY POINT, NORTH CAROLINA

WORK ORDER NO.

BUILDING 1281

VICINITY MAPLOCATION MAP DRAWING INDEX

MARINE CORPS AIR STATION

7434003

N N 01 12913289

(E)

LC

SEQUENCING NOTES SYMBOLS CONT'D SYMBOLS CONT'D GENERAL SYMBOLSABBREVIATIONS

SYMBOLS

RL

RS

PIPE TURN UP

PIPE TURN DOWN

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

DIRECTION OF FLOW

PIPE CAP

PIPE CLEANOUT

WALL PIPE CLEANOUT

FLOOR CLEANOUT

FLOOR DRAIN

C.O.

W.C.O.

F.C.O.

FL.D.

GATE VALVE

GLOBE VALVE

SWING CHECK VALVE

TWO-WAY CONTROL VALVE

THREE-WAY CONTROL VALVE

STRAINER

UNION

SAFETY RELIEF VALVE

FLOW MEASURING VALVE

COMBINATION FLOW MEASURING

AND BALANCING VALVE

BALANCING VALVE

BALL VALVE

BUTTERFLY VALVE

MOTORIZED BUTTERFLY VALVE

MANUAL AIR VENT 3/8" BALL VALVEM.A.V.

THERMOMETER AND WELL

PRESSURE GAUGE

WYE STRAINER WITH CAPPED

BLOWDOWN VALVE

RECTANGULAR DUCT

SIZE TRANSITION

RIGID ROUND DUCT

SIZE TRANSITION

DUCT TRANSITION FROM

SQUARE TO ROUND

DUCT WITH SMOKE DETECTORSD

DUCT ELBOW WITH

TURNING VANES

FLEXIBLE DUCTWORK. 5 FEET MAXIMUM

LENGTH, SIZE AS INDICATED OR SCHEDULED

SQUARE CEILING DIFFUSER WITH FLEXIBLE

DUCT(5' MAXIMUM LENGTH) SAME SIZE AS

DIFFUSER NECK SIZE. DIFFUSER SIZE PER

SCHEDULE UNLESS OTHERWISE NOTED.

PROVIDE CONICAL SPIN-IN TAP WITH

BALANCING DAMPER AT CIRCULAR DUCT.

NUMBER INDICATES BALANCING AIRFLOW CFM.

CEILING REGISTER, SIZE PER SCHEDULE UNLESS

OTHERWISE NOTED. NUMBER INDICATES

BALANCING AIRFLOW CFM.

SUPPLY AIR DIFFUSER, 24x24 FACE AREA, SUITABLE FOR 2'x4' TILE CEILING.

PERFORATED CEILING PANEL, 24x24 FACE AREA, SUITABLE FOR 2'x4' TILE CEILING.

CENTRIFUGAL FAN OR

PUMP BY APPLICATION

DOOR LOUVER

3/4" DOOR UNDERCUT

RETURN AIR SYMBOL

NUMBER INDICATES CFM

SUPPLY AIR SYMBOL

NUMBER INDICATES CFM

THERMOSTAT

U

L

CR

HUMIDITY SENSOR

NORTH ARROW

COLUMN BUBBLE

DESIGNATION

REVISION CLOUD WITH REVISION

NUMBER DESIGNATION

BREAKLINE

MATCHLINE DESIGNATIONM A T C H L I N E A-A

DEMOLITION LINETYPE

CENTERLINE

CENTERLINE SYMBOL

EXISTING

POINT OF CONNECTION TO EXISTING

POINT OF TERMINATION OF REMOVAL

NOTE NUMBER

EXHAUST OR RETURN DUCT UP

EXHAUST OR RETURN DUCT DOWN

SUPPLY DUCT UP

SUPPLY DUCT DOWN

ROUND DUCT UP

ROUND DUCT DOWN

A.D.

DUCT WITH ACCESS DOOR,

MINIMUM 16x16

DUCT WITH MANUAL BALANCING DAMPER.

PROVIDE ACCESS DOOR MINIMUM (DUCT

WIDTH MINUS 2") WIDE BY 16" LONG.M.B.D.

DUCT WITH FLEXIBLE CONNECTION

UP DUCT TRANSITION UP

DUCT TRANSITION DOWNDN.

DUCT RISERISE

T

H

M

A.D. ACCESS DOOR

A.F.F. ABOVE FINISHED FLOOR

AFMS AIRFLOW MEASURING STATION

AHU AIR HANDLING UNIT

ARCH. ARCHITECTURAL

A.P. ACCESS PANEL

APPROX. APPROXIMATELY

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

C COMMON

C.C. COOLING COIL

C.D. CEILING DIFFUSER

CFM CUBIC FEET PER MINUTE

C.G. CEILING GRILLE

C.O. CLEANOUT

CW DOMESTIC COLD WATER

D.B. DRY BULB

db DECIBEL

DDC DIRECT DIGITAL CONTROL

DESIG. DESIGNATION

DIA DIAMETER

DN. DOWN

(E) EXISTING

E.A.T. ENTERING AIR TEMPERATURE

E.D.B. ENTERING DRY BULB

EFF. EFFICIENCY

E.G. EXHAUST GRILLE

EHO EMERGENCY HVAC OFF

ENT. ENTERING

E.S.P. EXTERNAL STATIC PRESSURE

E.W.B. ENTERING WET BULB

E.W.T. ENTERING WATER TEMPERATURE

EXIST. EXISTING

°F DEGREES FAHRENHEIT

FL.D. FLOOR DRAIN

FLR. FLOOR

FPM FEET PER MINUTE

FT. FEET

GPM GALLONS PER MINUTE

H.C. HEATING COIL

HP HORSEPOWER

HW DOMESTIC HOT WATER

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

Hz HERTZ

IN. INCHES

L.A.T. LEAVING AIR TEMPERATURE

LBS. POUNDS

L.D.B. LEAVING DRY BULB

L.W.T. LEAVING WATER TEMPERATURE

MAX. MAXIMUM

M.B.D. MANUAL BALANCING DAMPER

MER MECHANICAL EQUIPMENT ROOM

MIN. MINIMUM

M.O.D. MOTOR OPERATED DAMPER

NC NOISE CRITERIA

N.C. NORMALLY CLOSED

N.I.C. NOT IN CONTRACT

N.O. NORMALLY OPEN

O.A. OUTSIDE AIR

P.D. PRESSURE DROP

PH PHASE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

R.A. RETURN AIR

R.G. RETURN GRILLE

RPM REVOLUTIONS PER MINUTE

S.A. SUPPLY AIR

SD SMOKE DETECTOR

S.P. STATIC PRESSURE

T.G. TRANSFER GRILLE

TYP. TYPICAL

V VOLTS

VAV VARIABLE AIR VOLUME

VOL. VOLUME

W.B. WET BULB

W.C. WATERCOLUMN

ARROW INDICATES

TRUE NORTH AND/OR

PROJECT NORTH

N

M101

N

8'0 1/8"=1'-0"

UNIQUE PLAN OR

DETAIL NUMBER

ON THIS DRAWING NORTH ARROW

NAME OF PLAN OR DETAIL

ALL DRAWINGS WHERE

DETAIL IS REFERENCED

GRAPHIC SCALE OF

PLAN OR DETAIL

SECTION IDENTIFICATION

INDICATES DIRECTION

OF CUTTING PLANE

NUMBER INDICATES SECTION

SHEET NUMBER WHERE

SECTION IS DRAWN

2-PART REFERENCE DETAIL IDENTIFICATION:

SHEET NUMBER WHERE

DETAIL/SECTION IS DRAWN

NUMBER INDICATES

DETAIL/SECTION

FLOOR PLAN

M101, M1022

FLOOR PLAN AND DETAIL TITLES:

M101

REFRIGERANT LIQUID

REFRIGERANT SUCTION

ROOM NUMBER DESIGNATION.1234CWS

DOMESTIC COLD WATERCW

CWR CHILLED WATER RETURN

CHILLED WATER SUPPLY

CONDENSATE DRAIND

G GAS PIPING

HW DOMESTIC HOT WATER

HWR HEATING WATER RETURN

HEATING WATER SUPPLYHWS

MAKE-UP WATERMU

1. SEQUENCING OF CONSTRUCTION

1.1 MAINTAIN HEATING AND/OR COOLING THROUGHOUT THE

FACILITY DURING OCCUPIED HOURS. COORDINATE WITH THE

GOVERNMENT FOR ANY TEMPORARY SHUTDOWN. CONDUCT

TEMPORARY SHUTDOWN OF HEATING/COOLING SYSTEMS

DURING UNOCCUPIED HOURS TO THE GREATEST EXTENT

PRACTICAL. PROVIDE A MINIMUM OF 2 WEEKS NOTICE TO

GOVERNMENT FOR ANY ANTICIPATED SHUTDOWN.

1.2 AVAILABLE CONSTRUCTION HOURS ARE LIMITED TO

NIGHTS AND MORNING HOURS FROM 2200 THE NIGHT PRIOR

TO 1000 HOURS THE FOLLOWING MORNING.

1.3 ALL CONSTRUCTION ACTIVITY MUST BE CLEANED AND THE

SPACE RETURNED TO PRIOR CONDITIONS BEFORE BUILDING

OCCUPIED HOURS (1000 HOURS).

1.4 PROVIDE DUST PROTECTION FOR KITCHEN EQUIPMENT

AND ENSURE ALL PREPARATION SURFACES AND EQUIPMENT

ARE PROTECTED FROM CONSTRUCTION ACTIVITIES. ANY

DAMAGE TO FURNITURE OR EQUIPMENT IN THE SPACE AS A

RESULT OF CONSTRUCTION ACTIVITIES MUST BE REPAIRED

OR REPLACED AT CONTRACTOR'S EXPENSE.

1.5 PROVIDE TEMPORARY FILTER MEDIA ON RETURN AIR

OPENINGS WHERE DUCT CONSTRUCTION ON ACTIVE

SYSTEMS ARE PARTIALLY COMPLETE AT THE END OF A SHIFT.

PROVIDE AS MUCH NEW DUCTWORK PRIOR TO

DISCONNECTION OF EXISTING GRILLES AND BRANCH TAPS.

2. CONTROLS MODIFICATIONS

2.1 COORDINATE PROGRAMMING FOR ADDITIONAL

EQUIPMENT POINTS LISTS AND BAS GRAPHICS DISPLAY WITH

EXISTING CONTROLS AND BUILDING MAINTENANCE PROVIDER.

EXISTING BAS CONTROLS ARE JOHNSON CONTROLS

METASYS. EXISTING CONTROLS SERVICE PROVIDER IS

JOHNSON CONTROLS, INC (JCI).

2.2 PROVIDE CONTROLS EQUIPMENT INCLUDING END DEVICES

AND CONTROLLERS COMPATIBLE WITH JCI METASYS.

2.3 PROVIDE UNIT PRICES FOR THE FOLLOWING END DEVICE

REPLACEMENT. FOR BIDDING PURPOSES AND IN ADDITION TO

EXPLICIT WORK ON DRAWINGS, PROVIDE THE FOLLOWING

END DEVICE REPLACEMENT AS PART OF BASE BID:

- 1 DUCT TEMPERATURE SENSOR

- 1 HYDRONIC CHILLED WATER TEMPERATURE SENSOR

- 2 DUCT DIFFERENTIAL PRESSURE SENSORS

- 2 SPACE HUMIDITY SENSORS

- 1 AIR FLOW MEASURING STATION (AFMS)

- 1 ACTUATOR FOR DAMPER

- 1 ACTUATOR FOR HYDRONIC CONTROL VALVE

ANY DEVICE REPLACEMENT BEYOND THE QUANTITIES ABOVE

WILL BE PROVIDED PER SUBMITTED UNIT PRICE SCHEDULE.

3. TEST AND BALANCE

3.1 PERFORM PRE-TEST AND BALANCE (PRE-TAB) ON EXISTING

KITCHEN HEAT PUMP SPHP-1 PRIOR TO ANY DUCT

MODIFICATIONS TO THE UNIT. THE PRE-TAB PERFORMANCE

SERVES AS THE BASELINE PERFORMANCE RELATIVE TO

ORIGINAL DESIGN INTENT. PROVIDE REPORT AND IDENTIFY

ANY EXISTING AIRFLOW OR CAPACITY DEFICIENCIES TO THE

GOVERNMENT. CONDUCT PRE-TAB AFTER UNIT CLEANING

AND PRIOR TO COMMENCING DUCT MODIFICATIONS.

3.2 IN ADDITION TO SYSTEMS AND EQUIPMENT PROVIDED

UNDER THIS CONTRACT, TEST AND BALANCE SCOPE

INCLUDES ALL EXISTING SYSTEMS. EXISTING DESIGN

AIRFLOWS AND EQUIPMENT SCHEDULES ARE PROVIDED ON

THE DRAWINGS FOR BALANCING PURPOSES. OUTDOOR AIR

AND BUILDING PRESSURIZATION AIRFLOWS HAVE BEEN

MODIFIED UNDER THIS CONTRACT. NOTIFY THE GOVERNMENT

OF ANY EXISTING EQUIPMENT DEFICIENCY THAT PREVENTS

THE COMPLIANCE OF BALANCING EXISTING EQUIPMENT

WITHIN 10% OF DESIGN AIRFLOW.

4. COMMISSIONING

4.1 COMMISSIONING IS INCLUDED IN THIS CONTRACT.

COMMISSIONING INCLUDES BOTH NEW AND EXISTING

SYSTEMS IN THEIR ENTIRETY. EXISTING AND MODIFIED

SEQUENCES WILL BE TESTED DURING COMMISSIONING

PROCESS. PROVIDE CORRECTIVE ACTIONS FOR ALL

CONTROLS AND AIR/WATER BALANCE DEFICIENCIES

IDENTIFIED DURING COMMISSIONING PROCESS. THIS IS

EXCLUSIVE OF DEFICIENCIES IDENTIFIED THAT EXCEED

EXISTING SYSTEM EQUIPMENT CAPACITIES OR CAPABILITIES.

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :19

:11 P

M

XX

X.

XX

1.0

M

-0

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

SY

M

BO

LS

A N

D A

BB

R

EV

IA

TI

O

N S

M-001

12913290

A B C D E F G H

MD401

T

T

T

T

TT

T

T T

T T

T

T

TT

TT

(E)EF-2

(E)16x16 UP TO

(E)EF-1 ON ROOF

(E)VAV-2 (E)VAV-3 (E)VAV-4

(E)VAV-5

(E)VAV-6

(E)VAV-7

(E)VAV-8

(E)CH-1

(E)VAV-9

(E)VAV-10

(E)VAV-11

(E)VAV-12 (E)VAV-14

(E)VAV-15

(E)VAV-17

(E)MSI-2

(E)MSO-2

(E)MSO-1

(E)EMERGENCY

HVAC OFF SWITCH

(E)VAV-1

GAMING

STORAGE

STORAGE

JANITOR

STORAGE

LOUNGE

OFFICE

CELLULAR SWITCH RM

SEATING

POOL HALL

PROMENADE

VESITBULE

VESITBULE

STORAGE133

MECH RM

MEETING

THEATER

(E)VAV-19

(E)VAV-16

(E)MSI-1

MD402

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :19

:33 P

M

XX

X.

XX

1.0

M

D1

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

FI

R

ST

F

LO

O

R P

LA

N

D

EM

O

LI

TI

O N

MD101

N

32'0 16' 1/16"=1'-0"

FIRST FLOOR PLAN - DEMOLITION1

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

SEE MD401 AND MD402 FOR DEMOLITION WORK. NO WORK

THIS SHEET. MECHANICAL SYSTEMS SHOWN FOR

REFERENCE ONLY.

12913291

(E)RTU-3

(E)RTU-2

(E)RTU-1

(E)ROOF HATCH

(E)CWS

(E)CWR(E)HWR

(E)HWS

(E)EF-1

SEE DETAIL 1/M-501.

SEE DETAIL 2/M-501.SEE DETAIL 3/M-501.

SUPPLY FAN VFD

EXHAUST FAN VFD

(E)16x82 SUPPLY PLENUM 20x82x40 DN.

(E)16x82 RETURN PLENUM 20x82x40 DN.

62x32x36 (E)16x82 SUPPLY PLENUM (E)16x82 RETURN PLENUM

(E)18x82 SUPPLY PLENUM

(E)18x82 RETURN PLENUM

14x70x40 DN.

40x36

60x30x36 24x82x40 DN.

(E)48x2448x24

16x80x30 DN.

36x2438x24

2 SUPPLY FAN VFD

(E)36x20

48x24 UP 14x70x40 DN.

(E)30x26(E)24x20

30x26 UP

(E)38x16

(E)ROOF DRAIN. RECONNECT DRAIN PIPE

FROM OVERFLOW TO THE ROOF DRAIN.

(E)48x24

(E)ROOF DRAIN. REMOVE CAP BELOW ROOF

AND RECONNECT TO DRAIN PIPE. SEE 4/M-501

FOR DETAILS.

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :19

:48 P

M

XX

X.

XX

1.0

M

D1

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

R O

O F

PL

AN

D

EM

O

LI

TI

O N

MD102

N

8'0 16' 1/8"=1'-0"

ROOF PLAN - DEMOLITION1

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

DEMOLISH 3-WAY CONTROL VALVE. DISCONNECT PIPING

AT POINTS INDICATED.

REMOVE VFD, SEE ELECTRICAL.

DEMOLISH DUCT, INSULATION, HANGERS, SUPPORTS AND

APPURTENANCES COMPLETE TO POINTS INDICATED.

KEY PLAN

NO SCALE

N

12913292

(E)KEF-2

(E)EXHAUST HOOD

(E)SPHP-1

12.5 TON

(E)KSF-1

OA

(E)KEF-1

EA

T

(E)MSI-1

(E)CH-1

(E)16x16 UP TO

(E)EF-1 ON ROOF

(E)VAV-12

(E)ROOF

HATCH

WOMEN'S TLT

PROMENADE

SMP DESK

ELECTRICAL

IT

MECH RM

ELECTRICAL ENCLOSURE

CELLULAR SWITCH RM

OFFICE

OFFICE115

OFFICE

KITCHEN

MEN'S TLT

VESTIBULE

VESTIBULE

PROMENADE

OFFICE

PREP

FREEZER

CORR.

LIQUOR STOR.1

DISHWASH AREA

(E)EMERGENCY

HVAC OFF SWITCH

(E)ROOF DRAIN. REMOVE CAP AND RECONNECT

TO DRAIN PIPE. SEE 4/M-501 FOR DETAILS.

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :20

:10 P

M

XX

X.

XX

1.0

4 M

D4

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

EN

LA

R G

ED

K

IT

C

H

EN

P

LA

N

D

EM

O

LI

TI

O

N

MD401

N

8'0 16' 1/8"=1'-0"

ENLARGED KITCHEN PLAN - DEMOLITION

MD1011

KEY PLAN

NO SCALE

N

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

DEMOLISH DUCT, INSULATION, HANGERS, SUPPORTS AND

APPURTENANCES COMPLETE TO POINTS INDICATED.

12913293

(E)KEF-2

(E)EXHAUST HOOD

(E)SPHP-1

12.5 TON

(E)KSF-1

(E)KEF-1

EA

(E)MSI-1

(E)CH-1

(E)VAV-12

(E)ROOF

HATCH

WOMEN'S TLT

PROMENADE

SMP DESK

ELECTRICAL

IT

MECH RM

ELECTRICAL ENCLOSURE

CELLULAR SWITCH RM

TRAINING

OFFICE115

STORAGE

KITCHEN

MEN'S TLT

VESTIBULE

VESTIBULE

PROMENADE

OFFICE

PREP

FREEZER

CORR.

LIQUOR STOR.

DISHWASH AREA

(E) (E)

(E) (E)

(E) (E)

(E) (E)

(E)

(E) (E)

(E) (E)

(E)

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 1 1:2

0:0 1 P

M

XX

X.

XX

1.0

M

D4

.D W

G

A

B

C

D

2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D E

P A

R T

M E

N T

O

F

T

H E

A V

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C Q

U I S

I T

I O

S

D

I V

I S

I O

N M

C A

S

C

H E

R R

Y

P

O I N

T

C

H E

R R

Y

P

O I N

T

N

C

B U

I L D

I N

G

U P

D A

P

U B

L

U

V A

C

S

Y S

T E

M S

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

M A

R I N

E

C

O R

A

T I O

N

C

H E

R R

Y

P

O I N

T

N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

K I T

C H

E M

O L

I T

I O

N

MD402

N

8'0 16' 1/8"=1'-0"

KITCHEN RCP - DEMOLITION

MD1011

KEY PLAN

NO SCALE

N

GENERAL NOTES

G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

REMOVE AND RELOCATE CEILING TILES WITHIN INDICATED

SPACES TO ACCOMMODATE FOR WORK ABOVE CEILING.

12913294

M-401

T

T

T

T

TT

T

T T

T T

T

T

TT

TT

A B C D E F G H

GAMING

STORAGE

STORAGE

JANITOR

STORAGE

LOUNGE

OFFICE

CELLULAR SWITCH RM

SEATING

POOL HALL

PROMENADE

VESITBULE

VESITBULE

STORAGE133

MECH RM

MEETING

THEATER

(E)EF-2

(E)16x16 UP TO

(E)EF-1 ON ROOF

(E)VAV-2 (E)VAV-3 (E)VAV-4

(E)VAV-5

(E)VAV-6

(E)VAV-7

(E)VAV-8

(E)VAV-9

(E)VAV-10

(E)VAV-11

(E)VAV-12 (E)VAV-14

(E)VAV-15

(E)VAV-17

(E)MSI-2

(E)MSO-2

(E)MSO-1

(E)EMERGENCY

HVAC OFF SWITCH

(E)VAV-1

(E)VAV-19

(E)VAV-16

(E)MSI-1

M-402

(TYP. OF

17)

315 CFM,

TYP. 3

315 CFM,

TYP. 3

425 CFM,

TYP. 2

425 CFM,

TYP. 2

295 CFM,

TYP. 2

290 CFM,

TYP. 2

525 CFM,

TYP. 2

H

(E)CH-1

245100150

330 330

245 245

100100

980 CFM,

TYP. 4

1200 CFM,

TYP. 4

180 180

355 350

355 355

355 355

355 355

1065 CFM,

TYP. 4

33090

175 180

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :20

:36 P

M

XX

X.

XX

1.0

M

-1

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

FI

R

ST

F

LO

O

R P

LA

N

M-101

GENERAL NOTES

G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED EXISTING,

EXIST., OR (E).

G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

TEST AND BALANCE FAN TO DESIGN CFM SHOWN AND

PROVIDE REPORT OF ANY DEFICIENCIES.

TEST AND BALANCE VAV BOX TO AIRFLOW AND WATER

FLOWS PER EXISTING VAV SCHEDULE ON DRAWING M-601.

BALANCE AIRFLOWS TO CFMS INDICATED FOR ROOMS 119,

123 AND 124.

PROVIDE HUMIDITY SENSOR IN ROOM 123.

N

32'0 16' 1/16"=1'-0"

FIRST FLOOR PLAN1

12913295

(E)RTU-3

(E)RTU-2 (E)RTU-1

(E)ROOF HATCH

(E)CWS

(E)CWR(E)HWR

(E)HWS

SUPPLY FAN 8510 CFM

RETURN FAN

8510 CFM

SUPPLY FAN

5785 CFM

RETURN FAN

5785 CFM

SUPPLY FAN

9610 CFM

RETURN FAN

9610 CFM

(E)EF-1

1350 CFM

(E)ROOF DRAIN. RECONNECT DRAIN PIPE

FROM OVERFLOW TO THE ROOF DRAIN.

SEE DETAIL 1/M-501.

SEE DETAIL 2/M-501.SEE DETAIL 3/M-501.

SUPPLY FAN VFD

SUPPLY FAN VFD

(E)16x82 SUPPLY PLENUM 20x46 DN.

(E)16x82 RETURN PLENUM (E)16x82 SUPPLY PLENUM (E)18x82 SUPPLY PLENUM

(E)18x82 RETURN PLENUM

48x24(E)36x20

18x48 DN.

48x18

46x20

(E)48x24

(E)30x26(E)24x20

16x30 DN.

30x16

16x30 DN.

(E)16x82 RETURN PLENUM

4 2

4 2

24x48 DN.

48x24 20x50 DN.

50x20

(E)38x16

(E)ROOF DRAIN. REPLACE DOME WITH NEW.

REMOVE CAP BELOW ROOF AND RECONNECT

TO DRAIN PIPE. SEE 4/M-501 FOR DETAILS.

EXHAUST FAN VFD 3

30x16 4 (E)48x24

V-3

V-2 V-1

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :20

:49 P

M

XX

X.

XX

1.0

M

-1

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

R O

O F

PL

AN

M-102

GENERAL NOTES

G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED EXISTING,

EXIST., OR (E).

G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

REPLACE 3-WAY CONTROL VALVE WITH 2-WAY VALVE.

CONNECT PIPING AT POINTS INDICATED.

TEST AND BALANCE FAN TO DESIGN CFM SHOWN AND

PROVIDE REPORT OF ANY DEFICIENCIES.

REPLACE VFD. BALANCE FAN AND VFD UPON

REPLACEMENT.

PROVIDE MINIMUM OF 8 INCHES BETWEEN THE BOTTOM

OF DUCT AND THE ROOF SURFACE.

N

8'0 16' 1/8"=1'-0"

ROOF PLAN1

KEY PLAN

NO SCALE

N

12913296

A B C D E F G

(E)EXHAUST HOOD

(E)SPHP-1

12.5 TON

(E)KSF-1, 2730 CFM

OA

(E)KEF-1

EA

(E)ROOF

HATCH

T

(E)MSI-1

(E)CH-1

(E)16x16 UP TO

(E)EF-1 ON ROOF

(E)VAV-12

WOMEN'S TLT

PROMENADE

SMP DESK

ELECTRICAL

IT

MECH RM

ELECTRICAL ENCLOSURE

CELLULAR SWITCH RM

OFFICE

OFFICE115

OFFICE

KITCHEN

MEN'S TLT

VESTIBULE

VESTIBULE

26x20

TG-1

110x8

8x8

10x8

EG-1

EG-1

RG-1

RG-1

8x8

PROMENADE

OFFICE

PREP

FREEZER

DISHWASH AREA

CORR.

LIQUOR STOR.

(E)KEF-2

RG-1

20x20 LOUVER

EF-3

(E)EMERGENCY

HVAC OFF SWITCH

RG-1

RG-1

20x16

685 CFM 2

4312 CFM 2

TG-1

TG-1

TG-1

(E)ROOF DRAIN. REMOVE CAP AND RECONNECT

TO DRAIN PIPE. SEE 4/M-501 FOR DETAILS.

20x14

30x10 30x10

M.O.D.

170160

TH

280 280

365 365 365

250250

80165

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :21

:11 P

M

XX

X.

XX

1.0

M

-4

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

EN

LA

R G

ED

K

IT

C

H

EN

P

LA

N

M-401

N

8'0 16' 1/8"=1'-0"

ENLARGED KITCHEN PLAN

M-1011

KEY PLAN

NO SCALE

N

GENERAL NOTES

G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED EXISTING,

EXIST., OR (E).

G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

PROVIDE POWER CONTROL RELAY FOR INTERLOCKING

FAN OPERATION WITH EXISTING EHO. UPON EHO

ACTIVATION, FAN SHALL BE DE-ENERGIZED.

TEST AND BALANCE FAN TO DESIGN CFM SHOWN AND

PROVIDE REPORT OF ANY DEFICIENCIES.

INSULATE ALL EXISTING MAKEUP AIR DUCTWORK.

PROVIDE FULL DUCT CLEANING OF ALL EXISTING KITCHEN

UNIT DUCTWORK BEFORE PERFORMING TAB ON THE

COMPLETE SYSTEM.

PROVIDE FULL CLEANING OF EXISTING KITCHEN UNIT

SPHP-1. CLEAN COILS, DRAIN PANS, ETC. TO REFURBISH

UNIT.

12913297

(E)SPHP-1

12.5 TON

(E)KEF-1

(E)ROOF

HATCH

T

(E)CH-1

WOMEN'S TLT

PROMENADE

SMP DESK

ELECTRICAL

IT

MECH RM

ELECTRICAL ENCLOSURE

CELLULAR SWITCH RM

TRAINING

OFFICE115

STORAGE

MEN'S TLT

VESTIBULE

VESTIBULE

PROMENADE

FREEZER

DISHWASH AREA

CORR.

LIQUOR STOR.

PREP

KITCHEN

OFFICE

(E)

(E)

(E) (E)

(E)

(E)

(E)

(E)

(E)

(E) (E)

(E) (E)

(E)

(E) (E) (E) (E)

(E) (E) (E)

(E)

(E)

(E) (E)

(E) (E)

(E)

(E)

(E)

(E) (E)

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :21

:29 P

M

XX

X.

XX

1.0

M

-4

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

KI

TC

H

EN

R C

P

M-402

N

8'0 16' 1/8"=1'-0"

KITCHEN RCP

M-1011

GENERAL NOTES

G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED EXISTING,

EXIST., OR (E).

G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

REPLACE CEILING TILES WITHIN INDICATED SPACES.

KEY PLAN

NO SCALE

N

12913298

NO SCALE

RTU-1

DETAIL

MD102,M-1021

NO SCALE

RTU-2

DETAIL

MD102,M-1022

NO SCALE

RTU-3

DETAIL

MD102,M-1023

NO SCALE

ROOF DRAIN

DETAIL

MD102,M-102,MD401,M-4014

REMOVE 3-WAY CONTROL

VALVE ON RTU-3 CHILLED

WATER RETURN. PROVIDE

2-WAY CONTROL VALVE

AND REINSULATE. REMOVE

BYPASS PORT PIPING BACK

TO SUPPLY MAIN, CAP AND

REINSULATE.

REMOVE 3-WAY CONTROL

VALVE ON RTU-1 CHILLED

WATER RETURN. PROVIDE

2-WAY CONTROL VALVE

AND REINSULATE. REMOVE

BYPASS PORT PIPING BACK

TO SUPPLY MAIN, CAP AND

REINSULATE.

REMOVE 3-WAY CONTROL

VALVE ON RTU-2 CHILLED

WATER RETURN. PROVIDE

2-WAY CONTROL VALVE

AND REINSULATE. REMOVE

BYPASS PORT PIPING BACK

TO SUPPLY MAIN, CAP AND

REINSULATE.

REMOVE CAP AND

RECONNECT DRAIN PIPE.

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :22

:18 P

M

XX

X.

XX

1.0

M

-5

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

D

ET

AI

LS

M-501

GENERAL NOTES

G1. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS

CONTRACT UNLESS SPECIFICALLY MARKED EXISTING,

EXIST., OR (E).

G2. VERIFY LOCATION AND DIMENSIONS OF EXISTING

EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE

START OF CONSTRUCTION.

NOTES

NONE.1

12913299

JOINT IS NOT ALLOWED ON TOP

DUCT WRAP INSULATION

FOIL TAPE OVER STAPLES

STAPLES

6 MIL DRY THICKNESS (MIN.)

BRUSH ON SEALANT OVER TAPE

JOINT LOCATED

ON SIDE OR

BOTTOM OF

DUCTWORK

USE ONLY AT LAST TAKEOFF

BEFORE OUTLETS & ONLY

WHERE ROUND RUNOUTS ARE

INDICATED ON THE DRAWINGS.

USE ONLY AT LAST TAKEOFF

BEFORE OUTLETS & ONLY

WHERE RECTANGULAR

RUNOUTS ARE INDICATED ON

THE DRAWINGS.

MAIN DUCT

6"

MAIN DUCT

6"

45°

45°

BRANCH DUCT

MANUAL BALANCING DAMPER

BRANCH DUCT

MANUAL BALANCING DAMPER

RECTANGULAR

ROUND

NO SCALE

BRANCH CONNECTIONS

DETAIL

NO SCALE

SEALING OF INTERIOR DUCT WRAP INSULATION - TYP.

DETAIL

AIR FLOW

TOP ACCESS PANEL

DUCT DIRECT DRIVE

FAN MOTOR

FLEXIBLE CONNECTION

(TYP)

NO SCALE

CENTRIFUGAL IN-LINE FAN

DETAIL

SEALANT

BIRDSCREEN

6"DEEP LOUVER

EXTENDED SILL PLATE

(E)EXTERIOR WALL

∠ 2"x2"x3/16" GALVANIZED

NO SCALE

EXHAUST LOUVER

DETAIL

TOLCO

MOUNTING FLANGE

OR BRACKET (TYP.

OF FOUR)

ROD COUPLING

(TYP. OF FOUR)

3/8" ALL THREAD

ROD (TYP. OF FOUR)

SUPPORT FAN FROM

STRUCTURAL BEAM ABOVE.

TOLCO

BEAM

CLAMP

(E)AHU COOLING COIL

COOLING COIL PIPING - DEMOLITION

COOLING COIL PIPING

(E)AHU COOLING COIL

AUTOMATIC CONTROL VALVE

(E)BALANCING VALVE

AUTOMATIC CONTROL VALVE

PROVIDE

STRAIGHT PIPE

(E)BALANCING VALVE

NO SCALE

COOLING COIL VALVE REPLACEMENT

DETAIL

T-BAR CEILING GRID

OPPOSED

BLADE

DAMPER

STAINLESS STEEL DRAW BANDDUCT COLLAR

AS DIFFUSER

SIZE SAME

NECK.

FLEXIBLE DUCT

STAINLESS STEEL DRAW BAND

MBD

SHEETMETAL DUCT

PROVIDE 24x24 T-BAR LAY-IN PANEL WITH

OPENING SIZED FOR OVERALL GRILLE SIZE AS

SPECIFIED ON THE AIR DEVICE SCHEDULE.

PROVIDE RECTANGULAR CEILING GRILLE, SQUARE TO

ROUND TRANSITION, NECK SIZE PER GRILLE SCHEDULE.

SEE DRAWINGS FOR CFM.

NO SCALE

CEILING GRILLE CONNECTION

DETAIL

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :22

:31 P

M

XX

X.

XX

1.0

M

-5

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

D

ET

AI

LS

M-502 12913300

FAN SCHEDULE

UNIT

NO.

TYPE WHEEL

DIA.

(IN.)

AIRFLOW

(CFM)

T.S.P.

(IN. W.G.) RPM BHP

MAX.

MOTOR

HP

ELEC.

DATA

(V/PH/HZ)

SERVICE LOCATION NOTES

EF-3 IL - 550 0.34 1080 0.16 1/6 115/1/60 DISHWASHER KITCHEN B,C,D,E

NOTES

A

A. IL = INLINE, CENTRIFUGAL FORWARD CURVED, DIRECT

DRIVE

B. INSTALL PER MANUFACTURERS RECOMMENDATIONS.

C. PROVIDE WITH REMOTE DISCONNECT.

D. SEE 3/M-502 FOR DETAILS.

E. PROVIDE WITH FLEXIBLE DUCT CONNECTIONS.

AIR DEVICE SCHEDULE

SYMBOL DESIG.

AIRFLOW

(CFM)

NECK

SIZE

(INCHES)

OVERALL

SIZE

(INCHES)

MAX. S.P.

DROP

(IN. W.G.)

MAX.

N.C.

HORIZONTAL

THROW @

100 FPM

FACE TYPE NOTES

RG-1 200-1200 22x22 24x24 0.04 20 - PERFORATED A,B

EG-1 275 22x22 24x24 0.04 20 - PERFORATED A

TG-1 500 30x10 0.04 20 - PERFORATED

NOTES

C

A. INSTALL PER DETAIL 6/M-502.

B. ALL DUCTED RETURN GRILLES.

C. ALL AIR DEVICES TO BE PAINTED. COORDINATE EXACT

PAINT COLOR WITH EXISTING.

MINIMUM

DEMAND CONTROL VENTILATION SCHEDULE

OUTSIDE AIR (CFM)

RTU-1

SYSTEM

MAXIMUM

21501390

RTU-2

RTU-3

(E)FAN SCHEDULE

(E)SHELL-AND-TUBE HOT WATER CONVERTER SCHEDULE

(E)CIRCULATING PUMP SCHEDULE

(E)STEAM CONDENSATE PUMP SCHEDULE

(E)VAV BOX SCHEDULE

(E)GRILLE, REGISTER & DIFFUSER SCHEDULE

(E)MINISPLIT SYSTEM AIR CONDITIONER SCHEDULE

(E)RV-1

PROVIDE SAFETY RELIEF VALVE. BODY SHALL BE CONSTRUCTED OF CAST IRON. GUIDE RING

SHALL BE CONSTRUCTED OF BRASS, THE DISC SHALL BE CONSTRUCTED OF SST AND THE

STEM SHALL BE STEEL PLATED. THE SET PRESSURE SHALL BE 25 PSI. BASIS OF DESIGN IS

WATSON McDANIEL WSVI SERIES.

CONTROL VALVE SCHEDULE

UNIT NO. VALVE

NO. SERVICE TYPE

FLOW

(GPM) CV

MAX P.D.

(FT. W.G.) NOTES

RTU-1 V-1 COOLING 2 WAY 82 39.4 10

RTU-2 V-2 COOLING 2 WAY 82 39.4 10

RTU-3 V-3 COOLING 2 WAY 63 30.3 10

NOTES

A. NOT USED.

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :22

:41 P

M

XX

X.

XX

1.0

M

-6

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

SC

H

ED

U

LE

S

M-601 12913301

(E)ROOF TOP HVAC UNIT SCHEDULE

(E)BASE BOARD ELECTRIC UNIT HEATER SCHEDULE

(E)DUCT CONSTRUCTION AND LEAK TEST SCHEDULE

(E)AIR COOLED CHILLER SCHEDULE

(E)AIR SEPARATOR/EXPANSION TANK SCHEDULE

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :22

:51 P

M

XX

X.

XX

1.0

M

-6

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

SC

H

ED

U

LE

S

M-602 12913302

WALL-MOUNTED CARBON DIOXIDE SENSOR. MOUNT

ADJACENT TO ROOM TEMPERATURE SENSOR.

M

AMS-#

ES-#

WALL-MOUNTED HUMIDITY TRANSMITTER. MOUNT ADJACENT TO ROOM

TEMPERATURE SENSOR.

FLOW METER

(TURBINE-STYLE)

AMS-#

1. PROVIDE THE FOLLOWING AUTOMATIC ALARM AT OWS EVERY MARCH 1ST AND

SEPTEMBER 1ST: "IN CONFORMANCE WITH THE UFCs AND IN ORDER TO SAVE

ENERGY, BUILDING SENSORS MUST BE CALIBRATED AND CLEANED AT REGULAR

INTERVALS. OUTSIDE AIR, DUCT, AND UNIT-MOUNTED TEMPERATURE, HUMIDITY,

AND ENTHALPY SENSORS SHOULD BE CALIBRATED ANNUALLY. AIR-FLOW

MEASURING STATIONS SHOULD BE CLEANED EVERY SIX MONTHS."

2. INSPECT, CALIBRATE, AND ADJUST AS NECESSARY TO PLACE IN PROPER

WORKING ORDER ALL EXISTING DEVICES WHICH ARE TO BE REUSED.

AIR OR WATER DIFFERENTIAL PRESSURE SWITCH, BY APPLICATION.

PROVIDE AIR SWITCH PER DETAIL 4/M-701/M-701. PROVIDE WATER

SWITCH PER DETAIL 6/M-701/M-701.

DIFFERENTIAL PRESSURE GAUGE, CONNECT TO STATIC

PRESSURE TAPS IN ACCORDANCE WITH DETAIL 3/M-701/M-701.

AIR OR WATER DIFFERENTIAL PRESSURE TRANSMITTER, BY APPLICATION.

PROVIDE AIR TRANSMITTER PER DETAIL 4/M-701/M-701. PROVIDE WATER

TRANSMITTER PER DETAIL 6/M-701/M-701.

LOW TEMPERATURE DETECTION FREEZESTAT, MANUAL RESET, WITH

20 FOOT ELEMENT. PROVIDE PER DETAILS 1/M-701/M-701 AND

2/M-701/M-701.

DUCT MOUNTED ELECTRONIC TEMPERATURE SENSOR WITH 20

FOOT AVERAGING ELEMENT. PROVIDE PER DETAILS 1/M-701/M-701

AND 2/M-701/M-701.

DUCT MOUNTED ELECTRONIC TEMPERATURE SENSOR WITH

RIGID STEM ELEMENT. PROVIDE PER DETAIL 2/M-701/M-701.

PIPE MOUNTED INSERTION TYPE ELECTRONIC

TEMPERATURE SENSOR WITH WELL.

WALL-MOUNTED ELECTRONIC TEMPERATURE SENSOR

DUCT MOUNTED CARBON DIOXIDE SENSOR. PROVIDE PER DETAIL

2/M-701/M-701.

DUCT MOUNTED ELECTRONIC RELATIVE HUMIDITY TRANSMITTER

PROVIDE PER DETAIL 2/M-701/M-701.

CURRENT SWITCH

END SWITCH

BINARY INPUT OR OUTPUT POINT

ANALOG INPUT OR OUTPUT POINT

NETWORK CONNECTION

THERMOMETER.

ELECTRIC TO PNEUMATIC SOLENOID VALVE

MOUNTED IN INSTRUMENTATION PANEL,

COIL VOLTAGES AS INDICATED ON WIRING

DIAGRAMS.

DUCT MOUNTED ENTHALPY TRANSMITTER

PROVIDE PER DETAIL 2/M-701/M-701.

GENERAL REQUIREMENTS

SYMBOLS & ABREVIATIONS

AI ANALOG INPUT

ANALOG OUTPUTAO

BI BINARY INPUT

BINARY OUTPUTBO

CLG COOLING

CHANGE OF VALUECOV

Cx COMMISSIONING

HEATINGHTG

I/O INPUT/OUTPUT

NETWORK VARIABLE INPUTNVI

NVO NETWORK VARIABLE OUTPUT

SETPOINTSP

HAND-OFF-AUTO SWITCH

MOTOR

NORMALLY OPEN CONTACTS

NORMALLY CLOSED CONTACTS

RELAY COIL

STARTER HOLDING COIL

THERMAL MOTOR SWITCH

PNEUMATIC TUBING

EXISTING PNEUMATIC TUBING

MOTOR STARTER

NC

NOEP#

C

FAN OR PUMP, BY APPLICATION

EMERGENCY HVAC OFF (SYSTEM VARIABLE)

OUTSIDE AIR TEMPERATURE SENSOR (SYSTEM VARIABLE)

OUTSIDE AIR ENTHALPY TRANSMITTER (SYSTEM VARIABLE)

VARIABLE FREQUENCY DRIVE

AIRFLOW MEASURING STATION - THERMAL DISPERSION TYPE

AIRFLOW MEASURING STATION - PIEZOMETRIC TYPE

R#

SYMBOLS & ABBREVIATIONS CONT'D

CONTROL AIR MAIN CONNECTION

OPPOSED BLADE DAMPER.D-#

D-# PARALLEL BLADE DAMPER.

A-#

DAMPER OR VALVE ACTUATOR.

2 WAY CONTROL VALVE (BALL OR GLOBE AS SPECIFIED).

V-#

3 WAY CONTROL VALVE (BALL OR GLOBE AS SPECIFIED).

V-#

HYDRONIC PIPING

AIR OR WATER FLOW PATH

FILTER OR COIL (AS LABELED)

M

A O

H

EN-#

VFD-#

DP-#

DPT-#

FZ-#

T-#

TS-#

TS-#

CD-#

HT-#

CS-#

EHO

TS-OA

EN-OA

RS-#

HT-#

CD-#

BUTTERFLY VALVE.

JUNCTION BOX AND COVER

CONDUIT TO

FIELD PANEL

FLEXIBLE METAL

CONDUIT TO

OTHER DEVICES,

IF NEEDED

FLEXIBLE CONDUIT BETWEEN

JUNCTION BOX AND DEVICE

TO ALLOW REMOVAL, MINIMUM

LENGTH OF 3 FT.

PROVIDE BRACKET IN

ACCORDANCE WITH

NOTE: DO NOT USE DEVICE AS A JUNCTION BOX. DO NOT

WIRE THRU DEVICE TO OTHER DEVICES

18 GAUGE GALVANIZED SHEET METAL

BRACKET ATTACHED TO DUCT WITH

FOUR #8 x 0.75" SHEET METAL SCREWS

PROVIDE RIGID FIBERGLASS INSULATION

WITH VAPOR BARRIER, THICKNESS TO

MATCH ADJACENT INSULATION

SEAL VAPOR TIGHT WITH

VAPOR BARRIER MASTIC

ATTACH DEVICE TO BRACKET

WITH SHEET METAL SCREWS

PROVIDE RIGID FIBERGLASS INSULATION

WITH VAPOR BARRIER, THICKNESS TO

MATCH ADJACENT INSULATION

M-701

NO SCALE

DEVICE MOUNTING BRACKET

DETAIL

M-7011

NO SCALE

DUCT MOUNTED SENSOR

DETAIL

M-7012

2 WAY CONTROL VALVE (BALL OR GLOBE AS SPECIFIED) WITH

PILOT POSITIONER.

3 WAY CONTROL VALVE (BALL OR GLOBE AS SPECIFIED).

WITH PILOT POSITIONER. DAMPER ACTUATOR WITH PILOT POSITIONER.

A-#

V-#

V-#

THE EXISTING CONTROL SYSTEM IS JOHNSON CONTROLS METASYS. PROVIDE NEW EQUIPMENT TO

INTEGRATE NEW HARDWARE, NEW SOFTWARE, AND NEW SEQUENCES. MODIFY EXISTING

PROGRAMMING AND SYSTEM GRAPHICS TO ACCOMMODATE THE NEW EQUIPMENT AND SEQUENCES.

THE EXISTING SEQUENCES OF OPERATIONS ARE MODIFIED AS FOLLOWS:

INSERTIONS ARE UNDERLINED AND BOLDED AND ARE NEW SEQUENCES REQUIRED TO IMPLEMENT

UNDER THIS CONTRACT.

DELETIONS ARE STRIKE-THROUGH AND BOLD AND ARE SEQUENCES REQUIRED TO BE DELETED OR

DISABLED FROM EXISITNG CONTROLS UNDER THIS CONTRACT.

MODIFICATIONS TO EXISTING SEQUENCE OF

OPERATIONS

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :23

:01 P

M

XX

X.

XX

1.0

M

-7

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

C O

N

TR

O

LS

C O

VE

R

M-701 12913303

RTU-1,2,3 CONTROL SCHEMATIC

AMS-X

OUTSIDE AIRFLOW MEASURING STATION

CD-X

OCCUPIED

SYSTEM DEFAULT SCHEDULE

ALL SYSTEMS

SYSTEM

UNOCCUPIED

OTHERWISEMON-SAT

0900-2400

OCCUPIED

SYSTEM DEFAULT SCHEDULE

VAV-RTU

SYSTEM

UNOCCUPIED

68 HEATING

75 COOLING

-- HEATING

-- COOLING

NOTE: TEMPERATURE SETPOINTS

SHALL BE ADJUSTABLE

KITCHEN 68 HEATING

85 COOLING

-- HEATING

-- COOLING

INSTALL AIRFLOW MEASURING

STATION ON ALL RTU INTAKES

FOR OUTDOOR AIR

PROVIDE CARBON DIOXIDE

SENSORS ON ALL RTU

RETURN AIR DUCTS

2-WAY CONTROL VALVE, V-X

CARBON DIOXIDE SENSOR

EXISTING EQUIPMENT POINTS LISTS - FOR REFERENCE ONLY

DESCRIPTION

AIRFLOW MEASURING STATION, QTY. 3

NO

D

DC

C

ON

NE

CT

IO

N

CO

MM

IS

SI

ON

IN

G

FR

EQ

UE

NC

Y

OP

ER

AT

IN

G

FR

EQ

UE

NC

Y

ANALOG BINARY

INPUT TO DDC OUTPUT FROM DDC

ANALOG BIN. LIMIT

ALARMS

WARNING

TRENDING

30%60%

PO

IN

T

NA

ME

AMS-X

CD-X

HT-X

V-X

CARBON DIOXIDE SENSOR, QTY. 3 X

TE

MP

ER

AT

UR

E

PR

ES

SU

RE

HU

MI

DI

TY

AI

RF

LO

W

S

EN

SO

R

CA

RB

ON

D

IO

XI

DE

LE

VE

L

PO

SI

TI

ON

ST

AT

US

DI

FF

ER

EN

TI

AL

P

RE

SS

UR

E

FA

UL

T

CU

RR

EN

T

SE

NS

IN

G

RE

LA

Y

EN

D

SW

IT

CH

DA

MP

ER

P

OS

IT

IO

N

SP

EE

D

VA

LV

E

PO

SI

TI

ON

SE

T

PO

IN

T

AD

JU

ST

ME

NT

OF

F-

ON

OP

EN

-C

LO

SE

FA

IL

HI

GH

LO

W

HI

GH

LO

W

RETURN AIR HUMIDITY, QTY. 3

CONTROL VALVE & POSITION FEEDBACK, QTY. 3

X X

15min15min 15min15min 15min15minX

HT-X

INSTALL DUCT MOUNTED

HUMIDITY SENSOR ON ALL

RTUS.

RTU-1,2,3 MODIFIED POINTS LISTS

X 15min15min

GENERAL NOTES

1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.

2. FOR PURPOSES OF SYSTEM REBALANCING - CONTROLS CONTRACTOR MUST COORDINATE WITH TAB CONTRACTOR IN ORDER TO DETERMINE THE BALANCED PRESSURE SETPOINT FOR EXISTING DUCT STATIC PRESSURE SENSOR (DPT). BALANCED PRESSURE IS

DEFINED AS THE PRESSURE READING AT THE DPT WITH THE UNIT AT DESIGN CONDITIONS.

3. EXISTING RTU IS DAIKIN MODEL OAH. COORDINATE WITH MANUFACTURER TO ENSURE ANY WORK CONDUCTED WITHIN THE UNIT IS IN

ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND DOES NOT VOID WARRANTY.

4. TREND DATA WAS NOT PREVIOUSLY INITIATED FOR HVAC SYSTEMS WITHIN THE BUILDING. PROVIDE TREND DATA OR THE ABILITY TO COLLECT TREND DATA FOR NEW AND EXISTING CONTROLS POINTS AS INDICATED IN PROVIDED POINTS LISTS SCHEDULES.

TT-X

COOLING COIL LAT, QTY. 3TT-X X X 15min15min

INSTALL TEMPERATURE

SENSOR DOWNSTREAM OF

COOLING COIL

HT-R1

(SPACE HUMIDITY,

ROOM 123)

30%60%HT-R1 RTU-2 SPACE HUMIDITY X 15min15min

PROVIDE HUMIDITY SENSOR

IN ROOM 123. SEE M-101 FOR

LOCATION.

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :23

:13 P

M

XX

X.

XX

1.0

M

-7

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

C O

N

TR

O

LS

M-702 12913304

MODIFIED SEQUENCE OF OPERATION (RTU-1, 2, 3)

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :23

:22 P

M

XX

X.

XX

1.0

M

-7

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

C O

N

TR

O

LS

M-703 12913305

AIR COOLED CHILLER CONTROL SCHEMATIC

T-1

REMOVE CHILLED WATER

RETURN TEMPERATURE

SENSOR. PROVIDE

TEMPERATURE SENSOR.

RE-USE EXISTING CONTROL

WIRING TO BAS.

DPT-1

REMOVE CHILLED WATER DIFFERENTIAL

PRESSURE SENSOR. PROVIDE

DIFFERENTIAL PRESSURE SENSOR.

REUSE EXISTING CONTROL WIRING TO

BAS.

EXISTING EQUIPMENT POINTS LISTS - FOR REFERENCE ONLY

GENERAL NOTES

1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.

2. FOR PURPOSES OF SYSTEM REBALANCING - CONTROLS CONTRACTOR MUST COORDINATE WITH TAB CONTRACTOR IN ORDER TO DETERMINE THE BALANCED PRESSURE SETPOINT FOR DIFFERENTIAL STATIC PRESSURE SENSOR, DPT-1. BALANCED PRESSURE IS

DEFINED AS THE PRESSURE READING AT THE DPT WITH THE UNIT AT DESIGN CONDITIONS.

3. EXISTING AIR COOLED CHILLER IS DAIKIN MODEL AGZ100EDSEPVG00. COORDINATE WITH MANUFACTURER TO ENSURE ANY WORK, START-UP, SHUT-DOWN AND OPERATIONS DURING CONSTRUCTION IS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.

4. TREND DATA WAS NOT PREVIOUSLY INITIATED FOR HVAC SYSTEMS WITHIN THE BUILDING. PROVIDE TREND DATA OR THE ABILITY TO COLLECT TREND DATA FOR NEW AND EXISTING CONTROLS POINTS AS INDICATED IN PROVIDED POINTS LISTS SCHEDULES.

OCCUPIED

SYSTEM DEFAULT SCHEDULE

ALL SYSTEMS

SYSTEM

UNOCCUPIED

OTHERWISEMON-SAT

0900-2400

DESCRIPTION

CHILLED WATER DIFFERENTIAL PRESSURE SENSOR

NO

D

DC

C

ON

NE

CT

IO

N

CO

MM

IS

SI

ON

IN

G

FR

EQ

UE

NC

Y

OP

ER

AT

IN

G

FR

EQ

UE

NC

Y

ANALOG BINARY

INPUT TO DDC OUTPUT FROM DDC

ANALOG BIN. LIMIT

ALARMS

WARNING

TRENDING

PO

IN

T

NA

ME

DPT-1

TE

MP

ER

AT

UR

E

PR

ES

SU

RE

HU

MI

DI

TY

AI

RF

LO

W

S

EN

SO

R

CA

RB

ON

D

IO

XI

DE

LE

VE

L

PO

SI

TI

ON

ST

AT

US

DI

FF

ER

EN

TI

AL

P

RE

SS

UR

E

FA

UL

T

CU

RR

EN

T

SE

NS

IN

G

RE

LA

Y

EN

D

SW

IT

CH

DA

MP

ER

P

OS

IT

IO

N

SP

EE

D

VA

LV

E

PO

SI

TI

ON

SE

T

PO

IN

T

AD

JU

ST

ME

NT

OF

F-

ON

OP

EN

-C

LO

SE

FA

IL

HI

GH

LO

W

HI

GH

LO

W

AIR COOLED CHILLER MODIFIED POINTS LISTS

X 15min15min COOLING COIL LAT, QTY. 3T-1 X 15min15min

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :23

:32 P

M

XX

X.

XX

1.0

M

-7

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

C O

N

TR

O

LS

M-704 12913306

MODIFIED SEQUENCE OF OPERATION - AIR COOLED CHILLER

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :23

:42 P

M

XX

X.

XX

1.0

M

-7

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

C O

N

TR

O

LS

M-705 12913307

MODIFIED SEQUENCE OF OPERATION - HEAT EXCHANGER

DESCRIPTION

START/STOP, STATUS

NO

D

DC

C

ON

NE

CT

IO

N

CO

MM

IS

SI

ON

IN

G

FR

EQ

UE

NC

Y

OP

ER

AT

IN

G

FR

EQ

UE

NC

Y

ANALOG BINARY

INPUT TO DDC OUTPUT FROM DDC

ANALOG BIN. LIMIT

ALARMS

WARNING

TRENDING

PO

IN

T

NA

ME

CS-1

EHO EMERGENCY HVAC OFF X

TE

MP

ER

AT

UR

E

PR

ES

SU

RE

HU

MI

DI

TY

AI

RF

LO

W

S

EN

SO

R

CA

RB

ON

D

IO

XI

DE

LE

VE

L

PO

SI

TI

ON

ST

AT

US

DI

FF

ER

EN

TI

AL

P

RE

SS

UR

E

FA

UL

T

CU

RR

EN

T

SE

NS

IN

G

RE

LA

Y

EN

D

SW

IT

CH

DA

MP

ER

P

OS

IT

IO

N

SP

EE

D

VA

LV

E

PO

SI

TI

ON

SE

T

PO

IN

T

AD

JU

ST

ME

NT

OF

F-

ON

OP

EN

-C

LO

SE

FA

IL

HI

GH

LO

W

HI

GH

LO

W

EF-3 POINTS LISTS

X COVCOV

GENERAL

OCCUPIED/UNOCCUPIED CYCLE: THE OCCUPIED OR UNOCCUPIED CYCLE SHALL BE SELECTED BY

THE DDC CONTROLLER TIME CLOCK FUNCTION. IT WILL RUN CONTINUOUS ON BUILDING TIME

CLOCK DURING OCCUPIED HOURS.

UNOCCUPIED CYCLE: THE FAN SHALL STOP AND DAMPER D-1 SHALL CLOSE.

OCCUPIED CYCLE: THE FAN SHALL START AND DAMPER D-1 SHALL OPEN.

FAN OPERATION: THE EXHAUST FAN SHALL BE STARTED AND STOPPED THROUGH THE BAS.

CURRENT SWITCH CS-1 SHALL INDICATE OPERATION.

EMERGENCY HVAC OFF: ON ACTIVATION OF THE EMERGENCY HVAC OFF SWITCH (EHO), THE FAN

SHALL STOP AND THE DAMPER SHALL RETURN TO ITS NORMAL POSITION.

PROVIDE INTERLOCKED CONTROL DAMPER ACTUATOR ALSO INTERLOCKED TO FAN.

120 VAC

MOTOR

RATED RELAY

BAS

D-1

NL1

D-1 N.C.

EF-3

FLOW DIAGRAM

WIRING DIAGRAM

DISHWASHING FAN EF-3

CS-1

X

X COVCOV

EXISTING EQUIPMENT POINTS LISTS - FOR REFERENCE ONLY

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :23

:52 P

M

XX

X.

XX

1.0

M

-7

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

C O

N

TR

O

LS

M-706 12913308

SEQUENCE OF OPERATION - KITCHEN EQUIPMENT

DESCRIPTION

HEAT PUMP SPHP-1 STATUS

PIZZA OVEN HOOD EXHAUST FAN STATUS, KEF-2

NO

D

DC

C

ON

NE

CT

IO

N

CO

MM

IS

SI

ON

IN

G

FR

EQ

UE

NC

Y

OP

ER

AT

IN

G

FR

EQ

UE

NC

Y

ANALOG BINARY

INPUT TO DDC OUTPUT FROM DDC

ANALOG BIN. LIMIT

ALARMS

WARNING

TRENDING

85°F 60°F

PO

IN

T

NA

ME

CS-1

CS-2

CS-3

KITCHEN HOOD EXHAUST FAN STATUS, KEF-1 X

TE

MP

ER

AT

UR

E

PR

ES

SU

RE

HU

MI

DI

TY

AI

RF

LO

W

S

EN

SO

R

CA

RB

ON

D

IO

XI

DE

LE

VE

L

PO

SI

TI

ON

ST

AT

US

DI

FF

ER

EN

TI

AL

P

RE

SS

UR

E

FA

UL

T

CU

RR

EN

T

SE

NS

IN

G

RE

LA

Y

EN

D

SW

IT

CH

DA

MP

ER

P

OS

IT

IO

N

SP

EE

D

VA

LV

E

PO

SI

TI

ON

SE

T

PO

IN

T

AD

JU

ST

ME

NT

OF

F-

ON

OP

EN

-C

LO

SE

FA

IL

HI

GH

LO

W

HI

GH

LO

W

MAKE-UP AIR FAN STATUS, KSF-1

KITCHEN SPACE TEMPERATURE

KITCHEN SPACE HUMIDITY

CS-4

TT-1

HT-1

X X

X X 60% 30%

15min15min 15min15min 15min15min 15min15min 15min15min

COVCOV

X XEMERGENCY OFF, QTY. 4EHO-X COVCOV

X

KITCHEN AREA EQUIPMENT POINTS LISTS

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 5 :24

:02 P

M

XX

X.

XX

1.0

M

-7

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

DER DER RAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

07/25/2025

C O

N

TR

O

LS

M-707 12913309

FI

LE

N

RE

F:

PL

OT

D

AT

E:

7/2

9/2

5 1 :22

:32 P

M

XX

X.

XX

1.0

E

-0

.D W

G

A

B

C

D

1 2 3 4 5

1 2 3

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

CHK

SATISFACTORY TO

ACTIVITY

DATE

FOR COMMANDER NAVFAC

OF

EPROJECT NO.:

AS NOTED

<<PM/DM>>

BRANCH MANAGER

CHIEF ENG/ARCH

<<XX>>

4325 Lake Boone Train|Suite 301|Raleigh, NC 27607

(984) 204-4500 | www.summerconsultants.com

SUMMER

CONSULTANTS

I N C O R P O R A T E D

4 5

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

MC

AS

C

HE

RR

Y

PO

IN

T, N

C

CH

ER

RY

P

OI

NT

, N

C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

C Q

U

IS

IT

IO

N S

D

IV

IS

IO

N M

C

AS

C H

ER

R

Y

PO

IN

T

- C H

ER

R

Y

PO

IN

T, N C

BU

IL

DI

NG

UP

DA

TE

P

UB

LI

C

HO

US

E

HV

AC

S

YS

TE

M S, N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

MA

RI

NE

C

OR

PS

A

IR

S

TA

TI

ON

, C

HE

RR

Y

PO

IN

T, N

C

7434003

NICHOLAS A. HALL

PATRICK FAULKNER

WM WM RS

07/25/2025

ABBREVIATIONS

A AMPERES.

AF FRAME SIZE IN AMPERES.

AFF ABOVE FINISHED FLOOR.

AHU AIR HANDLING UNIT.

AT TRIP SIZE IN AMPERES.

AWG. AMERICAN WIRE GAUGE.

BLDG. BUILDING.

CAB. CABINET.

C/B CIRCUIT BREAKER.

COR CONTRACTING OFFICER REPRESENTATIVE.

CWP COLD WATER PUMP.

(D) EXISTING TO BE DEMOLISHED.

DOAS DEDICATED OUTDOOR AIR SYSTEM

DTW DUAL TEMPERATURE WATER

(E) EXISTING TO REMAIN.

EC EMPTY CONDUIT.

EMT ELECTRICAL METALLIC TUBING.

FCU FAN COIL UNIT.

FLA FULL LOAD AMPERES.

FMCP FIRE ALARM / MASS NOTIFICATION CONTROL PANEL

FVNR FULL VOLTAGE NON-REVERSING.

GRD. GROUND CONDUCTOR.

GEC GROUNDING ELECTRODE CONDUCTOR.

H-O-A HAND-OFF-AUTOMATIC

SELECTOR SWITCH.

HWP HEATING WATER PUMP.

KAIC THOUSAND AMPERE

INTERRUPTING CAPACITY.

KW KILO-WATTS.

MECH. MECHANICAL.

MDP MAIN DISTRIBUTION PANELBOARD

MH MAN HOLE

M.L.O. MAIN LUGS ONLY.

N/A NOT APPLICABLE.

N.E.C NATIONAL ELECTRICAL CODE.

NEMA NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION.

NFSS NON-FUSED SAFETY SWITCH.

P NUMBER OF POLES.

PH. NUMBER OF PHASES.

SUS SANDHILLS UTILITY SERVICE

TYP. TYPICAL.

TRNS MASS NOTIFICATION TRANSCEIVER

UH UNIT HEATER.

U.L. UNDERWRITER'S LABORATORIES.

UON UNLESS OTHERWISE NOTED.

V VOLTAGE.

VFD VARIABLE FREQUENCY DRIVE.

WP WEATHERPROOF, OR

NEMA 3R ENCLOSURE.

GENERAL SYMBOLS

NORTH ARROW

COLUMN BUBBLE

DESIGNATION

REVISION CLOUD WITH REVISION

NUMBER DESIGNATION

BREAKLINE

MATCHLINE DESIGNATION

NOTE NUMBER

ARROW INDICATES

TRUE NORTH AND/OR

PROJECT NORTH

N

E-101

N

8'0 1/8"=1'-0"

UNIQUE PLAN OR

DETAIL NUMBER

ON THIS DRAWING NORTH ARROW

NAME OF PLAN OR DETAIL

ALL DRAWINGS WHERE

DETAIL IS REFERENCED

GRAPHIC SCALE OF

PLAN OR DETAIL

SECTION IDENTIFICATION

INDICATES DIRECTION

OF CUTTING PLANE

NUMBER INDICATES SECTION

SHEET NUMBER WHERE

SECTION IS DRAWN

2-PART REFERENCE DETAIL IDENTIFICATION:

SHEET NUMBER WHERE

DETAIL/SECTION IS DRAWN

NUMBER INDICATES

DETAIL/SECTION

FLOOR PLAN

E-101, E-1022

FLOOR PLAN AND DETAIL TITLES:

E-101

Ø PHASE.

M A T C H L I N E A-A

ELECTRICAL SYMBOLS

E EXISTING FEEDER

M 1,3,5

BRANCH CIRCUIT CONDUIT AND CONDUCTORS RUN EXPOSED ON

WALLS AND CEILINGS. SIZE IN ACCORDANCE WITH N.E.C. RACEWAY

SHALL BE MINIMUM 3/4" EMT, AND CONDUCTORS SHALL BE MINIMUM

SIZE #12 AWG COPPER WITH THHN/THWN INSULATION, UNLESS

OTHER SIZES ARE SPECIFICALLY NOTED.

HOME RUN TO PANEL. NUMBER OF ARROWS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .